PRODUCT BROCHURE DRILLING - Huisman Equipment

Transcription

PRODUCT BROCHUREDRILLING

DRILLINGCONTENTABOUT HUISMAN04WELL INTERVENTION24General 24GENERAL INTRODUCTIONMULTI PURPOSE TOWER0608Layout 08Hoist System 09Heave Compensation 10Installation and Commissioning 11HUISMAN INNOVATION TOWER 14OFFSHORE DRILLING16Drillships 16Bully Drillships 18Globetrotter Drillships 18HuisDrill 12000 19Semi-submersibles 20Huisman Innovation Tower2Arctic S 22Rotating Cantilever 23Open Water System 25Riser Based System 26MODULAR RIGS28ONSHORE DRILLING30LOC 400 30INNORIG series & HM150 rigs 30

01We are Huisman. We design, manufacture and service heavy construction equipment for theworld’s leading companies in the renewable energy, oil and gas, civil, naval and entertainmentmarkets. Our products range from Cranes, Pipelay Equipment, Drilling Equipment andWinches, to Vessel Designs and Specials.The history of Huisman is one of setting new industry standards. Of making impact, since 1929.With step changing technical solutions that vary from stand-alone to highly engineered integratedsystems. From concept to installation and lifetime support.In these times of transition, our passionate workforce and worldwide production, service & salesfacilities make us equipped for impact.Active in 6 MarketsOffshore windCivil worksSalvageLeisure2500 Operating203 vesselsemployeesfrom 7are equippedworldwidelocationswith our productsPeople4GeothermalOil and gasenergyTrack record5

DRILLINGGENERAL INTRODUCTION02Huisman has been designing and building equipmentfor the offshore drilling market for over 20 years. InitiallyHuisman delivered cranes and pipe handling equipment,but with the development of the Multi Purpose Tower(MPT) in the late 90’s, Huisman has created the meansto drastically reinvent offshore drilling and equipmenthandling. What started off with the delivery of riser andpipe handling equipment, has evolved into the design anddelivery of two state of the art UDW drilling vessels, the‘Noble Globetrotter I’ (2012) and the ‘Noble GlobetrotterII’ (2013). After delivery of these vessels, Huisman furtherdeveloped the design, demonstrated at the HuismanInnovation Tower, a 90m high test drill tower at theHuisman Schiedam quayside.In 2005 Huisman introduced its first land drilling rig to themarket: the LOC 250. This is a fully containerised super singledrilling rig for use on land and offshore. The introduction wassoon followed by the LOC 400. A new range of land rigshas been developed in close cooperation with the market,outperforming peers on rig move and pipe running speeds.These rigs combine performance with automated hands freepipe handling.In addition to on- and offshore drilling, Huisman also suppliesequipment for the well intervention market. With the everincreasing number of subsea wells the need for efficient meansof well intervention is growing every day. Huisman has alreadydelivered several well intervention systems.Huisman is continuously exploring and realising new stepchanging solutions to improve drilling operations. The Huismandrilling systems can reduce the flat time, by doubling thetripping speed. Moving forward, the focus point is to furtherimprove efficiency and reduce HSE risks, by fully automatingthe drilling system. Currently the rigs are already able to trip inand out of the hole fully automated, without the need of anypeople on the drill floor.2x 1,090mt Dual Multi Purpose Towers,Noble Globetrotter I, Noble Drilling67

DRILLING03MULTI PURPOSE TOWEROne of the most distinct features of the Huisman drillingoperated by Noble Drilling. In new designs the capacity can becenter the DMPT is equipped with a pipe racker systemsystems is the Multi Purpose Tower (MPT). The concept of theincreased to 3.6mln lbs.consisting of up to 16 manipulators. On each corner of theMPT is based on the use of a vertical box structure instead ofDMPT up to 4 manipulators are mounted between the wellthe traditional lattice structure typically applied for derricks. TheLAYOUTcenter and the setback drum. The manipulators can be utilisedbox structure provides both the main load carrying elementThe DMPT has two hoist sides; the main hoist side above theto transport pipes vertically from the setback drum to the welland an enclosed environment for the mounting of all majordrill floor and the construction hoist side above the constructioncenter (and back). It moves up and down by rack and pinionequipment.floor. With the two hoists many of the drilling activities canand can rotate and extend to the well center or setback drum.be performed simultaneously, which increases efficiency. TheThe MPT has the same functionality as a normal derrick, butmain hoist provides direct access to the drill floor and is usedThe equipment is located inside the MPT, offering goodoffers improved accessibility to the well centres, which allowsfor drilling operations. The construction hoist is generally onlyprotection from the harsh marine environment. It also providesfor new improved handling procedures that increase efficiencyused for heavy offline activities. Both hoist sides have their owna safe environment for maintenance.and safety. The MPT was designed and introduced to theindependent hoist systems.HOIST SYSTEMmarket in the late 90’s. This first MPT was installed in 2001 onthe Helix well intervention vessel Q4000.The DMPT is equipped with two circular setback drums forThe hoist system of the MPT is fully enclosed by the tower. Itvertical pipe storage. Each drum revolves around its centrehas active and passive heave compensation and is equippedOver the years the MPT has evolved through several stagescolumn to provide access to all pipe slots. The revolvingwith dual drum drawworks and splittable blocks to increaseinto the 2.4mln lbs Dual Multi Purpose Tower (DMPT) that issetback drums are mounted directly next to the DMPT. Toredundancy and efficiency.featured on the UDW drilling vessels Noble Globetrotter I and IItransport pipes vertically from the setback drums to the wellDual drum drawworksThe dual drum drawworks comprise two hoist winches eachholding one end of the drill line. The drill line is reeved from onedrum, over the passive heave cylinders, through the crown andtravelling block, and onto the second drum. This configurationreduces the overall line speed with a factor two and providesfull redundancy; if one winch fails the other winch can stilloperate the travelling block at full load, but at half the originalspeed.To reduce wire fatigue, the complete drilling line can betransferred continuously from one drum to the other, exposinga different part of the wire to a fatigue sensitive location (e.g.a sheave). This continuous wire transfer can be pre-set by theoperator and won’t affect normal operations.Splittable blocksThe travelling block is equipped with Huisman’s patentedsplittable travelling block. This splittable block comprises anumber of detachable sheaves which allow the reeving ofthe block to be changed without having to re-reeve the entiresystem. Splitting of the blocks is a push button operation andallows the operator to switch from 24 to 20, 16, 12, 8 or 4 fallsin just minutes. Splitting the blocks from 24 to 4 falls reducesthe hoist capacity, but increases the hoist speed with 600%.Traditional look8Functional lookNew lookSingle MPTDual MPT9

DRILLING03MULTI PURPOSE TOWERHEAVE COMPENSATIONPassive heave compensationINSTALLATION AND COMMISSIONINGAfter the testing and commissioning phase the DMPT canThe passive heave compensation system provides the controlSince the DMPT is a single integrated unit that houses allbe installed with one single lift onto the vessel, significantlyActive heave compensationneeded for extended periods of operation. The systemequipment, the interface with the vessel is greatly simplified. Inreducing the time that the vessel has to stay at the quayside.The active heave compensation system was developed frombalances the weight of the drill string, allowing for the heavecombination with the Huisman substructure, that houses theThis integrated approach allows for simultaneous production ofexisting and proven technology fitted on many Huisman cranesof the vessel. The passive heave compensation is done bycomplete drill floor, drilling switch board, HPU, controlthe equipment at Huisman and the vessel at the shipyard.and other Huisman equipment. The active heave compensationtwo hydraulic cylinders that are integrated in the hoist system.cabin and riser tensioners, the DMPT can be fully tested andIt also reduces the number and complexity of the interfacesis achieved through the automated control of the electricalThese hydraulic cylinders are pressurised by nitrogen pressurecommissioned on our quayside.between the vessel and the equipment, which reduces themotors of the drawworks. The vessel motions are measured byvessels. The wire from the drawworks is spooled over sheavesa Motion Reference Unit (MRU) and sent to the control systemon the cylinders, whereby the cylinders act as springs. Whenof the fast response winch drives. The use of a real time signalthe vessel moves up or down the cylinders keep the wiremeans that the system does not have to rely on any wave orunder tension, thereby compensating the vessel motions. Themotion prediction method.nitrogen pressure vessels that provide the back pressure for theinstallation and commissioning time.cylinders are located inside the tower.FEATURES DUAL MULTIPURPOSE TOWER Box girder structure Free access to drill floor(s) (no V-door) Dual activity Dual active heave compensated winches Dual passive heave compensated cylinders Splittable blocks No slip and cut Single lift installation Small footprint Low center of gravity Equipment inside MPTDual drawworks inside Huisman Innovation Tower (HIT)1011

DRILLING03MULTI PURPOSE TOWERDUAL MULTI PURPOSE TOWERName of units: Noble Bully I & IIMULTI PURPOSE TOWEROwner: Noble Drilling / ShellName of unit: Well EnhancerDelivery: 2009, 2010Owner: Helix Energy SolutionsDelivery: 2009 1,090mt, 16 falls, splittableblocks 150mt, single fall, 3,000m 545mt, 8 falls, fixed blocksSubsea installation and open 4x pipe rackerwater intervention 2x setback drumDUAL MULTI PURPOSE TOWERName of units:Noble Globetrotter I & IIMULTI PURPOSE TOWEROwner: Noble DrillingName of units: Q4000, Q7000,Delivery: 2011, 2013Siem Helix 1, Siem Helix 2Owner: Helix Energy Solutions Delivery: 2001, 2016122x 1,090mt, 16 falls, splittableblocks 4x pipe racker 800mt, 12 falls, splittable blocks 2x setback drum Drilling and riser based Topdrive storageintervention Hoistable construction floor13

DRILLING04HUISMAN INNOVATION TOWERThe Huisman Innovation Tower (HIT) is a 90m high drilltower, capable of handling 55m (180ft) stands and 46m(150ft) riser and with the ability to simulate dynamicalvessel movements. The HIT is located at the HuismanSchiedam quayside.PURPOSE:¡ Demonstration of equipment¡ Full scale testing including dynamics¡ Testing of automation / robotics¡ Training of operators¡ Pre-commissioning of equipment¡ Development of future equipment¡ Load testing of parts¡ Future downhole testingAutoslipFEATURES HUISMAN INNOVATION TOWER Robotic autotriping at 5600 ft/hr 3.6mln lbs (1,630mt) rated load Dual draw works / splittable blocks Active / passive heave compensation systems Up to 180ft stands Full scale setback drum Up to 8 multi purpose manipulators Open drill floor construction to allow installationof several types of rotary tables and / or hang-offequipment Drill floor 6m above ground level Total height approximately 88m Test well:- Ø 118” down to 50m- Ø 20” down to 400mManipulators1415

DRILLING05OFFSHORE DRILLINGHuisman offers complete drilling packages and isdedicated to explore and realise new solutions to improvedrilling operations. Our projects are typically complex andinnovative, requiring solution-aimed thinking, technicalexcellence and partnerships with our clients. This hasalready resulted in a number of new value-adding solutionsand orders for innovative and technically challengingdrilling equipment sets.DRILLSHIPSHuisman has in-house vessel design capabilities. This allowsus to provide solutions in which vessel and equipment are fullyintegrated. The main feature of Huisman’s drillship design is theDual Multi Purpose Tower (DMPT) and the reduced height of thedrill floor. By changing the way the BOP is deployed Huismanwas able to significantly lower the position of the DMPT and drillfloor on the vessel.This improved the vessel stabiliy and increased the efficiencyand safety on board. Designing both vessel and equipmentallows for optimisation of the entire drilling unit. The result isa more compact drilling vessel compared to drillships withequal capacities and, therefore, lower building costs and loweroperational costs.2x 1,090mt Dual Multi Purpose Towers,Noble Globetrotter I, Noble Drilling1617

DRILLING05OFFSHORE DRILLINGBULLY DRILLSHIPSGLOBETROTTER DRILLSHIPSHUISDRILL 12000flows on board are a top priority. The design of the vesselIn the first half of 2007 Huisman was awarded a contract forThe innovative Noble Globetrotter drillships, based onAfter the delivery of the two Noble Globetrotter vesselsis made to optimally accommodate the drilling process.the design and manufacturing of the drilling tower and relateda Huisman design, represent a true stepchange in theHuisman further developed the design. This resulted inpipe, riser and BOP handling equipment for the Noble Bully I.construction of ultra-deep water drillships. The vessels offerthe HuisDrill 12000. The HuisDrill 12000, as designed withThese changes in the design result in a vessel size thatThe order for the outfitting of a second vessel followed in 2008.improved operational efficiency due to the different equipmentHuisman’s DMPT technology and unique constructionis 216m x 39m with a maximum VDL of 30,000mt. DWOPsIn 2013 and 2014 Bully I & II respectively were awarded ‘Shelllayout. Designing both vessel and equipment allows formethodologies, exceeds many of the capabilities of competinghave shown that the vessel can deliver wells in 75 - 80% offloater rig of the year’. The Noble Bully drillships are designedoptimisation of the entire drilling unit. The result is a moredrillship designs. The Huisman approach results in severalthe time compared to other state of the art units.to offer a lower cost and more flexible alternative for drilling incompact drilling vessel.functional and operational advantages.The design is possible because of three radically differentThe vessel has a large unobstructed work deck forward andFEATURES HUISDRILL 12000Besides the drilling mast, Huisman also delivered all drill pipefeatures, namely: a DMPT, a hoistable floor and the engineaft of the tower that is flush with the drill floor. All ventilation, Compact vesselhandling equipment, the riser tensioning system, the riserrooms under the accommodation. The DMPT has no V-doormooring, access ladders and mob-boats are located below Dual Multi Purpose Towerhandling cranes, both deck cranes and the driller’s cabin. Thislimitations and a small footprint. It is possible to skid the BOPthis work deck. The vessel is equipped with 150ft risers Drill floor flush with deckincludes all power systems and an integrated control system,underneath the floor when it is hoisted and then lowered onminimising the time for running risers. Aft of the tower is a Movable floorwhich also controls third party equipment.the construction side. The BOP is then skidded from the aftunique movable construction floor which allows running of Riser storage in hullto the forward well center by means of a skid cart that moveslarge subsea components in one piece. Automated pipe handling Riser tensioner systemThe drilling unit is optimised as a whole. The design of the High payload / displacement ratiodrilling package, the functionality thereof and the material Engine rooms under accommodation blockultra-deep and arctic conditions.along the moon pool under the substructure.1819

DRILLING05OFFSHORE DRILLINGSEMI-SUBMERSIBLESThe drill floor, in the center of the rig, can be raised and lowered.In the mid 90’s Huisman was involved in the design of theIn the lowest position the drill floor is flush with the main deck ofPride Amethyst 2 class semi-submersible drilling rig. Thethe unit, enabling easy mobilising of equipment. When the floor issemi-submersible has a unique Huisman designed vertical riserraised, the floor can compensate for the vessel’s heave motion.storage. Four semi-submersible units were built according to theThe heave compensated floor enables that tubulars are alwaysHuisman design, including Huisman built riser handling cranesheave compensated (by either the heave compensated travellingand offshore cranes. The gained experience is continuously usedblock or the heave compensated floor). This significantly reducesin the design of complete drilling semi-submersibles.downhole surge and swab pressures, enables MPD on floaters inheavy seas, enables running of completions with control lines inThe innovative harsh environment semi-submersible drilling unitheavy seas and enables easier and faster coring.features a very large free deck area, approximately 1,5 times thedeck space available on other semi designs. There is no largeDue to the MPT and the heave compensated floor, the handlingaccommodation superstructure since the accommodation isprocedure of the SSBOP and X-mas trees is changed resultingcompletely fitted inside the deck box. The robotic Multi Purposein a complete elimination of the substructure. This lowers theTower (MPT) outfitted with manipulators and setback drum isvertical center of gravity and increases the stability of the unitfitted on top of the deck box. On the aft deck of the unit anresulting in a high payload / displacement ratio.automated container skidding system is present, to enable fullhands-off handling of containers with tubulars and other goods.The unit can be equipped with thrusters to have DP3 capability,This improves the safety of the rig and reduces the requiredan anchoring system or thruster assisted mooring.people on board.2x 820mt DMPT Drilling Semi-Submersible20Harsh Environment Semi21

DRILLING05OFFSHORE DRILLINGARCTIC SROTATING CANTILEVERThe Huisman designed Arctic S enables operations at twoWhen operating in ice the unit will ballast to ice draft (partlyThe Rotating Cantilever is designed for efficient operations.operating drafts. The unique design combines the advantagessubmerged deckbox) to protect the riser against level ice,By rotating the cantilever as opposed to skidding itof a conventional semi-submersible resulting in very lowrubble and ice ridges. The round conical shaped deckbox hastransversely, the cantilever has a large drilling envelopemotions in waves and a heavily strengthened ice resistant unita heavily strengthened structure at waterline level to deflectwithout sacrificing deck space. Especially the transversalwhen operating in ice at deep draft.and break the ice. The round floater is also strengthenedreach has more than doubled with respect to all existingfor transit through broken ice (icebreaker assisted). Whendesigns. It further eliminates the need for a transverseThe Arctic S drilling unit is designed to drill wells in arcticno ice is present the unit operates at its operating draft asskidding substructure on top of the cantilever or transversalconditions, moored in ice infested waters with ice thicknessa conventional semi-submersible unit. Station keeping inskid rails on the main deck. A variety of setups for theup to approximately 1,0 - 1,5m. Depending on ice conditions,ice infested waters is achieved by a heavy 16-point mooringdrilling equipment can be mounted on top of the cantilever,ice breaker support can be required. The unit consistssystem. The unit can operate in water depths between 50depending on the specific requirements. Features such asof a round floater, eight columns and a round deckbox.and 1,500m. If required the design can be customised tooffline standbuilding, offline building and handling of X-masset the unit on the seabed in shallow water.trees, coiled tubing operations etc. can be incorporated.2223

DRILLING06WELL INTERVENTIONWell intervention and workover operations are performedsurface equipment heaves up and down with respect to theOPEN WATER SYSTEMfor maintenance purposes to keep production levels up,deck. Downhole tools may be lowered through the riser onThe Huisman open water intervention system is based onbut also to get reservoir information and sometimes towireline, slick line or coiled tubing.a 150mt single fall MPT that provides a single lift point overchange out entire X-mas trees. Well intervention operationsa moonpool. The tower’s heave compensated hoist systemrepresent a large portion of the total field development cost.GENERALcan safely deploy modules to water depths up to 3,000m.Therefore reducing these cost significantly increases theTo serve both the open water and the riser based wellTwo trolleys, travelling the entire length of the tower, guide thefield economics. Up until now, most of the intervention workintervention markets, Huisman has developed two separatelifting hook and the subsea modules during lifting operations.has been performed by large expensive drillships and semi-systems. Both systems are based on the Multi Purpose TowerDepending on the vessel design, the lower trolley can travel allsubmersibles. By performing the well interventions from(MPT) which is responsible for all vertical movement of thethe way down into the moonpool to the vessel base to safelyspecialised dedicated vessels, the workover cost can beequipment on board. The MPT has the same functionality asdeploy subsea equipment through the moonpool.significantly reduced and the HSE improved. In the industrya normal derrick, but offers improved accessibility to the wellthere is a clear difference between ‘open water’ and ‘risercenters, which allows for new improved handling proceduresTypical applications for the open water system include:based’ intervention. Downhole tools may be lowered onthat increase efficiency and safety. The superior accessibility¡ Wire line and slick line servicesslick or wireline to perform logging, plugging, perforating, etc.to the well center and small footprint of the MPT are ideally¡ X-mas tree installationFor riser based intervention a high pressure riser is used assuited for well intervention and subsea installation services.¡ Plug and abandonmenta conduit between the seafloor and the vessel. Since theSubsea equipment can be skidded into the well center from¡ Subsea deploymentriser is high pressure, there is no telescopic joint and so thethree sides, giving the operator optimal flexibility.FEATURES OPEN WATER SYSTEM24 Multi Purpose Tower – SWL 150mt Active and passive heave compensation Deployment capability of up to 3,000m Guide and pod wire system Guide trolleys Accessible from three sides Small footprint of tower Flush deck Skidding of all intervention equipment Single lift installation25

DRILLING06WELL INTERVENTIONRISER BASED SYSTEMhandling of heavier riser and extended water depth capability.Huisman’s 800mt Multi Purpose Tower is perfectly suitedTo improve logistics and equipment handling on deckfor riser based well intervention. The unique passive heaveHuisman also supplies pipe handling equipment and deckFEATURES RISER BASED SYSTEMcompensated hoist system of the MPT provides safe andskid systems. The modular nature of these systems combined Multi Purpose Tower – SWL 800mtredundant means to supply top tension to the riser. The railswith the small footprint and excellent accessibility of the MPT Active and passive heave compensationon the MPT are extended into the moonpool allowing theallow for an almost infinite number of system variations and Splittable blocksguide trolley to travel with the load during the deployment.deck layouts. With these tools Huisman can provide efficient Accessible from three sidesFor ultra-deepwater operations or operations in harshand safe solutions for both monohulls and semi-submersibles. Hoistable drill floor Flush with main deckenvironments the passive heave system of the MPT can beupgraded to double capacity. With this upgrade the maximumTypical applications for the riser based system include: Offline storage for riser tensioning ringheave stroke of the system is doubled.¡ Wire line and slick line services Deck skid system¡ Coiled tubing services No unguided lifts during riser installationInstead of the passive heave compensation upgrade Huisman¡ Coiled tubing drillingalso provides riser tensioner systems that can be added¡ Through tubing rotary drillingto further extend the system capability. The riser tensionersystem will allow a broader range of operations and allows2627

DRILLING07MODULAR RIGSThe oil and gas exploration and production industry is currentlyLOC400 with a higher hook load capacity and the ability toAUTOMATIONfacing the challenge to commercially exploit unconventionaldrill deeper wells. To meet today’s demand for faster, moreThe rigs are designed to move people out of harms way.resources, requiring large amounts of wells to be drilled inflexible operations in unconventional plays, Huisman hasThe high degree of automation, including automatedFEATURES MODULAR RIGSareas that have traditionally not always been exploited. As ataken the lessons learned from their previous modular rigs andconnections and automated tripping, substantially removes High automated tripping speedsresult, drilling will need to be executed under stricter safety,redesigned them into a new serie of modular rigs.people from the drill floor during most operations and minimises Auto drillerhuman involvement during other operations. Due to the high Fast rig movesMulti pad drillingtransportation, and environmental regulations. Furthermore,the well cost will need to be lower for the resources to beREDUCTION OF FLAT TIMEgrade of automation, a limited crew is needed. It is no longer exploitable.Huisman’s drilling rigs are designed to reduce flat time on anynecessary to have a crew on the drill floor during the Double drum drawworksSplittable blockswell. Reduction of flat time includes extremely quick rig moves,process. The driller oversees the operation from the cabin Huisman’s first land drilling rig, the LOC250 was firstlyoffline testing of BOPs, incorporation of all sensors in rig designand can intervene at any time when necessary. During Rig walking systemintroduced in 2005, was designed to take advantage ofto reduce third party equipment, casing running equipmentautotripping, tripping in and out of the hole can be done Independent backyardEmerging Casing While Drilling technology in order to reduceincluded with rig package, efficient autodriller with very accuratewith low physical interference of the driller. The autotrip Craneless rig upthe cost as well as the environmental impact of drilling a well.weight on bit and one size fits all pipe handling. This results infunction continues its cycle while guarding certain parameters Integrated Huisman mpd (option)After a few years the demand for deeper / horizontal wellsrigs that reduce unseen downtime, as less time is spent waitingsuch as hook load and safety interlocks.triggered the development of the LOC250’s successor: theand paying for third party equipment.2829

DRILLING08ONSHORE DRILLINGLOC400rigs can easily be built up and moved quickly between wells,Two of the most important features of the LOC are its compacteither between single locations, or multiwell pads. The HM150size and the possibility to break down the entire rig into 19rig is fully trailerised and can be moved within a few hours. Themodules with the dimensions of standard ISO containers.modular InnoRig 250 is made for fast rig moves and easy rig up.The InnoRIg XL is designed for maximum efficient operations,Since the standard ISO containers can be transported quicklycharacterised by high automated trip speeds of 4,000ft / hr,and economically by any container ship, train, or truck, the LOCfast connections, large setback capacities and integrated casingcan be used to drill wells anywhere in the world. Transportationrunning.cost between worldwide locations are no longer an issue. Thecraneless rig up procedure and standard road transportableThe rigs can be delivered with a walking system to enablemodules further reduce human exposure during the activitiespad drilling. Due to the open substructure, wells can bewith the most risk and lower the time required for mobilisation.easily approached. For land applications, the craneless rigThe LOC is a highly automated rig built for quick rig moves andup procedure and easy transportable modules further reducehigh performance drilling through high automation.human exposure during the activities with the most risk andlower the time required for mobilisation. Offshore, the rig can beINNORIG SERIES & HM150 RIGSinstalled in a few loads, minimising installation time. The modularThe Huisman modular rigs are designed to better fit the needsrigs are specifically designed for the development of todays andof a drilling rig in modern land and offshore applications. Thetomorrows unconventional resources.HM60, HM150, Innorig C400, Innorig L60, Innorig XL90/120FEATURES LOC400FEATURES INNORIG Small footprint Auto drilling and tripping Auto drilling and tripping Small modules Very quick rig moves Multi pad drilling Splittable blocks Double drum drawworks Splittable blocks Rig walking system Independent backyardInnoRig XL 9030HM60 Workover Rig31

HUISMANAdmiraal Trompstraat 23115 HH SchiedamP.O. Box 1503100 AD SchiedamHarbour no. 51The NetherlandsEmail: Phone: 31 (0)88 070 22 22

market: the LOC 250. This is a fully containerised super single drilling rig for use on land and offshore. The introduction was soon followed by the LOC 400. A new range of land rigs has been developed in close cooperation with the market, outperforming peers on rig move and pipe running speeds.