Unit Price Averages ReportsDisclaimerThe information provided in this File is only for the use of Alberta Infrastructure & Transportation staff and itsConsultants for the development of construction cost estimates on Department construction projects.These unit price averages (UPA) are provided for information only and, while thought to be accurate, areprovided without warranty of any kind, either expressed or implied. The Crown, its agents, employees orcontractors will not be liable for any damages, direct or indirect, or lost profits arising out of the use of thisinformation, and as such, any user of this information shall assume all associated risks.

Note:1The UPA presented in this report are based on the cumulative average of the unit prices from thethree lowest bids received. The unit price averages are weighted by bid quantity.2The Cost is based on an average haul distance from various projects in the province. The 3 yearweighted haul distance for projects in 2015‐2017 is 51 km. Based on the project locationadjustment may be needed to prepare an accurate estimate for ACP and GBC.3Refer to the link to Bridge website for detailed information related to Bridge Project Cost 3.htm45In year 2016, low bid price was Ashphalt was on average 4% less than the average of three low bidsprovided in UPA.Asphalt Prices in the last three (provincial average) years have shown a downward trend as shownbelow:ACP PrIce: Weighted Average of the three Low bids 100 90 80 70 60 50 40 30 20 10 ‐2014 2014 2014 2014 2015 2015 2015 2015 2016 2016 2016 2016Qtr1 Qtr2 Qtr3 Qtr4 Qtr1 Qtr2 Qtr3 Qtr4 Qtr1 Qtr2 Qtr3 Qtr412345ContentProvincial 2017 Unit Price Averages (UPA) dataProvincial 2016 UPA dataComparison of Provincial 2015‐17 UPA dataRegional Data ( 2016 Data is provided. 2017 data is not available yet)Bridge UPA (updated June 2016)

PROVINCIAL, Weighted Unit Price AveragesBased on 2017 Construction Pricestendered between August 01, 2016 and Nov 30, No. ofDescriptionCntrcts.Subgrade Excavation5Granular Fill (Pit‐run) ‐ Des. 63Granular Fill ‐ Des. 25Granular Fill (Pit‐run) ‐ Des. 61Preparing Subgrade Surface (First Layer)6Preparing Subgrade Surface (Second Layer)1Granular Base Course ‐ Des. 2 Cl. 255Culverts ‐ Remove and Dispose (C.S.P.) (up to 75Culverts ‐ Remove and Dispose (C.S.P.) (over 706Granular Backfill ‐ Culverts1Culverts ‐ Supply and Install (600 mm dia. C.S.P.6Culverts ‐ Supply and Install (800 mm dia. C.S.P.5Culverts ‐ Supply and Install (900 mm dia. C.S.P.4Culverts ‐ Supply and Install (1000 mm dia. C.S.P2Culverts ‐ Supply and Install (1200 mm dia. C.S.P1Culverts ‐ Supply and Install (600 mm dia. C.P.P.1Filter Material2Perforated Pipe2Non‐Perforated Pipe ‐ Supply and Install1Culvert Liner ‐ Supply and Install (S.W.S.P.) ( mm2Misc. Environmental Work1Gabion Baskets ‐ Supply and Install1Gabion Mattress ‐ Supply and Install1Geotextile Fence Barrier ‐ Ditch6Geotextile ‐ Nonwoven (Supply and Install)2Geogrid ‐ Supply and Install2Soil Covering (Medium Flow)3Soil Covering (High Flow)2Broad‐Cast Seeding4Hydro‐Seeding2Slope Texturing2Haul of Bridge Materials1Heavy Rock RipRap (Class 1)8Heavy Rock RipRap (Class 2)1Heavy Rock RipRap (Class 3)2Supply of Piling ‐ H‐Pile3Pile Set‐up3Pile Driving3Concrete ‐ Class C3Concrete ‐ Class HPC3Plain Reinforcing Steel ‐ Supply3Reinforcing Steel ‐ Place3Deck Waterproofing2Asphalt Concrete Pavement ‐ Mix Type H2 (150‐4Clearing3Channel Excavation4Common Excavation6Borrow Topsoil Excavation1AmountQuantity 304,63520,745 321,01923,230 236,67113,330 89,000890 135,614593,660 3,2382,280 7,476,409522,400 36,635447 52,777406 56,8742,810 409,0861,489 130,941377 244,400631 43,55373 67,50045 9,78520 68,484725 58,805340 15,00040 570,233821 7,33480 396,9861,638 423,1765,200 24,9981,477 9,8702,150 63,03020,000 65,4286,950 6,125880 102,493159 11,0330 5,9163,300 14,5921 1,035,0651,874 321,132940 381,8311,365 176,1641,388 370,50464 93,8531,476 194,825119 886,793445 18,16716,589 106,20676,977 76,2721,112 111,594304 46,6689 91,53111,093 8,040,9901,789,460 am3m3m3Avg. 3 lowbids 14.68 13.82 17.75 100.00 0.23 1.42 14.31 82.05 129.99 20.24 274.74 347.32 387.32 596.61 1,500.00 489.26 94.46 172.96 375.00 694.56 91.67 242.36 81.38 16.92 4.59 3.15 9.41 6.96 642.99 27,583.33 1.79 14,592.42 552.33 341.63 279.73 126.92 5,789.12 63.59 1,637.18 1,992.79 1.10 1.38 68.59 367.09 5,490.32 8.25 4.49 4.21

PROVINCIAL, Weighted Unit Price AveragesBased on 2017 Construction Pricestendered between August 01, 2016 and Nov 30, No. ofDescriptionCntrcts.Borrow Excavation1Borrow Excavation ‐ Contractor's Supply4Overhaul1Common and/or Borrow Excavation Loaded to T1Sideslope Improvement4Topsoil Placement5Topsoil (Supply and Place)2Remove and Dispose of Existing Fence1New Fence ‐ Supply and Install ‐ Class B1Crack Repair ‐ Spray Patch1Gravel Surfacing ‐ Des. 4 Cl. 201Asphalt Mix For Others1Cold Milling Asphalt Pavement1Cold Milling Asphalt Pavement4Asphalt Concrete Pavement ‐ EPS Mix Type H12Asphalt Concrete Pavement ‐ EPS Mix Type H24Asphalt Concrete Pavement ‐ EPS Mix Type M12Asphalt Concrete Pavement ‐ EPS Mix Type S13Concrete Base ‐ Supply and Install2Supply of Signs, 3/4" Plywood4Supply of Signs, Extruded Aluminum2Supply of Signs, Aluminum6Supply of Signs, Aluminum ‐ 3M Diamond Grade3Removal and Reinstallation or Disposal of Existin6Removal and Reinstallation or Disposal of Existin4Install Sign ‐ Less than 1 m26Install Sign ‐ 1 m2 to 3 m24Install Sign ‐ over 3 m23Pavement Messages ‐ Gore Area1Pavement Messages ‐ Turn Arrow (Single or Dou1Pavement Messages ‐ Stop Bar1Durable Pavement Messages ‐ Turn or Straight A6Durable Pavement Messages ‐ Stop Bar6Roadway Lines ‐ Supplying Paint and Painting (D5Roadway Lines ‐ Supplying Paint and Painting (L2Roadway Lines ‐ Supplying Paint and Painting (L4Intersection Lines ‐ Supplying Paint and Painting6Removal of Existing Painted Lines12Underground Electrical Conduit ‐ Supply and Ins2Underground Electrical Conduit ‐ Supply and InsMilled Rumble Strips41Supply and Install Breakaway Steel Posts ‐ W2001Supply and Install Breakaway Steel Posts ‐ W150Supply and Install Post (100mm X 150mm)55Strong Post W‐Beam Guardrail ‐ Supply and InstRemove, Salvage and Reinstall Existing Guardra1Remove and Dispose of Existing Guardrail5Flexible Guide Post/Delineators ‐ Round ‐ Supply6Avg. 3 lowAmountQuantityUnitbids 1,902,560368,000m3 5.17 783,57027,260m3 28.74 1,016,2462,162,225m3.km 0.47 210,0004,200m3 50.00 836,62821km 39,594.32 1,155,9251,472,710m2 0.78 58,9752,790m2 21.14 13,4213km 3,879.02 193,00535km 5,514.44 440,42998,310m 4.48 206,75210,442t 19.80 43,8601,000t 43.86 1,053,42831,455m3 33.49 535,631182,360m2 2.94 13,215,664188,530t 70.10 18,001,797278,270t 64.69 3,612,92854,670t 66.09 2,981,45341,340t 72.12 74,85062units 1,207.26 28,79880m2 357.87 74,727234m2 319.80 32,032125m2 255.58 15,77555m2 284.90 20,021126signs 158.90 10,93332signs 341.66 35,997314signs 114.64 11,58334signs 340.67 21,34341signs 520.57 7,6504 messages 1,912.44 9,18048 messages 191.24 1,5308 messages 191.24 28,62789 messages 321.65 35,06264 messages 547.84 85,098124km 687.33 106,28582km 1,288.62 3,51210km 362.07 9,63937 intersections 260.51 2,920530m 5.51 21,704965m 22.49 34,559720m 48.00 169,681181km 939.90 26,10628m 932.35 30,94832m 967.11 86,667402posts 215.59 326,4482,360m 138.33 33,600336m 100.00 89,2993,953m 22.59 104,9371,631posts 64.34

PROVINCIAL, Weighted Unit Price AveragesBased on 2017 Construction Pricestendered between August 01, 2016 and Nov 30, 00X440X510DescriptionTrenching and BackfillingSecondary Cable ‐ Supply and InstallRemoval and Salvage of Existing StandardsRemoval and Disposal of Existing Light FixuresStreet Light Standard ‐ Supply and InstallSalvaged Street Light Standard ‐ InstallConcrete Curb (all Types)Curb and Gutter (all heights)Rock Rip‐Rap ‐ Hand LaidSolid Concrete IslandsSolid Concrete MediansMedian Concrete SurfacingCutting of Pavement EdgeNo. ofCntrcts.3311321111115AmountQuantity 31,5222,175 44,7632,955 6,58010 8,22012 87,84731 6,89712 91,101960 65,762530 10,545105 40,276109 52,567440 178,6362,840 Avg. 3 lowbids 14.49 15.15 658.00 684.98 2,833.76 574.72 94.90 124.08 100.43 369.17 119.47 62.90 9.72

C130PROVINCIAL, Weighted Unit Price AveragesBased on 2016 Construction Pricestendered between August 01, 2015 and July 31, 2016DescriptionNo. of AmountQuantityCntrcts.Supply of Aggregate ‐ No Option1 44,9243,620Crush to Stockpile1 244,00050,000Crush to Stockpile1 520,20045,000Supply of Aggregate ‐ No Option24 1,971,2651,304,716Subgrade Excavation40 1,510,09578,663Granular Fill (Pit‐run) ‐ Des. 634 4,104,617176,035Granular Fill ‐ Des. 224 1,328,11948,650Granular Fill , 6, 1251 82,0893,650Granular Fill (Pit‐run) ‐ Des. 61 141,4532,950Granular Fill ‐ Des. 21 5,974110Preparing Subgrade Surface (First Layer)27 1,631,6721,122,630Preparing Subgrade Surface (Second Layer)4 160,732273,020Preparing Granular Surface3 78,48377,420Granular Base Course ‐ Des. 2 Cl. 201 28,215900Granular Base Course ‐ Des. 2 Cl. 2542 25,216,5091,059,170Topsoil and Subsoil Stripping3 13,7272,729Topsoil and Subsoil Placement1 37,5484,200Common Excavation ‐ Civil Projects2 45,7295,820Wet Excavation ‐ Type 21 21,3462,600Random Fill Zone 2A1 19,8242,800Road Gravel Zone 4B1 11,526200Pitrun Gravel Zone 4C1 25,140500Pitrun Gravel Zone 4C2 86,2705,300Coarse Rip‐rap Bedding Zone 5B2 76,1601,040Gravel Armour Zone 5C3 166,9583,430Riprap Zone 6B1 60C265D100D105D110D200D235D400D405Salvage and Reinstall Existing RiprapFine Filter Zone 3ACoarse Filter Zone 3BGeotextileErosion Control BlanketDrill SeedingHydroseedingBarbed Wire FenceBarbed Wire Fencing and GatesTexas GatesVehicle Access Control GateCulverts ‐ Remove and Dispose (C.S.P.) (upCulverts ‐ Remove and Dispose (C.S.P.) (oveCulverts ‐ Remove and DisposeGranular Backfill ‐ CulvertsGranular Backfill ‐ CulvertsCulverts ‐ Supply and Install (400 mm dia. CCulverts ‐ Supply and Install (500 mm dia. CItem1111442111144314818582188.4 19,672 3,675 3,352 30,677 124,985 6,831 3,290 21,428 1,017 21,912 373,628 173,715 22,126 61,591 214,183 69,401 3m3m3m3m3m3m3tm3tm3Avg. 3 lowbids 12.41 4.88 11.56 1.51 19.20 23.32 27.30 22.49 47.95 54.31 1.45 0.59 1.01 31.35 23.81 5.03 8.94 7.86 8.21 7.08 57.63 50.28 16.28 73.23 48.68 128.95m3m3m3m2m2m2m2mmEachEachmmmm3tmm54.71 57.86 73.50 4.19 3.40 12.42 4.99 7.31 19.48 1,016.53 5,478.00 98.20 118.75 86.80 27.51 27.64 233.67 253.91

ItemPROVINCIAL, Weighted Unit Price AveragesBased on 2016 Construction Pricestendered between August 01, 2015 and July 31, 2016DescriptionNo. of E331E345Culverts ‐ Supply and Install (600 mm dia. CCulverts ‐ Supply and Install (800 mm dia. CCulverts ‐ Supply and Install (900 mm dia. CCulverts ‐ Supply and Install (1000 mm dia.Culverts ‐ Supply and Install (1200 mm dia.Culverts ‐ Supply and Install (1400 mm dia.Culverts ‐ Supply and Install (600 mm dia. CCulverts ‐ Supply and Install (600 mm dia. RCulverts ‐ Supply and Install (600 mm dia. Pand Auger (750 mm dia.)Smoothwall Steel Pipe Culvert ‐ Supply andSmoothwall Steel Pipe Culvert ‐ Supply andSmoothwall Steel Pipe Culvert ‐ Supply andSmoothwall Steel Pipe Culvert ‐ Supply andGrouting of Abandoned CulvertsGrouting LinersRiprap ‐ Random ‐ Supply and PlaceFilter MaterialPerforated PipeNon‐Perforated Pipe ‐ Supply and InstallManholes ‐ Supply and Install (1200 mm diaManholes ‐ Supply and Install (1200 mm diaAdjust ManholesAdjust Catch BasinsAjust Water ValveCatch Basin ‐ Supply and Install (600 mm diConcrete Storm Sewer ‐ Supply and Install (Culvert Liner ‐ Supply and Install (450 mm DCulvert Liner ‐ Supply and Install (525 mm DCulvert Liner ‐ Supply and Install (675 mm DCulvert Liner ‐ Supply and Install (750 mm DCulvert Liner ‐ Supply and Install (S.W.S.P.)Misc. Environmental WorkGabion Baskets ‐ Supply and InstallGabion Mattress ‐ Supply and InstallGeotextile for Gabions ‐ Supply and Install422314513113231453195148211122934211451321 1,274,959 433,287 294,532 57,845 473,754 3,750 7,618 27,044 70,287509655.58 43,327 187,941 586,125 264,125 509,253 42,917 9,000 112,139 152,702 10,050 33,991 6,524 46,691 1,230 37,156 44,658 221,026 25,007 93,500 15,913 160,820 120,184 14,934 296,403 151,401 2,036E400E420E435E452E453E454E456E500E505Straw Bale Barrier ‐ SlopeStone BarrierGeotextile Fence Barrier ‐ DitchGeotextile ‐ Nonwoven (Supply and Install)Geogrid ‐ Supply and InstallGeotextile for Materials Separation ‐ SupplyGeotextile for Stabilization ‐ Supply and InsSoil Covering (Low Flow)Soil Covering (Medium Flow)1261158411318766.06 192,209 343,128 145,108 98,169 38,879 196,821 7,829 1m287m215m140 13,60576,6502,02060,890mm3mm2m2m2m2m2m2Avg. 3 lowbids 271.27 278.46 414.25 280.80 550.24 1,250.00 476.12 659.61 354.98991.55 476.12 983.98 1,379.12 1,288.41 523.76 787.04 180.00 83.56 105.38 170.34 5,665.24 2,038.76 778.19 615.02 599.28 4,059.84 312.63 510.35 500.00 513.33 560.35 558.99 106.67 342.66 128.31 7.54383.03 172.77 12.20 3.61 5.32 2.86 2.57 3.88 5.84

54F974F980F982F992G100G105G210G220G225PROVINCIAL, Weighted Unit Price AveragesBased on 2016 Construction Pricestendered between August 01, 2015 and July 31, 2016DescriptionNo. of AmountQuantityCntrcts.Soil Covering (High Flow)36 522,115175,969Synthetic Permeable Ditch Barrier10 74,7674,211Drill Seeding10 77,79853Broad‐Cast Seeding29 105,10074Hydro‐Seeding8 143,03010Slope Texturing7 128,768267,625Excavation ‐ Structural8 238,34917,390Excavation ‐ Channel6 28,8851,800Backfill ‐ Non‐Granular11 268,14113,130Backfill ‐ Pit Run Granular ‐ Des. 6 Cl. 809 595,0619,509Backfill ‐ Crushed Granular, 2, 256 204,0272,595SPCSP ‐ Supply4 221,036188SPCSP ‐ Assembly4 149,901188CSP with Couplers ‐ Supply6 175,512282CSP ‐ Assembly6 109,497282Heavy Rock RipRap (Class 1)44 1,546,9588,153Heavy Rock RipRap (Class 1M)19 286,6911,438Heavy Rock RipRap (Class 2)13 1,801,4729,086Heavy Rock RipRap (Class 3)112936942.3820,485Surface Removal10 427,0877,322Partial Depth Repair23 818,746588Full Depth Repair8 190,42073Sandblasting (Deck Surface)5 80,1824,084Deck Overlay Concrete3 253,876241Placement Deck Overlay Concrete4 462,0653,494Supply of Piling ‐ H‐Pile10 756,0365,081Pile Set‐up9 568,008330Pile Driving9 259,4335,344Loading Tests1 5,6954Pile Concrete5 3,611,39511,378Drill Rig Set‐up5 691,467463Pile Installation6 1,615,4079,784Concrete ‐ Class C14 2,434,4832,074Concrete ‐ Class HPC11 2,770,3331,151Plain Reinforcing Steel ‐ Supply13 2,051,6601,540,538Epoxy‐coated Reinforcing Steel ‐ Supply2 43,64121,808Reinforcing Steel ‐ Place18 1,500,7161,734,229Deck Waterproofing7 306,2724,769Asphalt Concrete Pavement ‐ Mix Type H27 504,4061,935Asphalt Concrete Pavement ‐ Mix Type M14 230,975610Supply and Install Sign Panels ‐ Extruded Al1 34,40080Clearing14 220,52132Clearing and Timber Salvage3 25,7961Rippable Rock ‐ Premium1 43,7641,200Channel Excavation33 452,04545,615Common 3kgkgkgm2ttm2haham3m3m3Avg. 3 lowbids 2.97 17.76 1,457.43 1,421.61 14,274.49 0.48 13.71 16.05 20.42 62.58 78.62 1,173.60 795.90 622.60 388.43 189.74 199.37 198.27143.37 58.33 1,391.48 2,608.50 19.63 1,054.30 132.26 148.80 1,721.24 48.55 1,423.74 317.40 1,493.45 165.11 1,173.87 2,407.10 1.33 2.00 0.87 64.22 260.67 378.77 430.00 6,859.12 17,429.50 36.47 9.915.18

Q567PROVINCIAL, Weighted Unit Price AveragesBased on 2016 Construction Pricestendered between August 01, 2015 and July 31, 2016DescriptionNo. of AmountQuantityCntrcts.Borrow Topsoil Excavation2 594,450180,000Borrow Excavation4 3,129,142535,329Borrow Excavation ‐ Contractor's Supply25 5,624,323440,295Overhaul3 561,787352,600Common and/or Borrow Excavation Loaded6 1,093,982109,108Truck Haul of Common and/or Borrow Exca1 242,090563,000Sideslope Improvement22 3,806,158126Topsoil Placement43 1,645,0292,188,152Topsoil (Supply and Place)1 12,1701,000Remove and Dispose of Existing Fence24 102,77835Taking Down and Re‐erecting Existing Fence1 1,7590New Fence ‐ Supply and Install ‐ Class A2 1,6630New Fence ‐ Supply and Install ‐ Class B21 257,08627New Fence ‐ Supply and Install ‐ Class E3 12,1171New Fence ‐ Supply and Install ‐ Class F1 180,6502Remove and Reinstall Livestock Guards1 4,6132Crack Routing and Sealing1 22,8631,580Crack Repair ‐ Spray Patch9 1,075,042218,390Transverse Crack Repair ‐ Mill & Fill6 2,652,50530,895Gravel Surfacing ‐ Des. 4 Cl. 251 2,45310Gravel Surfacing ‐ Des. 4 Cl. 2013 1,213,09443,290Gravel Surfacing ‐ Des. 4 Cl. 2528 1,056,69443,694Asphalt Mix For Others12 686,81511,750Cold Milling Asphalt Pavement2 1,374,36624,037Cold Milling Asphalt Pavement41 11,530,8534,658,552Supply RejuvenatingAgent2 91Q992Q993Q994Q996S205S210S261S270S271S272S273from Bridge DecksSupply and Place Fog CoatGraded Aggregate Seal Coat ‐ Des. 3 Cl. 12.5Graded Aggregate Seal Coat ‐ Bridge DecksChip Seal Coat ‐ Des. 3 Cl. 12.5BWChip Seal Coat ‐ Bridge DecksAsphalt Concrete Pavement ‐ EPS Mix TypeAsphalt Concrete Pavement ‐ EPS Mix TypeAsphalt Concrete Pavement ‐ EPS Mix TypeAsphalt Concrete Pavement ‐ EPS Mix TypeAsphalt Concrete Pavement ‐ EPS Mix TypeAsphalt Concrete Pavement ‐ EPS Mix TypeAsphalt Concrete Pavement ‐ EPS Mix TypeRemove and Dispose of Existing Signs ‐ OneRemove and Dispose of Existing Signs ‐ TwoConcrete Base ‐ Supply and InstallSupply of Signs, 3/4" PlywoodSupply of Signs, Extruded AluminumSupply of Signs, AluminumSupply of Signs, Aluminum ‐ 3M Diamond 265115202910102121172717413960619.7 129,265 1,195,986 17,100 6,103,098 129,658 179,227 43,150,516 58,032,163 81,884,161 17,606,349 4,900,727 25,857,945 8,406 1,307 272,804 73,731 184,994 122,864 525537570UnitAvg. 3 lowbids 3.30 5.85 12.77 1.59 10.03 0.43 30,238.81 0.75 12.17 2,915.68 87,928.50 33,266.60 9,532.29 14,599.06 116,548.33 2,306.43 14.47 4.92 85.86 245.28 28.02 24.18 58.45 57.18 2.48 1.7238.86 0.75 3.26 18.39 3.72 14.96 115.63 70.61 70.81 69.46 70.28 77.90 62.28 93.40 261.33 1,311.56 259.04 352.51 228.90 283.21

06S730S735S740S765S770S772S773S800PROVINCIAL, Weighted Unit Price AveragesBased on 2016 Construction Pricestendered between August 01, 2015 and July 31, 2016DescriptionNo. of AmountQuantityUnitAvg. 3 lowCntrcts.bidsRemoval and Reinstallation or Disposal of E46 321,6061,812signs 177.49Removal and Reinstallation or Disposal of E35 92,745243signs 381.67Concrete Base ‐ Remove and Reinstall7 34,44634units 1,013.12Install Sign ‐ Less than 1 m248 229,2912,831signs 80.99Install Sign ‐ 1 m2 to 3 m233 69,933220signs 317.88Install Sign ‐ over 3 m217 64,549102signs 632.84Remove and Reinstall Breakaway Steel Post6 18,21837 posts 492.38Remove and Dispose ‐ Breakaway Steel1328934.890 posts321.5Pavement Messages ‐ Gore Area8 29,57925 messages 1,183.16Pavement Messages ‐ Turn Arrow (Single o13 35,927282 messages 127.40Pavement Messages ‐ Stop Bar14 24,249163 messages 148.77Pavement Messages ‐ Stop Ahead5 1,7609 messages 195.60Pavement Messages ‐ STOP2 1,0337 messages 147.64Pavement Messages ‐ Railway Crossing4 4,35016 messages 271.88Pavement Messages ‐ Pedestrian Crossing1 1,2534 messages 313.33Pavement Message Markings ‐ Removal1 7,3931 messages 7,393.33Durable Pavement Messages ‐ Turn or Strai25 139,416589 messages 236.70Durable Pavement Messages ‐ Stop Bar34 188,519372 messages 506.77Durable Pavement Messages ‐ Railway Cros7 9,00313 messages 692.51Durable Pavement Messages ‐ Stop Ahead17 29,65937 messages 801.58Durable Pavement Messages ‐ Aircraft Patr2 7,8194 messages 1,954.82Durable Pavement Messages ‐ Pedestrian C9 88,67187 messages 1,019.20Durable Pavement Messages ‐ STOP12 25,12261 messages 411.83Durable Pavement Messages ‐ SCHOOL ZON2 5,5334 messages 1,383.34Removal of Existing Durable Pavement Mes1 5302 messages 265.00Roadway Lines ‐ Supplying Paint and Paintin 49 776,6101,070km 725.47Roadway Lines ‐ Supplying Paint and Paintin 12 148,672186km 801.34Roadway Lines ‐ Supplying Paint and Paintin 18 18,01746km 390.22Roadway Lines ‐ Supplying Paint and Paiting4 5,80310km 560.66Intersection Lines ‐ Supplying Paint and Pai48 68,086367 ntersection 185.52Interchange Lines ‐ Supplying Paint and Pai2 4,7302 nterchange 2,365.00Removal of Existing Painted Lines2 11,1682,250m 4.96Removal of Existing Roadway Lines2 7,8082km 4,109.65Underground Electrical Conduit ‐ Supply an6 84,6832,510m 33.74and Install ‐ Pushed Conduit14142722.761,860m76.73Milled Rumble Strips for Stop Conditions17 107,91844sets 2,452.67Milled Rumble Strips32 733,888890km 824.81Supply and Install Breakaway Steel Posts ‐ W 13 143,607153m 938.61Supply and Install Breakaway Steel Posts ‐ W 3 11,39112m 949.28Supply and Install Breakaway Steel Posts ‐ W 3 53,10843m 1,235.06Cluster Frames ‐ Supply and Install14 19,50353 frames 367.98Supply and Install ‐ Wooden Post4 23,628139 posts 169.98Supply and Install Post (100mm X 150mm)48 427,6292,088 posts 204.80Supply and Install Post (150mm X 200mm)2 10,56238 posts 277.94W‐Beam Guardrail ‐ Supply and Install2 14,05932m 439.33

X346X350X355X360X400X415X435X440X510PROVINCIAL, Weighted Unit Price AveragesBased on 2016 Construction Pricestendered between August 01, 2015 and July 31, 2016DescriptionNo. of AmountQuantityCntrcts.Strong Post W‐Beam Guardrail ‐ Supply and39 2,686,82218,577Cable Barrier ‐ Supply and Install4 545,1015,958Remove, Salvage and Reinstall Existing Gua4 43,352348Supply of Guardrail Posts2 2,49427Remove and Dispose of Existing Guardrail47 1,008,10034,830Flexible Guide Post/Delineators ‐ Round ‐ S56 717,5369,254Trenching and Backfilling15 223,72614,272Secondary Cable ‐ Supply and Install16 292,44621,411Removal and Salvage of Existing Standards3 10,90912Removal and Disposal of Existing Light Fixu6 48,29267Cast In Place Concrete Base ‐ Supply and In5 340,060146Street Light Standard ‐ Supply and Install15 717,704239Salvaged Street Light Standard ‐ Install3 14,07912Distribution Enclosure ‐ Supply and Install9 206,75723Asphalt Surfacing (Remove and Dispose)1 1,85260Removing Curb and Gutter7 101,4513,482Removing Concrete Surface8165004.067,506Removing Catch Basin2 12,5256Removing Curb4 49,7182,159Concrete Sidewalk (all widths)4 137,543600Monolithic Sidewalk, Curb and Gutter (all w7 513,7441,952Monolithic Sidewalk, Curb and Gutter (all w2 39,398104Concrete Curb (all Types)2 237,9693,875Curb and Gutter (all heights)11 753,8226,021Rock Rip‐Rap ‐ Hand Laid3 13,584130Solid Concrete Islands3 164,5261,635Concrete Barrier2 416,6341,260Concrete Swale3 34,660155Solid Concrete Medians1 550,4485,750Granular Fill for Medians3 85,3482,230Median Asphalt Concrete Surfacing2 313,3301,720Median Concrete Surfacing4 283,2282,900Cutting of Pavement Edge46 nitspolesunitsm3mm2unitsmmmmmmm2m2mmm2ttm2mAvg. 3 lowbids 144.63 91.49 124.58 92.37 28.94 77.54 15.68 13.66 909.10 720.78 2,329.18 3,002.94 1,173.22 8,989.43 30.86 29.1421.98 2,087.56 23.03 229.24 263.19 378.82 61.41 125.20 104.49 100.63 330.66 223.61 95.73 38.27 182.17 97.66 8.12

ItemPROVINCIAL, Weighted Unit Price AveragesBased on 2015, 2016 and 2017 Construction Pricestendered between August 01, 2015 and Nov 30, 2016DescriptionUnitAvg. 3 low bids for Construction ly of Aggregate ‐ No OptionCrush to StockpileCrush to StockpileSupply of Aggregate ‐ No OptionSubgrade ExcavationGranular Fill (Pit‐run) ‐ Des. 6Granular Fill ‐ Des. 2Granular Fill , 6, 125Granular Fill (Pit‐run) ‐ Des. 6Granular Fill ‐ Des. 2Preparing Subgrade Surface (First Layer)Preparing Subgrade Surface (Second Layer)Preparing Granular SurfaceGranular Base Course ‐ Des. 2 Cl. 20Granular Base Course ‐ Des. 2 Cl. 25Topsoil and Subsoil StrippingTopsoil and Subsoil PlacementCommon Excavation ‐ Civil ProjectsWet Excavation ‐ Type 2Random Fill Zone 2ARoad Gravel Zone 4BPitrun Gravel Zone 4CPitrun Gravel Zone 4CCoarse Rip‐rap Bedding Zone 5BGravel Armour Zone 5CRiprap Zone 6BSalvage and Reinstall Existing RiprapFine Filter Zone 3ACoarse Filter Zone 3BGeotextileErosion Control BlanketDrill SeedingHydroseedingBarbed Wire FenceBarbed Wire Fencing and GatesTexas GatesVehicle Access Control GateCulverts ‐ Remove and Dispose (C.S.P.) (up to 700 mm diaCulverts ‐ Remove and Dispose (C.S.P.) (over 700 mm dia.Culverts ‐ Remove and DisposeGranular Backfill ‐ CulvertsGranular Backfill ‐ CulvertsCulverts ‐ Supply and Install (400 mm dia. C.S.P.)Culverts ‐ Supply and Install (500 mm dia. C.S.P.)Culverts ‐ Supply and Install (600 mm dia. m3m3m3m2m2m2m2mmEachEachmmmm3tmmm 12.41 4.88 11.56 0.6730.0529.6537.4931.46 1.651.27 31.435.10 13.681.48 20.0754.0033.84 65.0068.4543.333.84 0.651.369.0310.65 5,200.00108.60153.64 87.4657.30 313.36339.09 7.868.011.5119.2023.3227.30 22.49 47.95 54.311.450.591.01 31.3523.815.03 8.94 98.20118.7586.8027.5127.64233.67253.91271.27 14.6813.8217.75100 0.231.42 14.31 82.05129.99 20.24 274.74

ItemPROVINCIAL, Weighted Unit Price AveragesBased on 2015, 2016 and 2017 Construction Pricestendered between August 01, 2015 and Nov 30, 2016DescriptionUnitAvg. 3 low bids for Construction E607E608E609E610Culverts ‐ Supply and Install (800 mm dia. C.S.P.)Culverts ‐ Supply and Install (900 mm dia. C.S.P.)Culverts ‐ Supply and Install (1000 mm dia. C.S.P.)Culverts ‐ Supply and Install (1200 mm dia. C.S.P.)Culverts ‐ Supply and Install (1400 mm dia. C.S.P.)Culverts ‐ Supply and Install (600 mm dia. C.P.P.)Culverts ‐ Supply and Install (600 mm dia. R.C.P.)Culverts ‐ Supply and Install (600 mm dia. P.V.C.)Smoothwall Steel Pipe Culvert ‐ Supply and Auger (750Smoothwall Steel Pipe Culvert ‐ Supply and Auger (500 mSmoothwall Steel Pipe Culvert ‐ Supply and Auger (600 mSmoothwall Steel Pipe Culvert ‐ Supply and Auger (800 mSmoothwall Steel Pipe Culvert ‐ Supply and Auger (900 mGrouting of Abandoned CulvertsGrouting LinersRiprap ‐ Random ‐ Supply and PlaceFilter MaterialPerforated PipeNon‐Perforated Pipe ‐ Supply and InstallManholes ‐ Supply and Install (1200 mm dia. Std. Length)Manholes ‐ Supply and Install (1200 mm dia x Excess LengAdjust ManholesAdjust Catch BasinsAjust Water ValveCatch Basin ‐ Supply and Install (600 mm dia. x 1.83 m)Concrete Storm Sewer ‐ Supply and Install (all dia.)Culvert Liner ‐ Supply and Install (450 mm Dia.)Culvert Liner ‐ Supply and Install (525 mm Dia.)Culvert Liner ‐ Supply and Install (675 mm Dia.)Culvert Liner ‐ Supply and Install (750 mm Dia.)Culvert Liner ‐ Supply and Install (S.W.S.P.) ( mm)Misc. Environmental WorkGabion Baskets ‐ Supply and InstallGabion Mattress ‐ Supply and InstallGeotextile for Gabions ‐ Supply and InstallStraw Bale Barrier ‐ SlopeStone BarrierGeotextile Fence Barrier ‐ DitchGeotextile ‐ Nonwoven (Supply and Install)Geogrid ‐ Supply and InstallGeotextile for Materials Separation ‐ Supply and InstallGeotextile for Stabilization ‐ Supply and InstallSoil Covering (Low Flow)Soil Covering (Medium Flow)Soil Covering (High Flow)Synthetic Permeable Ditch BarrierDrill SeedingBroad‐Cast SeedingHydro‐SeedingSlope haham2 566.73532.03 724.29 1,756.67 2,153.331,458.691,099.47707.64 216.67181.93 1,777.781,083.331,672.22 598.3352.36 185.98 73738.469,669.270.46 573.885.842.9717.761,457.431,421.6114,

Note: 3 5 Content 1 Provincial 2017 Unit Price Averages (UPA) data 2 Provincial 2016 UPA data 3 Comparison of Provincial 2015‐17 UPA data