INSTALLATION AND OPERATION MANUAL - BoilerData

Transcription

INSTALLATION ANDOPERATION MANUALVSRT SeriesVertical Spiral-Rib Tubeless BoilerVIEW2Serial/ NationalBoard NumberModelFulton OrderOwnerSite NameUNLESS OTHERWISE NOTEDDIMENSIONS ARE IN INCHESTOLERANCESFRACTION &WHOLE VALUEDate 1/8 0.03(1) PLACE DEC. 0.015(2) PLACE DEC. 0.005(3) PLACE DEC. 0.5 DEGANGLESURFACE FINISH250 MICRO-INCHESThis design and drawingsare proprietary and are theexclusive property ofFulton Group N.A., Inc.The corporation does notThe items shown in thisdrawing may be covered byDRAWN BY:MECH. ENG:JOB NUMBER:CHECKED BY:ELEC. ENG:PROJECT NAME:B.O.M. REVIEWAPPROVED BY:PROJECT MANAGER:T. KENNEDY3/22/2017one or more patents ofFulton Group N.A., Inc.DESCRIPTION:VSRT-30 HIGH PRESSURE WITH LOW PRESSUREOPENINGS (150 PSI) MODULATED STEAM BOILERpermit their use exceptFulton Group N.A., Inc972 Centerville RoadPulaski, New York USA 13142DRAWING NUMBERwith prior written consent.THIRD ANGLE PROJECTION2 OF 2SHEET 2 OF 2VSRT IOM 2018-1213VSRT-30 SALES PDS2RR

Table of ContentsSection 1: Safety & Warnings.1-1Introduction. 1-2Receiving Inspection. 1-2General Warnings, Cautions and Notes . 1-2Steam Boiler Systems Warnings and Cautions . 1-6Section 2:Installation.2-1Product Overview. 2-2Massachusetts Installations. 2-2Placement & Rigging. 2-2Clearances & Serviceability. 2-2Equipment Ventilation & Combustion Air Requirements.2-16Utilities.2-17Electrical Supply.2-18Water Chemistry.2-18Steam Outlet.2-19Water Supply.2-19Piping Specifications.2-21Insulation.2-25System Interfaces.2-25Assembly of Fulton Multi-Skid Engineered Systems.2-28Stack & Flue Connections.2-28Venting Terminations.2-30System Piping Testing.2-31Before Leaving the Installation. 2-31Section 3:Section 4:Operation.3-1Start-Up Preparation & Installation Review. 3-2Start-Up Service. 3-2Prepare for Initial Start-Up.3-2.Perform Boil-Out. 3-2Sequence of Operation: Gas Fired Burners. 3-3Flame Programmers. 3-4Siemens Linkageless Modulation.3-4Commissioning the Unit. .3-5Operating Controls. 3-7Burner Settings. 3-7Pressure Modulation Controller. 3-7Cycle Testing.3-11Daily Start-Up. .3-11Daily Shutdown.3-11Maintenance & Troubleshooting.4-1Procedure for Cleaning Water Probes. 4-2Flame Scanner Adjustments for Fulton Gas Fired Steam Boilers. 4-2Recommended Daily Maintenance Schedule. 4-3Recommended Weekly Maintenance Schedule. 4-4Recommended Monthly Maintenance Schedule. 4-4Recommended Semi-Annual Maintenance Schedule. 4-5Recommended Annual Maintenance Schedule. 4-8After All Repairs or Maintenence. 4-8Assembly Drawings and BOMs. 4-8Troubleshooting .4-22

Section 5:Warranty.5-1Standard Warranty for Fulton Boilers. 5-3Extended Warranty for Fulton Skid Mounted Boilers. 5-3

SectionSafety & WarningsInstallationOperationMaintenance & TroubleshootingWarranty123451-1

1 - SAFETY & WARNINGSIntroductionReceiving InspectionPrior to shipment, the following inspections andtests are made to ensure the highest standards ofmanufacturing for our customers:The customer should examine the equipment for anydamage. It is the responsibility of the installer to ensureall parts supplied with the equipment are fitted in acorrect and safe manner. Material inspections Manufacturing process inspections American Society of Mechanical Engineers (ASME)welding inspection ASME hydrostatic test inspection Electrical components inspection Operating test Final engineering inspection Crating inspectionThis manual is provided as a guide to the correctoperation and maintenance of your Fulton equipment,and should be read in its entirety and be madepermanently available to the staff responsible for theoperation of the boiler. It should not, however, beconsidered as a complete code of practice, nor shouldit replace existing codes or standards which may beapplicable. Fulton reserves the right to change any partof this installation, operation and maintenance manual.Installation, start-up, and maintenance of thisequipment can be hazardous and requires trained,qualified installers and service personnel. Trainedpersonnel are responsible for the installation,operation, and maintenance of this product, andfor the safety assurance of installation, operation,and maintenance processes. Do not install, operate,service or repair any component of this equipmentunless you are qualified and fully understand allrequirements and procedures. Trained personnelrefers to those who have completed Fulton ServiceSchool training specific to this product.When working on this equipment, observe allwarnings,cautions, and notes in literature, on stickersand labels, and any additional safety precautions thatapply. Follow all safety codes and wear appropriatesafety protection. Follow all jurisdictional codes andconsult any jursidictional authorities prior to installation.1-2VSRT IOM 2018-1213General Warnings,Cautions & NotesThe following are general WARNINGS and CAUTIONS,which may also appear in various chapters of thismanual. It is critical that all personnel read andadhere to all information contained in WARNINGS andCAUTIONS throughout this manual. In addition, thereare bolded Notes throughout the manual, which areincluded as additional information for essential andeffective operation and conditions. WARNINGS must be observed to prevent seriousinjury or death to personnel. CAUTIONS must be observed to prevent damageor destruction of equipment or loss of operatingeffectiveness.!! WARNINGDo not operate, or allow others to operate, serviceor repair this equipment unless you (they) fullyunderstand all applicable sections of this manual andare qualified to operate/maintain the equipment.This boiler is equipped with an ignition device, whichautomatically lights the burner. Do not try to light theburner by hand.Prior to the commencement of any work requiring theremoval of cover plates and the opening of the controlpanel box, the electrical supply to the boiler must bedisconnected.Assure all electrical connections are powered downprior to attempting replacement or service of electricalcomponents or connections of the equipment. Ful

Vertical Spiral-Rib Tubeless Boiler Serial/ National Board Number Model Fulton Order Owner Site Name Date VSRT_IOM_2018-1213 VIEW2 DR AW IN G UM BE V V SRT-30 ALE PD 2 - VSRT-30 HIG H PRESSURE WITH LOW PRESSURE OPENIN GS (150 PSI) MODULATED STEA M BOIL ER AW BYD ES CR IPT ION: T.K EN DY CH EC KE DB Y: B. OI ME CH .N G: ELE C. EN G: AP D BY: 2 JOB NU