Csula Housing Services Civil Dining Hall

Transcription

11.12.13.2.3.DOOR HANDLES, PULLS, LATCHES, LOCKS AND OTHER OPERATING DEVICES ON DOORS REQUIREDTO BE ACCESSIBLE SHALL NOT REQUIRE TIGHT GRASPING, TIGHT PINCHING OR TWISTING OF THEWRIST TO OPERATE. MANUALLY OPERATED BOLTS OR SURFACE BOLTS ARE NOT PERMITTED. THEUNLATCHING OF ANY DOOR OR LEAF SHALL NOT REQUIRE MORE THAN ONE OPERATION. CBC1008.1.9.1.LATCHING AT LOCKING DOORS THAT ARE HAND ACTIVATED AND WHICH ARE IN A PATH OF TRAVELSHALL BE OPERABLE WITH A SINGLE EFFORT BY LEVER TYPE HARDWARE, PANIC BARS, PUSH-PULLACTIVATING BARS OR OTHER HARDWARE DESIGNED TO PROVIDE PASSAGE WITHOUT REQUIRINGTHE ABILITY TO GRASP THE OPENING HARDWARE. CBC 1133B.2.5.2HAND ACTIVATED DOOR OPENING HARDWARE SHALL BE CENTERED BETWEEN 30" AND 44" ABOVETHE FLOOR. CBC 1133B.2.5.2.4.WHEN INSTALLED, DOORWAYS SHALL HAVE A MINIMUM CLEAR OPENING OF 32” WITH THE DOOROPEN 90 DEGREES. CBC 1133B.1.1.1.15.FOR HINGED DOORS, THE OPENING WIDTH SHALL BE MEASURED WITH THE DOOR POSITIONED AT ANANGLE OF 90 DEGREES FROM ITS CLOSED POSITION. CBC 1133B.2.3.14. THE GENERAL CONTRACTOR SHALL MAINTAIN A CURRENT AND COMPLETE SET OF CONSTRUCTION 53. PROVIDE ILLUMINATED EXIT SIGNS AND EMERGENCY LIGHTING AS REQUIRED BY CBC 1006,6.DOCUMENTS ON THE JOB SITE DURING ALL PHASES OF CONSTRUCTION FOR USE OF ALL TRADESEMERGENCY LIGHTING SHALL PROVIDE A VALUE OF ONE FOOT-CANDLE AT FLOOR LEVEL.AND SHALL PROVIDE ALL SUBCONTRACTORS WITH CURRENT CONSTRUCTION DOCUMENTS ASREQUIRED. THE PLANS SHALL NOT BE SEPARATED.54. WHERE EXIT DOOR SWING OUT OVER A LANDING, THE LANDING SHALL BE NOT MORE THAN ½” BELOWTHE THRESHOLD.15. THE GENERAL CONTRACTOR SHALL REMOVE ALL DEBRIS AND WASTE MATERIALS ON A REGULARBASIS FOR ALL SUB-CONTRACTORS AND TRADES. GENERAL CONTRACTOR SHALL EXERCISE STRICT 55. ALL GLAZING ALUMINUM SECTIONS SHALL CONFORM TO CBC REQUIREMENTS OF 1/175 DEFLECTIONCONTROL OVER JOB CLEANING THROUGHOUT CONSTRUCTION INCLUDING FINAL CLEAN-UP UPONFACTOR.COMPLETION OF WORK.7.56. CONTRACTOR SHALL NOTIFY ARCHITECT AND OWNER OF ANTICIPATED POURING OF FOOTINGS ONE16. THE CONSTRUCTION DOCUMENTS ARE PROVIDED TO ILLUSTRATE THE DESIGN AND GENERAL TYPEWEEK IN ADVANCE.OF CONSTRUCTION DESIRED, AND IMPLY THE FINEST QUALITY OF CONSTRUCTION, MATERIAL ANDWORKMANSHIP.THE GENERAL CONTRACTOR, IN ASSUMING RESPONSIBILITY FOR THE WORK 57. UNLESS OTHERWISE INDICATED ON THESE PLANS OR IN THE SPECIFICATIONS AS BEING N.I.C. OR8.INDICATED, SHALL ENFORCE CONSTRUCTION STANDARDS FOR EACH TRADE.THE GENERALEXISTING, ALL ITEMS, MATERIALS, ETC. AND INSTALLATION OF SAME ARE A PART OF THE CONTRACTCONTRACTOR SHALL ALSO ENFORCE QUALITY CONTROL PRIOR TO FINAL PUNCH WALK.DEFINED BY THESE PLANS AND SPECIFICATIONS.17. CONTRACTOR SHALL PROVIDE PROTECTION DURING CONSTRUCTION IN ACCORDANCE WITH CBC 58. KEEP ALL PIPING, DUCTWORK AND STRUCTURAL MEMBERS AS CLOSE TO WALLS AND AS HIGH TO9.CHAPTER 33.UNDERSIDE OF ROOF FRAMING AS POSSIBLE.MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT EXCEED 5 POUNDS FOR EXTERIOR DOORS AND 5POUNDS FOR INTERIOR DOORS, WITH SUCH PULL OR PULL EFFORT BEING APPLIED TO RIGHTANGLES TO HINGED DOORS AND AT THE CENTER PLANE OF SLIDING OR FOLDING DOORS.COMPENSATING DEVICES OR AUTOMATIC DOOR OPERATORS MAY BE UTILIZED TO MEET THE ABOVESTANDARDS. WHEN FIRE DOORS ARE REQUIRED, THE MAXIMUM EFFORT TO OPERATE THE DOORMAY BE INCREASED TO THE MAXIMUM ALLOWABLE BY THE APPROPRIATE ADMINISTRATIVEAUTHORITY, NOT EXCEED 15 POUNDS. CBC 1133B.2.5.WHEN THE DOOR HAS A CLOSER, THEN THE SWEEP PERIOD OF THE CLOSER SHALL BE ADJUSTED SOTHAT FROM AN OPEN POSITION OF 70 DEGREES, THE DOOR WILL TAKE AT LEAST 3 SECONDS TOMOVE TO A POINT 3” FROM LATCH, MEASURED TO THE LANDING EDGE OF THE DOOR. CBC 1133B.2.5.1THRESHOLDS SHALL NOT BE GREATER THAN 1/2" IN TOTAL HEIGHT WITH THE LEADING EDGESREVEALED OR SLOPED AT AN ANGLE NOT EXCEEDING 45 DEGREES SO THAT NO SINGLE VERTICALCHANGE OF ELEVATION EXCEEDS 1/4".THERE SHALL BE A LEVEL AND CLEAR FLOOR OR LANDING ON EACH SIDE OF A DOOR. THE LEVELAREA SHALL HAVE A LENGTH IN THE DIRECTION OF THE DOOR SWING OF AT LEAST 60" AND THELENGTH OPPOSITE THE DIRECTION OF THE DOOR SWING OF 48" AS MEASURED AT RIGHT ANGLES TOTHE PLANE OF THE DOOR IN THE CLOSED POSITION.18. CONTRACTOR SHALL FIREPROOF AS REQUIRED BY CODE ALL NEW PENETRATIONS GENERATED BY 59. SIZES OF MECHANICAL EQUIPMENT PADS, BASES, ROOF EQUIPMENT PADS, AND OPENINGS ARE ATHE WORK DESCRIBED IN THESE DOCUMENTS. THE CONTRACTOR SHALL PATCH & REPAIR ALLBASIS FOR DESIGN ONLY.CONTRACTOR SHALL VERIFY DIMENSIONS OF ALL MECHANICALFIREPROOFING DAMAGED DURING DEMOLITION AND/OR CONSTRUCTION.CONTRACTOR EQUIPMENT MANUFACTURERS. MECHANICAL CONTRACTOR SHALL VERIFY ALL SIZES10. THE WIDTH OF THE LEVEL AREA ON THE SIDE TO WHICH THE DOOR SWINGS SHALL EXTEND AAND LOCATIONS OF DUCT OPENINGS ON ROOF AND WALLS.MINIMUM OF 24" PAST THE STRIKE EDGE OF THE DOOR FOR THE EXTERIOR DOORS AND A MINIMUM19. THE CONTRACTOR SHALL PROVIDE AND COORDINATE ALL NECESSARY BLOCKING, BACKING,OF 18" PAST THE STRIKE EDGE FOR INTERIOR DOORS.FRAMING, HANGERS OR OTHER SUPPORT FOR ALL INTERIOR AND EXTERIOR TRIM, FIXTURES, 60. WHERE LARGER STUDS OR FURRING IS REQUIRED TO COVER DUCTS, STRUCTURAL MEMBERS,EQUIPMENT, CABINETRY, FURNISHINGS, AND ALL OTHER ITEMS REQUIRING THE SAME, INCLUDINGSTRUCTURAL HARDWARE, PIPING CONDUIT, ETC. THE LARGER SIZE STUD OR FURRING SHALL EXTEND11. THE BOTTOM 10" OF ALL DOORS EXCEPT AUTOMATIC AND SLIDING SHALL HAVE ASMOOTH“NOT IN CONTRACT” ITEMS.THE FULL LENGTH OF THE SURFACE WHERE THE FURRING OCCURS.UNINTERRUPTED SURFACE TO ALLOW THE DOOR TO BE OPENED BY A WHEELCHAIR FOOTRESTWITHOUT CREATING A TRAP OR HAZARDOUS CONDITION. WHERE NARROW FRAME DOORS ARE20. ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSIDERED CONSTRUCTION 61. ALL ROOF DRAINS SHALL BE LOCATED AT THE LOWEST POINT OF THE ROOF, TAKING INTOUSED, A 10" HIGH SMOOTH PANEL SHALL BE INSTALLED ON THE PUSH SIDE OF THE DOOR WHICHSTANDARDS. IF THE CONTRACTOR HAS QUESTIONS REGARDING SAME, OR THEIR EXACT MEANING,CONSIDERATION THE CAMBER OF BEAMS AND DEFLECTION OF CANTILEVERS. CONTRACTOR SHALLWILL ALLOW THE DOOR TO BE OPENED BY A WHEELCHAIR FOOTREST WITHOUT CREATING A TRAPENVIRON ARCHITECTURE SHALL BE NOTIFIED FOR CLARIFICATION.VERIFY THAT POSITIVE DRAINAGE EXISTS FROM ALL POINTS ON ROOF.OR HAZARDOUS CONDITION.21. ALL ITEMS ARE NEW UNLESS OTHERWISE NOTED.62. TOILET ROOMS AND MECHANICAL EQUIPMENT ROOMS SHALL BE PROVIDED WITH A MECHANICAL12. ALL EXIT ACCESS DOORWAYS SHALL BE PROTECTED BY TIGHT-FITTING SMOKE AND DRAFT CONTROLVENTILATING SYSTEM TO PROVIDE ONE (1) COMPLETE CHANGE OF AIR EVERY 15 MINUTES ANDASSEMBLIES HAVING A FIRE PROTECTION OF NOT LESS THAN 20 MINUTES WHEN TESTED IN22. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSURE THAT INSTALLATION METHODS CONFORM TOCONNECTED TO THE LIGHT SWITCH (MIN).ACCORDANCE WITH UBS STANDARD 7-2, PART II. SMOKE AND DRAFT CONTROL DOOR ASSEMBLIESALL BUILDING CODE REQUIREMENTS. THE MATERIALS SPECIFIED ARE INTENDED TO MEET CODESHALL BE PROVIDED WITH A GASKET INSTALLED SO AS TO PROVIDE A SEAL WHERE THE DOORREQUIREMENTS.ANY DISCREPANCY BETWEEN THE CONSTRUCTION DOCUMENTS AND CODE 63. PROVIDE METAL TRIM OR CASING AT ALL EDGES OF PLASTER AND DRYWALL SURFACES WHERE ITMEETS THE STOP ON BOTH SIDES AND ACROSS THE TOP.REQUIREMENTS SHALL BE BROUGHT TO THE ATTENTION OF ENVIRON ARCHITECTURE IMMEDIATELYTERMINATES OR MEETS ANY OTHER MATERIAL, UNLESS NOTED OTHERWISE. PROVIDE SEALANT ATBY THE CONTRACTOR, PRIOR TO PROCEEDING WITH THE SPECIFIED WORK.SUCH EDGES.23. DO NOT SCALE OFF DRAWINGS, DIMENSIONS GOVERN.SMALLER DETAILS.LARGE SCALE DETAILS GOVERN OVER 64. SEALANT SHALL BE PROVIDED AT ALL VERTICAL AND HORIZONTAL CONCRETE EXPANSION JOINTS.24. ALL INTERIOR WALL DIMENSIONS ARE TO FACE OF STUD, UNLESS OTHERWISE NOTED.65. ALL EXTERIOR WALL OPENINGS, FLASHINGS, COUNTER FLASHINGS, COPINGS, AND EXPANSION JOINTSSHALL BE WEATHERPROOF.25. ALL EXTERIOR WALL DIMENSIONS ARE TO FACE OF CONCRETE, CONCRETE BLOCK OR STUD UNLESS 66. UNLESS NOTED OTHERWISE, ALL EXTERIOR AND INTERIOR EXPOSED METAL TRIM, MOLDING, FRAMES,OTHERWISE NOTED.CASING, COPING AND FLASHING, ELECTRICAL GEAR AND ROOF LADDER SHALL BE PAINTED VERIFYPLANS FOR PAINT COLORS.26. NO SUBSTITUTIONS OF SPECIFIED MATERIALS SHALL BE PERMITTED WITHOUT FIRST SUBMITTINGSPECIFICATIONS, SAMPLES & COST IMPACT TO ENVIRON ARCHITECTURE FOR APPROVAL.67. ALL RAMPS, STAIRS, AND WALKWAYS SHALL HAVE A SLIP RESISTANT FINISH AT LEAST EQUAL TO AMEDIUM BROOM FINISH UNLESS OTHERWISE NOTED.27. AT THE TIME OF BID SUBMITTAL, THE CONTRACTOR SHALL ADVISE ENVIRON, IN WRITING, OF ANYSPECIFIED MATERIALS OR EQUIPMENT WHICH ARE EITHER UNAVAILABLE OR WILL CAUSE A DELAY IN 68. FIRE STOPPING SHALL BE PROVIDED TO CUT OFF ALL CONCEALED DRAFT OPENINGS (BOTHTHE CONSTRUCTION COMPLETION SCHEDULE.HORIZONTAL AND VERTICAL) IN ALL STUD WALLS AND PARTITIONS, INCLUDING FURRED SPACES, SOTHAT THE MAXIMUM DIMENSIONS OF ANY CONCEALED SPACE IS NOT OVER 10 FEET.28. THE CONTRACTOR SHALL PROVIDE AND INSTALL ROUGH AND FINAL HOOK-UP FOR ALL SPECIFIEDFIXTURES AND SHALL SUPPLY ALL SUCH FIXTURES UNLESS OTHERWISE NOTED.69. IN ALL CASES, PROVIDE ISOLATION OF ALUMINUM FROM ADJACENT STEEL OR COAT SURFACES INCONTACT WITH BITUMINOUS PAINT.29. CONTRACTOR SHALL SECURE THE JOB SITE AT ALL TIMES DURING THE CONSTRUCTION PERIOD,INCLUDING THOSE TIMES WHEN THE CONTRACTOR'S WORKMEN ARE NOT ACTUALLY ON THE JOB.70. THE CONTRACTOR IS TO NOTIFY THE OWNER WHEN THE PLUMBING AND ELECTRICAL HAS BEEN“ROUGHED IN”, SO LOCATION CAN BE VERIFIED BEFORE SLAB IS POURED.30. THE CONTRACTOR SHALL PATCH, REPAIR, REPLACE AND/OR REFINISH ALL EXISTING CONSTRUCTIONIN THE CONTRACT AREA TO A "LIKE NEW" CONDITION.71. REFER AND REVIEW THE SOILS REPORT IN ITS ENTIRETY.REVIEW ALL RECOMMENDATIONSPERTAINING TO FOUNDATIONS, LATERAL LOADS, RETAINING WALLS, EXCAVATIONS, GRADING, PAVING,31.THE CONTRACTOR IS RESPONSIBLE TO MEET ALL ACCESSIBLE CODE REQUIREMENTS WITHDRAINAGE AND MOISTURE PROTECTION, FLOOR SLABS, CORROSIVITY, AND OTHER SERVICES.FACILITIES INSTALLED, INCLUDING SIGNAGE.72. MECHANICAL, ELECTRICAL AND PLUMBING CONTRACTORS SHALL CONNECT ALL FIXTURES AND32. ANY REVISIONS OR ADDITIONAL WORK REQUIRED BY THE CLIENT, FIELD CONDITIONS OR LOCALEQUIPMENT. THE INSTALLATION SHALL BE PER CODE REQUIREMENTS.GOVERNING AUTHORITIES SHALL BE BROUGHT TO THE ATTENTION OF ENVIRON ARCHITECTUREBEFORE PROCEEDING. INFORM ENVIRON ARCHITECTURE IF SUCH WORK WILL HAVE A SCHEDULE 73. PROVIDE AS REQUIRED, PORTABLE FIRE EXTINGUISHERS WITH BRACKETS AND INSTALL IN A LOCATIONIMPACT.WHICH SATISFIES THE FIRE DEPARTMENT.ELECTRICAL NOTES1.2.3.4.THE HIGHEST OPERABLE PART OF ALL CONTROLS, DISPENSERS, RECEPTACLES AND OTHEROPERABLE EQUIPMENT SHALL BE INSTALLED AT AN ACCESSIBLE LOCATION MEETING THECLEARANCES AND REACH RANGE REQUIREMENTS OF SECTION CBC 1117B.6, 1118B.5 AND 1118B.6ELECTRICAL SWITCHES: CONTROLS AND SWITCHES INTENDED TO BE USED BY THE OCCUPANT OFTHE ROOM OR AREA TO CONTROL LIGHTING AND RECEPTACLE OUTLETS, APPLIANCE OR COOLING,HEATING AND VENTILATING EQUIP. LOCATED NO MORE THAN 48 INCHES MEASURED FROM THE TOPOFTHE OUTLET BOX NOR LESS THAN 15 INCHES MEASURED FROM THE BOTTOM OF THE OUTLET BOXTO THE LEVEL OF THE FINISH FLOOR OR WORKING PLATFORM. CBC 117B.6.5.1ELECTRICAL RECEPTACLE OUTLETS: ELECTRICAL RECEPTACLE OUTLETS ON BRANCH CIRCUITS OF30 AMPERES OR LESS AND COMMUNICATION SYSTEM RECEPTACLE LOCATED NO MORE THAN 48INCHES MEASURED FROM THE TOP OF THE RECEPTACLE OUTLET BOX OR RECEPTACLE HOUSINGNOR LESS THAN 15 INCHES MEASURED FROM THE BOTTOM OF THE RECEPTACLE OUTLET BOX ORERECEPTACLE HOUSING TO THE LEVEL OF THE FINISH FLOOR OR WORKING PLATFORM. CBC 1117B.6.5.2COMPLETE ELECTRICAL INSTALLATION IS TO BE PROVIDED FOR ALL EQUIPMENT SHOWN IN THISCONTRACT. FURNISH ALL LABOR AND TOOLS NECESSARY. FURNISH AND INSTALL ALL APPARATUS,MATERIALS AND EQUIPMENT IN A FASHION COMPLYING WITH ALL APPLICABLE CODES, INCLUDINGITEMS REQUIRED BUT NOT NORMALLY SHOWN, SUCH AS LAMPS, COUPLINGS, HANGERS, BRACKETS,CLAMPS, BOXES, CONNECTORS, AND HARDWARE.5.FURNISH AND INSTALL ALL FIXTURES COMPLETE WITH LAMPS AS SPECIFIED ON PLANS.6.PROVIDE POWER DISTRIBUTION TO ALL LIGHTING AND EQUIPMENT.7.DETERMINE EXACT ROUTING OF CONCEALED FEEDERS AND BRANCH HOME-RUNS IN COOPERATIONWITH OTHER TRADES TO SIMPLIFY INSTALLATION WHEREVER POSSIBLE, SUBJECT TO APPROVAL OFARCHITECT FOR VISUAL AND STRUCTURAL REASONS. ALL EXPOSED CONDUITS AND JUNCTIONBOXES ARE TO BE PAINTED AS DIRECTED BY THE ARCHITECT WITH THE EXCEPTION OF SURFACEMOUNTED CONDUIT ON ROOF OR OTHERWISE HIDDEN FROM PUBLIC VIEW.33. ANY AND ALL REVISIONS SHALL BE PROCESSED IN ACCORDANCE TO THE GENERAL CONDITIONS OF 74. PROVIDE SECURITY GRILLS AT ANY OPENING ,EXISTING AND NEW (OPEN DUCTS, PIPES, REGISTERS,THE CONTRACT, AIA 201.LOUVERS, VENTS, SEWERS, ETC) IN EXCESS OF 96 INCHES IN AREA AND OVER 6 INCHES IN ITS 8.SMALLEST DIMENSION. VERIFY CSULA SECURITY REQUIREMENTS.34. BEFORE ACCEPTANCE BY THE OWNER, THE COMPLETED CONSTRUCTION SHALL BE CLEANED,LABELS REMOVED AND ALL OTHER TOUCH-UP COMPLETED.75. SHOULD ANY ASPHALTIC CONCRETE REQUIRE PATCHING ADJACENT TO BUILDING, IT SHALL BE DONE 9.ACCORDING TO THE PAVING SPECIFICATIONS AND THE SOILS REPORT AND SHALL BE OF THE SAME35. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL LIFE SAFETY EQUIPMENT ASSECTION AND DRAIN SCHEME AS ADJACENT PAVED AREAS.REQUIRED BY STATE AND LOCAL BUILDING CODES.10.76. ADDRESS NUMBERS SHALL BE PROVIDED AND INSTALLED BY THE GENERAL CONTRACTOR AT THE36. THE CONTRACTOR SHALL HOLD HARMLESS ENVIRON ARCHITECTURE AND ITS AGENTS, THE BUILDINGFRONT ENTRANCE AND SERVICE ENTRANCE OF THE BUILDING PER TENANTS REQUIREMENTS. FINALOWNER AND THEIR REPRESENTATIVES OF ANY SUITS OR ANY OTHER LEGAL ACTION ARISING FROMDETERMINATION ON SIZE, COLOR, AND EXACT LOCATION TO BE CONFIRMED BY LOCAL AUTHORITY.THE CONTRACTOR'S WORK.PROVIDE ADDRESS NUMBERS SO AS TO BE ILLUMINATED BY SOME SOURCE OF LIGHT.11.37. GENERAL CONTRACTOR IS TO PROVIDE ACCESS PANELS FOR MECHANICAL, ELECTRICAL, PLUMBING, 77. GENERAL CONTRACTOR TO PROVIDE ALL GOVERNMENTAL REQUIRED SIGNAGE NECESSARY FOR THEAND DATA CONTROLS AS REQUIRED. LOCATIONS TO BE REVIEWED BY ENVIRON ARCHITECTURECERTIFICATE OF OCCUPANCY (FIRE LANE SIGNAGE, “DO NOT BLOCK DOOR”, ETC).PRIOR TO THE INSTALLATION OF THE SYSTEMS REQUIRING THE ACCESS PANELS.78. EXPANSION JOINTS IN STUCCO SHALL BE PLACED WHERE SHOWN ON PLANS AND/OR AT LEAST EVERY100 SQUARE FEET, AND ABOVE AND BELOW OPENINGS PER ASTM #1063.SIZE OUTLET BOXES IN CONFORMITY WITH CODE FOR NUMBER AND GAUGE OF CONDUCTORSTHEREIN, MIN. BOX SIZE SHALL BE 4" SQ. BY 1 1/2" DEEP.CONTRACTOR TO CONNECT ALL HARDWIRED EQUIPMENT AND FIXTURES AND SHALL PROVIDE ALLNECESSARY CONNECTIONS FROM LOW VOLTAGE TRANSFORMER TO EQUIPMENT. ALL LOW VOLTAGEWIRING MUST BE IN CONDUIT.ALL NEW BRANCH CIRCUIT BREAKERS SHALL MATCH THE EXISTING BREAKERS WHEREVERPOSSIBLE. THIS WORK MAY REQUIRE THE USE OF REFURBISHED BRANCH BREAKERS IF BREAKERSTO MATCH TO EXISTING ARE NO LONGER AVAILABLE.ALL ELECTRICAL WORK MUST COMPLY WITH DISABLED ACCESS REQUIREMENTS.(NEW) ALLOWABLE BUILDINGAREA (CBC 2010, TABLE 503)OCCUPANCY A-2 6,000 SQ. FT.ALLOWABLE BUILDING AREA PER CBC SECTION 508.4.2ACTUAL BUILDING AREA OF EACH SEPARATED OCCUPANCY/1 ALLOWABLE BUILDING AREA OF EACH SEPARATED OCCUPANCY 17765 4832/ 9000 6000 112,597/15000 1.8398 1 RATIO IS LESS THAN 1.OCCUPANT LOAD(CBC 2010, TABLE 1004.1.1):DINING AREA (NEW ADDITION)ASSEMBLY UNCONCENTRATED (TABLES AND CHAIRS) 15 NET2,750/15 184 OCCUPANTSEXITS REQUIRED: 2EXITS PROVIDED: 2DINING AREA (EXISTING)ASSEMBLY UNCONCENTRATED (TABLES AND CHAIRS) 15 NET740/15 49 OCCUPANTSEXITS REQUIRED: 1EXITS PROVIDED: 1KITCHEN 200 GROSS1,253/200 7 OCCUPANTSEXITS REQUIRED: 1EXITS PROVIDED: 1BUILDING PLANS AND CALCULATION SHALL BE IN COMPLIANCE WITH:2010 CALIFORNIA BUILDING CODE2010 CALIFORNIA PLUMBING CODE2010 CALIFORNIA MECHANICAL CODE2010 CALIFORNIA ELECTRICAL CODE2010 CALIFORNIA FIRE CODE2010 NFPA-13 FIRE SPRINKLER STANDARDS2010 NFPA-72 FIRE ALARM CODEPROJECT DESCRIPTIONDEMO EXISTING CONCRETE PLAZA AND PREPARE FOR NEWBUILDING ADDITION.CONSTRUCTION OF NEW ADDITION WITH KITCHEN TO EXISTINGBUILDING.SEPARATE PERMITSDEFERRED APPROVALS 1SEPARATE PERMITS ARE REQUIRED FORTHE FOLLOWING:DEFERRED APPROVAL ITEMS:1. FIRE ALARM/LIFE SAFETY2. FIRE SPRINKLERS3. FIRE SPRINKLER MONITORING SYSTEM1. PRE-MANUFACTURED TRUSSEDRAFTERSPROJECT TEAMPROJECT:STUDENT HOUSING DINING ADDITIONCALIFORNIA STATE UNIVERSITY, LOS ANGELESFACILITIES PLANNING AND CONSTRUCTION5151 STATE UNIVERSITY DRIVELOS ANGELES, CA 90032ARCHITECT:ENVIRON ARCHITECTURE INC.100 OCEANGATE SUITE P200LONG BEACH, CA 90802TEL: 562-495-7110FAX: 562-432-5427CONTACT: ALAN BURKSSTRUCTURAL ENGINEER:MHP STRUCTURAL ENGINEERS3900 COVER STREETLONG BEACH, CA 90808TEL: 562-985-3200FAX: 562-985-1011CONTACT: JAMES KRAMERMEP:GOTAMA BUILDING ENGINEERS434 EAST BROADWAYLONG BEACH, CA 90802TEL: 562-216-7366FAX: 562-216-7369CONTACT: CAECILIA GOTAMACIVIL:JOHN M. CRUIKSHANK CONSULTANTS, INC.411 NORTH HARBOR BLVDSUITE 201SAN PEDRO, CA 90731TEL: 310-241-6550FAX: 310-320-8871CONTACT: FELIX SINLICANLLABURTEONIANo. C22608Ren.12 / 31 / 2013F C ALI FORMECHANICALM-0.0MECHANICAL SYMBOLS, ABBREVIATIONS, ANDDRAWING LISTM-0.2MECHANICAL EQUIPMENT SCHEDULEM-0.3MECHANICAL EQUIPMENT SCHEDULEM-0.4MECHANICAL T24 FORMSM-0.5MECHANICAL T24 FORMSM-0.6MECHANICAL T24 FORMSM-0.7MECHANICAL T24 FORMSM-1.1MECHANICAL SITE PLANM-3.0MECHANICAL FLOOR PLANM-4.0MECHANICAL ROOF PLANM-4.1MECHANICAL SECTIONSM-5.0MECHANICAL DETAILSM-5.1MECHANICAL DETAILSM-5.2MECHANICAL DETAILSELECTRICALE-0.0ELECTRICAL SYMBOLS, ABBREVIATIONS ANDDRAWING LISTE-0.2ELECTRICAL TITLE 24 CALCULATIONSE-0.3ELECTRICAL SCHEDULES AND SINGLE LINE DIAGRAME-1.0ELECTRICAL OVERALL SITE PLANE-1.1ELECTRICAL SITE PLANE-2.0ELECTRICAL POWER PLANE-2.1ELECTRICAL ENLARGED POWER PLANE-3.0ELECTRICAL LIGHTING PLANE-4.0ELECTRICAL ROOF PLANE-5.0ELECTRICAL P-5.0P-5.1P-6.0P-6.1HOUSING SERVICES DINING HALL5151 STATE UNIVERSITY DRIVELOS ANGELES, CA 9003210.1.(EXISTING) ALLOWABLE BUILDINGAREA (CBC 2010, TABLE 503)OCCUPANCY B 9,000 SQ. FT.PLUMBING SYMBOLS, ABBREVIATIONS AND DRAWINGLISTPLUMBING SCHEDULE AND CALCULATIONSKITCHEN SCHEDULESPLUMBING OVERALL SITE PLANPLUMBING FLOOR PLANPLUMBING ENLARGED FLOOR PLANPLUMBING ROOF PLANPLUMBING RISER DIAGRAMPLUMBING RISER DIAGRAMPLUMBING DETAILSPLUMBING DETAILSKITCHEN CONSULTANTK-000FOODSERVICE NOTES AND SYMBOLSK-100FOODSERVICE EQUIPMENT LAYOUTK-200FOODSERVICE EQUIPMENT SCHEDULEK-300FOODSERVICE EQUIPMENT PLUMBING PLANK-400FOODSERVICE EQUIPMENT ELECTRICAL PLANK-500FOODSERVICE EXHAUST AND BUILDING WORK PLANK-510FOODSERVICE REFRIGERATION CHASE ANDCONDUIT PLANK-520FOODSERVICE CURB AND DEPRESSION PLANK-600FOODSERVICE EQUIPMENT ELEVATIONSK-610FOODSERVICE EQUIPMENT ELEVATIONSK-620FOODSERVICE EQUIPMENT ELEVATIONSK-700FOODSERVICE DETAILSK-710FOODSERVICE SEISMIC DETAILK-720FOODSERVICE SEISMIC DETAILK-730FOODSERVICE SEISMIC DETAILK-800FOODSERVICE EXHAUST HOOD DETAILSK-810FOODSERVICE EXHAUST HOOD DETAILSK-820FOODSERVICE EXHAUST HOOD DETAILSK-830FOODSERVICE EXHAUST HOOD DETAILSK-840FOODSERVICE EXHAUST F.S.S. DETAILSK-900FOODSERVICE REFRIGERATION DETAIL PLANVICINITY MAPVALLEY BLVDMARIONDALE AVE9.ENTRANCE & EXIT DOORS NOTES:NEW BUILDING ADDITION 4,832.00 SQ. FT.KITCHEN CONSULTANT:R. W. SMITH AND CO.3186-A AIRWAY AVECOSTA MESA, CA 92626TEL: 714-795-6726FAX: 714-540-9523CONTACT: ART MANNISTILLA8.BEFORE THE INSTALLATION OF MECHANICAL, ELECTRICAL, AND PLUMBING WORK.ANYDISCREPANCIES BETWEEN THE CONSTRUCTION AND THE CONSULTANT'S PLANS SHALL BE BROUGHTTO THE ATTENTION OF ENVIRON ARCHITECTURE FOR CLARIFICATION.WORK INSTALLED INCONFLICT WITH THE ENVIRON PLANS SHALL BE CORRECTED BY THE CONTRACTOR AT HIS OWNEXPENSE AND SHALL NOT IMPACT THE SCHEDULE.710NODESCRIPTIONDATEBLDG DEPT SUBMITTAL12312-14-2012PLAN CHECK SET1-4-2013REVISIONS1-4-2013PEER REVIEW1-16-2013BID SET2-14-2013TITLEGENERALNOTESHELLMAN AVECSULACAMPUS2SITECA7.THE CONTRACTOR SHALL RESERVE AN ALLOWANCE TO VERIFY THAT ANY HVAC SYSTEM TO REMAIN 46. THE CONTRACTOR SHALL, ERECT TEMPORARY BARRICADES AND DUST PROOF PARTITIONS ASIS FUNCTIONAL AND MEETS CURRENT CODE.NEEDED FOR PROTECTION AGAINST ACCIDENT AND SHALL CONTINUOUSLY MAINTAIN ADEQUATEPROTECTION OF HIS WORK AND THE OWNERS PROPERTY FROM DAMAGE ARISING IN CONNECTIONTHE CONTRACTOR SHALL, BEFORE STARTING EACH PORTION OF THE WORK, CAREFULLY STUDY ANDWITH CONSTRUCTION.COMPARE THE VARIOUS CONTRACT DOCUMENTS RELATIVE TO THAT PORTION OF THE WORK.47. BEFORE STARTING WORK IN THE FIELD, THE CONTRACTOR SHALL MEET WITH BUILDING MANAGEMENTALL CONSTRUCTION WORK SHALL COMPLY TO THE GOVERNING CITY AND/OR COUNTY CODES,TO DETERMINE PUBLIC ACCESS ROUTES AND ARRANGE FOR USE OF LOADING AREAS IF REQUIRED.LATEST EDITION AS WELL AS OTHER GOVERNING CODES AND REGULATIONS.48. THE CONTRACTOR SHALL PROTECT EXISTING FLOOR AND WALL SURFACES FROM DAMAGE.THE GENERAL CONTRACTOR WILL SUBMIT A DETAILED CONSTRUCTION SCHEDULE WITHIN ONE WEEKOF AWARDING CONTRACT.49. "HAZARDOUS SUBSTANCE" MITIGATION OR REMOVAL IS THE RESPONSIBILITY OF THE CONTRACTOR.WHEN PREPARING FOR AND PROCEEDING WITH CONSTRUCTION, THE CONTRACTOR MUST COMPLYCONTRACTOR TO NOTIFY ARCHITECT OF ANTICIPATED FINAL INSPECTION DATE TWO WEEKS INWITH ALL REQUIREMENTS OF ALL APPLICABLE LAWS CONCERNING HAZARDOUS SUBSTANCES. THEADVANCE, IN WRITING.CONTRACTOR SHALL NOT PERMIT THE INSTALLATION OR USE OF ANY HAZARDOUS SUBSTANCES INANY COMPONENT OF THE PREMISES.ALL WORK LISTED, SHOWN OR IMPLIED ON ANY CONSTRUCTION DOCUMENT SHALL BE SUPPLIED ANDINSTALLED BY THE GENERAL CONTRACTOR EXCEPT WHERE OTHERWISE NOTED. THE GENERAL 50. ALL MATERIALS USED IN THE CONSTRUCTION MUST BE ASBESTOS FREE.CONTRACTOR SHALL CLOSELY COORDINATE THE WORK OF OTHER SUBCONTRACTORS AT THE JOBSITE.51. PRIOR TO COMMENCEMENT OF WORK,THE GENERAL CONTRACTOR AND EACH SUBCONTRACTORSHALL SUBMIT TO OWNER CERTIFICATES OF INSURANCE SHOWING THE REQUIRED INSURANCE. IFTHE GENERAL CONTRACTOR SHALL OBTAIN AND PAY FOR ALL BUILDING PERMITS, INCLUDING ALLTHE COVERAGE EXPIRES PRIOR TO COMPLETION OF THE WORK, THEN CONTRACTOR AND EACHFEES, INSPECTION FEES, AND MISCELLANEOUS FEES THE ISSUING AGENCY MAY REQUIRE.THESUBCONTRACTOR SHALL SUBMIT REPLACEMENT CERTIFICATES OF INSURANCE TO OWNER PRIOR TOGENERAL CONTRACTOR SHALL PAY ANY FEES REQUIRED FOR THE REMOVAL OR RELOCATION OFTHE EXPIRATION OF SUCH COVERAGE. ALL CERTIFICATES SHALL PROVIDE THAT THERE WILL BE NOEXISTING UTILITIES OR OTHER PHYSICAL BARRIERS.CANCELLATION, MATERIAL MODIFICATION OR REDUCTION OF COVERAGE WITHOUT REASONABLEWRITTEN NOTICE TO OWNER.THE CONTRACTOR SHALL COMPLY WITH THE BUILDING OWNER'S "RULES AND REGULATIONS” IF ANYARE AVAILABLE.52. PROVIDE ILLUMINATED EXIT SIGNS AT ALL EXITS AS REQUIRED BY CBC 1006.STRUCTURALS-1.0STRUCTURAL GENERAL NOTESS-1.1STRUCTURAL GENERAL NOTES CONT.S-1.2TYP. FOUNDATION, SECTIONS & DETAILSS-1.3TYPICAL FOUNDATION, SECTIONS & DETAILS CONT.S-1.4TYPICAL FRAMING, SECTIONS & DETAILSS-1.5TYPICAL FRAMING, SECTIONS &DETAILS CONT.S-2.0FOUNDATION PLANS-2.1ROOF FRAMING PLANS-3.0FOUNDATION, SECTIONS & DETAILSS-4.0FRAMING, SECTIONS & DETAILSS-4.1FRAMING, SECTIONS & DETAILSHO6.SED ARCHIEN EEK5.ARCHITECTUREG-1TITLE GENERAL NOTESG-2ACCESSIBILITYG-3FURNITURE EGRESS PATH & GREEN CODEA-1.0OVERALL SITE PLANA-1.1SITE PLANA-1.2SITE PLAN DETAILSA-2.0FLOOR PLANA-3.0REFLECTED CEILING PLANA-4.0ROOF PLANA-5.0ELEVATIONSA-6.0SECTIONSA-8.0INTERIOR FINISHESA-8.1INTERIOR FINISHESA-9.0DOOR/WINDOW E S4.PROJECT INFORMATIONTITLE SHEETDEMO PLANGRADING AND DRAINAGE PLANUTILITY NOTESUTILITY PLANEROSION CONTROL PLANNC3.TITLE GENERAL 6AST38. FIRE DAMPERS, SMOKE DAMPERS, COMBINATION FIRE/SMOKE DAMPERS AND CEILING RADIATION 79. DESIGN MATERIALS, EQUIPMENT, AND PRODUCTS OTHER THAN THOSE DESCRIBED OR INDICATED 12. THE POWER SUPPLY FOR MEANS OF EGRESS ILLUMINATION SHALL NORMALLY BE PROVIDED BY THEDAMPERS SHALL BE PROVIDED AT THE FOLLOWING LOCATIONS, CBC SECTION 716:PREMISES’ ELECTRICAL SUPPLY. IN THE EVENT OF POWER SUPPLY FAILURE, AN EMERGENCYON THE DRAWINGS MAY BE CONSIDERED FOR USE, PROVIDED PRIOR REVIEW (IN ACCORDANCEELECTRICAL SYSTEM SHALL AUTOMATICALLY ILLUMINATE THE FOLLOWING AREAS:WITH SPECIFICATIONS) IS OBTAINED FROM OWNER, ARCHITECT AND THE APPLICABLE GOVERNINGa. FIRE WALLSCODE AUTHORITY, ANY MODIFICATIONS TO DESIGN ELEMENTS OR STRUCTURAL COMPOSITIONSb. FIRE BARRIERSa. AISLES AND UNENCLOSED EGRESS STAIRWAYS IN ROOMS AND SPACES THAT REQUIRE TWOTHAT ARE REQUESTED BY THE CONTRACTOR FOR HIS BENEFIT OR CONVENIENCE THAT REQUIRESc. SHAFT ENCLOSURESOR MORE MEANS OF EGRESS.ADDITIONAL WORK BY THE ARCHITECT AND/OR ENGINEERS, SHALL BE PAID FOR BY THEd. FIRE PARTITIONSb. CORRIDORS, EXIT ENCLOSURES AND EXIT PASSAGEWAYS IN BUILDINGS REQUIRED TO HAVECONTRACTOR. COMPENSATION FOR THIS WORK, SHALL BE PAYABLE IN ADVANCE OF THE WORKe. HORIZONTAL ASSEMBLIESTWO OR MORE EXITS.BEING PERFORMED.c.EXTERIOR EGRESS COMPONENTS AT OTHER THAN THE LEVEL OF EXIT DISCHARGE UNTIL39. THE CONTRACTOR SHALL PROVIDE THREE (3) SETS OF SHOP DRAWINGS TO ENVIRON ARCHITECTURE 80. THE CONTRACTOR SHALL INDEMNIFY AND HOLD HARMLESS THE OWNER, THE ARCHITECT, AND THEIREXIT DISCHARGE IS ACCOMPLISHED FOR BUILDINGS REQUIRED TO HAVE TWO OR MORE EXITS.FOR DESIGN REVIEW AFTER GENERAL CONTRACTOR HAS REVIEWED THEM FOR CONSTRUCTION ANDd. INTERIOR EXIT DISCHARGE ELEMENTS, AS PERMITTED IN CBC, SECTION 1027.1, IN BUILDINGSAGENTS AND EMPLOYEES FROM AND AGAINST CLAIMS, DAMAGES, LOSSES AND EXPENSESCONFORMANCE WITH THE CONTRACT DOCUMENTS.2REQUIRED TO HAVE TWO OR MORE EXITS.INCLUDING ATTORNEY’S FEES ARISING OUT OF OR RESULTING FROM THE PERFORMANCE OF THEe.EXTERIOR LANDINGS, AS REQUIRED BY CBC SECTION 1008.1.6, FOR EXIT DISCHARGEWORK PROVIDED THAT ANY SUCH CLAIM, DAMAGE, LOSS OR EXPENSE (1)IS ATTRIBUTABLE TO40. SHOP DRAWINGS FOR ALL MILLWORK SHALL BE SUBMITTED TO ENVIRON ARCHITECTURE FOR REVIEWDOORWAYS IN BUILDINGS REQUIRED TO HAVE TWO EXITS AND MORE.BODILY INJURY, SICKNESS, DISEASE OR DEATH OR TO INJURY TO OR DESTRUCTION OF TANGIBLEPRIOR TO FABRICATION.PROPERTY (OTHER THAN THE WORK ITSELF) INCLUDING THE LOSS OR USE RESULTING THEREFROM,AND (2) IS CAUSED IN WHOLE OR PART BY ANY NEGLIGENT ACT OR OMISSION OF THE CONTRACTOR, 13. THE EMERGENCY POWER SYSTEM SHALL PROVIDE POWER FOR A DURATION OF NOT LESS THAN 90GENERAL CONDITIONS, AIA DOCUMENT 201, FOR THE PERFORMANCE OF A CONTRACT ARE HEREBY 41. THE CONTRACTOR SHALL SUBMIT SAMPLES OF MATERIAL FINISHES TO ENVIRON ARCHITECTURE FORMINUTES AND SHALL CONSIST OF STORAGE BATTERIES, UNIT EQUIPMENT OR AN ON-SITEANY SUBCONTRACTOR, ANYONE DIRECTLY OR INDIRECTLY EMPLOYED BY ANY OF THEM OR ANYONEINCORPORATED INTO THESE DRAWINGS AND SHALL BE CONSIDERED AS PART OF THEDESIGN REVIEW PRIOR TO INSTALLATION. FAILURE TO DO SO WILL BE THE TOTAL RESPONSIBILITYGENERATOR. THE INSTALLATION OF THE EMERGENCY POWER SYSTEM SHALL BE IN ESSORWHETHERORNOTITISCAUSEDREQUIREMENTS FOR THE COMPLETION OF THE WORK.AND LIABILITY OF THE CONTRACTOR WHETHER SPECIFIED CORRECTLY OR INCORRECTLY ON THEWITH CBC SECTION 2702.IN PART BY A PARTY INDEMNIFIED HEREUNDER.CONTRACT DOCUMENTS.THE CONTRACTOR SHALL NOTE THAT SOME EXISTING CONDITIONS REPRESENTED IN THECONSTRUCTION DOCUMENTS MAY NOT MATCH THE ACTUAL CONDITIONS. THE CONTRACTOR SHALL 42. THE GENERAL CONTRACTOR SHALL SUBMIT PAINT DRAW DOWNS TO ENVIRON ARCHITECTURE FOR 81. INTERIOR FINISH MATERIALS APPLIED TO WALL AND CEILINGS SHALL BE TESTED AS SPECIFIED INCBC SECTION 803.VISIT THE SITE TO OBSERVE PRESENT CONDITIONS AND BASE THE BID ON THOSE CONDITIONS.REVIEW. IF ANY DRAW DOWN IS APPROVED, A 4’x4’ AREA SHALL BE PAINTED ON THE ACTUAL SURFACE(INCLUDING RAILINGS, AND STAIRS) TO BE REVIEW BY ENVIRON ARCHITECTURE PRIOR TO PAINTING 82. WALL, FLOOR AND CEILING SHALL NOT EXCEED THE FLAME SPREAD CLASSIFICATIONS IN CBCTHE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS AT THE JOBTHE ENTIRE COMPONENT.T-803.9.SITE PRIOR TO STARTING WORK INCLUDING UTILITIES AND ALL OTHER WORKS AND FACILITIES THATEFFECT THIS PROJECT. ANY DISCREPANCIES, CONFLICTS, OMISSIONS, OR UNUSUAL CONDITIONS 43. IT SHALL BE UNDERSTOOD, UNLESS OTHERWISE STATED, THAT ALL MATERIALS AND WORKMANSHIP5151 STATE UNIVERSITY DRIVE83. INTERIOR FINISH MATERIALS APPLIED TO FLOOR SHALL BE TESTED AS SPECIFIED IN CBC PROJECT ADDRESS:SHALL BE REPORTED TO ENVIRON ARCHITECTURE BEFORE PROCEEDING WITH THE WORK. NOSHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FROM THE ACCEPTANCE OF THE PROJECT BYSECTION804.LOS ANGELES, CA 90032ALLOWANCE SHALL BE MADE FOR ANY EXTRA EXPENSE OR EXTENSION OF TIME DUE TO GENERALTHE OWNER.CONTRACTOR'S FAILURE OR NEGLECT TO COMPLETE EXAMINATION OF THE JOB SITE.84. INTERIOR FINISH MATERIALS SUCH AS DECORATIVE MATERIALS AND TRIM SHALL BE TESTED AS44. THE DRAWINGS SHALL NOT BE SEPARATED. ANY ELEMENTS INDICATED ON ANY DRAWING SHALL BEEXISTING OCCUPANCY:B (HOUSING SERVICES OFFICE)SPECIFIED IN CBC SECTION 806.ENTERING INTO AN AGREEMENT FOR CONSTRUCTION INDICATES THAT THE CONTRACTOR(S) HAVEASSUMED TO BE INDICATED ON ALL DRAWINGS INCLUDING ENGINEERING DRAWINGS.NEWADDITIONOCCUPANCY:A-2 (DINING HALL)VISITED THE JOB SITE, FAMILIARIZED THEMSELVES WITH EXISTING CONDITIONS AND REVIEWED HCBC719(CBC807.1).CONSTRUCTIONTYPE:V-BSAME WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS.45. THE CONTRACTOR IS RESPONSIBLE FOR THE TIMELY ARRIVAL OF ALL SPECIFIED MATERIAL(S). THESPRINKLERED:YES (NEW ADDITION ONLY)CONTRACTOR SHALL NOTIFY THE ARCHITECT IN WRITING WITHIN 15 DAYS OF THE DATE OF CONTRACT 86. ALL DRYWALL FINISH SHOULD BE LEVEL 4 THROUGHOUT UNLESS OTHERWISE NOTED.CONTRACTOR SHALL PROTECT AREAS FROM DAMAGE, WHICH MAY OCCUR DURING CONSTRUCTION.OF ITEMS NOT READILY AVAILABLE. IF NOTIFICATION IS NOT RECEIVED BY THE ARCHITECT, THESTORIES:1ANY DAMAGE TO NEW AND EXISTING CONSTRUCTION, STRUCTURE OR EQUIPMENT SHALL BECONTRACTOR SHALL ACCEPT RESPONSIBILITY FOR PROPER ORDERING AND WILL PURSUE MEANS 87. THE MECHANICAL, ELECTRICAL, PLUMBING, AND KITCHEN CONSULTANT PLANS ARECONTRACTOR'S RESPONSIBILITY AND SHALL BE IMMEDIATELY REPAIRED OR REPLACED TO THENECESSARY AT NO ADDITIONAL COST TO THE OWNER, INSURE AVAILABILITY OF ALL SPECIFIED ITEMSSUPPLEMENTAR

csula campus 710 10 csula general notes general notes sheet index housing services dining hall structural s-1.0 structural general notes s-1.1 structural general notes cont. s-1.2 typ. foundation, sections & details s-1.3 typical foundation, sections & details cont.