DEVELOMENT OF PERMANENT CAMPUS FOR NALANDA UNIVERSITY, RAJGIR (PHASE-I)REPLY TO THE QUERIES RECEIVED BY PRE BID HELD ON 22.05.2018 - OUTREACH HVAC- PACKAGE 3AClause, Sectionand VolumeItem DescriptionAs per Bid DocumentProspective Bidder's QueriesEMD ANDTENDER FEESEMD AND TENDER FEES EMD - Rs. 10.26 LacsE-tender Processing Fees - Rs. 15000/-BOQBOQ DocumentBOQ DocumentApproved MakeListApproved make forScrew Chiller.Screw Chiller - York/ Carried/ DiakinTechnicalSpecificationsScrew type WaterCooled MachineScrew Compressor shall have an open / semihermetic direct / gear drive with integratelubrication system utilizing compressor pressuredifferential.Some manufacturers have Twin Screw Hermetic Vertical type Compressor design. Hence NIT Condition shall Prevailrequest you to kindly accept Twin Screw Hermetic Vertical type Compressor also. Thesetype of compressor do not require external Oil pump and Ensure superheat on part load–maximize oil separation, minimize oil carry-over.BOQ ITEM NO.1.0ChillerMinimum COP (At ARI conditions) : 6.4As per current ECBC 2017 Guidelines for Super ECBC Building; COP requirements for Please refer Corrigendum being issuedWater Cooled Screw Chiller with Capacity less than 150TR is 6.0. Hence we request you tokindly accept Minimum COP (At ARI conditions) : 6.0 for Screw Chillers of subject Tender.BOQ ITEM NO.1.0ChillerMinimum IPLV (ARI 550/590)- 8.6As per current ECBC 2017 Guidelines for Super ECBC Building; IPLV requirements for Please refer Corrigendum being issuedWater Cooled Screw Chiller with Capacity less than 150TR is 7.9. Hence we request you tokindly accept Minimum IPLV (ARI 550/590)- 7.9 for Screw Chillers of subject Tender.PROSPECTIVE BIDDER NO: 01We are MSME company registered with NSIC for the Tendered Item. As per the Govt ofINDIA Norms we request your good office to pl allow us for the exemption of Tender feeand the EMD deposit. For your ref pl find attached herewith our NSIC and MSMEcertificate copy.PROSPECTIVE BIDDER NO: 02We kindly request you to upload correct excel file of BOQ.We are unable to recover the lost data of BOQ. It is the problem with file not macros.Reply to the QueryThe NIT conditions prevails and theEMD exemption is NOT allowed for theworks related tenders. This is as perthe guidelines stipulated in the CPWDworks manual and CPWD OFFICEMEMORANDUMNo.DG/MAN/Misc./10 Dated 27.06.2017The Technical Error have beenrectified with the corrigendum.Document is already uploaded. Pleasere-download the latest documents.PROSPECTIVE BIDDER NO: 03We request you to kindly accept Dunham-Bush as one of the manufacturer's of Screw NIT Condition shall PrevailChiller for subject Tender. Dunham-Bush is also in the approved make list of CPWD andrecent tender of Government Dental College at Nalanda for Screw Chillers. AttachedCredentials of Dunham-Bush for your kind consideration.PROSPECTIVE BIDDER NO: 041 of 10

Clause, Sectionand VolumeItem DescriptionAs per Bid DocumentProspective Bidder's QueriesItemSpecificationsChillerCOMPRESSOR (Twin Screw Design)Screw Compressor shall have an open / semihermetic direct / gear drive with integratelubrication system utilizing compressor pressuredifferential. Refrigerant shall be HFC134a/R410a. Compressor casing shall beconstructed from a high strength iron casting,having reinforced double wall construction toprovide a rigid structure and minimize thetransmission of noise. Oil separator shall beprovided at discharge side of compressor. Stepless capacity control to exactly match systemload shall be provided. A microprocessor basedcontroller shall modulate slide valve in responseto chilled water outlet temp. Controller shall beprogrammed for necessary logic. Compressorshall be able to unloadup to30% of load withstable running.For Chillers, as per specification only Twin Screw Technology is to be considered. Please NIT Condition shall Prevailclarify if Mono Screw Technology will also be acceptable as one of the approved makesonly these type Chillers are offered. Also, we would like you to approve Trane andKirloskar make for this Project.BOQ ITEM NO.1.0ChillerMinimum COP (At ARI conditions) : 6.4As per ECBC ARI 550/590 conditions acceptable Minimum COP is 4.7 and minimum IPLV Please refer Corrigendum being issued5.49 for Water Cooled Screw Chillers of less than 150 TR capacity. But as per Tender MinCOP asked for is 6.4 and IPLV of 8.6 which are far high. Please look at these parameters.York and Carrier has confirmed of not being able to match the requirements. Daikin isTechnically out for Twin Screw issue. Please clarify.Minimum IPLV (ARI 550/590)- 8.6BOQ ITEM NO.1.0ChillerBOQ ITEM NO.2.0 & 3.0Primary and Secondary Primary Pump shall be end Suction Type PumpWater PumpSecondary Pump shall be Vertical In-line closecoupled type pump.Reply to the QueryChilled Water Flow: 264 USGPM (1200 LPM) As per the Chiller Selection that is coming for approved makes the Flow for Chiller part is NIT Condition shall PrevailNominalcoming in the range of 290 – 300 USGPM. So We will request you to make the Flowrequirement for Primary and Secondary Pump in this range only.For Primary and Condenser Water Pumps the BOQ says we can quote with Centrifugal Please refer Corrigendum being issuedEnd Suction with back Pull Out Design but for only Secondary Pumps it is given as VerticalInline type is required. We will request you to accept all Pumps with End Suction withback Pull out type design as all the manufactures (approved makes) can provide all 3 typeof Pumps in that case. We would request you to consider Wilo (Mather & Platt) makesPumps also.2 of 10

Clause, Sectionand VolumeItem DescriptionAs per Bid DocumentProspective Bidder's QueriesBOQ ITEM NO.3.0Secondary Water Pump Secondary Water PumpFor Secondary Pumps VFD is said to Factory in Built. We will request you to make this as a NIT Condition shall Prevailpart of Secondary Pump Controller part along with 2 Nos DPT. Please give yourconfirmation on this. Also, we will consider IP – 20 rated VFD’s with no Harmonic Filters.The VFD will be housed inside the Controller Enclosure which will be IP 55 rated. Thepump logic controller assembly shall be manufactured as per standards approved byUnderwriter's Laboratory, Inc. (UL). Please confirm.BOQAll PumpsAll PumpsApproved MakeListAHU/ Dessicant Units/Ventilation FansAHU: Zeco/ Edgetech/ VTSDessicant Unit: DRI / MunterVentilation Fans: Kruger/ Green Heck/ NicotraThe Sound Level acceptable for Pumps as per BOQ is 75 DB @ 2 Mtrs distance. Please NIT Condition shall Prevailaccept DB level as 80-85 DB @ 2 Mtrs distance.For AHU/ Desiccant Units/ Ventilation Fans we will request you to consider Crompton NIT Condition shall Prevail(CGL) / Bharaj Bijlee/ make Motors. Please confirm.Approved MakeListBOQFiltersMechmark/ Camfil/ Sterile airFor Filter Section for AHU / Desiccant Units please consider Thermodyne / Spectrum /AAF makes. Please confirm.All MotorsThe motor shall have efficiency class IE-3 or EFF- Since Project of Completion period is only 4 Months for all Motors we will request you to1, whichever is more efficient.accept IE-2 (EEF 1) rated motors instead of IE-3 rated. IE3 rated has 3-4 months’ leadtime only for dispatch.BOQ Item No. 4.0 Condensor Water Pump 412 USGPM , 22 meter headFor Condenser Pumps we feel Capacity of 412 USGPM will be on a Tighter side. It shouldbe around 500 USGPM. Please confirm on this part.Approved Make Hot Water PumpsXylem/ Grundfoss/ ArmstrongFor Hot Water Pumps we would like the makes to be same as given for the other majorListPumps. Please confirm.BOQ item No 6.0Cooling TowerCHILLED WATER FLOW: 412 USGPMFor Cooling Tower Design please see that Flow rate of 412 USGPM might not be sufficientHEAT REJECTION : 591125 Kcal/hralong with heat rejection data. Also we will provide VFD as per the specification we havementioned for Secondary Pump. We will seek approval for Bells / Paharpur makes for thispart. Please confirm.BOQ item No 7.0 Closed Expansion tank The tank shall be designed to absorb thewith Pressurisation expansion forces of cooling/heating systemPumpwater while maintaining proper s. The heavy duty bladder shouldcontain system water thereby eliminating tankcorrosion and water logging problems. Thesystem should include airvent and complete asper technical specification. Tank shall beselected for 125 psiReply to the QueryNIT Condition shall PrevailNIT Condition shall PrevailNIT Condition shall PrevailNIT Condition shall PrevailCooling tower shall be designed tocater the heat rejection from thechiller.Please refere Corrigendum beingissued.Please confirm PN rating of Closed Expansion Tank. We would also request approval of PN 16 to be consider.Anergy and Emerald makes for this part and also for Air Separator part.No changes in Makes shall beaccepted.Please refere Corrigendum beingissued.3 of 10

Clause, Sectionand VolumeBOQ Item No 9.0Item DescriptionHEAT PUMP FOR HOTWATER REQUIREMENTAs per Bid DocumentApproved MakeListBOQ ITEM NO1.0, 2.1, 3.1,Reply to the QuerySupply, installation, testing and commissioning of We would require detailed Specification of the Heat Pump Equipment as stated in the Please Refer to Corrigendum beingImported Air Cooled Outdoor Heat Pump Unit for BOQ. Please provide the same.issuedthe production of Hot Water upto 60ºC. HeatPump shall include dual circuit Scroll Compressorsuitable for R 407c / R 410a refrigerant driven bysuitable KW squirrel cage induction motor ratedfor 400 10% volts, 3 phase , 50 Hz AC supplycompleteBOQ Item No 9.0 Hot water storage tank 1200 Litre TankApproved Make Water Softening PlantListApproved Make Pre Insulated PipeListBOQChilled Water PipeProspective Bidder's QueriesThermax/ Ion-Exchange/ PentairWe would also like you to look at the requirement for Hot Water Storage Tank as to us NIT Condition shall Prevail1200 Ltr Tank is on the higher side. Please clarify.For Water Softening Plant we will request you to approve METCON make.NIT Condition shall PrevailLoyld/ Prima PipeFor Pre Insulated Pipe please consider ZECO and GP Spiro make. Please confirm.MS ERW Pre Insulated PipeIt’s a suggestion on our part from our previous experience in working at IIT, Kharagpur for NIT Condition shall PrevailNalanda Class Room Complex wherein the total Ring of Under Ground piping was donewith HDPE pipes and ancillaries. Even after Testing as per Tender requirement we foundthat there leakage issues and pipes Busted many a times. It will be our suggestion to useConventional method of using MS Pipes (Heavy) covered with 75 mm thick Thermocolesupported by wire mesh and finish with Sand Cement Plaster. We need to place propersupport (PUF Blocks) at 3 mtrs interval with proper Sand bedding. Please note that wewill not be doing any excavation work/ Filling and Re Filling work/ Trench work/Foundation work for this part. Its just a suggestion.NIT Condition shall PrevailDevap/ Dessicant AHU DRI/ MunterFor DEVAP and Desiccant AHU we will like you consider APIDDI make as they were the NIT Condition shall Prevailsuppliers for IIT, Kharagpur Project also wherein we have used units of this type 24 nos intotal.DEVAP, DE AHU, AHU ThecompleteAHUshallconfirmtostandardspecific For AHU Velocity across Filter is stated to be 400 FPM. Can we make that 500 FPM. Accepted. Please refer Corrigendumation.The face velocity across cooling coil shall be Please confirm.being issuedlimited to 400 FPM maximum. The capacity of Airhandlers shall be as follows: Total Static pressuregiven below minimum required for the system.Actual static pressures hall be calculated &confirmed by thevendor at time of Bidding. Theunit shall be BMS compatible.4 of 10

Clause, Sectionand VolumeBOQ ITEM NO4.1.1,4.1.2,Item DescriptionFan Coil Unit FloorAs per Bid DocumentProspective Bidder's QueriesReply to the QuerySupply , Installation , testing and commissioningof Dobule sking floor mounted factory fabricatedFan coil unit with 12 mm static pressure eachcomplete with copper pipe connections withbrass fittings , wiring with 3 pin socket plug , Utrap in drain pipe connection near FCU , 3 speedswitch , fire retardant double canvas connections, 3/4 row deep chilled water coil , three speedmotor , washable filters , 18 G-SS304 Stainlesssteel drain pan insulated with 13 mm aluminiumfaced nitrile rubber. Fan coil unit shall be suitablefor 220 10 volts , 50 Hz cycle single phasepower supply , maximum RPM of motor shall be960 & Maximum db level not more than 35 db(A)at 1 mtr. distance.As per the Tender BOQ FCU’s are Floor Mounted type. But till now none of the approved NIT Condition shall Prevailmanufacturers have confirmed that they will provide Floor Mounted units in this range.Also FCU with 3 Row Deep coils will be provided with no Heating Coil in them. We willrequest you to incorporate Waves make AHU and FCU in the approved Make List. Pleaseconfirm.1.0 TR cooling Capacity/400 CFM, 3 row deepcooling coil, Floor mounted1.5 TR cooling Capacity/500 CFM, 4 row deepcooling coil, Floor mountedBOQ ITEM NO10.1Chiller Plant Manager Supply,Installation,Testing and commissioning of There is mention of Plant Manager in the BOQ. Please clarify what all needs to be Details IO summary shall be shared tochiller plant manager as per specification and Controlled by this. Please give us more information for Plant Manager part.successful bidder.shall be BMS compatilbe.5 of 10

Clause, Sectionand VolumeItem DescriptionBOQ Item C 2.1Cabinet FanBOQ Item D1.0,2.0Sheet Metal DuctApproved MakeListApproved MakeListBOQ item NO16.1As per Bid DocumentProspective Bidder's QueriesSupply, installation, testing and commissioning of For Cabinet Fans sound DB requirement is given as 60DB @ 3 Mtrs. Please accept this NIT Condition shall Prevailfactory fabricated double Skinned cabinet type upto 75 DB @ 3 mtrs distance.fans section made out of extruded aluminiumsection with 1.0 mm pre-plasticized / pre-coatedGalvanised steel sheet with DIDW blower, blowersection and TEFC motor suitable for operationon 415 volts 10%, 50 Hz 5% AC supply withmotor and belt drive package. The fan Motorshall be of efficiency class IE2 . The blower shouldbe AMCA Certified for air performance andsound rating and should be selected formaximum efficiency.The motor & blower assembly shall be mountedon Aluminium extruded section only. Thecomplete fan section shall conform to standardspecification. The fan outlet velocity shall belimited to 9.5 MPS maximum.The maximumsound level of unit shall be 60dB(A) @ 3 m fromsourceSheet Metal DuctFor Ducting please clarify if 120 GSM sheet is acceptable. For 24G Ducts will you accept NIT Condition shall PrevailC&S Joints instead of TDF flanges. Consider GP Spiro/ Zeco/ ECO Duct make for this part.Duct Acoustical Lining Duct Insulation - Thermobreak/ Torcellene/ Cani For Acoustic and Thermal Insulation of Ducts please consider UP Twiga make.Acoustic Insulation - Armacell/ Owen Corning/ KflexADPHeat ExchangerReply to the QueryJohnson/ Honeywell/ BelimoFor ADP please consider Airflow (Mapro) make / Dynacraft make.Accepted. Please refer Corrigendumbeing issuedNIT Condition shall PrevailSupplying, fixing , testing & commissioning of For Heat Exchangers, can you please let us know details as no details is available for us to Please Refer to Corrigendum beingheat exhanger unit for hot water as per quote. Also, please confirm makes as Tranter / Alfa Laval.issued.specificationNIT conditions shall prevail for makes.6 of 10

Clause, Sectionand VolumeItem DescriptionBOQ Item NO E1.0Chiled Water pipingBOQ Item NO E5.0, 6.0Balancing ValveApproved MakeListApproved MakeListApproved MakeListApproved MakeListTENDER NOTICEY StrainerElectrical PanelCablesCable TrayEMDAs per Bid DocumentProspective Bidder's QueriesReply to the ng of following nominal sizes ofchilled / hot water piping inside the building(with necessary clamps, vibration isolators andfittings but excluding valves, strainers, gaugesetc.) duly insulated with following closed cellelastometric nitrile rubber of minimum 45 Kg /m3 density, thermal conductivity 0.037 W/MK orbetter at 20 deg mean temperature class ‘O’insulation applied by suitable adhesive completeincluding repairing of damage to building etc. asper specifications and as required complete in allrespect. Note:-The Pipes of sizes 150 mm &below shall be M.S. ‘C’class as per IS : 1239 and pipes size above 150mm shall be welded black steel pipe heavy classas per IS: 3589, from minimum 6.35 mm thickM.S. Sheet for pipes upto 350 mm dia.and from minimum 7mm thick MS sheet forpipesof 400 mm dia,testingand abovSupply,installationand commissoning ofFor Chilled Water Insulation for Pipes 150 mm Dia to 40 mm 38 mm Thickness is found to NIT Condition shall Prevailbe OK. Below that 25 mm Thickness is Ok. Please give your clarification on this part. Therewill be no AL Cladding involved in this. For Nitrile Rubber Pipe Insulation please approveAeroflex (ALP) make.Sant/ Sandhu/ EmeraldFor Y Strainers please confirm DS Engineering in the approved Make List.NIT Condition shall PrevailSchneider/ ABB/ L&TFor MCC and Other Panels please approve KEPL / SPC/ Adlec for this Project.NIT Condition shall PrevailKEI/ Universal/ KECFor Cables please consider makes for Havells/ Gloster etc.NIT Condition shall PrevailThe Balancing Valves will be standard Balancing Valves only with No In Built Measuring NIT Condition shall PrevailBALANCING VALVE WITH BUILT IN MEASURING possible. For Balancing and NRV Valves please confirm makes as Castle / Advance /FACILITY with C I body flanged construction with Honeywell.EPDM coated discBalancing Valve: Danfoss/ Belimo/ AdvanceRMCON/ Indiatech/ MEMFor Cable Trays, please confirmation of using standard Local make Products after Sample NIT Condition shall PrevailCertification from Consultant / Client.Earnest Money Deposit (EMD) shall be accepted EMD: We will be submitting both DD and Bank Guarantee as stated in the NIT. Please let Please refer to Notice Inviting Tenderonly in the form of Deposit at Call us to whom we should address these as payee. Please give us payee details.Clause NO 8 ( a ).receipt/Demand Draft drawn in favour ofDD in favour of "Nalanda University"Nalanda University, payable at Rajgir, BiharPayable at Rajgir.from any scheduled bank guaranteed by theReserve Bank of India.7 of 10

Clause, Sectionand VolumeTENDER NOTICEItem DescriptionE-tender ProcessingFeesTENDER NOTICEIntegrity AgreementTENDER NOTICEEligibility CriteriaTENDER NOTICESimilar WorkAs per Bid DocumentProspective Bidder's QueriesInterested bidders who wish to participate in the E- Tender Processing Fee: Please mention payee details for making the DD.tender shall pay Rs. 15,000/ (Rupees FifteenThousand only) as e-Tender Processing Fee infavour of Nalanda University, Rajgir, Bihar in theform of Demand Draft of any scheduled bank, acopy of which shall have to be scanned anduploaded to the e-Tendering website beforetender submissionReply to the QueryPlease refer to Notice Inviting TenderClause NO 8 ( c ).DD in favour of "Nalanda University"Payable at Rajgir.Corrigendum being issuedNote : Integrity Agreement will be signed and Should the Integrity Agreement be submitted along with the Tender documents as part of NIT condition shall prevail. Pleasesealed by the Authorised Representative of Technical Submittal or this must be given after the job is awarded.submit accordingly.bidder as per the format of NIT on bidder'sletter head initially. Formal agreement on stamppaper shall be signed between NU and thesuccessful bidder only, at the time of Signing ofagreement for the work.For this purpose cost of work shall mean gross The Format that we will submit for establishing our Credential should that be endorsedvalue of the completed work. This should be by the authorities from whom it was given or their Certificate given to us earlier will do.certified by an officer not below the rank of Please clarify.Executive Engineer/Project Manager orequivalentFor the purpose of this clause, “similar work”shall mean “Supply, Installation, Testing andCommissioning of HVAC system including,Chillers, Pumps, Pipes, Heat Pump, AHU’s, FCU’sand related works complete with SCADACompatibility etc within a single campus /premises of Residential or Non-residentialcampus, in India, within last seven years”.NIT Condition shall Prevail. REFERForm D. Project Completion Certificategiven in Required Format shall besubmitted.Credential (PQ): Supply, Installation, Testing and Commissioning of HVAC system Please Refer to corrigendum beingincluding, Chillers, Pumps, Pipes, Heat Pump, AHU’s, FCU’s and related works complete issued.with SCADA Compatibility etc. within a single campus / premises of Residential or Nonresidential campus, in India, within last seven years.--- Do we need to provide aCertificate wherein we have used at least 70% of the above things or you will evaluate thecriteria as the selected Project must have all the above in them. As for example in thepresent BOQ there is no SCADA compatibility is needed but still you want that as a clausefor passing PQ criteria for this Project. Instead of SCADA we can provide Projects whereinwe have done BMS and has been commissioned and handed over to the clients andConsultant’s satisfaction. Same with Heat Pump. The Heat Pump in this Project is used forgeneration of hot water which will be required for de humidification purpose and notdirectly as a major equipment. This Hot Water could have been generated by othermeans also like by using Hot Water Generators. So, we feel this part can also beconsidered with leniency and should not be considered as an absolute essentiality to fulfilPQ criteria.8 of 10

Clause, Sectionand VolumeItem DescriptionAs per Bid DocumentTENDER NOTICEGSTTENDER NOTICELD ClauseTENDER NOTICEPower and WaterPower and WaterTENDER NOTICELabour CessLabour CessTENDER NOTICELabour HutmentLabour HutmentStorage SpaceStorage SpaceCivil worksCivil worksProspective Bidder's QueriesReply to the QueryGSTGST: For this Tender GST is applicable. But the Price format ED / VAT are there. This will Please refer to NIT Clause 5.14, Pagebe a SITC Contract and the rate of GST will be 18% flat on every Item. While evaluating 152purpose should our rates should be inclusive or exclusive of GST for every Item. Pleaseclarify.Compensation for delay of work @ 1 % per LD Clause: From the Tender, it is not clear on the Percentages. We will request you to Please refer to NIT Clause 2, Page 83month of delay to be computed on per day basis. make it 0.5% per week upto a maximum of 5%.Provided always that the total amount ofcompensation for delay to be paid under thisCondition shall not exceed 10% (Ten per cent) ofthe Tendered Value of workPower and Water: From the Tender Document, it is not clear whether Power and Water Please refer to NIT Clause 5.5 Pagewill be provided at one point and we must distribute the same on our own cost paying for 137 and Clause 31, Page 122the units as per prescribed rates that we will consume. Or we must bring our Gensetthroughout the Project and arrange our Power on our own during Erection part. ButTesting & Commissioning purpose Free Water and Power needs to be provided at siteLabour Cess: Please clarify is Labour Cess will be borne at your end or we must cost forthe same.Labour Hutment: Please specify if Labours can stay at site during Erection. Can any spacebe provided so that we can make arrangement for Labours to stay at site only withminimum amenities available at site.Storage Space at site: Covered Space needs to be provided at site for storage purpose.Please refer to NIT Clause 5.14 (B),Page 153Space shall be available at Site atNominal rent as decided by NUSpace shall be available at Site atNominal rent as decided by NU.Contractor has to make their ownstorage space arrangements.Civil and allied Works: We will not be doing any Civil work like Under Ground Trench Civil Work required for SITC of ChilledWork for Pipe and Cables along with Refilling and support requirements. Opening of Walls water pipe Underground shall be in/ Roof Cutting and making it good with proper Water Proofing for Ducts Cables and Pipes the scope of the Bidderrouting is also not under our scope. Foundation work for Chiller / Pumps/ AHUs’/etc arealso not in our scope of work. Also Fire Sealant job will also not in our scope of work.9 of 10

Clause, Sectionand VolumeItem DescriptionTENDER NOTICE Scope of Work for AMCAs per Bid DocumentScope of Work for AMCProspective Bidder's QueriesReply to the QueryAMC: Please clarify if this will be used for Tender evaluation purpose. In the BOQ there isprovision for 2 Years only but in Technical Specification need for 5 Years is specified.Please clarify. During DLP we will give free Maintenance but no operational support. Inthe Second Year both Maintenance and Operation will be charged. Now, please clarifythen for 1st year of AMC we should give only Operational cost and in the 2nd Year as perBOQ we must give Maintenance and Operation cost both. In both the cases GST will becharged EXTRA. Please clarify if our understanding is correct or not.YES. The AMC cost shall be included inthe overall evaluation of Price Bid. DLPshall be Operation and Maintenanceincluded. The AMC for 2 yearsmentioned in the BOQ is for Operationduring DLP. All rates shall be inclusiveof all taxes, GST, Duties etc.TENDER NOTICEAMCAMCScope of Work for AMC: Please clarify the time of operation (12 Hrs or 24 hr) / No of Please Refer SLA Duringshifts you are looking for / Number of man Power you are looking for in each shift with document at NIT Page 202.details.- Please confirm this part for operational purpose.TENDER NOTICEArbitrationArbitrationArbitration: Any dispute or difference whatsoever arising between the parties of or NIT CONDITION SHALL PREVAILrelating to the construction, meaning or operation or effect of this agreement shall,unless resolved amicably, be settled by Arbitration of three arbitrators, one to beappointed by each party and the third arbitrator (who shall act as the presidingarbitrator) to be appointed by the two arbitrators.All proceedings under such Arbitration shall be held in Mumbai and be in accordance withthe provisions of the Arbitration and Conciliation Act, 1996 and any statutorymodifications or re-enactment thereof.It is agreed and understood that the court having jurisdiction over Mumbai alone shall becompetent to entertain any application or petition pertaining to the ArbitrationAgreement and/or arbitral proceedings pursuant to this clause.AMC10 of 10

Screw Chiller - York/ Carried/ Diakin We request you to kindly accept Dunham-Bush as one of the manufacturer's of Screw Chiller for subject Tender. Dunham-Bush is also in the approved make list of CPWD and recent tender of Government Dental College at Nalanda for Screw Chillers. Attached Credentials of Dunham-Bush for your kind consideration.