IBM Power Systems - APSU

Transcription

IBM Power SystemsTherese EatonClient Technical Specialist, POWER IBM i

Accelerating change in our industry IBM Corporation, 2016

POWER8 strategyOptimized forDataOpen InnovationPlatformSuperior CloudEconomics IBM Corporation, 2016

Leverage Broad Open EcosystemOpenPlatformOpen SystemSoftwareLinux andOpen CloudManagement IBM Corporation, 2016

(Coherent Accelerator Processor Interface)Two major technology trends will heavily impact the industry Hardware acceleration will become commonplace as microprocessortechnology and design continues to deliver far less than the historical rate ofcost/performance improvement per generation New advanced memory technologies will change the economics of computingThe new standard, called OpenCAPI provides an open, high-speed pathway fordifferent types of technology – advanced memory, accelerators, networking andstorage – to more tightly integrate their functions within servers.This data-centric approach to server design, which puts the compute powercloser to the data, removes inefficiencies in traditional system architectures tohelp eliminate system bottlenecks and significantly improve serverperformance.http://opencapi.org/about/ IBM Corporation, 2016

Leadership portfolio of System & Solutions IBM Corporation, 2016

Introducing New IBM Enterprise Power Systems for the CloudAccelerate your cloud transformationReduce Total Cost of Ownership Adaptable to your architecture: runsAIX, IBM i and Linux workloads New capacity consumption pricingmodel Supports Private and Hybridor On-prem and off-prem clouds 1.7 x Performance guarantee per core vs.POWER7 Built-in OpenStack based Management Cut operating costs by as much as 50%(over 5 years) Free access to IBM’s Cloud with aSoftLayer starter pack New IBM Power to Cloud Rewardsprovides Complementary Clouddeployment servicesCut operating costs by as much as 50% (over 5 years)

Power Enterprise Cloud Models - What’s IncludedE850E850CE870, E880 E870C, E880CStarter Pack forSoftLayerStarter Pack forSoftLayerIBM Cloud HMC appsIBM Cloud HMC appsIBM Cloud PowerVCManager Lic & SWMA(1yr) 5765-VCCIBM Cloud PowerVCManager Lic & SWMA(1yr) 5765-VCCIBM Cloud PowerVCManager Lic & SWMA(1yr) 5765-VCCIBM Power-to-CloudRewardsPowerCareIBM Power-to-CloudRewardsPowerVM SWMA1 or 3yr – 57xx-xxxPowerVM SWMA1 or 3yr – 57xx-xxxPowerVM SWMA1 or 3yr – 57xx-xxxPowerVM SWMA1 or 3yr – 57xx-xxxPowerVM License5765-PVEPowerVM License5765-PVEPowerVM License5765-PVEPowerVM License5765-PVEPower E8508408-E8E3y 24x7 ServicesincludedPower E8508408-44E3y 24x7 ServicesincludedPower E870, E8809119-MME/MHE1y 24x7 HWMAPower E870/E8809080-MME/MHE1y 24x7 HWMAIBM Cloud PowerVCManager Lic & SWMA(1yr) 5765-VCC Base, included in HW 8 Part of base offering, separately priced Optional product 2016 IBM Corporation

IBM Power E850C (8408-44E) processor & activation options48 cores @ 3.65GHz(can overclock to 3.82 GHz)40 cores @ 3.95 GHz12121212(can overclock to 4.12 GHz)1010101032 cores @ 4.22 GHz(can overclock to 4.32 GHz) 888816-32 core systemUp to 4TB DDR4 Memory2, 3 or 4 sockets8-core processorsMin active cores 8Min active memory 50% of installedBuilt-in PowerVM Enterprise Editionlicense entitlementCapacity on Demand & Power IFL 20 – 40 core systemUp to 4TB DDR4 Memory2, 3 or 4 sockets10-core processorsMin active cores 10Min active memory 50% of installedBuilt-in PowerVM Enterprise Editionlicense entitlementCapacity on Demand & Power IFL 24 – 48 core systemUp to 4TB DDR4 Memory2, 3 or 4 sockets12-core processorsMin active cores 12Min active memory 50% of installedBuilt-in PowerVM Enterprise Editionlicense entitlementCapacity on Demand & Power IFL IBM Corporation, 2016

Power E850C performance vs. Power 770 (POWER7 & POWER7 )80c64c48c64c32c40c32c48c64c40c48c32c32cPOWER7 770POWER7 770Power E850CPower E870C IBM Corporation, 2016

4 TerabytesAmount of enterprise memory that will be supported on aPower E850C system192 GB/secMaximum memory bandwidth per socketRun big data applications faster for competitiveadvantageFeature SizeServer MaxMemoryDIMM SizeMemory Speed16 GB1,600 MHz DDR40/64 GB DDR4512 GB32GB1,600 MHz DDR40/128 GB DDR41 TB64 GB1,600 MHz DDR40/256 GB DDR42 TB128 GB1,600 MHz DDR40/512 GB DDR44 TBMemory Buffer Chip 16MB eDRAM L4 cache per DIMM 8 DIMMs slots per socket Up to 128MB L4 cache/socket IBM Corporation, 2016

Introducing the IBM Power System LC LineOpenPower Servers for cloud & cluster deployments that are different by design IBM Corporation, 2016

A Lot of Hardware Enhancements» High performance I/O for Big Data &Analytics – including:» 100Gb Ethernet PCIe new» 100Gb InfiniBand PCIe enhanced» PCIe NVMe Flash Adapter enhanced» DDR4 memory across POWER8 servers» Two new SAS Storage Enclosures» Other cost reductions» Lower cost PCIe Gen3 I/O Drawer» High function PDU» Enhanced Enterprise CBU» Top Mount S814 RDX» IBM i edition S814 lower cost disk» S822 EasyScale and IBM i MSPenhance» New PCIe Cryptographic Adapter11 October Announce18 November GA9 December for top mount RDXNote 860 Firmware pre-requisite to most IBM Corporation, 2016

Hardware SODs IBM plans to add the new memory and I/O features announced on the Power E850C(8408-44E) to the existing Power E850 server (8408-E8E) in a future firmware Service Packin 1H 2017. Features planned for support include 16GB, 32GB and 64GB DDR4 CDIMMs,EXP12SX and EXP24SX SAS Expansion Units, 100GbE adapter, 100Gb EDR InfiniBandadapter and PCIe Cryptographic Adapter. IBM plans to provide SAS cables longer than 3 meters for the new EXP12SX and EXP24SXSAS Storage Enclosures in 1H 2017. This will allow clients with data center constraints tomore conveniently locate the enclosures in their data center similar to the existing EXP24Senclosure cabling options.Standard SOD DisclaimerIBM’s statements regarding its plans, directions, and intent are subject to change or withdrawal without notice at IBM’s sole discretion. Information regardingpotential future products is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The informationmentioned regarding potential future products is not a commitment, promise, or legal obligation to deliver any material, code or functionality. Information aboutpotential future products may not be incorporated into any contract. The development, release, and timing of any future features or functionality described for ourproducts remains at our sole discretion. 2016 IBM Corporation

Boost Infrastructure performance and flexibility while cutting costsibm.co/2dVnsgRWith this estimator, you will see: A 3 to 5 year cost comparison between POWER8 and Previous generations of Power servers Commodity x86-based servers Savings on hardware and software maintenance, labor,and facility costs Cost reduction estimates as a result of consolidationonto ialias?htmlfid POO03507USEN IBM Corporation, 2016

Power Processor RoadmapSource: mccredie-board-advisor-ibm/ IBM Corporation, 2016

IBM POWER9, NVIDIA GPU, and Mellanox 325M supercomputer contract Expected on-line in 2017 Oak Ridge National Labs Lawrence Livermore NationalLabsCourtesy of Oak Ridge National Laboratory, U.S.Dept. of EnergyIntroducing Zaius, Google andRackspace’s open serverrunning IBM POWER9 IBM Corporation, 2016

Software updates IBM Corporation, 2016

Platform, Virtualization, and Cloud ntBasic PowerVMIaaS CloudHardwareManagement ConsolePowerVCStandard EditionIBM CloudPowerVC Manager Hardware and firmwareconfiguration and mgt. Service and support PowerVM Simple user interface Capture, deploy, resize,migrate VMs Placement policies PowerVM / PowerKVM Self-service portal Projects Image templates Approvals Metering IBM Corporation, 2016

Control FlowData FlowSR-IOV Backed AIX orIBM iAIX orIBM iDataDatavNICAdaptervNICAdapter PowerVM Direct Ethernet virtualizationLow CPU overhead / high throughputLive partition mobility capableQoS capable IBM Corporation, 2016

PowerVM v2.2.5Virtualization without Limits Reduces IT infrastructure costs NovaLink Enhancements I/O Improvements Resiliency ImprovementsConsolidate diverse workloads save operational costs Improves service levelsVirtualized resources can be applied dynamically to workloads as needed Manages riskUnrivaled flexibility enables rapid response to business change minimizing riskAnnounce –10/11/16 PowerVM GA 11/11/2016– vNIC Failover – improves availability for SR-IOV Configurations– Shared Ethernet Adapter(SEA) Improvements – Improves Performance and ResiliencyLarge Send Performance improvements for Linux & IBM i, Failover Health checks, Failback Controls– Live Partition Mobility Improvements – Redundant Multiple Data Movers increase LPM Reliability and Performance– Shared Storage Pools Improvements – Scalability and Resiliency Improvements Support Larger More reliable SSPs24 Nodes Supported in SSP PowerVM NovaLink Enhancements v1.0.0.4 GA 12/16/16 NovaLink partition can run on Red Hat as well as Ubuntu Linux - Provides more options for Clients SR-IOV Support - Improves I/O Performance and Quality of Service options Software Defined Networking Tech Preview(Open vSwitch) - Network Overlays enable Cloud Deployments Firmware v860 GA 11/18/16– Reduction of Hypervisor Memory Usage through large page Usage - Especially helpful for SAP HANA Workloads HMC v860 GA 11/18/16– Ability to export Performance data to csv format– Dynamic Setting of Simplified Remote Restart property– Reporting on Energy Consumption via Rest APIs and export facility IBM Corporation, 2016

PowerVC v1.3.2 Automates VM provisioning and best practices Improve resource utilization to reduce capital expense and power consumption Increase agility and execution to quickly respond to changing business requirements Increase IT productivity and responsiveness Manage scalability without adding complexityAnnounce – 10/11/2016 GA – 12/16/2016 New HA Capabilities– Improvements in Managementof High Availability for PowerVM New storage managementcapabilities Enhanced Policies for DynamicResource Optimization Improved Management Supportfor PowerVM NovaLinkAutomated Policy-Based VM Restart for NovaLink and HMC Configurations - Enablesfaster recovery from server failures New Storage Capabilities–Support for NPIV Hitachi VSP Storage–Improved Zoning Control - Allows clients to have fewer zones Dynamic Resource Optimizer(DRO) Improvements–Balances workload based on Memory usage as well - Allow memory constrainedenvironments to be automatically balanced optimizing systems and reducing laborcosts PowerVM NovaLink Management ImprovementsSupport for–SR-IOV vNIC and vNIC Failover Configurations–NovaLink Partition running Red Hat Linux–PowerVM Shared Storage Pools–VM Console Launch IBM Corporation, 2016

AIX Continued Commitment in 2016 ReleasesPerformanceReduced DowntimeInvestment OptimizationSecurityefficientZEROeasy100Xmemory utilizationplanned downtime forAIX SP and TL upgradescloud automationfaster management ofsecurity compliancewithwithwithwithAME with 64K PagesAIX Live UpdateOpen Source for AIXPowerSC 1.1.5 IBM Corporation, 2016

AIX 7.2 Technology Level 1 - Available Nov 11Remove costly downtime impacts, improve performance, and automate cloud operationsActive Memory Expansionwith 64K Pageso Use memory efficiently,and further accelerateother workloadso AME enables efficientmemory usage, and nowcan be used whilemaintaining theperformance benefit of largepagesAIX Live Updateo Zero downtimeZero downtime upgradesupgradesforAIXfor AIX releasesreleaseso For the first time, applyTechnology Level orService Pack updateswithout a reboot – furtherreducing planned downtimeoutagesOpen Source for AIXo Leverage existing opensource skills to enablecloud automation for AIXenvironmentso Chef, cloud-init, and yumnow availableo Packages in the IBMprovided toolbox will becurrent and secure IBM Corporation, 2016

PowerSC 1.1.5 - Available Dec 2Save time, save money, and have peace of mindIntroducing a robust, modern user interface to manage PowerSC complianceo Quickly view & manage securitycompliance across your Powerenvironmento Reduce cost of security & complianceo Lower risk of human error in thecomplexity of implementing industrystandardsHealthcare (HIPAA), Financial and Retail (PCI-DSS), Utilities (NERC), Federal (DoD STIG),And general profiles: COBIT, and Custom Low, Medium and High Profiles for AIXAvailable in AIX Enterprise Edition or Standalone IBM Corporation, 2016

IBM i Roadmap20107.120112012 7.1 TRs20132014201520167.37.2 i next i next 17.1 and 7.2 TRsIBM i 7.2 TR5&IBM i 7.3 TR1** All statements regarding IBM's future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only. IBM Corporation, 2016

IBM i 7.3 - Simplifying Insights and Intelligent Security DB2 for i Temporal Support allows clients to conduct accurate analysis of datawithin a specific historical time period and contrast that against current data sets New OLAP capability added to the SQL language on IBM i allows clients to performmore advanced analytics on their data Security Authority Collection provides guidance for establishing security levelsbased on usage of data and applications Planned and unplanned downtime from hours to minutes with PowerHA V7.2 for IBMi HyperSwap Cluster. New version of DB2 WebQuery for IBM i expands options for data sources includingsome Open Source data environments such as Postgres and Maria DB Git and Orion application environments are being added to theIBM i Open Source suite of products, providing clients with morechoice for their business solutions on IBM i. New enhancements to RPG streamline and simplify developmentallowing developers to innovative more easily and manage theirapplications more efficiently. The more modern GUI interface of IBM i Navigator improvesease of use for system management tools and for monitoringperformance. Much, much more IBM Corporation, 2016

IBM i 7.3 TR 1 Highlights*Solution Enablement RDi tools now run on Mac OS X Open Source portfolio increased with Perl eGit free user interface ships with RDi baseDatabase Enhancements JSON tables supported Major enhancements for Run SQL scriptsformatting WebQuery improves Query/400 migrationand adds new Audit reportsIntegration and improvement Access Client Solutions Visual Explain RDi Run SQL scriptsHardware Enablement Support for S822 expands to 4-cores perpartition Optical Containers Make USB Flash look like astack of DVDs Power S814 Integrated RDX (top mountedRDX docking station for tower models)* Some of the these enhancements are available in IBM I 7.2 TR5 IBM Corporation, 2016

IBM i Cloud Storage Solutions for i Announce: Oct 11, GA: Oct 28, initial offering English only An API that enables object based storage to a cloud Automates archiving and backup operations Initial Cloud providers are SoftLayer or MSPs supporting the SoftLayer interface Target customer market: IBM i customers with 1 or 2 cores and less than 1 terabyte of storageTurn-key BRMS automates and backup and restore operations and provides encryption over VPN IBM Corporation, 2016

for i SVC HyperSwap clustering Announce Oct 11, GA Nov 11 PowerHA SystemMirror for i V7.2 TR 5& V7.3 TR 1 Continuous two-site SVC storageavailability within a PowerHA clusterVirtual IASP PowerHA switchable LUN HA clusterconfiguration for production outagesHyperSwap IBM Corporation, 2016

www.ibm.com/developerworks/ibmi/techupdates IBM Corporation, 2016

Questions

9119-MME/MHE 1y 24x7 HWMA Power E850 8408-44E 3y 24x7 Services included Power E870/E880 9080-MME/MHE 1y 24x7 HWMA PowerVM License 5765-PVE PowerVM License 5765-PVE PowerVM License 5765-PVE Base, included in HW PowerVM SWMA 1 or 3yr – 57xx-xxx IBM Power-to-Cloud Rewards IBM Cloud PowerVC Manager Lic & SW