JCISD Addendum #2-Camera And Access Controls Copy

Transcription

JCISD District-Wide Video Surveillance and Access Control Systemsand InstallationADDENDUM #2QUESTIONS:1. Is bid opening still occurring on same date and at same location?a. Yes. Bid opening is Wednesday, March 25, 2020 at 2:00 PM at 303 NorthLBJ Drive, Johnson City, TX 78636.DESIGN CLARIFICATIONS:1. The attached plan sheets replace the previously issued sheets.END OF ADDENDUM #203/20/2020

04. DO NOT INSTALL ANY CABLES IN ANY CONDUIT SLEEVE, STUB UP, OR WALL CAP WITHOUT A PROTECTIVEBUSHING. CABLES PULLED INTO UNPROTECTED CONDUITS WILL BE REPLACED AT THE CONTRACTOR'S EXPENSE. DONOT INSTALL ANY CABLING INTO ANY CONDUIT THAT HAS NOT BEEN CONFIRMED TO BE BLOWN CLEAR. COORDINATEWITH ELECTRICAL PRIOR TO ROUGH IN OF ANY CABLING.XX#XX#DATA OUTLET(S) INSTALLED ABOVE CEILING SPACE. CONTRACTOR SHALL PROVIDE AND INSTALL A 1-GANGBACK BOX 6" ABOVE CEILING. ELECTRICAL CONTRACTOR SHALL PROVIDE AND INSTALL 6" OF 1" CONDUITPATHWAY FROM 1-GANG BACK BOX. CONTRACTOR SHALL PROVIDE AND INSTALL DATA CABLING TO 1-GANGBACK BOX, FACEPLATE(S) AND DATA JACK(S) TO EACH LOCATION SHOWN.05. ANY CABLING FOUND PAINTED DURING THE CONSTRUCTION PROCESS WILL BE REPLACED AT CONTRACTOR'SEXPENSE. CONTRACTOR SHALL COORDINATE WITH THE GENERAL CONTRACTOR AND PAINTER TO AVOID CONFLICTS.AVXXXX #CBXXCPXXCONTROL PANEL LOCATIONS. CONTRACTOR SHALL PROVIDE AND INSTALL (1) 1 1/4" CONDUIT FROMACCESSIBLE CEILING SPACE TO BACK BOX (UNO) AT 18" AFF.CONTRACTOR SHALL PROVIDE AND INSTALLCONTROL PANEL PER SPECIFICATIONS AT LOCATIONS SHOWN ON PLANS. REFERENCE A/V DETAILS FORINSTALLATION HEIGHT AND TYPE.ERXXSOUND EQUIPMENT RACK ON FLOOR. CONTRACTOR SHALL PROVIDE AND INSTALL A NEW SOUNDEQUIPMENT RACK IN LOCATION SHOWN AS PER SPECIFICATIONS. SOUND EQUIPMENT RACK SHALL BESECURED AS PER MANUFACTURERS SPECIFICATIONS. CONTRACTOR IS RESPONSIBLE FOR ALLINSTALLATION HARDWARE.ERXXSOUND EQUIPMENT RACK ON WALL. CONTRACTOR SHALL PROVIDE AND INSTALL A NEW SOUND EQUIPMENTRACK IN LOCATION SHOWN AS PER SPECIFICATIONS. SOUND EQUIPMENT RACK SHALL BE SECURED AS PERMANUFACTURERS SPECIFICATIONS. CONTRACTOR IS RESPONSIBLE FOR ALL INSTALLATION HARDWARE.FBXXAUDIO VISUAL FLOOR BOX LOCATION. REFERENCE AUDIO VISUAL DETAILS FOR CONDUIT SIZE ANDQUANTITY.HAXXHEARING ASSIST ANTENNA LOCATION INSTALLED AT 1'-0" - 2'-0" DOWN FROM FINISHED CEILING TYPICAL.CONTRACTOR SHALL PROVIDE AND INSTALL (1) 1 1/4" CONDUIT FROM ACCESSIBLE CEILING SPACE TO BACKBOX .CONTRACTOR TO PROVIDE CABLING. REFERENCE AUDIO VISUAL DETAILS FOR CUSTOM WALL PLATE.# INDICATES QUANTITY OF DATA DROPS TOBE INSTALLED07. CONTRACTOR SHALL COORDINATE ALL FINAL CAMERA LOCATIONS, HEIGHTS AND CAMERA VIEWING ANGLES WITHOWNER/OWNER'S REPRESENTATIVE. FAILURE TO COORDINATE ALL FINAL CAMERA LOCATIONS, HEIGHTS AND VIEWANGLES MAY REQUIRE RELOCATION OF CONDUITS, CABLE AND CAMERA LOCATIONS AT CONTRACTOR'S EXPENSE.OUTLET INSTALLATION TYPE:AC - OUTLET INSTALLED IN CEILING SPACEAP - OUTLET INSTALLED ABOVE CEILING FOR ACCESS POINTCC - OUTLET INSTALL 18" ON CENTER AFFFB - OUTLET INSTALLED IN FLOOR BOXFN - OUTLET INSTALLED IN FURNITUREHD - OUTLET INSTALLED AT 44" AFFHG - OUTLET INSTALLED AT 12" AFF UNOMB - OUTLET INSTALLED 6" ABOVE MARKER BOARDML - OUTLET INSTALLED 18" AFF IN MULLIONPI - OUTLET INSTALLED IN CEILING FOR PAGING INTERFACEPOS - OUTLET INSTALLED ABOVE WORK SURFACE FOR POINT OF SALESRW - OUTLET INSTALLED IN RACEWAYSC - OUTLET INSTALLED FOR SURVEILLANCE CAMERATV - OUTLET INSTALLED AT 24" BELOW CEILING HEIGHT UNOVP - OUTLET INSTALLED AT PROJECTOR LOCATIONWS - OUTLET INSTALLED ABOVE WORK SURFACE08. CONTRACTOR SHALL COORDINATE TECHNOLOGY, TELECOM, SECURITY AND AUDIO VISUAL LOCATIONS SO THATDATA AND POWER ARE AT THE SAME HEIGHT AND SPACED 18"-24" APART UNLESS SPECIFIED OTHERWISE.REFERENCE TECHNOLOGY AND MEP SHEETS FOR COORDINATION.09. ALL CABLING INSTALLED IN AREAS WITH EXPOSED CEILINGS SHALL BE INSTALLED IN A PROPERLY SIZED CONDUITPATHWAY. CONDUIT PATHWAYS SHALL BE PROVIDED AND INSTALLED BY THE CONTRACTOR. THE CONDUIT MAY BEPAINTED TO MATCH CEILING COLOR AS DIRECTED BY THE CONTRACT DOCUMENTS.10. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW THE ARCHITECTURAL DEMOLITION DRAWINGS FORALL DEMOLITION AREAS.11. CONTRACTOR SHALL DOCUMENT ALL EXISTING TECHNOLOGY, TELECOM, SECURITY AND AUDIO VISUAL DEVICESAND LOCATIONS PRIOR TO DEMOLITION OF CEILINGS AND SPACES. PROVIDE TEMPORARY SUPPORT IN ALLDEMOLITION AREAS FOR DEVICES, RE-INSTALL ALL EXISTING DEVICES IN NEW CEILINGS.MXX13. CONTRACTOR SHALL BE RESPONSIBLE FOR STOPPING ALL TECHNOLOGY, TELECOM, SECURITY AND AUDIOVISUAL CONDUIT PENETRATIONS FROM WATER OR RODENT INGRESS IN ALL BUILDINGS UPON COMPLETION OF THEPROJECT.SINGLE SIDED CLOCK LOCATION. CONTRACTOR SHALL PROVIDE REQUIRED BACK BOX FOR SINGLE SIDEDCLOCK INSTALLATION FOR ROUGH-IN. CONTRACTOR SHALL COORDINATE FINAL HEIGHT OF CLOCK PRIOR TOS FINAL ROUGH IN. CONTRACTOR SHALL PROVIDE AND INSTALL (1) 1" CONDUIT FROM NEAREST ACCESSIBLECEILING SPACE TO CONTRACTORS BACK BOX. CONTRACTOR SHALL PROVIDE AND INSTALL SINGLE SIDEDCLOCK AS PER SPECIFICATIONS. ALL CLOCKS ARE MOUNTED AT 8'-0" AFF UNLESS NOTED OTHERWISE.GENERAL PROJECT NOTESCEILING MOUNTED PROJECTION SCREEN LOCATION. REFERENCE SPECIFICATIONS FOR INFORMATION.CONTRACTOR TO PROVIDE REQUIRED MATERIALS TO SUPPORT PROJECTION SCREEN FROM BUILDINGSTRUCTURE.PSWALL MOUNTED PROJECTION SCREEN LOCATION. REFERENCE SPECIFICATIONS FOR INFORMATION.CONTRACTOR TO PROVIDE REQUIRED MATERIALS TO SUPPORT PROJECTION SCREEN FROM BUILDINGSTRUCTURE.S2XXLOCAL SOUND SYSTEM SURFACE MOUNTED SPEAKERS. CONTRACTOR SHALL SUPPORT SPEAKERS PERMANUFACTURER'S APPROVED METHODS ONLY FROM EITHER STRUCTURAL STEEL OR WITH UNI-STRUTSUPPORTED BY THE STRUCTURAL STEEL. REFERENCE STRUCTURAL DRAWINGS FOR JOISTS AND BEAMLOCATIONS. CONTRACTOR SHALL PROVIDE AND INSTALL (1) 1 1/4" CONDUIT FROM ACCESSIBLE CEILINGSPACE TO BACK BOX .CONTRACTOR SHALL SUPPORT SPEAKER CABLE IN SEPARATE J-HOOKS FROMSTRUCTURED CABLING FROM SOUND EQUIPMENT RACK TO SPEAKER LOCATION.S2XXLOCAL SOUND SYSTEM SPEAKERS IN CEILING. CONTRACTOR SHALL SUPPORT SPEAKERS IN CEILING PERMANUFACTURER'S APPROVED METHODS ONLY FROM EITHER STRUCTURAL STEEL OR WITH UNI-STRUTSUPPORTED BY THE STRUCTURAL STEEL. REFERENCE STRUCTURAL DRAWINGS FOR JOISTS AND BEAMLOCATIONS.PAGING / INTERCOM AUDIO INPUT PLATE LOCATED UNDER RECEPTION DESK. CONTRACTOR TO PROVIDEBACK BOX WITH (1) 1" CONDUIT TO NEAREST ACCESSIBLE CEILING. CONTRACTOR TO PROVIDE COVERPLATE.SCPROJECTION SCREEN SWITCH LOCATION. ELECTRICAL CONTRACTOR TO INSTALL (1) 1" CONDUIT FROMACCESSIBLE CEILING TO BACK BOX MOUNTED AT 48" AFF. CONTRACTOR TO PROVIDE AND INSTALL LOWVOLTAGE PROJECTION SCREEN SWITCH.ADMINISTRATIVE INTERCOM PHONE LOCATION. CONTRACTOR TO PROVIDE CABLING.TPXXTOUCH PANEL CONTROL LOCATIONS. CONTRACTOR SHALL PROVIDE AND INSTALL (1) 1-1/4" CONDUIT FROMACCESSIBLE CEILING SPACE TO CONTRACTOR PROVIDED BACK BOX INSTALLED 48" AFF. CONTRACTORSHALL PROVIDE AND INSTALL CONTROL PANEL PER SPECIFICATIONS AT LOCATIONS SHOWN ON PLANS.REFERENCE A/V DETAILS FOR INSTALLATION HEIGHT AND TYPE.APPROXIMATE LOCATION OF PAGING / INTERCOM SPEAKER/HORN. CONTRACTOR SHALL PROVIDE ANDINSTALL (1) 1" CONDUIT SLEEVE FROM NEAREST ADJACENT AND ACCESSIBLE CEILING SPACE TO BACK BOXINSTALLED 8'-0" AFF AND 12' AFF FOR ALL EXTERIOR LOCATIONS UNO. CONTRACTOR SHALL COORDINATEFINAL INSTALLATION LOCATION AND HEIGHT. NO POWER REQUIRED AT THESE LOCATIONS. FAILURE TOCOORDINATE MAY RESULT IN RELOCATION OF THE HORN AT CONTRACTOR'S EXPENSE.TVXXAUDIO AND/OR VIDEO OUTLET ON WALL. CONTRACTOR SHALL PROVIDE AND INSTALL (1) 1 1/4" CONDUITFROM ACCESSIBLE CEILING SPACE TO BACK BOX (UNO) AT TV - OUTLET INSTALLED BEHIND TV. COORDINATEA/V LOCATIONS SO THAT THEY ARE HIDDEN FROM AUDIENCE VIEW AND BEHIND DISPLAY. REFERENCEDETAILS AND/OR KEYNOTES FOR COORDINATION. CONTRACTOR SHALL PROVIDE AND INSTALL A/V CABLING,FACEPLATE(S) AND JACKS. REFERENCE SPECIFICATIONS FOR OUTLET TYPES AND QUANTITIES.APPROXIMATE LOCATION OF CEILING MOUNTED INTERCOM SPEAKER LOCATION. CONTRACTOR SHALLPROVIDE AND INSTALL CEILING MOUNTED INTERCOM SPEAKER. CONTRACTOR SHALL SECURE AND SUPPORTPER MANUFACTURERS SPECIFICATIONS AND TO TYPE OF CEILING. REFERENCE ARCHITECTURAL RCP PLANSFOR CEILING HEIGHT AND TYPE. CONTRACTOR SHALL COORDINATE WITH MEP PLANS FOR DEVICES ON THEGRID AND IN THE CEILING SPACE. FAILURE TO COORDINATE WILL RESULT IN RELOCATION OF THE SPEAKER ATCONTRACTOR'S EXPENSE.TVXXCEILING MOUNTED FLAT PANEL MONITOR LOCATION. CONTRACTOR SHALL PROVIDE AND INSTALL (1) 1 1/4"CONDUIT FROM ACCESSIBLE CEILING SPACE TO BACK BOX (UNO). COORDINATE A/V LOCATIONS SO THAT A/VOUTLETS ARE AT THE SAME HEIGHT AND IN CLOSE PROXIMITY TO POWER AND OTHER INPUT/OUTPUTLOCATIONS. REFERENCE DETAILS FOR COORDINATION. CONTRACTOR SHALL PROVIDE AND INSTALL A/VCABLING, FACEPLATE(S) AND JACKS. REFERENCE SPECIFICATIONS FOR OUTLET TYPES AND QUANTITIES.USBUSB OUTLET ON WALL. CONTRACTOR SHALL PROVIDE AND INSTALL (1) 1 1/4" CONDUIT FROM ACCESSIBLECEILING SPACE TO BACK BOX AT 18" AFF (UNO). AT INTERACTIVE WHITE BOARD LOCATIONS, COORDINATEUSB LOCATIONS SO THAT THEY ARE JUST BELOW (UNO). REFERENCE SPECIFICATIONS FOR OUTLET TYPESAND QUANTITIES.VCVOLUME CONTROL LOCATIONS. CONTRACTOR SHALL PROVIDE AND INSTALL (1) 1" CONDUIT FROMACCESSIBLE CEILING SPACE TO BACK BOX. CONTRACTOR SHALL PROVIDE AND INSTALL VOLUME CONTROLPER SPECIFICATIONS AT LOCATIONS SHOWN ON PLANS. REFERENCE A/V DETAIL NOMENCLATURE FORINSTALLATION HEIGHT AND TYPE.DOUBLE SIDED CLOCK LOCATION. CONTRACTOR SHALL PROVIDE REQUIRED BACK BOX FOR DOUBLE SIDEDCLOCK INSTALLATION FOR ROUGH-IN. CONTRACTOR SHALL COORDINATE FINAL HEIGHT OF CLOCK PRIOR TOD FINAL ROUGH IN. CONTRACTOR SHALL PROVIDE AND INSTALL (1) 1" CONDUIT FROM NEAREST ACCESSIBLECEILING SPACE TO CONTRACTORS BACK BOX. CONTRACTOR SHALL PROVIDE AND INSTALL DOUBLE SIDEDCLOCK AS PER SPECIFICATIONS. ALL CLOCKS ARE MOUNTED AT 8'-0" AFF UNLESS NOTED OTHERWISE.PICIPAPAGING / INTERCOM CABINET LOCATION.INTERCOM PUSH-TO-TALK BUTTON LOCATION. CONTRACTOR SHALL PROVIDE AND INSTALLPTT (1) 1" CONDUIT PATHWAY FROM NEAREST ACCESSIBLE CEILING SPACE TO BACK BOX INSTALLED AT 44" AFF.CONTRACTOR SHALL PROVIDE AND INSTALL INTERCOM PUSH-TO-TALK BUTTON.S1S1VCVOLUME CONTROL LOCATIONS. CONTRACTOR SHALL PROVIDE AND INSTALL (1) 1" CONDUIT FROMACCESSIBLE CEILING SPACE TO BACK BOX. CONTRACTOR SHALL PROVIDE AND INSTALL VOLUME CONTROLPER SPECIFICATIONS AT LOCATIONS SHOWN ON PLANS. REFERENCE A/V DETAIL NOMENCLATURE FORINSTALLATION HEIGHT AND TYPE.PAGING, INTERCOM AND CLOCK SYMBOLS LEGENDC:\Users\dporter\Documents\JCISD - Multi-Campus Renos TECH v17 dporter.rvtVPXXX-XCRACCESS CONTROL CARD READER INSTALLED AT SPECIFIED LOCATION. INSTALL ONE(1) 1" CONDUITPATHWAY FROM THE NEAREST ACCESSIBLE CEILING SPACE TO A SINGLE GANG BACKBOX INSTALLED AT 44"AFF.DRDOOR RELEASE BUTTON. CONTRACTOR SHALL PROVIDE AND INSTALL (1) 3/4" CONDUIT PATHWAY FROMNEAREST ACCESSIBLE CEILING SPACE TO BUTTON LOCATION, ALLOWING FOR A SAFE AND SECUREPATHWAY. IF TRANSITION TO FLEX IS REQUIRED ENSURE THAT CONDUIT SIZES MATCH WITH NO ROUGHEDGES AND NO CABLING IS EXPOSED. COORDINATE WITH THE CONTRACTOR FOR ANY MODIFICATIONSNEEDED ON THE FURNITURE TO ALLOW FOR THE PATHWAY INSTALLATION. CONTRACTOR SHALL ADDBUTTON BELOW DESK SURFACE AND CONNECT INTO SYSTEM. COORDINATE WITH OWNER/OWNER'SREPRESENTATIVE ON FINAL LOCATION PRIOR TO FINAL ROUGH-IN. FAILURE TO COORDINATE MAY RESULT INRELOCATION OF THE BUTTON AT CONTRACTOR'S EXPENSE. DOOR RELEASE BUTTONS SHOULD NEVEROPERATE MORE THAN (1) DOOR.DSDOOR POSITION SWITCH REQUIRED IN SPECIFIED DOOR. CONTRACTOR SHALL PROVIDE AND INSTALL (1) 3/4"CONDUIT PATHWAY FROM NEAREST ACCESSIBLE CEILING SPACE TO THE TOP OF THE INSIDE OF THE DOORFRAME FOR A DOOR CONTACT PATHWAY. COORDINATE CONDUIT PATHWAY WITH CONTRACTOR PRIOR TOFINAL ROUGH IN. CONTRACTOR SHALL PROVIDE AND INSTALL A DOOR POSITION SWITCH AT ALL LOCATIONSSHOWN ON PLANS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONNECT THESE DEVICES INTO THEACCESS CONTROL PANEL. DOOR POSITION SWITCH NEEDS TO BE ON THE LATCH SIDE OF DOOR AT TOP NOMORE THAN 6" FROM EDGE OF DOOR.ELEMERGENCY LOCK DOWN BUTTON. CONTRACTOR SHALL PROVIDE AND INSTALL A 3/4" CONDUIT PATHWAYFROM NEAREST ACCESSIBLE CEILING SPACE TO BUTTON LOCATION, ALLOWING FOR A SAFE AND SECUREPATHWAY. IF TRANSITION TO FLEX IS REQUIRED ENSURE THAT CONDUIT SIZES MATCH WITH NO ROUGHEDGES AND NO CABLING IS EXPOSED. COORDINATE WITH THE CONTRACTOR FOR ANY MODIFICATIONSNEEDED ON THE FURNITURE TO ALLOW FOR THE PATHWAY INSTALLATION. CONTRACTOR SHALL ADD BUTTONBELOW DESK SURFACE AND WIRE INTO SYSTEM. COORDINATE WITH OWNER/OWNER'S REPRESENTATIVE ONFINAL LOCATION PRIOR TO FINAL ROUGH-IN. FAILURE TO COORDINATE MAY RESULT IN RELOCATION OF THEBUTTON AT CONTRACTOR'S EXPENSE. EACH LOCK DOWN CABLE SHOULD BE HOMERUN WITH NO SPLICES TOTHE ACCESS CONTROL PANEL.GBGLASS BREAKAGE SENSOR AT SPECIFIED LOCATION. CONTRACTOR SHALL SECURE AND SUPPORT GLASSBREAKAGE SENSOR PER MANUFACTURERS SPECIFICATIONS AND TO TYPE OF CEILING. CONTRACTORSHALL COORDINATE WITH MEP PLANS FOR DEVICES ON THE GRID AND IN THE CEILING SPACE. FAILURE TOCOORDINATE MAY RESULT IN RELOCATION OF THE GLASS BREAKAGE SENSOR AT THE CONTRACTORSEXPENSE. CONTRACTOR SHALL CONNECT GLASS BREAKAGE SENSOR TO THE INTRUSION MAIN PANEL.GSGUN SHOT SENSOR AT SPECIFIED LOCATION. CONTRACTOR SHALL PROVIDE AND INSTALL A 3/4" CONDUITPATHWAY FROM NEAREST ACCESSIBLE CEILING SPACE INTO ONE OF THESE APPROVED BOXES: CARLON CA320OR B232BR FOR IN-WALL INSTALLATION (TYPICAL) OR WIREMOLD NM2044-2HW OR V5744-2 FOR SURFACEMOUNT INSTALLATION (ATYPICAL AND CASE-BY-CASE). THE HEIGHT OF THE BOX SHALL BE 4"-10" BELOW THECEILING BUT NO HIGHER THAN 10'-0"-12'-0" AFF FOR CEILINGS OVER 12'-0" IN HEIGHT.JB#XXJUNCTION BOX. CONTRACTOR SHALL PROVIDE AND INSTALL (1) 3/4" CONDUIT FOR COMMUNICATIONS AND (1)1" CONDUIT FOR AV FROM ACCESSIBLE CEILING SPACE TO THE BACK BOX LOCATION SHOWN ON PLANS.REFERENCE TECHNOLOGY DETAILS.KPKEY PAD AT SPECIFIED LOCATION. CONTRACTOR SHALL PROVIDE AND INSTALL (1) 3/4" CONDUIT PATHWAYFROM NEAREST ACCESSIBLE CEILING SPACE TO BACK BOX INSTALLED 44" AFF. COORDINATE POWER WITHMEP AT THIS LOCATION. CONTRACTOR SHALL PROVIDE AND INSTALL SPECIFIED KEY PAD AT LOCATION SHOWNON PLANS. CONTRACTOR SHALL CONNECT KEY PAD INTO THE ACCESS CONTROL PANEL.MDMOTION DETECTOR AT SPECIFIED LOCATION. CONTRACTOR SHALL SECURE AND SUPPORT MOTIONDETECTOR PER MANUFACTURER'S SPECIFICATIONS AND TO TYPE OF CEILING. REFERENCEARCHITECTURAL RCP PLANS FOR CEILING HEIGHT AND TYPE. CONTRACTOR SHALL COORDINATE WITH MEPPLANS FOR DEVICES ON THE GRID AND IN THE CEILING SPACE. FAILURE TO COORDINATE MAY RESULT INRELOCATION OF THE MOTION DETECTOR AT CONTRACTOR'S EXPENSE. CONTRACTOR SHALL CONNECTMOTION DETECTOR TO THE ACCESS CONTROL PANEL.MD360 DEGREE MOTION DETECTOR AT SPECIFIED LOCATION. CONTRACTOR SHALL SECURE AND SUPPORTMOTION DETECTOR PER MANUFACTURER'S SPECIFICATIONS AND TO TYPE OF CEILING. REFERENCEARCHITECTURAL RCP PLANS FOR CEILING HEIGHT AND TYPE. CONTRACTOR SHALL COORDINATE WITH MEPPLANS FOR DEVICES ON THE GRID AND IN THE CEILING SPACE. FAILURE TO COORDINATE MAY RESULT INRELOCATION OF THE MOTION DETECTOR AT CONTRACTOR'S EXPENSE. CONTRACTOR SHALL CONNECTMOTION DETECTOR TO THE ACCESS CONTROL PANEL.MDWALL MOUNTED MOTION DETECTOR AT SPECIFIED LOCATION. CONTRACTOR SHALL SECURE AND SUPPORTMOTION DETECTOR PER MANUFACTURER'S SPECIFICATIONS. REFERENCE ARCHITECTURAL FLOOR PLANDETAILS FOR WALL HEIGHT AND TYPE. CONTRACTOR SHALL COORDINATE WITH MEP PLANS FOR DEVICESLOCATIONS. FAILURE TO COORDINATE MAY RESULT IN RELOCATION OF THE MOTION DETECTOR ATCONTRACTOR'S EXPENSE. CONTRACTOR SHALL CONNECT MOTION DETECTOR TO THE ACCESS CONTROLPANEL.RHDOOR POSITION SWITCH AT A ROOF HATCH LOCATION. CONTRACTOR SHALL PROVIDE AND INSTALL (1) 3/4"CONDUIT PATHWAY TO THE TOP OF THE INSIDE OF THE DOOR FRAME FOR A DOOR POSITION SWITCHPATHWAY. COORDINATE CONDUIT PATHWAY WITH CONTRACTOR PRIOR TO FINAL ROUGH IN. CONTRACTORSHALL PROVIDE AND INSTALL A DOOR POSITION SWITCH AT ROOF LOCATIONS SHOWN ON PLANS. IT IS THERESPONSIBILITY OF THE CONTRACTOR TO CONNECT THESE DEVICES INTO THE ACCESS CONTROL PANEL.RDDOOR POSITION SWITCH AT A ROLL UP DOOR LOCATION. CONTRACTOR SHALL PROVIDE AND INSTALL (1) 3/4"CONDUIT PATHWAY TO AN ARMORED LOOP TO THE INSIDE OF THE DOOR FOR A DOOR POSITION SWITCHPATHWAY. COORDINATE CONDUIT PATHWAY WITH CONTRACTOR PRIOR TO FINAL ROUGH IN. CONTRACTORSHALL PROVIDE AND INSTALL A DOOR POSITION SWITCH AT THE ROLL UP DOOR LOCATIONS SHOWN ONPLANS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONNECT THESE DEVICES INTO THE ACCESSCONTROL PANEL.RTEREQUEST TO EXIT (RTE) REQUIRED IN SPECIFIED DOOR. CONTRACTOR SHALL PROVIDE AND INSTALL (1) 3/4"CONDUIT PATHWAY FROM NEAREST ACCESSIBLE CEILING SPACE TO BOTH SIDES OF THE DOOR FRAME FORELECTRIC POWER TRANSFER (EPT). COORDINATE CONDUIT PATHWAY WITH CONTRACTOR PRIOR TO FINALROUGH IN. THE CONTRACTOR SHALL CONNECT THE RTE TO THE EPT TO THE ACCESS CONTROL PANELSI-MSECURITY INTERCOM MASTER STATION AT SPECIFIED LOCATION. MASTER STATION REQUIRES CATEGORYCABLE TO CONNECT TO CEU TYPICALLY LOCATED IN THE NEAREST COMMUNICATIONS ROOM. CONTRACTORSHALL PROVIDE AND INSTALL (1) 3/4" CONDUIT PATHWAY FROM NEAREST ACCESSIBLE CEILING SPACE TOBACK BOX INSTALLED NEAR MASTER STATION. COORDINATE EXACT LOCATION AND BOX HEIGHT WITH OWNER.SI-RSECURITY INTERCOM REMOTE DOOR STATION AT SPECIFIED LOCATION. CONTRACTOR SHALL PROVIDE ANDINSTALL (1) 3/4" CONDUIT PATHWAY FROM NEAREST ACCESSIBLE CEILING SPACE TO BACK BOX INSTALLED 44"AFF. COORDINATE POWER WITH MEP AT THIS LOCATION. CONTRACTOR SHALL PROVIDE AND INSTALLSPECIFIED DEVICE AT LOCATION SHOWN ON PLANS. CONTRACTOR SHALL CONNECT DEVICE OUTPUT INTO THEACCESS CONTROL PANEL INPUT TO SIGNAL DOOR RELEASE.MICROPHONE INSTALLED IN CEILING. CONTRACTOR SHALL PROVIDE AND INSTALL (1) 3/4" CONDUIT FROMSOUND EQUIPMENT RACK TO APPROXIMATE MICROPHONE LOCATION. NO POWER REQUIRED AT THESELOCATIONS. LABEL BOTH ENDS OF CABLE PER SPECIFICATIONS. FAILURE TO COORDINATE FINAL LOCATIONPRIOR TO FINAL ROUGH-IN MAY RESULT IN RELOCATION OF THE MICROPHONE AT THE CONTRACTOR'SEXPENSE.PSDATA SYMBOLS LEGENDEXTERIOR SURVEILLANCE CAMERA, “X-X” REFERS TO SECTION NUMBER - CAMERA NUMBER (SEE CAMERASCHEDULE AND RESPONSIBILITY SCHEDULE FOR ADDITIONAL INFORMATION). COORDINATE ALL FINALLOCATIONS, HEIGHTS AND VIEWING AREAS WITH THE OWNER/OWNER'S REPRESENTATIVE PRIOR TO FINALINSTALLATION. CONTRACTOR SHALL USE SECTION 27 0000 SUPPLIED WORK AREA PATCH CORD TO CONNECTCAMERA(S). FAILURE TO COORDINATE ALL CAMERA LOCATIONS, HEIGHTS AND VIEWING ANGLES MAY RESULTIN RELOCATION OF CAMERA AND CABLING AT CONTRACTOR'S COST.A/V OUTLET IN CEILING. CONTRACTOR SHALL PROVIDE AND INSTALL A/V CABLING, FACEPLATE(S) AND JACKS.COORDINATE A/V LOCATIONS SO THAT A/V OUTLETS ARE IN CLOSE PROXIMITY TO POWER AND OTHER INPUTLOCATIONS. REFERENCE SPECIFICATIONS AND DETAILS FOR OUTLET TYPES AND QUANTITIES.PLENUM RATED STORAGE BOX MOUNTED WITHIN THE CEILING AT OR NEAR DISPLAY LOCATION.COORDINATE WITH THE CONTRACTOR FOR POWER REQUIREMENTS AND INSTALLATION. CONTRACTORSHALL FOLLOW ALL MANUFACTURE RECOMMENDED INSTALLATION INSTRUCTIONS AND WITH A MINIMUMSAFETY FACTOR OF 5:1. VERIFY LOCATION WITH OWNER/OWNER'S REPRESENTATIVE PRIOR TOINSTALLATION.OUTLET INSTALLATION LOCATION06. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REFERENCE BOTH THE PROJECT DRAWINGS AND THEPROJECT SPECIFICATIONS. TOGETHER THEY FORM THE COMPLETE CONTRACT DOCUMENTS. PLEASE REFERENCETHE PROJECT SPECIFICATIONS FOR ALL MATERIALS, EQUIPMENT AND COMPONENTS NOT INDICATED ON THEDRAWING SET.12. CONTRACTOR SHALL DOCUMENT ALL EXISTING CEILING TECHNOLOGY, TELECOM, SECURITY AND AUDIO VISUALLABELING ON EXISTING CEILING GRID. PROVIDE NEW LABELING PER SPECIFICATIONS.AVCCXX-XCEILING MOUNTED VIDEO PROJECTOR / MOUNT(S). CONTRACTOR SHALL PROVIDE AND INSTALLPROJECTOR MOUNT PER MANUFACTURES SPECIFICATIONS. COORDINATE PROJECTOR MOUNT LOCATIONWITH OWNER/OWNER'S REPRESENTATIVE AND SO THAT POWER AND INPUTS ARE IN CLOSE PROXIMITY TOTHE PROJECTOR MOUNT. FAILURE TO COORDINATE MAY RESULT IN RELOCATION OF THE PROJECTORMOUNT LOCATION AT CONTRACTORS' EXPENSE. REFERENCE A/V NOMENCLATURE FOR INSTALLATIONHEIGHT AND TYPE.VPXXWALL MOUNTED

JCISD District-Wide Video Surveillance and Access Control Systems and Installation 03/20/2020 ADDENDUM #2 QUESTIONS: 1. Is bid opening still occurring on same date and at same location? a. Yes. Bid opening is Wednesday, March 25, 2020 at 2:00 PM at 303 North LBJ Drive, Johnson City, TX 78636. DESIGN CLARIFICATIONS: 1.