SmartPlant Construction“Streamline Work Process”Jason DuboseExecutive Business Consultant – Materials and Construction – Americas Region2015 AWP ConferenceTuesday, October 6th, 201511:30 am -12:30 PM

Agenda The ChallengeThe SolutionImplementation Plan for SuccessClient Case Studies 2014. Intergraph Corporation. All Rights Reserved .

#HxGNLIVEConstructionChallengeTime on tools

#HxGNLIVEEfficiencyImproveExecute EfficientlyOptimize DynamicallyTrack ProgressDocument Accurately

Improving Productivity Construction ReadinessLean Construction PrinciplesAWPWorkface Planning“Smart Technology” .links intelligent datalike 3D models, schedules,materials, drawings etcto work planning withimbedded rules andprinciples that focus onvalue. 2014. Intergraph Corporation. All Rights Reserved .Smart Technology

Smart eet Data 2014. Intergraph Corporation. All Rights Reserved .Schedule

Smart TechnologyVisualizationAutomationLook MaterialsavailabilityAnimationProgressing

SmartPlant Construction 2014. Intergraph Corporation. All Rights Reserved .

Smart Plant Construction Work PackageProjectCWALevel 3 CWPLevel 4Level 5 FIWP 2014. Intergraph Corporation. All Rights Reserved .

Benefit of SmartPlant Construction Reduce Risk Lower Construction Costs Improve Transparency Save Time Integrate Materials & Schedule Prevent Planning Errors Make Informed Decisions Improve Productivity Track Progress Promotes Lean Principles Visualize Constructability 2014. Intergraph Corporation. All Rights Reserved .

Implementation Plan For Success

Implementation Considerations Work Package concepts and benefits needs to be clear between all stake holdersEstablish a Construction Management TeamClear construction strategy document and responsibilities for the projectCreate/Revise Project’s Construction Standard Operating Procedures and Processes andWorkflowsClear understanding of SPC requirement and deliverablesEstablish a SPC owner and administrator for the projectDefine support and training strategyEstablish a technology Roadmap to address the planning of software upgrades as newversions of SPC are released over time 2014. Intergraph Corporation. All Rights Reserved .

Construction Strategy and Sequence 2014. Intergraph Corporation. All Rights Reserved .

Project Data - Contracts 2014. Intergraph Corporation. All Rights Reserved .

Project Data - Contractors 2014. Intergraph Corporation. All Rights Reserved .

Project Data – Construction Work Packages(CWPs) 2014. Intergraph Corporation. All Rights Reserved .

Project Data – Drawings to CommissioningSystems 2014. Intergraph Corporation. All Rights Reserved .

Project Data – Construction Resources 2014. Intergraph Corporation. All Rights Reserved .

Identified and Engage Key Stakeholders Executive Project ManagementProject ControlsIT Administration and SupportEngineering CoordinatorProcurement CoordinatorMaterials Coordinator (Corporate and Site)Construction PlannersConstruction SuperintendentGeneral Foreman and ForemanEquipment and Tools CoordinatorScaffolding CoordinatorField EngineeringProduct Owner 2014. Intergraph Corporation. All Rights Reserved .

Data Assessment Front End Engineering– P&IDs– Instrumentation– Electrical SchematicsDetailed Engineering– Civil– Concrete– Piling– Structural Steel– Hangers and Supports– Piping– Insulation– Modules– Mechanical– Cable Tray– Cables– Electrical and Instrumentation– Terminations– HVAC 2014. Intergraph Corporation. All Rights Reserved .

Procurement and Fabrication In House Developed Material Management SystemsSmartPlant MaterialsJD EdwardsSAPExcelOther Off the Shelf Systems 2014. Intergraph Corporation. All Rights Reserved .

IT Infrastructure Survey Operating Systems in PlayRelational Database Management Systems– Oracle– SQL Server– BothApplication Servers– SPF/SPC– SP Materials– PrimaveraClient Side– SPC Client– SPR– Office– Adobe– Internet ExplorerFast, Stable and Robust NetworkCloud Considerations 2014. Intergraph Corporation. All Rights Reserved .

SPC Architecture 2014. Intergraph Corporation. All Rights Reserved .

Engineering to Construction Handover: 3 ScenariosDesigndataDesigndataSPFBacks onSPF& SPCPublishPublished datain SPFRestores &retrievesdataEngineeringImportshandover& retrievesdataEngineeringDesigndataEngineering & ConstructionSPCSPC PublishDesigndataScenario 1:Scenario 2:Scenario 3:Handover to constructionDeliver design datato constructionUse published design data forin-house construction2 systemsUses SPE/SPO HandoverConstruction receives selecteddocuments 2014. Intergraph Corporation. All Rights Reserved . 2 systemsConstruction receives alldesign data and selectsrequired documents 1 system used by bothEngineering and ConstructionNot recommended

Level 1 – SP Construction Work Package Planning 2014. Intergraph Corporation. All Rights Reserved .

Level 2 - Define Construction Strategy - Project Configuration 2014. Intergraph Corporation. All Rights Reserved .

Level 2 – Define and Develop Work Packages 2014. Intergraph Corporation. All Rights Reserved .

Level 2 – Determine the Work Package Constructability Part 1 2014. Intergraph Corporation. All Rights Reserved .

Level 2 – Determine the Work Package Constructability Part 2 2014. Intergraph Corporation. All Rights Reserved .

Level 2 – Issue Work Package and Monitor Progress Part 1 2014. Intergraph Corporation. All Rights Reserved .

Level 2 – Issue Work Package and Monitor Progress Part 2 2014. Intergraph Corporation. All Rights Reserved .

Questions and Answers 2014. Intergraph Corporation. All Rights Reserved .

Thank You

SmartPlant Construction “Streamline Work Process” Jason Dubose Executive Business Consultant –Materials and Construction –Americas Region 2015 AWP