A Winding Road: Building aSustainable Sanitary SewerStream Crossing in EmergencyConditionsAPWA Mid-Atlantic ConferenceVirginia Beach, VAMay 10, 2013

OutlineBackground Site Conditions Immediate Response Temporary Solution Permanent Solution Construction Questions

Background – LocationDCFairfaxCountyAlexandria

Tropical Storm LeeFairfaxCountyDCAlexandria

Tropical Storm Lee The HolmesRun Crossing saw 8-10inches of rain Parts of Fairfax County received over5 inches of rain in 5 hours Rainfall equated to 500-1000 yearstorms in parts of Fairfax County

OutlineBackground Site Conditions Immediate Response Temporary Solution Permanent Solution Construction Questions

Before LeeNeighboringUtility SewerFairfaxCountySewer

After dSewer

Site Conditions (After Lee)County 36”EncasedConcreteSewerWeir ApronLow Flow weirCut into DamConcrete Damwith Z-pile

Apron Void

Causes for Damaged Pipe Large highintensity flows in HolmesRun Scour caused by high flows Earthquake?

OutlineBackground Site Conditions Immediate Response Temporary Solution Permanent Solution Construction Questions

Immediate Response By passpumping in place within 48hours of discovery of the break Emergency Contractors Adjustment of weir boards in anupstream flow structure Working with neighboring agencies tocoordinate pumps and response

Pumps Silent pumps to limit disturbance to surroundingcommunity24 pump monitoring to prevent overflowsHigh Cost

OutlineBackground Site Conditions Immediate Response Temporary Solution Permanent Solution Construction Questions

Temporary Solution On landconnection to the adjacenttrunk sewer The connection is suitable dryweather and smaller wet weatherstorms Allowed for time to design a long termsolution

Connection to Adjacent SewerNeighboringUtility SewerFairfaxCounty SewerNew SewerDamagedSewer

Temporary Structure Features Canal Gate PipeSlope

OutlineBackground Site Conditions Immediate Response Temporary Solution Permanent Solution Construction Questions

Permanent Solution Drop Manhole Micropiles Structural Steel Protecto 401 StreamBank Protection Stream Restoration

Permanent Crossing OverviewNeighboringUtility SewerFairfaxCounty SewerNew SewerNew Manhole

Drop Manhole Lowers the elevation ofthe pipe in the streamAllows for better pipeprotection and armoring

Micropiles 14 micropiles in 7 pairsCore reinforcement,steel casing, groutDrilled intodisintegrated rockDrilled and not driven toprotect the weir andstream

Structural Steel Gussett PlateLacingTransversal beamLongitudinal BeamsCradle Stiffener PlateBents

Pipe and Protecto 401 36”Diameter Ductile Iron Pipe Protecto 401 Liner Selected

Stream Bank Restoration Coir Block Soil Lifts at Construction entrances

Stream Restoration Upstream and Downstream of the Weir ApronReinforced Bed MixtureStream Base FillImbricated Rock

Stream Restoration Downstream

Low Flow Weir Cut Out

OutlineBackground Site Conditions Immediate Response Temporary Solution Permanent Solution Construction Questions

Construction PortaDam Goose

Porta Dam

Porta Dam

Porta Dam

Dry Site

Dry Site

Goose on Site

OutlineBackground Site Conditions Immediate Response Temporary Solution Permanent Solution Construction Questions

Acknowledgements Jonathan OkaforJonathan.okafor@fairfaxcounty.govThomas J. RussellThomas.russell@fairfaxcounty.govSam ShaikhSam.shaikh@fairfaxcounty.govBrendan SchilloBrendan.schillo@fairfaxcounty.govKen Eyrekeyre@greeley-hansen.comGary Ferrantegferrante@greeley-hansen.comEd Gerulategerulat@greeley-hansen.com Mike Pekkalampekkala@greeley-hansen.com Clyde Wilbercw@clydewilberllc.comCarlos Englertcenglert@schnabel-eng.comQamar Kazmiqkazmi@schnabel-eng.comMohammad Nasimmnasim@schnabel-eng.com

Questions

Fairfax County Sewer Damaged Sewer . Site Conditions (After Lee) County 36” Encased Concrete Sewer Concrete Dam with Z-pi