THE BAMBINO TECHNICAL INFORMATION - Apeks Supercritical

Transcription

apeks CO2 EXTRACTION The BambinoSophisticated engineering with superior processingcapabilities, comparable to larger CO2 extraction systems,The Bambino provides both subcritical and supercriticalparameters in a compact design. Ideal for start-ups, productdevelopment and research and development labs.Full AutomationValveless Expansion Technology10-14 pounds per dayTHE BAMBINO TECHNICAL INFORMATIONCO2 FLOW RATESubcritical: 0.8 kg/minSupercritical: 0.4 kg/minCOMPRESSOR DISPLACEMENT21 liters/minVESSEL CONFIGURATION5LCall us (740) icalPower Options:1-phase: 230V (60Hz)3-phase: 208V, 230V,460V (50 or 60Hz)Power Consumption:12.9 kWADVANTAGESUp to 75% trade up deal for larger system95% CO2 gas recovery, closed loop systemOpen frame designValveless Expansion Technology: no cloggingInternet messaging and data collectionFractionates terpenesManufactured in ASME certified facility inJohnstown, OH

PRICING FOR THE UNITED STATES MARKETi.2000-5LDSystemEquipmentCost 92, 500ApproximateProcessingCapacity (g)CO2Recovery& ReloadTime MachineRun Timeper Day(hours)SourceMaterialCycle RunTime (hr)Run/DayRawMaterialProcessedper Day(g/day)RawMaterialProcessedper Day(lbs/day)Hemp3.35.66,40914Quality ofSourceMaterialAverageYield (%)AverageYieldper Run(g)AverageYieldper %227908**20% hemp assumes high CBD cannabisDAILY OPERATIONAL COSTSSystemi.2000-5LDTRAINING:All Apeks systems include free onsite or virtualtraining. Training is a two step process: FaceTime/Skypeto verify set up and operation, followed by a fourhour block of instruction of system operation andpreventative maintenance.Alaska, Hawaii and international locations mayrequire additional costs for onsite training.Service PlanCost per DayPowerConsumption(kW)ElectricalCost per DayCO2 Cost perDayTotal DailyOperationalCost(Includes Labor) 1912.9 56 21 186WARRANTY/SERVICE:1 year warranty covers all parts/labor.A comprehensive 70 point preventativemaintenance service plan available.Field service verification voucher from PSI.FINANCING:Please call 740 809-1160 for financinginformation.SHIPPING:CO2 cost per pound 1.25Electricity kWh cost 0.18Labor rate/hour 16ASSUMPTIONS:Approximate processing capacity assumes a200-300 micron particle size.Single phase and three phase power availableat 60Hz. Call for pricing for internationalconversions to 50Hz.Run times are calculated with supercriticalparameters on decarbed material.80-90% extraction completion.Labor only required for load/reload timeMachine can run unattended during extraction.PURCHASE TERMS:Estimated shipping cost: 2,500.50% down, 50% upon completion.Shipments to Alaska and Hawaii will haveadditional shipping costs.System ships upon receipt of full payment.Sales tax will apply unless tax exempt.Please contact us for international shipmentcosts, duties and fees.Illustration purposes only. These calculations are based upon the sample performance of the listed Apeks systems operatedunder normal conditions and following proper procedures for operation and maintenance. Actual performance may vary and isnot guaranteed. These hypothetical calculations include a number of input variables or “Assumptions” in which Apeks has nocontrol and which may be different in actual practice for a particular customer or system. Prices are subject to change.Introductory: The Bambino Price List CHPRDS000001-01 (ENAQ) April 2021UL-508A

apeks CO2 EXTRACTION The DUPLEXSpecifically engineered for subcritical high production output,The Duplex is more efficient than liquid pumping systems, isGMP friendly, and reduces post processing requirements. Fourseparators and two separator cups provide continuous batchoperation while the regenerative heat exchanger allows coldseparation, preventing thermal degradation while conservingenergy. Designed for large scale operations.Full AutomationCompatible with The Fleet 126-180 pounds per dayTHE Duplex TECHNICAL INFORMATIONCO2 FLOW RATESubcritical: 6.1 kg/minSupercritical: 2.9 kg/minCOMPRESSOR DISPLACEMENT133 liters/minVESSEL CONFIGURATION20Lx20L4x20LCall us (740) icalPower Options:3-phase: 208V, 230V, 460V, 575V (50 or 60Hz)Power Consumption:64.7 kWADVANTAGESCompatible with The Fleet platformExtractor, separator and mechanical componentscan be separated to prevent cross-contaminationOptimized for subcritical extractionsUp to 75% trade up deal for larger system95% CO2 gas recovery, closed loop systemOpen frame designValveless Expansion Technology: no cloggingInternet messaging and data collectionFractionates terpenesManufactured in ASME certified facility inJohnstown, OH

PRICING FOR THE UNITED STATES tApproximateProcessingCapacity (g)CO2Recovery& ReloadTime n Timeper Day(hours)SourceMaterialCycle RunTime (hr)Hemp2.66Run/DayRawMaterialProcessedper Day(g/day)RawMaterialProcessedper Day(lbs/day)9.081,925180Quality ofSourceMaterialn/a ldper Run(g)AverageYieldper %3,63211,46924batch) 455,000AverageYield (%)24batch)Cannabis7.63.257,347126**20% hemp assumes high CBD cannabisDAILY OPERATIONAL COSTSService PlanCost per DayPowerConsumption(kW)ElectricalCost per DayCO2 Cost perDayTotal DailyOperationalCost(Includes Labor)2000-20Lx20LDU 3364.7 280 34 490.582000-4x20LDU 3364.7 280 17 401.48SystemTRAINING:All Apeks systems include free onsite or virtualtraining. Training is a two step process: FaceTime/Skypeto verify set up and operation, followed by a fourhour block of instruction of system operation andpreventative maintenance.Alaska, Hawaii and international locations mayrequire additional costs for onsite training.WARRANTY/SERVICE:1 year warranty covers all parts/labor.A comprehensive 70 point preventativemaintenance service plan available.Field service verification voucher from PSI.FINANCING:Please call 740 809-1160 for financinginformation.SHIPPING:CO2 cost per pound 1.25Electricity kWh cost 0.18Labor rate/hour 16ASSUMPTIONS:Approximate processing capacity assumes a200-300 micron particle size.Single phase and three phase power availableat 60Hz. Call for pricing for internationalconversions to 50Hz.Run times are calculated with supercriticalparameters on decarbed material.80-90% extraction completion.Labor only required for load/reload timeMachine can run unattended during extraction.PURCHASE TERMS:Estimated shipping cost: 2,500.50% down, 50% upon completion.Shipments to Alaska and Hawaii will haveadditional shipping costs.System ships upon receipt of full payment.Sales tax will apply unless tax exempt.Please contact us for international shipmentcosts, duties and fees.Illustration purposes only. These calculations are based upon the sample performance of the listed Apeks systems operatedunder normal conditions and following proper procedures for operation and maintenance. Actual performance may vary and isnot guaranteed. These hypothetical calculations include a number of input variables or “Assumptions” in which Apeks has nocontrol and which may be different in actual practice for a particular customer or system. Prices are subject to change.High Output: The Duplex Price List CHPRDS000003-01 (ENAQ) April 2021UL-508A

apeks CO2 EXTRACTIONThe FLEET The Fleet is the perfect solution for large processingfacilities looking to expand capacity. Multiple systems cancause redundancy and back up but with The Fleet , up tothree systems can be added to one platform using a singleexternal chiller. It is an efficient and practical solution witheach system capable of operating with different parametersat the same time.expandableflexible420-600 pounds per dayTHE FLEET TECHNICAL INFORMATIONCO2 FLOW RATESubcritical: 12.6 kg/minSupercritical: 18.3 kg/minCOMPRESSOR DISPLACEMENT133 liters/min (1st Stage)89 liters/min (2nd Stage)VESSEL CONFIGURATIONUp to three Duplex systemsUp to three Force systemsCombination of the twoCall us (707) icalPower Options:3-phase: 208V, 230V, 460V, 575V (50 or 60Hz)Power Consumption:194.1 kW (The Duplex )240.3 (The Force )ADVANTAGESFlexible platform – expand as you growGas pumping allows cold separation preventingthermal degradationOptimized for subcritical extractionsUp to 75% trade up deal for larger system95% CO2 gas recovery, closed loop systemOpen frame designValveless Expansion Technology: no cloggingInternet messaging and data collectionFractionates terpenesManufactured in ASME certified facility inJohnstown, OH

L2ST 5000-20Lx20L2STThe Force The Duplex SystemPRICING FOR THE UNITED STATES MARKET 1,125,000 1,365,000 1,380,000 1,575,000ApproximateProcessingCapacity (g)ApproximateProcessingCapacity(lb)CO2Recovery& ReloadTime Yieldper 8,232AverageYield dper Run(g)Quality ofSourceMaterialCycle RunTime Processed Processedper Dayper atch)12027,240TotalMachineRun Timeper Day(hours)24Start with one Duplex 20LX20LDU on The Fleet platform for 415,000, add a second for 355,000, and a third for 355,000Start with one Force 20LX20L2ST on The Fleet platform for 500,000, add a second for 440,000, and a third for 440,000**20% hemp assumes high CBD cannabisDAILY OPERATIONAL COSTSServicePlan Costper DayPowerConsumption(kW)ElectricalCost perDayCO2Costper DayTotal DailyOperational Cost(Includes Labor)2000-20Lx20LDU 99194.1 839 102 1,183.012000-4x20LDU 99194.1 839 51 1,060.075000-20Lx20L2ST 123240.3 1,038 113 1,433.885000-40Lx40L2ST 123240.3 1,038 56 1,297.63SystemThe Duplex The Force TRAINING:All Apeks systems include free onsite or virtualraining. Training is a two step process: FaceTime/Skypeto verify set up and operation, followed by a fourhour block of instruction of system operation andpreventative maintenance.Alaska, Hawaii and international locations mayrequire additional costs for onsite training.WARRANTY/SERVICE:1 year warranty covers all parts/labor.A comprehensive 70 point preventativemaintenance service plan available.Field service verification voucher from PSI.FINANCING:Please call 740 809-1160 for financinginformation.CO2 cost per pound 1.25Electricity kWh cost 0.18Labor rate/hour 16ASSUMPTIONS:Approximate processing capacity assumes a200-300 micron particle size.Single phase and three phase power availableat 60Hz. Call for pricing for internationalconversions to 50Hz.Run times are calculated with supercriticalparameters on decarbed material.80-90% extraction completion.Labor only required for load/reload timeMachine can run unattended during extraction.SHIPPING:PURCHASE TERMS:Estimated shipping cost: 2,500.50% down, 50% upon completion.Shipments to Alaska and Hawaii will haveadditional shipping costs.System ships upon receipt of full payment.Sales tax will apply unless tax exempt.Please contact us for international shipmentcosts, duties and fees.Illustration purposes only. These calculations are based upon the sample performance of the listed Apeks systems operatedunder normal conditions and following proper procedures for operation and maintenance. Actual performance may vary and isnot guaranteed. These hypothetical calculations include a number of input variables or “Assumptions” in which Apeks has nocontrol and which may be different in actual practice for a particular customer or system. Prices are subject to change.High Output Expansion Platform: The Fleet CHPRDS000005-01 (ENAQ) April 2021UL-508A

apeks CO2 EXTRACTIONThe Force Developed for supercritical high production output, The Force is optimized for supercritical extraction but flexible, offeringhigher and lower subcritical parameters. The newest modelfeatures dual separators and dual extractor vessels that allowfor continuous batch extraction. The Force is designed forlarge scale operations.Full AutomationCompatible with The Fleet 140-200 pounds per dayTHE FORCE TECHNICAL INFORMATIONCO2 FLOW RATESubcritical: 4.2 kg/minSupercritical: 3.5 kg/minCOMPRESSOR DISPLACEMENT89 liters/min (1st Stage)26 liters/min (2nd Stage)VESSEL CONFIGURATION20Lx20L40Lx40LCall us (707) icalPower Options:3-phase: 208V, 230V, 460V, 575V (50 or 60Hz)Power Consumption:80.1 kWADVANTAGESCompatible with The Fleet platformGas pumping allows cold separation preventingthermal degradationOptimized for subcritical extractionsUp to 75% trade up deal for larger system95% CO2 gas recovery, closed loop systemOpen frame designValveless Expansion Technology: no cloggingInternet messaging and data collectionFractionates terpenesManufactured in ASME certified facility inJohnstown, OH

PRICING FOR THE UNITED STATES tCostApproximateProcessingCa

provides both subcritical and supercritical parameters in a compact design. Ideal for start-ups, product . development and research and development labs. Call us (740) 204-7279. sales@prospiant.com. www.prospiant.com. Full Automation Valveless Expansion Technology 10-14 pounds per day. The Bambino apeks CO. 2. EXTRACTION. Power Options: 1-phase: 230V (60Hz)