Barangay Disaster Risk ReductionManagement PlanBarangay Casili-onSalcedo, Eastern Samar

Local Government Unit of Salcedo, Philippines 2016The document must be attributed as the Participatory Capacity and VulnerabilityAssessment: Barangay Casili-on, Salcedo, Eastern Samar.Published by Local Government Unit, Salcedo, December 2014.Disclaimer: The views in this publication are those of the authors.Brgy. Casili-on BDRRMP 2017-20192

Table of ContentsIntroduction4Barangay Profile: Caridad5Barangay History7Spot Map8Hazard Map8Disaster Timeline10Social Venn Diagram10Hazard Assessment11Barangay Resources12Seasonal Calendar12Vulnerability and Impact Assessment13Capacity Assessment16Adaptation Assessment19BDRRM Organizational Structure22Sectoral Plan(Supply/Relief)23Sectoral Plan(Evacuation)24Sectoral Plan(Damage Control)25Sectoral Plan(Medical)26Sectoral Plan(Security Rescue)27Evacuation Plan28BDRRM Plan29Pictures30Brgy. Casili-on BDRRMP 2017-20193

IntroductionThe Participatory Capacity and Vulnerability Assessment (PCVA) was designedand implemented by Local Government Unit of Salcedo for the Child CenteredCommunity Based Climate Change Adaptation (CC-CBA) project in order to assistdifferent project stakeholders in the efficient collection, management and analysis ofcommunity-generated data for mainstreaming disaster risk reduction and climatechange adaptation in local development plans of schools and local government units.The CC-CBA PCVA is an attempt to stimulate people's understanding andanalysis of the factors that affect children, youth and their community's resilienceagainst climate change. The PCVA is both an approach and platform of convergenceand empowerment that encourages children and different community stakeholders tocollectively assess, plan, implement, advocate and mainstream climate changeadaptation for an evidence-based resiliency against climate change impacts.The design of PCVA identifies five primary areas of assessment by and for thecommunity in subsequent order:1. Natural Resource Assessment: Changes, trends and current state of thecommunity's natural resources to establish link of climate - weather hazards on theexposure and sensitive units of the community.2. Hazard Assessment: Levels of vulnerability of the human and non-humanelements and the historical impact and types of hazards to a specific location andsystem of interests in the community.3. Vulnerability and Impact Assessment: The vulnerabilities of each exposedunit and sensitive systems of community in terms of human and non-human elements,including the likelihood of a unit and its interaction with every exposed and sensitiveelements of the community to the effect of a changing climate or extreme weatherevent; also gauges direct and indirect impacts of hazards to each system of interests.4. Capacity: The existing capacity, adaptive/required capacity and capacity gapsof human and non-human element.Brgy. Casili-on BDRRMP 2017-20194

Barangay ProfileI. Geographical ClassificationThe barangay is situated along the national road. It is located 10.5 kilometers northwestof the town proper of Salcedo, 26.5 kilometers of the town proper of Guiuan, and 58.5kilometers south east of Borongan City (the capital City of E. Samar).BoundariesEast: Brgy. TalangdawanWest : Brgy. Sta. Margarita,QuinapondanNorth : Brgy. CaridadSouth : Brgy. TagbacanThe National Highway passes through the barangay. Buses from Manila, Tacloban andBorongan, public utility vehicle such as jeepneys, vans, tricycles and trucks are available duringdaytime, early morning and night.II. Physical Profile/ Land AreaThe Barangay has a total land area of 241.19 hectares (source: MENRO Salcedo2009). The land use distribution is not yet planned, hence, there is no specific measureof areas for residential, institutional, agricultural, etc.III. Demographic ProfilePopulationAs to the conduct of PCVA, the total Barangay population isnumber of Male iswhile the female is. There arehouseholds in Barangay Palanas., whereIV. Livelihood and EmploymentMajority of the people in the barangay are dependent on its income from copramaking, tuba gathering and farming. Some are dependent salary of being governmentemployees, remittances from relatives either in local and abroad. Other sources ofincome are derived from food vending and extracting chromites.V. Economic profileBarangay Caridad is a 5th class Barangay. The Barangay income is dependent onthe release of Internal Revenue Allotment (IRA), coming from the National Government.VI. Infrastructure and UtilitiesBarangay roadRoadCaridad-CasilionTagbacan- CasilionSan Antonio St.San Roque St.Fatima St.San Jose St.Sto. Nino St.Unnamed roadDistance1.2 kms.kms.80meters100 meters80 meters122meters73 meters6 metersRoad condi-tionRough-doHalf-concrete laneRough roadRough roadConcreteHalf concrete laneRough roadBrgy. Casili-on BDRRMP 2017-20195

Water systemFacilitiesOpen Dug WellJetmatic PumpNo.12532Uses/ConditionAll purposeFunctionalNon-functionalBrgy. Property (non-functional)Private propertyPowerBarangay Casili-on is already energized by Eastern Samar ElectricCooperative (ESAMELCO).CommunicationThe radio broadcast is the primary source of communication in this area.There is satellite broadcast TV using satellite dish (Cignal), to watch TV newslocally or internationally. The reliability of local broadcast of AM radio is stillthe main source of information specially when there is a threat of typhoon.VII. EducationBarangay Casili-on offers complete elementary education, servicing in-schoolchildren and youth with 3 elementary school buildings. There is also one available DayCare Center.VIII. Health and NutritionHEALTH PROGRAMS AND SERVICES Feeding ProgramMaternal and Child CareImmunization ProgramFamily Planning ProgramFree regular check-upBP and OPTDewormingWeight monitoringPre and Post Natal servicesGarantisadong PambataFelariases ProgramOther special programsBrgy. Casili-on BDRRMP 2017-20196

BRIEF HISTORY OF THE BARANGAYHadton una nga mga panahon, ine nga lugar in usa nga Sitio han Brgy. Caridad,Salcedo nga gin ngaranan hin “HIGARON”. Gin ngaranan ini nga Sitio Higaron dara kayabunda ine dinhe nga lugar hin pagka-on, sugad han palawan, kamote, bilanghoy ug aniba pa nga mga pagkaon nakanhe kukuha-a han mga mulopyo.Ini nga lugar in may mga salug o sapa nga diin damo an mga kasili o isda ha tabang nga nagin Kasilihon. Dara hini nga kadamo han kasili, an nagmamangulo han BaryoCaridad hi Juancho Gilber asya an nagtikang hin pagngaran han lugar nga Casili-on.Ha pagkanhe ha Casilion ni Florentino Duran, nga taga Brgy. Camanga ginpauswag ine niya nga lugar ug nagin progresibo ine. Pag abot han panahon nga nagdamona an nag uuma ngan mga nagbabalay naglarang ini hi Florentino Duran hinpagparihistro ha munsipyo nga maging barangay ngan gin ngaran nga Barangay Casilion.Para hanka patronan han Barangay, an mga tawo ug an simbahan innagsisilibrar han patron ha kada Agosto 25 han tuig.An Barangay Casilion in gin administrar hin mga aktibo nga barangay kapitan. Anuna hini amo hi Hon. Florentino Duran, sinundan ni Hon. Sofio Yaranon Sr., Hon. RobertoCayosa ngan ha pagkayana in ginpapadayon pagpakaupay ubos han pamunuan ni HON.MARIETTA J. OBILLO.Brgy. Casili-on BDRRMP 2017-20197

SPOT MAP OFBARANGAY CASILI - ONHAZARD MAP OFBARANGAY CASILI-ONBrgy. Casili-on BDRRMP 2017-20198

Hazard MapsBrgy. Casili-on BDRRMP 2017-20199

DISASTER TIMELINEYEAR - DISASTERDecember 2014Typhoon Ruby2013Typhoon YolandaEPEKTO SA KOMUNIDADooooo1966Typhoon ClarinooDestruction of cropsDestruction of housesDestruction of farm crops andother livelihoodDestruction of housesDestruction of infrastructuresDestruction of farm crops andother livelihoodDestruction of housesSINU-SINO AT ILANANG APEKTADOFarmers90 Families2 totally damaged HHWhole community:o 102 totallydamaged HHo 57 partiallydamaged HHo Churcho Health Center30 totally damaged HHAll the farm cropsSAAN - SAANooooPurok SampaguitaPurok OrchiddsPurok CamiaPurok Cadena de AmorBrgy. Casili – onMGA ARAL MULA SA KARANASANooooooPagputol ng mga tangkay ng kamotengkahoyBuild / construct a strong resilient houseCut the branches of trees near the housesAlways be readyBrgy. Infrastructures should be strong /resilientEvacuate as early ass possibleBrgy. Casili - onSOCIAL VENN DIAGRAMBrgy. Casili-on BDRRMP 2017-201910

HAZARD ASSESSMENTElements of Characteristic of HazardCharacteristic of Hazard (ano bang meron ang isang bagyo) Malamig na hanginMaitim at maulap ang kalangitanPagkakaroon ng low pressure sa dagatPagkulog at pagkidlatForce (Gaano kalakas) 120-150 kphWarning Signs & Signals (saan ba narinig, radio, tv obgy) BandilyoPag – asaMobile PhoneTVRadyo Moon sorounded with ringPaglabas ng mga paniki sa arawPaglakas at paglaki ng mga alon sa dagatSpeed of Onset (gaano ba kabilis bago dumating) Depende sa signal warning ng PAGASA5 hrs. Pinakamadali2 days pinakamatagalFrequency (gaano ba ito kadalas) 1 – 2 per yearPeriod of Occurrence (ilang beses ba itong nangyayarisa isang taon) 1 – 2 beses sa isang taonDuration (gaano katagal ang epekto nito 1-3 hrs2-3 yrs hangang makabawi ng mga pananim para magkaprudoktoCause / Origin (saan nangaling o ano ang dahilan)Analytical Description ofHazard Malakas nahangin at ulanNabubuwal namga punoLumilipad na mgayeroPagkasira ng mgabahayFloodGustinets of windForewarning (indigenous EWS)Brgy. Casili-on BDRRMP 2017-201911

BARANGAY CASILI – ON RESOURCESUPLANDo Houses, Provincial Road, Bamboo (bagakay), Goat, Cow, Dog, Cat & PigLOWLANDo Caladium, Coconut Tree, Cassava, Banana, Sweet potato, Bird, Papaya,Bamboo, Chicken, Mango Tree, Butterfly & CacaoSEASONAL CALENDARSITUATIONS/ ACTIVITIESLivelihood : Rootcrop farming Fishing Sari –sari store operator Food Vending Carpentry Sawali Making Bread Making Dapon Vending Hog FatteningOccasions : Christmas and New Year Fiesta BalintawakHealth : Fever and FluMalaking Pagkakautang EnrolmentFiestaJFMAMJJASOND Brgy. Casili-on BDRRMP 2017-201912

VULNERABILITY AND IMPACT ASSESSMENTHAZARDTyphoonSYSTEM OF INTERESTEXPOSURESENSITIVITYIMPACTHUMAN ELEMENTS1. Children 0-5 yearsold Male 51Female 60 Cough, Cold, Diarrhoea, Fever,Trauma, Diarrhoea, Mosquitobites, Chiconggonia & Dengue Malnutrition, Hospitalization, Insect bitediseases & Displacement2. Children 6-12 yearsold Male 49Female 64 Cough, Cold, Diarrhoea, Fever,Trauma, Diarrhoea, Mosquitobites & Chiconggonia Malnutrition, Hospitalization, Insect bitediseases, Displacement & Poverty3. Children 13-17 yearsold Male 32Female 36Male 154Female 167DiseasesMale 33Female 39Male 1Female 3Male 8Female 5 Cough, Cold, Fever, Diarrhoea &Skin deseases Hospitalization, Insect bite diseases,Displacement & Poverty Cough, Cold, Skin disease(kurikong), Fever, Diarrhoea,High Blood, Arthritis & Trauma Hospitalization, Insect bite diseases,Displacement & Poverty High blood, Arthritis, Cold,Cough, Fever & Diarrhoea Hospitalization, Insect bite diseases,Displacement, Death, Poverty Cough, Cold, Skin disease(kurikong), Fever & Diarrhoea Hospitalization, Insect bite diseases,Displacement & Poverty Cough, Cold, Diarrhoea, Fever &Skin disease Hospitalization, Insect bite diseases,Displacement, Poverty & Malnutrition School buildingsComfort RoomStaff : 8 Elem. Teachers No classes, Pupils may transfer to otherschools, Leads to students drop out,Insufficient funds & Unsanitary waste isobserved 1 concrete health center Totally DamagedTotally / Partially damagedInability to teach the lessonwellUnder construction Can’t be used & Damage of health4. 18 to 595. Elderly ( 60 up )6. CWD7. PWDNON-HUMAN ELEMENTS1. Social Services1.1. Education1.2. HealthBrgy. Casili-on BDRRMP 2017-201913

1.3. Water2. Livelihood2.1. Coastal2.2. Agriculture 24 units jetmatic & 22 opendug well Turbidity is high &Contaminated apparatusCause of human illnesses, Diarrhoea &Stomach ache 10 fishermen Destruction of pump boatDestruction of fish nets andother fishing gear Destruction of farmDestruction of crops and otherplant PovertyPossibility of theft cases arisesLow yield on catch fishAlkansi / lugiPovertyThe family will suffer starvationPagkasira ng tindahanThe goods will get wetLoss / damage of materials /toolsLoss / damage of materials /toolsLoss / damage of the rawmaterialDamage of the materialsPagkabasa ng harenaPagkamatay ng mga puno ngdaponPagkasira ngn bahay nitoDeath of the hogs, Pagkabasang pagkaing baboy & Pagjkasirang kulungan ng baboy Pagkalugi, Poverty & The family will sufferstarvation Mahina ang kita & poverty Mahina ang kita & poverty Mahina ang kita & poverty Mahina ang kitapovertyMahina ang kitapoverty Mahina ang kitapoverty -2.3. Others:Sari – sari store95 farmersFertilizerBoloSundang12 retailers-Food Vending 7 vendors -Carpenter 50 carpenters -Amakan making 3 makers -Bread making 5 makers-Dapon vending 3 dapon vendors 2 Hog raisers --Hog fattening /Raise 3. EcosystemBrgy. Casili-on BDRRMP 2017-201914

3.1. Water4. Institution4.1. Government4.2. Private5. Infrastructure 5 creeksGOVERNANCE: Punong Brgy., 7 Brgy.Kagawad, 1 Treasurer, 1Secretary, 4 tanod, 4 Utility,10 Lupon, 6 BHW, 1 Day CareWorker, Volunteer Teachers& 1 Bookkeeper 3 credit facility- CARD Inc., SIKAP & ASAPhil. Brgy. Hall, Data Board,Jetmatic Pumps, TanodOutpost, Reading Center,Children’s park, Church,Water system & Day carecenter Contamination Lalala ang siltationMawawalan ng lugar ng paglalabhan Implementation of ordinanceResolution5% DRRMFOfficial and employees areaffected by the hazard 70 % DRRMF Mitigation and preparation of30% emergency response are minimal tosupport damages Late response Hindi nakakatulong para makabangon angbeneficiary Destroyed & Lack of ReadingMaterilas The council will not be able to conduct itsregular sessionBrgy. Information is not feasibleUnavailabilitry of water resourcesLack of Reading MaterialsIncomplete facilities in the Children’s Park REMARKSBrgy. Casili-on BDRRMP 2017-201915

CAPACITY ASSESSMENTSYSTEM OF INTERESTHUMAN ELEMENTS1. Children 0-5 years oldMale – 51Female - 602. Children 6-12 years oldMale – 49Female - 643. Children 13-17 years oldMale – 32Female - 364. 18 – 59 years oldMale – 154Female -1675. 60 upMale – 33Female - 396. CWDMale – 1Female - 37. PWDMale – 8Female – 5NON-HUMAN ELEMENTS1. Social Services1.1. EducationREQUIRED CAPACITY(ADAPTIVE CAPACITY)EXISTING CAPACITY (COPING) 8 BHW’s, 3 CHT, 3 Utility & 4 Barangay Tanod 5 Utility8 Brgy. TanodGAPS* Available stay in midwife 2 utility 4 Barangay TanodSame aboveSame aboveSame aboveSame aboveSame aboveSame aboveSame aboveSame aboveSame aboveSame aboveSame aboveSame aboveSame aboveSame aboveSame aboveSame aboveSame aboveSame above0 pupils table, 0 Teachers Chair, 2 TeachersTable, 2 Black Boards, 0 H.E. Room, 0 Library, 0Electric Fans 40 Pupils Table, 6 Teachers 40 Pupils Table, 6 TeachersChair, 7 Teachers Table, 6 BlackChair, 5 Teachers Table, 4 BlackBoards, 1 H.E. Room, 1 LibraryBoards, 1 H. E. Room, 1 LibraryBrgy. Casili-on BDRRMP 2017-201916

1.2. Health 1.3. Water 2. Livelihoodo Farmingo Fishingo Carpentryo Amakan Wavingo Bread Makingo Dapon Producerso Hog Raisingo Sari – sari storeoperator3. Ecosystem3.1. Forestry3.2. Water4. Institution4.1. Government4.2. Private1 concrete Health Center, 2 Weighing Scale, 5sphygmomanometer, 5 Thermometer, 1 Heightboard, 1 Baby Bed & 1 Bed24 units jetmatic pump22 open dug well 95 farmers10 fishermen50 carpenters3 amakan makers5 bread makers3 dapon producers2 hog raisers None5 Creeks BLGUBHWTanodLuponDCWTeacherSenior CitizenFarmers AssociationFisher folk associationWomen’s Organization & 16 Electric Fans4 weighing Scale, 2 Bed, Medicines& 3 Thermos 28 units jetmatic pump Trained on new technologyAvialability of tractors and otherfacilitiesTraining on organic farmingFishing boat and gearsCapital ( puhunan )Enhancement of Amakantechnology& 16 Electric Fans 2 Weighing Scale, 1 Bed, Medicines& 3 Thermos 4 units jetmatic pump None NoneCreate ordinances andresolutions on health, peace andorder, and barangay sanitation.Livelihood programMaterials and equipment onorganic farming and organicfertilizer productionHand tractorShredding MachineProduction of kawayan andbagakayTraining on sawali / bamboomaking Trainings and seminarsFund for conducting trainingsand seminars Trainings and seminarsFund for conducting trainingsand seminarsBrgy. Casili-on BDRRMP 2017-201917

5. InfrastructureHealth CenterDay Care CenterJetmatic pumpChurchData BoardTanod OutpostReading CenterChildren’s ParkWater SystemRemarksUnder Construction5 jetmatic PumpNot ResilientIncomplete DataComplete facilities and apparatus for thehealth centerNo CR for Male10 jetmatic pumpResilient to any disasterComplete dataLack of reading facilitiesComplete reading facilitiesIncomplete recreational facilitiesNot potable waterComplete recreational facilitiesPotable water and tap standConstructionConstruction of the male CRConstruction of 5 jetmatic pumpRehabilitation of the Barangay ChurchComplete dataRehabilitation of the Tanod OutpostProcurement of reading materials andconstruction of comfort RoomRehabilitation of the Children’s ParkRehabilitation of the water systemBrgy. Casili-on BDRRMP 2017-201918

ADAPTATION ASSESSMENTSYSTEM OF INTERESTHEALTHEDUCATIONWATER / SANITATIONLIVELIHOODADAPTATION MEASURESPRIORITY RANKTIME FRAMERequest stay in midwife for the lying inDetail more utility for the Brgy.Deatil another Brgy. Tanod for safety of our Brgy.Purchase weighing scale for the BHWPurchase 3 sphygmomanometerPurchase 3 thermometerPurchase 1 height boardPurchase more medicinePurchase 1 more bedPurchase 5 thermos for the lying inPurchase tables and chairs for the lying 5201520151. Rehabilitation school buildings used as an evacuationcenter11. Rehabilitation of 24 units Jetmatic pump2. Cleaning and chlorination of water hase of hand tractorPurchase of shredderTraining for cassava cake and cassava chips makingTraining for cassava flour makingTraining for hat wavingPurchase of other farm materials ( bolo, sundang )Production of organic fertilizerTraining for bubu, panggal and timing makingThroughout the yearBrgy. Casili-on BDRRMP 2017-201919

FORESTRY AND WATERGOVERNMENT1. Tree planting2. Crafting of ordinance for tree park and production areaof bamboo and bagakay3. Crafting of ordinance for mandating segregation ofhousehold waste4. Crafting of ordinance designating of dumping site andcomposting area5. Tree planting along the river bank6. Clearing of water ways7. Crafting of ordinance banning the throwing / dumping oftrash in the water ways1. 70 % DRRMF for preparation and mitigation of 30%emergency response2. Organized BDRRMC3. Trained BDRRMC4. Pre-positioning of materials and equipment’s fordisaster preparedness5. Construction / rehabilitation of safe evacuationcenter6. Inclusion of identified recovery & rehab project in20 % DF7. Hazard map posting8. Drill and simulation9. Evacuation plan posting10. IEC for family preparedness11. Adaptation of environmental ordinances12. Evacuation route plan posting73245614135121196871028May 20152015April 2015May 2015June 2015June 2015April 2015March 2015Feb. 2015Feb. 2015March 2015Jan. 2016Jan. 2016Sep. 2015July 2015Sep. 2015July. 2015Sep. 2015March 2015Sep. 2015Brgy. Casili-on BDRRMP 2017-201920

INFRASTRUCTURE1.2.3.4.5.6.Construction of Health CenterConstruction of Male CR in the day care centerRehabilitation of Brgy. ChapelCompletion of the data board informationRehabilitation of level 2 water systemProcurement of reading materials andconstruction of comfort room in the readingcenter7. Rehabilitation of the tanod outpost8. Rehabilitation of children’s park28763541Aug. 2015Dec. 2015Dec. 2015-2016Nov. 2015-2016Dec. 2015Feb. 2015- 2016Jan. 2015 – 2016Dec. 2015Brgy. Casili-on BDRRMP 2017-201921

BDRRM ORGANIZATIONAL STRUCTURE OF BRGY. CASILI–ONALBERTO G. LOYOLABDRRMOVICE CHAIRMANPREPAREDNESSPREVENTION / MITIGATIONRECOVERY / REHABEMERGENCY RESPONSESUPPLY & RELIEFEVACUATIONDAMAGE CONTROLSECURITY / RESCUEMEDICALDELIA TAMBOLOGANMYRNA NADERALUZ YAKITRODULFO SEBALONESTRELLA YAKITGILDEGARDO APILADOALBERTO LOYOLAVILMA LOYOLADAINA MACABOCSITROSALIA APILADORENATO MACAWILECLAUDIA YAKITMARIETTA OBILLOFLORA YAKITMARGARITA TAMBOLOGANJUDE ODIVELASJAIME COLANDOGFAUSTINO NADERAJESSIE AYONFRANCISCO LACTAWANFRANCISCA JALBAYNIEVES ABDONEDITA BALDICANASJANICE QUILBIOCRISTEE GALANGUEJUVELYN OGARIOAMALIA CABUGAWANBrgy. Casili-on BDRRMP 2017-201922

SECTORAL PLAN (SUPPLY/ RELIEF)SYSTEM OF INTERESTChildren 0 – 5y.o.- Male 51- Female 60Children 6 – 12y.o.- Male 49- Female64Children 13 – 17y.o.- Male 32- Female 3618 above- Male 154- Female 167Elderly- Male 33- Female 39CWD- Male 1- Female 3PWD- Male 8- Female 5Total: 735EXISTINGRESOURCES30 % of 5 %BDRRM FundPROJECTED NEED RiceCoffeeSugarSardinesNoodlesPowdered milkBiscuitsMedicineDistilled waterBath soapLaundry soapGAPS 11 sacks rice181 (25g) packscoffee1 sack sugar543 canssardines543 PacksNoodles111 packspowdered milk181 packsbiscuitsMedicines111 distilledwater181 boxes bathsoap181 bar laundrysoapACTIVITY TOMEET THE NEEDSSUPPORTAGENCY INGO /NGOSOURCE OF FUNDResolution forprocurementBLGUMLGUDSWDPLANUNICEF30 % OF 5 %BDRRM FundESTIMATEDCOSTNGO’ 863,62070,862Brgy. Casili-on BDRRMP 2017-201923

SECTORAL PLAN (EVACUATION)SYSTEM OF INTERESTChildren 0 – 5y.o.- Male 51- Female 60Children 6 – 12y.o.- Male 49- Female64Children 13 – 17y.o.- Male 32- Female 3618 above- Male 154- Female 167Elderly- Male 33- Female 39CWD- Male 1- Female 3PWD- Male 8- Female 5Total: 735EXISTINGRESOURCES MegaphoneFlashlightDay CareCenterBrgy. HallMedicineHealthCenterElem. SchoolBldg.GeneratorPROJECTED NEED to netThermosCoffeeSugarNoodlesMatchSolar radioSolar lampMedicineGAPS 1 evacuationcenter3 megaphones50 mosquitonets28 thermos50 doz. Coffee50 pcs. Matches7 solar radio7 solar lamp20 L. diesel3 boxes basicMed.ACTIVITY TOMEET THE NEEDSBLGU ResolutionCoordinate riskassistance indifferent NGO’sSUPPORTAGENCY INGO /NGOBLGULGUPLANPRCUNICEFAMURTOXFAMUNDPSOURCE OF FUNDESTIMATEDCOSTLGUBLGUPLANPRCMLGUUNICEFP 3MP 10, 500P 2, 100P 840P 6, 300P 6, 000P 3, 640P 1, 250P 1, 900P 3, 000P 150P 4, 200P 4, 200P 800P 2, 000P 3, 046 , 880.00Brgy. Casili-on BDRRMP 2017-201924

SECTORAL PLAN (DAMAGE CONTROL)SYSTEM OF INTERESTChildren 0 – 5y.o.- Male 51- Female 60Children 6 – 12y.o.- Male 49- Female64Children 13 – 17y.o.- Male 32- Female 3618 above- Male 154- Female 167Elderly- Male 33- Female 39CWD- Male 1- Female 3PWD- Male 8- Female 5EXISTINGRESOURCES JetmaticPumpPROJECTED NEED Day CareCenterTanodOutpostReadingCenter Children’sPark WaterSystem Construction ofjetmatic pumpsChlorination ofexisting watersourcesConstruction ofMale andFemale CRRehab. OfTanod Outpostandconstruction ofCRCompletereadingmaterials andother facilitiesCompleterecreationalfacilitiesPotable waterwith tap standGAPS 5 jetmatic PumpSeparatecomfort roomfor male andfemaleComfort roomfor male andfemaleCompletereadingmaterials andother facilitiesCompleterecreationalfacilitiesRehab of watersystemACTIVITY TOMEET THE NEEDSThroughresolution toconcernedagencies.SUPPORTAGENCY INGO /NGOKALAHISOURCE OF FUNDESTIMATEDCOSTKALAHIP 50,000MLGUMLGU“P 100,000“AMURT““P 100,000MLGUBRGY. GEN. FUNDP 20, 000“BLGU“P 60,000PLAN“PLAN“KAL;AHIP 1.5 MKAL;AHI“Brgy. Casili-on BDRRMP 2017-201925

SECTORAL PLAN (MEDICAL)SYSTEM OF INTERESTChildren 0 – 5y.o.- Male 51- Female 60Children 6 – 12y.o.- Male 49- Female64Children 13 – 17y.o.- Male 32- Female 3618 above- Male 154- Female 167Elderly- Male 33- Female 39CWD- Male 1- Female 3PWD- Male 8- Female 5EXISTINGRESOURCES8 BHWPROJECTED NEED terBand AidBetadineCottonBandageAlcoholGauze BandageToothbrushSanitary napkinPillsMefenamicMetoprololAgua oxinadaLosartanNeoblocClothesRosaryMana packSolarWheel chairGAPS 2 boxes5 boxes5 boxes10 boxes2 pc.1 box2 pcs.3 pcs.2 pcs.3 bottles.2 packs1 doz.3 packs50 boxes10 boxes10 boxes2 bottles2 boxes2 boxes1 doz.12 pcs.2 boxes2 pcs.1 pc.ACTIVITY TO MEETTHE NEEDSBrgy.AppropriationSUPPORT AGENCYINGO / NGOSOURCE OF FUNDPLANLGUOXFAMPLANRED CROSSCHRISTIAN AIDCARITASBLGU 5 %ESTIMATED COSTP 400P 300P 120P 600P 200P 50P 100P 24P 150P 124P 60P 90P 90P 120P 2500P 120P 160P 160P 180P 240P 600Total: 735PBrgy. Casili-on BDRRMP 2017-201926

SECTORAL PLAN (SECURITY RESCUE)SYSTEM OF INTERESTChildren 0 – 5y.o.- Male 51- Female 60Children 6 – 12y.o.- Male 49- Female64Children 13 – 17y.o.- Male 32- Female 3618 above- Male 154- Female 167Elderly- Male 33- Female 39CWD- Male 1- Female 3PWD- Male 8- Female 5EXISTINGRESOURCES6 Tanod’s withHonorarium of P400/ mos.PROJECTED NEED TrainingIDUniformBatutaSolar flashlightWhistlleRaincoatBootsWall clockRadio gramMotorcycleSafety helmetChainsawNylon ropeHand cupStretchersNescafeSugarThermosJacketGAPS Training6 pcs. ID6 pairs uniform6 pcs. Batuta6 pcs. Flashlight6 pcs. Whistle6 pcs. Raincoat6 pairs boots1 pc. Wall clock2 pairs radiogram1 motorcycle6 pcs. Helmet1 pc. Chainsaw50m. rope1 hand cup1 stretcher2 doz. Nescafe1 kl. Sugar1 thermos6 pcs. jacketACTIVITY TOMEET THE NEEDSResolution to theconcernedagencyCoordinate todifferent NGO’sSUPPORTAGENCY INGO /NGOLGUUNDPMLGUPLANCRSOXFAMAMURTRED CROSSHABITATUN OCHAUNICEFDILGBLGUPNPWFPZUILEGUNHCRMSFSOURCE OF FUNDLGUUNDPMLGUPLANCRSOXFAMAMURTRED CROSSHABITATUN TP 360P 1,500P 600P 900P 210P 2,400P 1,200P 150P 4,000P 36,000P 3,00P 20, 000P 400P 600P 1,500P 60P 40P 120P 1,200Total: 735P 74,240Brgy. Casili-on BDRRMP 2017-201927

EVACUATION PLANMGA LUGAR NA LILIKASAN AT KAKAHAYAN NITOEVACUATION CENTERCasili – on Elem. School : Grade VI Bldg. Grade IV Bldg. Grade V Bldg. Pre – Elem. Bldg. Principal’s OfficeCAPACITY4 families (15 persons )10 families (36 persons )2 families (9 persons )9 families ( 48 persons)5 families ( 22 persons )Day Care Center6 Families (21 persons )Barangay HallSALAS’s ResidenceJAPSON Bldg.APILADO’s ResidenceLACANDAZO’s ResidenceOBILLO’s ResidenceOGKING’s ResiddenceMYRNA NADERA’s ResidenceROBERT TAMBOLOGAN’s ResidenceMILAGROSA NADERA’s ResidenceYAKIT Sr. ResidenceBALDICANAS ResidenceQUILBIO ResidenceC. YAKIT Residence2 Families ( 8 persons )5 families (16 persons )6 families ( 25 persona )2 Families ( 9 persons )2 families ( 14 persons )5 families ( 18 persons )2 families ( 10 persons )4 families (19 persons )4 families ( 19 persons )8 families ( 25 persons )8 families ( 38 persons )7 families ( 28 persons )4 families (21 persons )4 families (19 persons )SINU - SINOF. Caandoy Family; A. Nuevo Family; E. Macasusi Family; Y. Sebalon FamilyR. Ogario Family, Sr.; R. Ogario Family, Jr.; G. Nuevo family; E. Nuevo Family; J. Ayon Family; T.Pagaspas Family; C. Jalbay Family; Carlito Jalbay Family; D. Jalbay FamilyM. Abdon Family; Cabugawan FamilyA.Colandog Family; A. Elogario Family; B. Clemente Family; R. Colandog Family; Abeo Family;Centillas Family; Robert Family; Rowel Family; Lumactod FamilyMarlon Edano Family; Mamerto Edano Family; R. Candido Family; Marcelino Edano Family;Elacion Abutan FamilyDionisio Abdon Family; Jumar Abdon Family; Leonilo Cayosa Family; Allan Ogana Family; ZaidaFamily; Michael Abdon FamilyLoyola Family; Macawile FamilyMacawile family; Gandia Family; Colandog Family; Ogario Family; Salas FamilyLumen Family; Ida Family; Abejo Family; Yodico Family; Yodico Family; Bade FamilyApilado Family; Engr. Apilado FamilyBautista Family; Lacandazo FamilyGilber Family 1; Gilber Family 2; Macale Family; Obillo Family; Oliverio Family; Caberio FamilyQuilbio Family; Campo Family; Olivar Family; Nadera FamilyPoncion; Cebricus; Baldicanas ; tambologanOdivelas Family 1; Odivelas Family 2; Delfin; Randy; PabloF. Nadera; F Yakit; J. Yakit’ E. Yakit; M. Colandog; M. Gagarino; M. ArcillaA.Ogsila Sr.; Ogsila Jr,; Yaranon Family; R. Yaranon; Dacutan; J. Baldicanas; E. Baldicanas FamilyV. Odivelas; Raagas; Yarzo; QuilbioSuico Family; Arca Family; Yakit; Partolan Family; C. Yakit FamilyBrgy. Casili-on BDRRMP 2017-201928

BDRRM Plan4 THEMATIC AREASPREVENTION AND MITIGATIONDISASTER PREPAREDNESSEMERGENCY RESPONSERECOVERY AND REHABILITATIONoooooooooooooooooooooooooooPROJECTS AND ACTIVITIES UNDER EACH AREACreation of ordinance on tree plantingCreation of ordinance on the cleanliness of the BarangayPosting of the DRRM PlanConstruction of evacuation centerProduce billboards or signage’s of the safe route to safe placesCreation of ordinance on waste segregationAdoption of the memorandum circular of the DPWH on the exact distance of the national road to thehousesOrientation of the family on the safe evacuation centerCreation of ordinance for producing the early warning systemDrill simulationProduce billboards or signage’s of the safe route to safe placesPrepare / bring banig, kumot, clothing, and medicinesFamily savings for emergencyBring your own food to the evacuation centerCleaning of the communityRepair of houses and other destroyed facilitiesRelief operationFree medical consultationPost traumatic activitiesLivelihood trainingCleaning and chlorination of the waterwaysDRRM PlanningCreation of ordinance on the design construction of resilient housesSustainable livelihood programRehabilitation of public infrastructuresLivelihood support training’sConstruction of standard drainageBrgy. Casili-on BDRRMP 2017-201929

PicturesBrgy. Casili-on BDRRMP 2017-201930

Brgy. Casili-on BDRRMP 2017-201931

The Participatory Capacity and Vulnerability Assessment (PCVA) was designed and implemented by Local Government Unit of Salcedo for the Child Centered-Community Based Climate Change Adaptation (CC-CBA) project in order to assist different project stakeholders in the efficient collection, management and analysis of