Moffitt Cancer Center MIP CT Equipment Replacement - RM. 1055 Pretest .

Transcription

Moffitt Cancer CenterMIP CT Equipment Replacement - RM. 1055 Pretest Report April 17, 2020140A Whitaker Road, Lutz, Florida 33549

SOUTHERN INDEPENDENTTESTING AGENCY, INC.Testing & Adjusting of Building Environmental Systems140A Whitaker Road Lutz, FL 33549 (813) 949-1999 Fax (813) 949-5084 www.sita-tab.comCERTIFIEDTEST, ADJUST AND BALANCEPROJECTMoffitt Cancer Center - MIP CT EquipmentReplacement - RM. 1055 PretestADDRESS4101 Jim Walter Blvd.CITY, STATETampa, FL 33607CERTIFICATION NO. 20201138DATEARCHITECTLDC International, Inc.ADDRESS1406 Swann AvenueTampa, FL 33606ENGINEERSSR - Smith Seckman Reid, Inc.ADDRESS301 N. Cattlemen Road, Suite 300Sarasota, FL 33606GENERAL CONTRACTOR-ADDRESS-MECHANICAL CONTRACTOR-ADDRESS-OWNERMoffitt Cancer CenterADDRESS12902 Magnolia DriveTampa FL 33612NATIONALLY CERTIFIEDApril 17, 2020

TABLE OF CONTENTSMoffitt Cancer Center - MIP CT EquipmentReplacement - RM. 1055 PretestPRETEST REPORTProject # 20201138ITEMPAGEInsertAABC CERTIFICATION. . .InsertAABC NATIONAL PERFORMANCE GUARANTY . .InsertINSTRUMENT LIST. . . .APROJECT SUMMARY. . 1AIR MOVING EQUIPMENT TEST SHEET . . . 2STATIC PRESSURE PROFILE SHEET . . DUCT / PIPE TRAVERSE SHEET . . 3 -56TERMINAL UNITS TEST SHEET . . . 7AIR DISTRIBUTION TEST SHEET . . . 8EXHAUST / SUPPLY FAN DATA SHEET . . 9DUCT / PIPE TRAVERSE SHEET . . 10AIR DISTRIBUTION TEST SHEET . . . 11COIL PERFORMANCE TEST SHEET . . . 12ELECTRIC COIL / DUCT HEATER TEST SHEET . . InsertMECHANICAL LAYOUT . . .

ASSOCIATED AIRBALANCE COUNCILCERTIFICATIONPROJECTMoffitt Cancer Center - MIP CT EquipmentReplacement - RM. 1055 PretestADDRESS4101 Jim Walter Blvd.Tampa, FL 33607The data presented in this report is a record of system measurements and final adjustments thathave been obtained in accordance with the current edition of the AABC procedural standards fortesting, adjusting and balancing of environmental systems and per the project specifications.Any variances from design quantities, which exceed AABC tolerances, are noted in the testreport project summary.THE DATA CONTAINED WITHIN THIS REPORT IS TRUTHFUL AND REFLECTS THE OPTIMUMPERFORMANCE CAPABILTIIES OF THE INSTALLED SYSTEMS.SUBMITTED AND CERTIFIED BY THIS AABC AGENCYSITA - SOUTHERN INDEPENDENT TESTING AGENCY, INC.140A Whitaker Road, Lutz, FL 33549TEST & BALANCE ENGINEERPROJECT / CERTIFICATION NUMBERBRIAN C. KAUPP20201138TBE REGISTRATION NUMBERDATE OF CERTIFICATION03-09-36April 17, 2020TEAS TBE6 03-09-3BrppianC. Kau[ SEAL ]ency, Inc.COUNCILSouthern IndSOCIACEDAAgent TestingendpeIR BALANBrianC.KauppDigitally signed by:Brian C. KauppDN: CN Brian C.Kaupp email brian@sita-tab.comC US O SITA,Inc. OU PresidentDate: 2020.04.1712:30:07 -04'00'[ SIGNATURE ]

INSTRUMENT LISTDATE:04/15/20PROJECT NAME:JOB # 20201138Moffitt Cancer Center - MIP CT Equipment Replacement - RM. 1055TAB TECH:I. ValdezMFG.MODEL #SERIAL #RANGECALIBRATEDATECALIBRATIONDUE DATEEBT BALOMETERALNOREBT-731EBT73164701325 TO 2500 FPM6/24/196/24/20EBT MICROMANOMETERALNOREBT-731EBT751647013 15 IN. H2O6/24/196/24/20HUMIDITY / TEMPERATURE PROBEALNOR800220P16450013- 14º TO 140º F6/24/196/24/20ROTATING VANE ANEMOMETERALNORRVA801A048620 TO 3000 FPM7/8/197/8/20AMP / VOLT METERFLUKE323452604260 TO 400 AMP12/20/1912/20/20TACHOMETERTESTO460388051240 - 10,000 RPM1/16/201/16/21TSI / ALNORHM 680718202060 - 250 IN. H2O7/31/197/31/20PITOT TUBE - 12"DWYER160-12----N/AN/APITOT TUBE - 24"DWYER160-24----N/AN/APITOT TUBE - 36"DWYER160-36----N/AN/APITOT TUBE - 60"DWYER160-60----N/AN/AINSTRUMENTDIGITAL HYDRONIC MANOMETERABBREVIATION LISTAHU AIR HANDLING UNITBCU BLOWER COIL UNITBTU BRITISH THERMAL UNITCAV CONSTANT AIR VOLUMECFM CUBIC FEET PER MINUTECRU COMPUTER ROOM UNITDH DUCT HEATERDP DIFFERENTIAL PRESSUREEDH ELECTRIC DUCT HEATEREF EXHAUST FANERU ENERGY RECOVERY UNITERV ENERGY RECOVERY VENTILATOREWT ENTERING WATER TEMPERATUREFCU FAN COIL UNITFPBU FAN POWERED BOX UNITSFPM FEET PER MINUTEGPM GALLONS PER MINUTEHp HORSEPOWERHPU HEAT PUMP UNITLWT LEAVING WATER TEMPERATUREMUA MAKE-UP AIRMVD MOTORIZED VOLUME DAMPERN / A NOT APPLICABLE - NO ACCESSN / O NOT OPERATINGN / S NOT SPECIFIEDNTS NO TEST SITEPIU POWERED INDUCTION UNITSPTU POWER TERMINAL UNITSRTU ROOF TOP UNITSSP STATIC PRESSUREVAV VARIABLE AIR VOLUMEVD VOLUME DAMPER (MANUAL)VFD VARIABLE FREQUENCY DRIVEVSC VARIABLE SPEED CONTROLLER

Testing, Adjusting & Balancing (TAB) of Building Environmental Systems140A Whitaker Road Lutz, FL 33549 (813) 949-1999 Fax (813) 949-5084www.sita-tab.comMoffitt Cancer CenterMIP CT Equipment Replacement - RM. 1055Pretest ReportProject SummaryJO B # 20 20 1 13 8April 17, 2020This project summary and comments reflects the equipment operation and capacitystatus as of the date indicated on the following performance data forms.1.AIR HANDLING UNIT1.1RTU-1-2: This unit was tested and determined to be producing 11,495CFM.1.22.Outside Air: The outside air volume is producing 1403 CFM.VARIABLE AIR VOLUME TERMINALS2.1EXISTING VTU-1-2-11 & VTU-1-2-12: The VAV terminals were testedwith supply diffusers read in max flow. Refer to page 6 for test results.3.EXHAUST FANS3.14.EF-1-2-1: This fan is producing 382 CFM.ELECTRIC DUCT HEATERS4.1The electric heaters were tested by pressing in the contactors. AT the timeof testing the temperature outside was 80º with 88% R.H. cloudy andhumid.A

Moffitt Cancer Center - MIP CT Equipment Replacement- RM. 1055 PretestPROJECT SUMMARYJob #20201138APRIL 17, 20205.COOLING COIL PERFORMANCE5.1The cooling coil was tested for performance with results indicated on page11. During this testing 4 compressors were in operation.B

AIR MOVING EQUIPMENTTEST SHEETDATE:4/1/20; 4/2/20PROJECT NAME:JOB # 20201138PAGE # 1SYSTEMRTU-1-2EQUIPMENT LOCATIONROOFAREA SERVEDEASTSIDEEQUIPMENT MANUFACTURERMCQUAYMODEL NUMBERMPS040FY4QV3YYYYSERIAL NUMBER177271DESIGNACTUALTOTAL CFM OF FANN/S11495TOTAL CFM OF OUTLETS10092-1403-RETURN AIR CFMSETTING/CAL.N/SN/SOUTSIDE AIR CFMSETTING/CAL.N/SDESIGNSTATIC PRESSURE (TOTAL / EXT.)N/SN/S2.342.92INLET STATIC PRESSUREN/SN/S-1.12-1.70DISCHARGE STATIC PRESSUREN/S 1.22FAN RPMN/S1349SYSTEM STATIC PRESSURE-ACT.-SETPOINTDESIGNACTUALN/SBALDORMOTOR MANUFACTURER B.H.P.15-1513.3PHASE FRAME3254T3254TMOTOR EFFIC. POWER FACTOR93869386ROTATION MOTOR RPMCW1765CW1765460VOLTAGE CORRECTED AMPS17.7-SPEED: VARIABLE or LO, MED, HIVFD @ 58HZFINAL Hz SERVICE FACTOR6048948114.815.1 15.0ACT.SETPOINTACTUAL483VFD @ 58HZ1.15581.15-HEATER ELEMENT SIZEACTUALDESIGNMOTOR H.P.AMPSTAB TECH: IVMOFFITT C.C. - MIP CT EQUIPMENT REPLACEMENT - RM. 1055 PRETEST-FIXEDADJ.FIXEDADJ.MOTOR SHEAVE & BORE6-1/2 x 6-1/2 bl x1-5/8BORExbl xBOREFAN SHEAVE & BORE8--1/2 x 8-1/2 bl x1-3/4BORExbl xBOREBROWNINGSHEAVE BELT MFG.2 @ B-85BELT(S) / SIZETYPE1224 X 24 X 2MERV 81224 X 24 X 4ULTRAQTY.SIZETYPE

STATIC PRESSURE PROFILETEST SHEETDATE:04/02/20PROJECT NAME:JOB # 20201138PAGE # 2MOFFITT C.C. - MIP CT EQUIPMENT REPLACEMENT - RM. 1055 PRETEST TAB TECH: IVCOILAFILTERSOSABFANCDUNITABCDRTU 1-2-1.12-1.70 1.26 1.22REMARKS:EFGHI

RECTANGULAR DUCT TRAVERSEREPORTDATE:04/02/20JOB # 20201138PAGE # 3PROJECT NAME:MOFFITT C.C. - MIP CT EQUIPMENT REPLACEMENT - RM. 1055 PRETESTSYSTEM / UNITRTU 1-2ALTITUDESERVICEOSATEST LOCATION ROOFSEA LEVELDUCTS.P.-SIZE:1.00DENSITY .075INSTRUMENT USED VELGRIDREQUIREDL: 82.0W: 235551097827410613410845106141189217123PODISTANCE FROMBOTTOMSQ. FT.CORR. FACTORONAIR TEMP 80ºTAB TECH: IV67891011121334567DISTANCE FROMBOTTOMVELOCITYSUBTOTALSSYSTEM / UNITRTU 1-2 BRANCH 5ALTITUDESERVICERETURNTEST LOCATION CT CEILINGSEA LEVELDUCTS.P.-.04SIZE:L: 28.0W: 637613779567DISTANCE FROMBOTTOMVELOCITYSUBTOTALSREMARKS:DENSITY .075REQUIRED1PODISTANCE FROMBOTTOMSQ. FT.1.00INSTRUMENT USED AIRFOILONAIR TEMPCORR. FACTOR678910111213

RECTANGULAR DUCT TRAVERSEREPORTDATE:04/02/20JOB # 20201138PAGE # 4PROJECT NAME:MOFFITT C.C. - MIP CT EQUIPMENT REPLACEMENT - RM. 1055 PRETESTSYSTEM / UNITRTU 1-2 BRANCH 1ALTITUDESERVICESUPPLY BRANCH 1TEST LOCATION CEILINGSEA LEVELDUCTS.P. .84SIZE:SQ. FT.1.00DENSITY .075INSTRUMENT USED AIRFOILREQUIREDL: 20.0W: PODISTANCE FROMBOTTOMCORR. FACTORACTUALFPMN/SFPM1411CFMN/SCFM3527ONAIR TEMPTAB TECH: IV5678910111213567DISTANCE FROMBOTTOMVELOCITYSUBTOTALSSYSTEM / UNITRTU 1-2 BRANCH 2ALTITUDESERVICESUPPLY BRANCH 2TEST LOCATION CEILINGSEA LEVELDUCTS.P. 1.12SIZE:L: 14.0W: 982149138898698323492357935433300567DISTANCE FROMBOTTOMVELOCITYSUBTOTALSREMARKS:DENSITY .075REQUIRED1PODISTANCE FROMBOTTOMSQ. FT.1.00INSTRUMENT USED AIRFOILACTUALFPMN/SFPM869CFMN/SCFM1182ONAIR TEMPCORR. FACTOR5678910111213

RECTANGULAR DUCT TRAVERSEREPORTDATE:04/02/20JOB # 20201138PAGE # 5PROJECT NAME:MOFFITT C.C. - MIP CT EQUIPMENT REPLACEMENT - RM. 1055 PRETESTSYSTEM / UNITRTU 1-2 BRANCH 3ALTITUDESERVICESUPPLY BRANCH 3TEST LOCATION CEILINGSEA LEVELDUCTS.P. .98SIZE:SQ. FT.1.00DENSITY .075INSTRUMENT USED AIRFOILREQUIREDL: 30.0W: 2483045134680PODISTANCE FROMBOTTOMCORR. FACTORONAIR TEMPTAB TECH: IV67891011121367DISTANCE FROMBOTTOMVELOCITYSUBTOTALSSYSTEM / UNITRTU 1-2 BRANCH 4ALTITUDESERVICESUPPLY BRANCH 4TEST LOCATION CEILINGSEA LEVELDUCTS.P. .84SIZE:L: 16.0W: 01510751129125930463132320334834567DISTANCE FROMBOTTOMVELOCITYSUBTOTALSREMARKS:DENSITY .075REQUIRED1PODISTANCE FROMBOTTOMSQ. FT.1.00INSTRUMENT USED AIRFOILACTUALFPMN/SFPM1072CFMN/SCFM1426ONAIR TEMPCORR. FACTOR5678910111213

VARIABLE AIR VOLUMEDATE: 4/2/20JOB # 20201138PAGE # 6PROJECT NAME: MOFFITT C.C. - MIP CT EQUIPMENT REPLACEMENT - RM. 1055 PRETESTUNIT # RTU 1-2MFR: MCQUAYSTATIC PRESSURE SETPOINT:TAB TECH: IVMODEL: VCEF0 / VCEF1ACTUAL STATIC PRESSURE (1) No controls contractor on site- unable to interface.DESIGN CFMMINMAXACTUAL CFMMINMAX

AIR DISTRIBUTION TEST SHEETDATE:03/30/20JOB # 20201138PAGE # 7PROJECT NAME: Moffitt Cancer Center - MIP CT Equipment Replacement - RM. 1055 PretestRELATED TO UNIT(S): RTU 1-2TERMINALTERMINALROOMNUMBER#TYPESIZETAB TECH: IVAREA: CT-1054 & 1055K REVISED DESIGN PRELIM. FPM / CFMCFMFACTTEST 1 TEST 2FPMFINALCFM% DEV.VTU-1-2-11S-1RM 1054C61.065444468%S-2RM 1054A101.0180919151%S-3RM 1054A101.018013013072%42526526562%VTU-1-2-12S-4CT RM 1055A121.029516316355%S-5CT RM 1055A121.029513013044%S-6CT RM 1055A121.029514714750%S-7CT RM 1055A121.029516416456%S-8CT RM 1055A121.029514514549%S-9CT RM 1055A121.029512612643%177087587549%RETURNR-1CT SCAN RM 1055R-2R-3REMARKS:1054B22 X 223.368321183511814%B22 X 223.368351374113716%B22 X 223.36340874260874257%20071129112956%

EXHAUST / SUPPLY FANTEST SHEETDATE:04/15/20PROJECT NAME:JOB # 20201138PAGE # 8SYSTEMEF-1-2-1EQUIPMENT LOCATIONROOFAREA SERVED-EQUIPMENT MANUFACTURERGREENHECKMODEL NUMBERGB-16P-5-XSERIAL NUMBER12326230DESIGNACTUALTOTAL CFM OF FANN/S382TOTAL CFM OF OUTLETSN/S-TOTAL PRESSUREN/S-INLET STATIC PRESSUREN/S-.25DISCHARGE STATIC PRESSUREN/SATMOSFAN RPMN/S1319DESIGNACTUALN/SMARATHONMOTOR MANUFACTURERMOTOR H.P. B.H.P.1/2-1/2.48PHASE OTOR EFFIC. POWER FACTORROTATION MOTOR RPMVOLTAGEAMPS TAB TECH: IVMOFFITT C.C. - MIP CT EQUIPMENT REPLACEMENT - RM. 1055 PRETESTCORRECTED AMPS-SPEED: VARIABLE or LO, MED, HIFINAL Hz SERVICE FACTOR60ACTUALDESIGNACTUAL1.25601.25-STARTER HEATER ELEMENTDESIGN-FIXEDADJ.FIXEDADJ.MOTOR SHEAVE & BORE3-1/4 x 3-1/4 bl x1/2BORExbl xBOREFAN SHEAVE & BORE4-1/4 x 4-1/4 bl x7/8BORExbl xBORESHEAVE MFG.BROWNINGBROWNING--BELT MFG.1 @ A20BELT(S) / IZETYPE

RECTANGULAR DUCT TRAVERSEREPORTDATE:04/02/20JOB # 20201138PAGE # 9PROJECT NAME:MOFFITT C.C. - MIP CT EQUIPMENT REPLACEMENT - RM. 1055 PRETESTSYSTEM / UNITEF 1-2-1ALTITUDESERVICEEFTEST LOCATION CEILINGSEA LEVELDUCTS.P.-.11SIZE:1.00DENSITY .075INSTRUMENT USED AIRFOILREQUIREDL: 8.0SQ. FT.W: 942502PODISTANCE FROMBOTTOMCORR. FACTORACTUALFPMN/SFPM869CFMN/SCFM382ONAIR TEMPTAB TECH: IV456789101112134567DISTANCE FROMBOTTOMVELOCITYSUBTOTALSSYSTEM / UNITALTITUDESERVICETEST LOCATIONSEA LEVELSIZE:SITI1234567DISTANCE FROMBOTTOMVELOCITYSUBTOTALSREMARKS:REQUIREDL:W:SQ. FT.PODISTANCE FROMBOTTOMDENSITY .075ACTUALFPMFPMCFMCFMONAIR TEMP1.00INSTRUMENT USEDDUCTS.P.CORR. FACTOR12345678910111213

AIR DISTRIBUTION TEST SHEETDATE:04/02/20JOB # 20201138PAGE # 10PROJECT NAME: Moffitt Cancer Center - MIP CT Equipment Replacement - RM. 1055 PretestRELATED TO UNIT(S): EF 1-2TERMINALTERMINALROOMNUMBER#TYPESIZETAB TECH: IVAREA:K REVISED DESIGN PRELIM. FPM / CFMCFMFACTTEST 1 TEST 2FPMFINALCFM% DEV.EXHAUSTE-1CT TOILETEG11 X 111.070525274%E-2PAT TOILETEG11 X 111.070616187%14011311381%REMARKS:

HYDRONIC COOLING COIL / DXPERFORMANCE TEST SHEETDATE:04/02/20JOB # 20201138PROJECT NAME: MOFFITT C.C. - MIP CT EQUIPMENT REPLACEMENT - RM. 1055 PRETESTCOOLING AIR PERFORMANCEWATER PERFORMANCEENT ENT LVG LVG AIR AIR AIR FACE FACE H20 H20 H20 H20DB WB DB WB T CFM P AREA VEL. EWT LWT T P GPMUNITRTU 1-2PAGE # 11TAB TECH: IVDESIGNN/SACTUAL74.56254.253---AIR BTUH DESIGN(AIR BTUH ACTUAL( 27.85HYDRONIC BTUH ACTUAL (OUTSIDE CONDITIONS DB / RH:20.3 11495------)x4.5x- -BTUH-22.02 )x4.5x11,495 301,571BTUH-- ) x80º / 88%500x- -BTUHDESIGNACTUALAIR BTUH DESIGN(-)x4.5x BTUHAIR BTUH ACTUAL(-)x4.5x BTUH-)x500x BTUHHYDRONIC BTUH ACTUAL (OUTSIDE CONDITIONS DB / RH:DESIGNACTUALAIR BTUH DESIGN(-)x4.5x BTUHAIR BTUH ACTUAL(-)x4.5x BTUH-)x500x BTUHHYDRONIC BTUH ACTUAL (OUTSIDE CONDITIONS DB / RH:DESIGNACTUALAIR BTUH DESIGN(-)x4.5x BTUHAIR BTUH ACTUAL(-)x4.5x BTUH-)x500x BTUHHYDRONIC BTUH ACTUAL (OUTSIDE CONDITIONS DB / RH:DESIGNACTUALAIR BTUH DESIGN(-)x4.5x BTUHAIR BTUH ACTUAL(-)x4.5x BTUH-)x500x BTUHHYDRONIC BTUH ACTUAL (OUTSIDE CONDITIONS DB / RH:FORMULA (ENTHALPY IN - ENTHALPY OUT) 4.5 X CFM BTUHREMARKS: COIL SIZE 83 X 64 X 6 4 COMPRESSORS RUNNING.--

ELECTRIC COIL / DUCT HEATERTEST SHEETDATE:JOB # 20201138PROJECT NAME:PAGE # 12Moffitt Cancer Center - MIP CT Equipment Replacement - RM. 1055 PretestTAB TECH: IVDESIGN DATAVoltsKW StageAmps CFMPhaseKWActVTU-1-2-112.02277 / 1 7.2N/S1.90-279-VTU-1-2-129.02480 / 3 10.8N/S8.70-483484SystemLocationREMARKS:TEST DATACFMVoltageAmperageCoil T1-T2 T2-T3 T3-T1 T1 T2 T3-6.9--483 10.5 10.3 10.4Ent LvgDB DB----SINGLE PHASE VOLTS X AMPERAGE 1000 KW; THREE PHASE VOLTS X AMPERAGE 1000 X 1.73 KWContactor pressed in for heater test.

humidity / temperature probe alnor 800220 p16450013 - 14º to 140º f 6/24/19 6/24/20 rotating vane anemometer alnor rva801 a04862 0 to 3000 fpm 7/8/19 7/8/20 amp / volt meter fluke 323 45260426 0 to 400 amp 12/20/19 12/20/20 tachometer testo 460 38805124 0 - 10,000 rpm 1/16/20 1/16/21 tsi / alnor hm 680 71820206 0 - 250 in. h2o 7/31/19 7/31/20