Buildings DepartmentPractice Note for Authorized Persons,Registered Structural Engineers andRegistered Geotechnical EngineersAPP-13Submission of Certificate of Completion of Building Works,Application for Occupation Permitand Submission of Record Plans and InformationSubmission of Certificate of Completion of Building WorksUpon the completion of building works, a certificate of completion ofbuilding works not resulting in a new building (Form BA14/14A and/or Form MW02/04)or resulting in a new building (Form BA12/13) should be submitted in accordance withregulation 25 of the Building (Administration) Regulations (B(A)R). While there is nostatutory time limit under the Buildings Ordinance (BO) for processing such certificates,the Buildings Department (BD) will generally provide a reply to Form BA14/14A within28 days, advising the acceptance of the completed works or the outstanding issues to berectified. As a certificate of completion of new buildings and application for anoccupation permit (OP) are usually submitted together in Form BA12/13, they will beprocessed together within 14 days in accordance with section 21 of the BO.2.If the same contractor is employed for both the foundation works and thesuperstructure works for a new building or in the alteration and addition (A&A) works toan existing building, where spread footing foundation with excavation depth notexceeding 4.5m is adopted, the certification of completion of both the spread footing andsuperstructure works in such cases may be made in the Form BA12/13 or a single FormBA14, as the case may be, and a separate Form BA14 for completion of the spread footingworks is not required.Simultaneous Submission of Amended Building Plans and Application for OP3.A Form BA12/13 is sometimes submitted at or about the same time as thesubmission of amended plans for approval. This would complicate the processing of anapplication for OP. In line with the declaration in the Form BA12/13 that the new buildinghas been erected in accordance with the plans approved, the Building Authority (BA)takes the view that the authorized person (AP)/registered structural engineer (RSE)/registered geotechnical engineer (RGE) should submit and secure approval of amendmentplans in advance of an application for OP. The exception is that minor positionaldeviations from the approved plans which do not contravene the BO and its subsidiaryregulations may be acceptable.Submission of Record Plans4.Where several alterations have been made to the original design, the BAmay require, under regulation 46 of the B(A)R, the submission of “new plans” showingthe building as completed./5.

-2-5.For those projects (including A&A works) with approved amendment plans,the AP should submit a set of general building plans when applying for OP and submittingForm BA14 for A&A works, amalgamating all the plans approved by the BA and therebyrepresenting the building/A&A works as completed. Each of those plans should beareither the signed and dated approval chop applied by the BA or a chop giving the AP’spersonal certification of the plans being identical to those approved by the BA on the datespecified. To limit the volume of paper and encourage paperless submission, the BAwould accept record plans in hard copy photographically reduced to not less than a ratioof 1:200 or soft copy in DVD-ROM format 1 as an alternative to the conventional hardcopy.6.approved.Record plans should not contain any amendments which have not been7.In addition, the Rating and Valuation Department (RVD) has requested thatfor all newly completed buildings and completed A&A works, one set of record plans besupplied to them for rating purposes. As record plans are now mostly produced fromcomputer software such as AutoCAD or Microstation which could effectively shorten theprocessing time and assure the accuracy of the valuation work of RVD, AP areencouraged to submit a DVD-ROM containing the softcopy of the record plans inAutoCAD or Microstation format and marked “DVD-ROM containing plans for RVD”on the cover in addition to the required paper copy for BD’s onward transmission to RVD.RVD has committed that the record plans will only be used for relevant rating purposesand will not be released to other Departments or parties.Submission of Schedule of Building Materials and Products8.Under the BO, AP, RSE, RGE and the registered contractor (RC) haveresponsibilities to supervise building works including the selection and application ofbuilding materials and to certify compliance with relevant provisions of the BO uponcompletion of works. To expedite the processing of an application for OP, the BA requiresthe submission of a schedule under regulation 44 of the B(A)R, confirming the use ofaccepted building materials and products in construction.9.The schedule should be submitted with an application for OP. The APshould confirm and certify in the schedule that the application and performance ofbuilding materials and products are in compliance with the relevant provisions of the BOand its subsidiary regulations and the RC should confirm the use of those buildingmaterials and products in construction. Except for regularly used building materials, theschedule should cover all materials and products not specified on the approved plans, theapplication of which would involve the structural integrity and fire safety of the building,and the cast iron pipes and fittings as stipulated in Practice Note for Authorized Persons,Registered Structural Engineers and Registered Geotechnical Engineers/(PNAP) 1The DVD-ROM should be non-rewritable in ISO/IEC 13346:1995 format containing soft copiesof the record plans/documents in appropriate format which are searchable (where applicable)and properly indexed in accordance with Appendix H. Essential information, including (i) BDfile reference number, (ii) project title and address, (iii) name of AP, (iv) AP’s declaration: “Ideclare that the information in this disc is true and correct, and the disc has been finalised”, and(v) disc number together with the AP’s signature should be provided on the cover of the disc.

-3-(PNAP) APP-133. Where appropriate, a schedule should be submitted on completion ofA&A works not resulting in a new building or minor works. Sample schedules forbuilding works and minor works are provided at Appendices A and B respectively.10.As an alternative to accepting test and assessment reports in the schedule,the BA will accept valid certificates of conformity of fire rated doorsets andnon-loadbearing partition walls issued by the accredited certification body in accordancewith the Product Conformity Certification Scheme as promulgated in paragraph 4 ofPNAP APP-165.11.Where the building works involve the installation of fire dampers, the firedampers may be installed by the registered general building contractor (RGBC) of theproject and a registered specialist contractor in the ventilation works category (RSC(V))appointed for such purpose. Furthermore, under the Minor Works Control System,erection or alteration of a fire damper in a ventilation system of an existing building isdesignated as minor works, which may be carried out under the simplified requirementsas an alternative to obtaining approval and consent under the BO. Reference can be madeto Schedule 1 of the Building (Minor Works) Regulation and PNAP APP-147respectively.12.For fire dampers installed by RGBC/registered minor works contractor(RMWC), a RSC(V) should be engaged to inspect and certify that the fire dampers are insafe and efficient working order pursuant to Clause E8.3 of the Code of Practice for FireSafety in Buildings 2011. For fire dampers installed by RSC(V), the same RSC(V) couldinspect and certify the fire dampers. The AP/RMWC in submitting the certification onfire dampers should include an inspection certificate on fire dampers by RSC(V).Submission of Structural Documents13.When giving approval of foundation or structural plans, the BA may imposecertain conditions and requirements under the BO and its subsidiary regulations. Theseconditions and requirements may include the submission of structural documents, such asmaterial testing reports, mill certificates, method statements of tests, construction records,compliance certificates, foundation record plans, foundation reports, monitoring records,and quality assurance and quality control documents within specified time frames. It isthe RSE's duties and responsibilities to ensure that these structural documents aresubmitted to BD in a timely manner.14.RSE should keep track of the submission status of the required structuraldocuments and submit summary tables of approved foundation and structural plans andthe required structural documents (samples are at Appendices C and D) at half-yearlyintervals and at completion of the foundation works and OP application respectively.15.To facilitate the processing of Form BA14 upon completion of thefoundation works, RSE should include a summary table of the as-built information offoundation works (samples are at Appendix E) in the foundation report./Submission

-4-Submission of Building Related Documents16.To ensure all essential works and procedures have been completed and allrequired documents are submitted prior to or together with the submission of certificatesof completion of building works, APs may make reference to the checklists at AppendicesF and G as appropriate.17.Upon the application for an OP, AP should submit DVD-ROM1 containingsoft copies of the documents required under PNAP ADM-2, APP-126, APP-151,APP-152 and APP-156 to facilitate uploading of information to BD’s website.Paperless Submission of Documents18.BD encourages paperless submission of documents and reports. Save forany certificates or statements confirming compliance with the relevant acceptancecriteria/standards (such as Form BA 12/13/14, Schedule of Accepted Building Materialsand Products, Certificate of Completion of Vehicular Run-in and Run-out) that should besubmitted in hard copies and the required documents to be submitted in soft copies asmentioned in paragraph 17 above, other documents may be submitted in DVD-ROMformat1 as an alternative to the conventional hard copy.( YU Po-mei, Clarice )Building AuthorityRef. : BD GP/BORD/10 (VII)BD GR/BORD/93 (II)BD GR/OP/4/MBD GR/OA/177BD GR/1-125/106 (X)This PNAP is previously known as PNAP 53First issueJuly 1978Last revision September 2021This revision May 2022 (AD/NB1 and AD/NB2) (Paragraphs 5 and 7 amended,paragraphs 13 to 18 added, andAppendices C to H added)

��明書 � 認收電郵之用 ��行動。日期日月年* �師及註冊岩土工程師作業備考(附錄 )

��文)*註冊承建商類別註冊 �明可引致法律行動。日期日月年* �師及註冊岩土工程師作業備考(附錄 )

�上述建築工程中的每 工程中的每 動。日期日月年* �師及註冊岩土工程師作業備考(附錄 )

注意事項## ��被檢控。甲. 個人資料收集的目的1. �資料作下列用途:(a) �事務;(b) �例》及有關法例的相關事務;及(c) 方便屋宇署與你聯絡。2. 你必須提供本表格所要求的個人資料 料的部門/人士3. ��供的個人資料,以作上述第 1 段所列的用途。索閱個人資料4. �資料,請與屋宇署聯絡。 . 填寫表格1. . �將不能處理呈交的文件。3. �絡。丙. 呈交方法1. 郵寄/親身呈交 - 下 4號7樓屋宇署收發處。丁. �電話:2626 1616 (由 1823 接聽)傳真:2537 ��(附錄 )

Annex A(PNAP APP-13)Schedule of Building Materials and ProductsBD Ref. :(A1)Re :Fire Resisting Products with Test or Assessment ReportBuildingProducta)(*Address of development site/Location of alteration and addition works)Fire rateddoorsetb) Lift landing doorProductNameName ofManufacturerand Place ofManufacture(City andCountry)Fire ildingIntegrity InsulationRegulationsand Codes ofPractice Details of Test or Assessment ReportName ofLaboratoryAccreditationBodyName ofLaboratory e of Test / ValidityAssessmentDateReport c)Fire rated glazingd) Fire-stop or sealing systemin wall/floor/curtain wall,etc.e) Fire dampersфf)Others (e.g. proprietaryproducts, fire shutter, etc.)The performance on stability has to be demonstrated where applicable. Corresponding legend in approved plan should be specified where applicable.фPart C of the Certificate of Accepted Building Materials and Products in Appendix A of PNAP APP-13 should be completed by RSC(V).@Date# In accordance with the registration record* Delete whichever is inapplicable-1-Signature# of authorized person

Annex A(PNAP APP-13)Schedule of Building Materials and ProductsBD Ref. :(A2)Re :(*Address of development site/Location of alteration and addition works)Fire Resisting Products with Certificate of Conformity (CoC)BuildingProducta) Fire rateddoorsetb) Nonloadbearingfire partitionProductNameName ofManufacturerand Place ofManufacture(City andCountry)Fire ResistanceRating @(minutes)ComplianceDetails of CoCwithRelevantBuildingIntegrity InsulationName ofName ofCoC No. Date of CoCRegulationsAccreditation Certificationand Codes yDate @ The performance on stability has to be demonstrated where applicable. Corresponding legend in approved plan should be specified where applicable.Date# In accordance with the registration record* Delete whichever is inapplicable-2-Signature# of authorized person

Annex A(PNAP APP-13)Schedule of Building Materials and ProductsBD Ref. :Re :(*Address of development site/Location of alteration and addition works)(B) Other Building Materials and ProductsBuildingProducta)ProductNameGlazing barrierName ofManufacturerand Place ofManufacture(City andCountry)Compliance withRelevant BuildingRegulations andCodes of PracticeDetails of Test or Assessment ReportName ofLaboratoryAccreditationBodyName ofLaboratory /AssessingOrganisationReportNo.Date of Test /AssessmentReportRemarks/CommentsValidityDateb) Cast iron pipes andfittingsc)OthersI confirm that the above mentioned building products have been tested or assessed as stated and hereby certify that the application and performanceof these products comply with the relevant Building Regulations.Date# In accordance with the registration record* Delete whichever is inapplicable(Rev. 9/2021)-3-Signature# of authorized person

��明書 (小型工程) � �必須填寫小型工程呈交編號 �地址 � �證 ��人士/註冊檢驗人員填寫 �動。日期日月年* �師及註冊岩土工程師作業備考(附錄 )

由已獲委任的訂明註冊承建商核證 �� I 級別小型工程)本人 / �築物料和產品。(適用第 II 或 III ��行動。日期日月年* �師及註冊岩土工程師作業備考(附錄 )

��置中的每 �每 動。日期日月年* �師及註冊岩土工程師作業備考(附錄 )

注意事項## ��被檢控。甲. 個人資料收集的目的1. �資料作下列用途:(a) �事務;(b) �例》及有關法例的相關事務;及(c) 方便屋宇署與你聯絡。2. 你必須提供本表格所要求的個人資料 料的部門/人士3. ��供的個人資料,以作上述第 1 段所列的用途。索閱個人資料4. �資料,請與屋宇署聯絡。 . 填寫表格1. . �將不能處理呈交的文件。3. �絡。丙. 呈交方法1. 郵寄/親身呈交 - �合署北座屋宇署總部地下 般查詢及收件處2. 電子郵件傳送 - �件(全部必須獲香港郵政署 ��數碼證書認證) 到屋宇署的電子收件處,電郵地址為 receipt@bd.gov.hk。3. 電子呈交 - �關文件 (全部必須附上數碼證書認證)。請使用 Acrobat Reader �證的文件。丁. �座屋宇署總部電話:2626 1616 (由 1823 接聽)傳真:3162 ��(附錄 )

Schedule of Building Materials and Products for Minor WorksMinor works submission no. (if available) :Annex B(PNAP APP-13)MWLocation or address of the minor works (if minor works submission no. is not available):(A1)Fire Resisting Products with Test or Assessment ReportBuildingProductProductNameFire ResistanceName ofRating@Compliance withManufacturer(Minutes)Relevant Buildingand Place ofRegulations andManufacture(City andIntegrity Insulation Codes of PracticeCountry)a) Service lift landingdoorb) Fire rated glazingc) Fire-stop orsealing system inwall, floor, etc.d) Fire dampersфDetails of Test or Assessment ReportName ofLaboratoryAccreditationBodyName ofDate of TestLaboratory /ValidityReport No. / AssessmentAssessingDateReportOrganisatione) Others@ фThe performance on stability has to be demonstrated where applicable.Corresponding legend in prescribed plans or plans should be specified where applicable.Part C of the Certificate of Accepted Building Materials and Products in Appendix B of PNAP APP-13 should be completed by RSC(V).Date# Signature# ofappointedIn accordance with the registration recordEnter “ ”in the appropriate box-1- authorized person (for minor works withprescribed building professionals appointed) prescribed registered contractor (for minor workswithout prescribed building professionals appointed)Remarks/Comments

Annex B(PNAP APP-13)Schedule of Building Materials and Products for Minor WorksMinor works submission no. (if available) :MWLocation or address of the minor works (if minor works submission no. is not available):(A2)Fire Resisting Products with Certificate of Conformity (CoC)BuildingProducta) Fire rateddoorsetb) Nonloadbearingfire partition@ ProductNameName ofManufacturerand Place ofManufacture(City andCountry)Fire ResistanceRating@(minutes)ComplianceDetails of CoCwithRelevantBuildingIntegrity InsulationName ofName ofCoC No. Date of CoCRegulationsAccreditation Certificationand Codes ofBodyBodyPracticeValidityDate The performance on stability has to be demonstrated where applicable.Corresponding legend in prescribed plans or plans should be specified where applicable.Date# CoCSchemeSignature# ofappointedIn accordance with the registration recordEnter “ ”in the appropriate box-2- authorized person (for minor works withprescribed building professionals appointed) prescribed registered contractor (for minor workswithout prescribed building professionals appointed)Remarks/Comments

Annex B(PNAP APP-13)Schedule of Building Materials and Products for Minor WorksMinor works submission no. (if available) :MWLocation or address of the minor works (if minor works submission no. is not available):(B)Other Building Materials and ProductsBuildingProductProductNameName ofCompliance withManufacturer andRelevantPlace ofBuildingManufacture (City Regulations andand Country)Codes of Practicea) Glazing barrierDetails of Test or Assessment ReportName ofLaboratoryAccreditationBodyName of Laboratory/ AssessingReport No.OrganisationDate of Test /ValidityAssessmentDateReportRemarks/Commentsb) Cast iron pipes &fittingsc) Others*I/We confirm that the above mentioned building products have been tested or assessed as stated and hereby certify that the application and performance of theseproducts comply with the relevant Building Regulations.Date*# Signature# ofappointedDelete whichever is inapplicableIn accordance with the registration recordEnter “ ”in the appropriate box(Rev. 9/2021)-3- authorized person (for minor works withprescribed building professionals appointed) prescribed registered contractor (for minor workswithout prescribed building professionals appointed)

Appendix C(PNAP APP-13)Summary of Approved Foundation Plans and Required Structural DocumentsBD Ref. :StructuralSubmissionsFoundation (LargeDiameter BoredPiles)Address of ted on: (Date)Imposed Conditions/RequirementsMonitoring recordsDate of Submission ofStructural Documentsdd.mm.yydd.mm.yyApp IPerformance review report (if specified)dd.mm.yyPredrilling recordsdd.mm.yyConstruction record (date of construction, quality and quantity ofmaterials used, excavation records)Results of rock specimen testsdd.mm.yy1st submission(from dd.mm.yy to dd.mm.yy)2nd submission(from dd.mm.yy to dd.mm.yy)outstandingResults of ultrasonic echo sounder testoutstandingResults of ultrasonic crosshole sonic logging testoutstandingPost-installation proof drilling recordsoutstandingAssessment report with rockhead contour planoutstandingReinforced Concrete Works Test results of steel reinforcing bars with RSE’s statementdd.mm.yy Test results of concrete test cube with RSE’s statementdd.mm.yy Certificate of quality scheme for the production and supply ofconcreteApp IIRemarksoutstandingFoundation record plansdd.mm.yyType 1 mechanical coupler Results of strength tests with RSE’s statementdd.mm.yy Mill certificates of constituent materials used to produce thecoupler with RSE’s statement-1-dd.mm.yy

Appendix C(PNAP APP-13)Summary of Approved Foundation Plans and Required Structural DocumentsBD Ref. :StructuralSubmissionsFoundation (DrivenSteel Bearing Piles)Address of ted on: (Date)Imposed Conditions/RequirementsMonitoring recordsDate of Submission ofStructural Documentsdd.mm.yydd.mm.yyApp IPerformance review report (if specified)dd.mm.yyReports of non-destructive tests for welded joints in splicedsections of the pilesdd.mm.yyRemarks1st submission(from dd.mm.yy to dd.mm.yy)2nd submission(from dd.mm.yy to dd.mm.yy)Structural Steel Works Mill certificates with RSE’s Statementdd.mm.yy Test results of structural steel (Class 2) with RSE’s statementdd.mm.yyConstruction record (date of installation, quality and quantity ofmaterials used and driving performance)outstandingFoundation record plansoutstanding-2-

Appendix C(PNAP APP-13)Summary of Approved Foundation Plans and Required Structural DocumentsBD Ref. :Address of dixFoundation (SteelBearing Piles Drivento Bedrock)dd.mm.yyLetterApp IUpdated on: (Date)Imposed Conditions/RequirementsMonitoring recordsDate of Submission ofStructural DocumentsRemarksdd.mm.yy1st submission(from dd.mm.yy to dd.mm.yy)dd.mm.yy2nd submission(from dd.mm.yy to dd.mm.yy)Performance review report (if specified)dd.mm.yyReports of non-destructive tests for welded joints in splicedsections of the pilesdd.mm.yyPre-drilling recordsdd.mm.yyPost-installation proof drilling recordsoutstandingReports of dynamic load testsoutstandingStructural Steel Works Mill certificates with RSE’s Statementdd.mm.yy Test results of structural steel (Class 2) with RSE’s statementdd.mm.yyConstruction record (date of installation, quality and quantity ofmaterials used, driving performance, test on the bearing strata)outstandingAssessment report with rockhead contour planoutstandingFoundation record plansdd.mm.yy-3-

Appendix C(PNAP APP-13)Summary of Approved Foundation Plans and Required Structural DocumentsBD Ref. :StructuralSubmissionsFoundation(Socketed Steel Hpiles)Address of ted on: (Date)Imposed Conditions/RequirementsMonitoring recordsDate of Submission ofStructural Documentsdd.mm.yydd.mm.yyApp IPerformance review report (if specified)dd.mm.yyTest installation reportdd.mm.yyPredrilling recordsdd.mm.yyRemarks1st submission(from dd.mm.yy to dd.mm.yy)2nd submission(from dd.mm.yy to dd.mm.yy)Post-installation proof drilling recordsoutstandingReports of test on bearing strataoutstandingReports of non-destructive tests for welded joints in splicedsections of the pilesdd.mm.yyGrout cube test reports with RSE’s statementdd.mm.yyStructural Steel Works Mill certificates with RSE’s Statementdd.mm.yy Test results of structural steel (Class 2) with RSE’s statementdd.mm.yyConstruction record (date of construction, quality and quantity ofmaterials used, grouting records, excavation and boring records)outstandingAssessment report with rockhead contour planoutstandingFoundation record plansdd.mm.yy-4-

Appendix C(PNAP APP-13)Summary of Approved Foundation Plans and Required Structural DocumentsBD Ref. :StructuralSubmissionsFoundation (Minipiles)Address of ted on: (Date)Imposed Conditions/RequirementsMonitoring recordsDate of Submission ofStructural Documentsdd.mm.yydd.mm.yyRemarks1st submission(from dd.mm.yy to dd.mm.yy)2nd submission(from dd.mm.yy to dd.mm.yy)Performance review report (if specified)App IPredrilling recordsdd.mm.yyPost-installation proof drilling recordsoutstandingReports of test on bearing strataoutstandingGrout cube test reports with RSE’s statementdd.mm.yyTest results of steel reinforcing bars with RSE’s Statementdd.mm.yyConstruction record (date of construction, quality and quantity ofmaterials used, grouting records, excavation and boring records)outstandingAssessment report with rockhead contour planoutstandingFoundation record plansApp IIdd.mm.yyType 1 mechanical coupler Results of strength tests with RSE’s statement Mill certificates of constituent materials used to produce thecoupler with RSE’s statement-5-dd.mm.yydd.mm.yy

Appendix C(PNAP APP-13)Summary of Approved Foundation Plans and Required Structural DocumentsBD Ref. :StructuralSubmissionsFoundation (SpreadFootings/Rafts) withFoundation UnitsFounded on SoilAddress of ted on: (Date)Imposed Conditions/RequirementsMonitoring recordsDate of Submission ofStructural Documentsdd.mm.yydd.mm.yyApp IReinforced Concrete Works Test results of steel reinforcing bars with RSE’s statementdd.mm.yy Test results of concrete test cube with RSE’s statementdd.mm.yy Certificate of quality scheme for the production and supply ofconcreteTest reports for static plate loading testsApp II2nd submission(from dd.mm.yy to dd.mm.yy)dd.mm.yyoutstandingdd.mm.yyType 1 mechanical coupler Results of strength tests with RSE’s statementdd.mm.yy Mill certificates of constituent materials used to produce thecoupler with RSE’s statementdd.mm.yy-6-1st submission(from dd.mm.yy to dd.mm.yy)outstandingConstruction record (date of construction, quality and quantity ofmaterials used and excavation records)Foundation record plansRemarks

Appendix C(PNAP APP-13)Summary of Approved Foundation Plans and Required Structural DocumentsBD Ref. :StructuralSubmissionsFoundation (SpreadFootings/Rafts) withFoundation UnitsFounded on RockAddress of ted on: (Date)Imposed Conditions/RequirementsMonitoring recordsDate of Submission ofStructural Documentsdd.mm.yydd.mm.yyApp IReinforced Concrete Works Test results of steel reinforcing bars with RSE’s statementdd.mm.yy Test results of concrete test cube with RSE’s statementdd.mm.yy Certificate of quality scheme for the production and supply ofconcretePredrilling records1st submission(from dd.mm.yy to dd.mm.yy)2nd submission(from dd.mm.yy to dd.mm.yy)outstandingdd.mm.yyConstruction record (date of construction, quality and quantity ofmaterials used, excavation records, results of rock specimen tests,predrilling records and assessment report with a rockhead contourplan)Foundation record plansApp IIRemarksoutstandingdd.mm.yyType 1 mechanical coupler Results of strength tests with RSE’s statementdd.mm.yy Mill certificates of constituent materials used to produce thecoupler with RSE’s statementdd.mm.yy(5/2022)-7-

Appendix D(PNAP APP-13)Summary of Approved Structural Plans and Required Structural DocumentsBD Ref. :StructuralSubmissionse.g. SuperstructureAddress of Site:ApprovalDatedd.mm.yyAppendixIIIe.g. Superstructure –Curtain Walldd.mm.yyIIIUpdated on: (Date)Imposed Conditions/RequirementsReinforced Concrete Works Test results of steel reinforcing bars with RSE’s statement Test results of concrete test cube with RSE’s statementStructural Steel Works Mill certificates with RSE’s statement Test results of structural steel (Class 2, 3 or 1H) with RSE’sstatementStructural Steel Works Mill certificates with RSE’s statement Test results of structural steel (Class 2, 3 or 1H) with RSE’sstatementDate of Submission ofStructural urtain Wall Works Safety test results with RSE’s state

safe and efficient working order pursuant to Clause E8.3 of the Code of Practice for Fire Safety in Buildings 2011. For fire dampers installed by RSC(V), the same RSC(V) could inspect and certify the fire dampers. The AP/RMWC in submitting the certification on fire dampers should include an inspection certificate on fire dampers by RSC(V).