Middle East Hire FleetAC - 5KW to 1000KW Resistive LOADBANKSDC - 12V to 600V LOADBANKS upto 2000ARack Load Banks (Server Simulators)

Hillstone are Based in Bury, Lancashire Hillstone have manufactured and rented load banks for 25 years Hillstone have supplied load banks to Hillstone cross hire load banks only from

Full UK coverage for delivery & collections Site surveys, Risk Assessments, Method Statements Load bank technicians with CSCS cards & full PPE Road tow trailers, vans fitted with digital tachographs

Based at Dubai , UAE with Rental depot In Saudi Arabia with With Partner at Jubail and Hillstone Repbased at Riyadh Full GCC Coverage for delivery & collections Site surveys, Risk Assessments, Method Statements for LoadBank Testing for Generators and UPS Systems and BatteryDischarge Testing. Largest fleet of Rack Load Banks(Server Simulators) inKingdom of Saudi Arabia (3 Megawatts)

Battery & UPS testing proceduresDC Load banks Battery Capacity Test Connection direct to battery terminalsAC Load banks UPS autonomy testing Connection to the output of the UPSHillstone provide full technical support

DC Load BanksVoltage ranges from 12V to 600VCurrent available from 100A to 5000A solutionsSmall portable designsHillstone provide full technical support

DC enquiry check listFor DC load bank enquiries answers to the following questions will providesufficient information to allow a quotation to be issued What is the required test?Battery capacity testBattery charger testFuel Cell load test What is the test voltage?( also what is the maximum voltage?) What is the required current? For battery testing:What is the battery type? Lead Acid or Ni-Cad?What is the battery capacityHow many cells does the battery have ( connected in series per string )How many parallel strings does the battery have?

AC Load BanksSingle & 3 phase designs30KW100KW200KW300KW500KW1000KW*

AC enquiry check listFor AC load bank enquiries answers to the following questions willprovide sufficient information to allow a quotation to be issued What is the required test?Generator load testUPS autonomy test What is the test voltage?( also what is the maximum voltage?) What is the required current or power? Is a re-active load test required? How many meters of cable are required? Where is the site located? & How long is the hire for? Are we providing delivery, cable laying, removal etc? Is an operator required with the load bank

Oil & Gas SectorBattery testingGenerator testingUPS System testing

Telecom SectorBattery Testing - 48V DC high current dischargesServer RoomsUPS System - Autonomy testing

Datacentre SectorStandby PowertestingCoolingIntegrated System Teststesting

Integrated System TestsElectrical power systems - such as:Power Distribution Units,UPS systems,Gen-setsHeat Ventilation Air-Conditioning equipment such as:ChillersCompressorsAir Handling units

Stage 1- IST testingPortable 100KW, 200KW, 300KW 3 phase load banksprovide data hall testing of power UPS systems autonomy testing Generator black start testing Possible HVAC testing subject to datahall design Power Distribution Unit testing

Stage 2- IST testingProving your data hall power & cooling infrastructure

Stage 2- IST testing20KW portable Mini Tower load banks Data hall cabling verification Uniformed Air-Con heat testing 1KW to 20KW switched load steps Single phase 230V 50Hz 3 phase 415V 50Hz

Stage 3- IST testingContainment Pod Server Simulator1.1KW to 6.66KW loads4U modules fitted into 19ā€¯racks

For DC load bank enquiries answers to the following questions will provide sufficient information to allow a quotation to be issued DC enquiry check list What is the required test? Battery capacity test Battery charger test Fuel Cell load test For battery testing: What is the battery type? Lead Acid or Ni-Cad? What is the battery capacity