Planning With Microsoft Project Building A House

Transcription

Eng 200ExamplePlanning with Microsoft ProjectBuilding A House1

Eng 200Important Points Introduction is a pseudo-contract for the building of a fictitiousmillion dollar house in Los Angeles WBS is self explanatory and gives structure of project over 2 pages. WBS Dictionary gives a little more detail than the WBS itself. Budget details costs of each phase of the project, broken down byWBS areas. Costs include labor and materials. Resources give details of labor and material rates. Tracking Gantt with costs essentially shows the costs entered intoMS Project at an arbitrary stage of the project (not the final statusdate). Status Summary shows a MS Project summary of the project as itstands at the status date 11/3/03. This summary clearly shows asmall estimated variance at completion, but more importantly aschedule variance of 11 days, which will be costly and will ideallybe caught up.2

Eng 200Important Points (cont’d) Tracking Gantt with Earned Value shows the project as it stands at the statusdate. Important things to note are:– Ground works ran over cost and over time due to poor weather.– Structure was completed ahead of schedule and under cost, saving the project 12,000.– Services are running behind schedule – a lot of catch up needs to be done.– Services delays are the major cause of the estimated schedule variance of 11days.– The project is estimated to run slightly ( 2,120) over budget at present. Theover-expenditure due to weather has been almost offset by the savingsachieved in structure. Management reserve is more than adequate to absorbthis small difference if required at completion.– The 11 day schedule variance can be made up by placing more people on thejob or asking people to put in some “green time.” The extra costs if anyshould be weighted against the penalties for late completion.3

Eng 200Important Points (cont’d) The Dashboard shows 3 measures of project performance, schedule,cost and quality. Schedule and cost are based on estimates atcompletion. Quality is subjective and is based on the ProjectManager’s ‘feel’ for the quality of the installation, feedback fromthe customer and amount of rework thus far required.4

Eng 200IntroductionBuilding A House5

Eng 200Contract – House Building 2314 Amber StreetContact Number 102458791.2.GeneralThe contractor shall provide the Owner with a complete house at2314 Amber St., Los Angeles, CA. The premises shall be handedover to the Owner no later than 12/11/03. The contract price isUS 964,100.SpecificationsGenerally the house must be completed in accordance with therequirements of the contract with the Owner as laid out in thesection 1000 through 8000 of the contract. These specs. Includeachievement of signoff for energy, building envelope andstructural integrity from appropriate integrity from appropriategovernment bodies.1000 Ground Works5000 Interior2000 Materials6000 Services3000 Structure7000 Signoff4000 Project Management8000 Exterior Systems6

Eng 200Contract – House Building 2314 Amber StreetContact Number 102458793. WarrantyThe contractor offers to warrant the house postcompletion for the period, of 1 year or the minimumrequired by California State Law, whichever is thegreater.4. Late DeliveryThe contractor shall provide the Owner with a credit of 1,000 per day that the contract runs beyond schedule,unless prior agreement is reached between the parties.7

Eng 200Work Breakdown StructureBuilding A House8

Eng 200House Building0000Ground nt4000Concrete Works Excavation el1310132013303100320033009

Eng 20010

Eng 200Work Breakdown Structure DictionaryBuilding A House11

Eng 20012

Eng 20013

Eng 200BudgetBuilding A House14

WBS BudgetEng 20015

Eng 20016

Eng 200ResourcesBuilding A House17

Eng 20018

Eng 20019

Eng 200Tracking Gantt showing CostsBuilding A House20

Eng 20021

Eng 20022

Eng 20023

Eng 20024

Eng 200Status SummaryBuilding A House25

As of 5/15/03Eng 20026

Eng 200Tracking Gantt showing Earned ValueBuilding A House27

Eng 20028

Eng 20029

Eng 20030

Eng 20031

Eng 200DashboardBuilding A House32

Eng 20033

MS Project at an arbitrary stage of the project (not the final status date). Status Summary shows a MS Project summary of the project as it stands at the status date 11/3/03. This summary clearly shows a small estimated variance at completion, but more importantly a schedule variance of 11 days, which will be costly and will ideally be caught up. 3 Eng 200 Important Points (cont’d .