WATERFLEETWOOD RESERVOIR AND PARK IMPROVEMENTS PROJECTWelcometo the Open House for Fleetwood Reservoirand Park Improvements ProjectTo meet the growing demand for drinking water,Metro Vancouver needs to build a new undergroundreservoir in Meagan Anne MacDougall Park.

WATERFLEETWOOD RESERVOIR AND PARK IMPROVEMENTS PROJECTProject OverviewMetro Vancouver provides clean, safe drinking water for over 2.4 million residents in theLower Mainland. Operating our vast drinking water system, with a growing population,requires constant upgrades, improvements, maintenance and expansion.FLEETWOOD RESERVOIR AND WATER MAIN PROJECT95A AveGREEN TIMBERS GREENWAY95 AveExistingWater MainThe Fleetwood Reservoir Projectincludes:CITY OFSURREY153A StTo meet the growing demand fordrinking water, Metro Vancouver isplanning to build a new undergroundreservoir in Meagan Anne MacDougallPark at 9008 Fleetwood Way in Surrey.96 Ave94 AveBERKSHIRE PARKELEMENTARYSCHOOL One underground water storage cell156 StSURREYCHRISTIANSCHOOL92 AveFleetwoodReservoirProject Area An above-ground exit structure forthe underground valve chamberlocated near the playground91 AveFleSHOPPINGCOMPLEXFraser91 AveMEAGAN ANNEMACDOUGALLPARKetNewPlayground91A AvewoodWay90 AveveAA90154 StIn addition, a water main connecting thereservoir to the regional drinking watersystem will also be constructed along154 Street.154 St An above-ground maintenanceaccess building next to the existingpump station building9152 St An underground valve chamberev3ANew FleetwoodWater Main90 AveNewReservoirStructureExistingPump StationHwyProject ScheduleReservoir constructionWater main constructionStarting mid-2020 and lasting approximately two yearsStarting during reservoir construction and lastingapproximately one year

WATERFLEETWOOD RESERVOIR AND PARK IMPROVEMENTS PROJECTConstruction ActivitiesFleetwood Reservoir An underground reservoir An underground valve chamber An above-ground maintenance access building next to the existing pumpstation building An above-ground exit structure for theunderground valve chamber A temporary walking path through the parkwill be maintained during constructionPerson Height1.8 m(approximately 6')Fleetwood Water MainNew Water Main0.9 m(approximately 3')Metro Vancouver will also construct a 0.9 m diameter,1.1 km long water main to connect the FleetwoodReservoir to the regional drinking water system.Playground in Meagan Anne MacDougall ParkThe existing playground in the park will be closed during construction. After reservoirconstruction is complete, the City of Surrey will design and install a new playground thatincorporates public feedback received at the project open houses in 2016 and 2019.To share your comments about park improvements contact:Ted Uhrich, Parks Planning ManagerTelephone: 604-598 -5706Email: parksrecculture@surrey.caWorking with the CommunityMetro Vancouver is committed to working closely with the community and the City of Surreyto ensure concerns and interests are considered as the project continues. Local residentsand businesses will receive ongoing notification through newsletters, web updates, emailand on‑site signage.

WATERFLEETWOOD RESERVOIR AND PARK IMPROVEMENTS PROJECTMap of the Project Area91 AveTemporaryWalking PathDuringConstructionMeagan AnneMacDougallCITY OFSURREYParkExit StructureNewFleetwoodWater MainAccess HatchesNewPlayground4St90 Ave90 AveFleetwood WayProjectArea15New ReservoirStructureExisting PumpStation

WATERFLEETWOOD RESERVOIR AND PARK IMPROVEMENTS PROJECTArtist’s Renderings of the ParkAfter ConstructionOnce construction of the new reservoir infrastructure is complete, the park will berestored and landscaped.Above: new reservoir infrastructure with an above-ground maintenance building (left) and exit structure (right).

WATERFLEETWOOD RESERVOIR AND PARK IMPROVEMENTS PROJECTWhat We HeardMetro Vancouver hosted an open house in January 2016 for the community to learn moreabout the project and provide feedback on parts of the project. This included possiblefeatures of a new playground that will be designed and installed by the City of Surreyonce construction of the Fleetwood Reservoir is complete, and a recommendation for therelocation of the existing public art. This is what we heard:Playground FeaturesThe City of Surrey will replace the existing playground with modern equipment and provideplay elements for a larger range of age groups. New pathways and seating areas will alsobe added. There is a strong preference that the new playground include a single bay swing,spiral slide, curved benches, stationary net climber, log steppers and FIBAR safety surfacing.TraditionalSwingsetClimbing Structurewith SlideProtected ParentalSupervisionClimbing NetStructureInformal PlaySeatingSafetySurfacingSingle Bay Swingfor ages 3 Spiral Slidefor ages 5-12Curved Benches (3)Stationary NetClimberfor ages 5-12Log Steppers(3 pcs)for ages 2-5FIBAR SafetySurfacing@Victor Stanleyplus drainage mats &concrete curb edging6' fall height Playsense8' height1 belt seat, 1 bucket seat Kompan6' 9" fall height Landscape Structures Landscape StructuresPublic ArtThere is a strong preference by the community that the existing public art be relocated.Based on this feedback, the City of Surrey will permanently relocate the art to a new park.Through the City’s public art process, in collaboration with Fleetwood stakeholders, The Cityof Surrey will explore opportunities to integrate new art into the park and its infrastructurethat better reflects the vision of the Fleetwood community.

WATERFLEETWOOD RESERVOIR AND PARK IMPROVEMENTS PROJECTCommunity EngagementMetro Vancouver is committed to working closely with the community and the City of Surreyto ensure concerns and interests are considered as the project continues. Ongoing scheduleupdates and other project information will be communicated through:SignsLetters, door hangers, email and web updatesA Community Liaison Officer to answer questions and listen to concernsProject UpdatesMetro Vancouver will provide advance notification of upcoming construction activities.For additional information on this project, or to sign up for project updates, please visitwww.metrovancouver.org and search “Fleetwood Reservoir”.Contact Metro VancouverInformation Centre: 604-432-6200(Monday to Friday from 8 AM to 4:30 PM)After Hours Emergency: 604-451-6610Email: icentre@metrovancouver.org(Please include “Fleetwood Reservoir” in the subject line)

Playground Features The City of Surrey will replace the existing playground with modern equipment and provide play elements for a larger range of age groups. New pathways and seating areas will also be added. There is a strong preference that the ne