FIRE SAFETY INSPECTION REPORTMULTIFABS LTDKASHIMPUR, NAYAPARAOther Factories: NoneApril 9, 2014

Accord - Bangladesh RMG Fire Safety InspectionMultifabs LtdFire Safety Inspection ReportMultifabs LtdIntroductionMultifabs Ltd manufacturing complex was surveyed for fire safety on 4/9/2014by Hughes Associates, Inc.The purpose of the survey was to identify significant fire safety issues and toprovide recommendations for remediation based on applicable standardsspecified by the Accord. The scope of this initial fire safety inspection waslimited to the review and identification of major fire safety issues. Theinspection did not include identification of minor deficiencies, which will befurther addressed as part of follow-up inspections.LimitationsThe information in this fire safety inspection report was obtained during a visitto the facility and during interviews with local factory management. It has notbeen possible to provide independent verification for all the information anddata collected, and, therefore, Hughes cannot accept general responsibility foromissions or errors arising from inaccuracies in this report from the informationobtained.The findings and recommendations in this report are not intended to imply,guarantee, ensure or warrant compliance with any government regulations.Additionally, the results do not imply in any way that compliance with thefindings or recommendations as stated in this report will eliminate all hazards,risks or exposures or that hazards, risks or exposures not referred to in thisreport do not exist. Compliance with the findings and recommendations statedin this report does not relieve the factory owner from obligation to comply withspecific project requirements, industry standards, or the provisions of any localgovernment regulations.Page 2

Accord - Bangladesh RMG Fire Safety InspectionMultifabs LtdGeneral Factory InformationFactory name(s):Dyeing ShedProduction BuildingFactory Address:Kashimpur, NayaparaPoints of Contact:Abdul Quddus,Executive DirectorMultifabs88 01713-015656Quddus@multi-fans.comBivuti Hira,Manager of ComplianceMultifabs88 01730-734-892Compliance@multi-fans.comMuhammed Abu Mehedi Khan,Social Compliance AuditorEuro Centra880 2 8413390Mehedi@Page 3

Accord - Bangladesh RMG Fire Safety InspectionPage 4Multifabs LtdGeneral Building Information - Dyeing ShedNo. of Stories Below /Above Grade0/1High RiseNoOccupancy ClassificationG2 IndustrialFloor Plans AvailableYesGround floor layoutDate Of Construction1996Major RenovationsNoOther TenantsNoFloors Occupied ByFactoryAllMezzanine layout

Accord - Bangladesh RMG Fire Safety InspectionPage 5Multifabs LtdFloorGMUseOccupant LoadDyeingLaboratory16315Construction g SurroundingsNorthApproximately 30 foot separationSouthApproximately 30 foot separationEastCovered alley to Production BuildingWestApproximately 30 foot separationEgress FeaturesTwo (2) exits serve the building. Egress from the mezzanine is provided by two (2) exit stairs.Each floor had an adequate number of exits with sufficient exit capacity based on occupantload. All exits were remotely located. All exits discharge to the exterior of the building. Egressdoors with locking features were present at building exits. All doors were open and unlockedduring the inspection. Emergency evacuation plans were located at building entrances. Firedrills are conducted monthly, records were provided during the inspection.FloorOccupant LoadGM16315No. Exits22Exit Capacity437233

Accord - Bangladesh RMG Fire Safety InspectionMultifabs LtdGeneralNumber of ExitsAdequateYesExits RemoteYesExit DoorsSliding Gates/DoorsUsed?NoEgress Doors SwingCorrectly?YesEgress Doors Lockable?YesExit StairsAll Stairs Discharge tothe Exterior?YesHandrails on at least OneSide?YesStorage Located inStairs?NoExit Access From Factory AreasStorage in Egress Paths?NoEgress Paths ofAdequate Width?YesExcessive TravelDistances, CPT, DE'sNoEmergency PlanningPage 6

Accord - Bangladesh RMG Fire Safety InspectionPage 7Multifabs LtdEmergency EvacuationPlans Provided?YesFire Drills ConductedYesRecords MaintainedYesExemplar emergency plansFire Protection FeaturesSprinkler SystemThere is no sprinkler system installed. One is not required because the height of the floor of thehighest occupied story is less than 23 meters.Fire Hose SystemTwo (2) fire hose reels are provided in the building, one at each building exit.

Accord - Bangladesh RMG Fire Safety InspectionPage 8Multifabs LtdHose Size(s) Provided1 in.LocationsAt each exitExemplar hose reelFire Water SupplyThe water supplying the standpipes comes from a deep well. The water is pumped into anunderground reservoir with a reported capacity of 500,000 liters. It is then piped to a cistern ofa reported 100,000 liter capacity on the roof. This tank provides fire water for the main buildingin addition to the two sheds. There is no fire pump and pressure is supplied solely by gravity. Anew centralized, automatic fire pump has been planned.Source(s)CisternLocationRoof of Production BuildingCapacity100,000 litersFire PumpNo

Accord - Bangladesh RMG Fire Safety InspectionPage 9Multifabs LtdFire Alarm SystemA fire alarm system was provided in the factory building. It consists of manual alarm switches,sirens and beacon units installed near the entrances to each floor. The activation switches oneach floor reportedly trigger the fire alarm for the entire building, but are not connectedbetween all buildings in the complex. No functional test was conducted on the system duringthe inspection. There is no fire alarm panel or system supervision.Type of SystemManual Fire Alarm (Audible and Visible)Fire Panel LocationNoneVisible NotificationAppliances?YesAudible NotificationAppliances?YesAlarm AnnunciationManualWhole BuildingFunctional TestConductedNoRegular Inspection,Testing, & Maintenance?No

Accord - Bangladesh RMG Fire Safety InspectionPage 10Multifabs LtdExemplar fire alarmExemplar fire alarm switchFire Detection SystemThere are no smoke detectors installed in the shed. Heat detectors, interconnected to the firealarms and an addressable fire panel have been planned.Regular Inspection,Testing, & Maintenance?YesExemplar smoke alarmPortable Fire ExtinguishersCO2 and dry chemical fire extinguishers are sufficient in number and spacing.

Accord - Bangladesh RMG Fire Safety InspectionPage 11Multifabs LtdTypes ProvidedCO2, dry chemicalAdequateNumber/Spacing?YesExemplar fire extinguisherManual Fire Fighting EquipmentThe manual fire fighting equipment was conveniently located and well maintained.Types of EquipmentProvidedBeaters, hooks, buckets, gloves, gumboots, fire blankets, hardhats, ropeLocation of Equipment2 locations on open factory floor.Other Features

Accord - Bangladesh RMG Fire Safety InspectionPage 12Multifabs LtdEmergency Lighting & Exit SignsThere were multiple fluorescent lights that are serviced by either an alternate “Instant PowerSupply” (IPS) or battery backup located inside and outside the exit enclosure walls as well asthroughout the factory floor on each floor. Each floor had a number of illuminated exit signs (amix of directional and nondirectional) located along the exit access and at exits. The factoryreports that these are all serviced by normal electricity as well as by an “Instant Power Supply”(IPS) unit. There were no records or assertions of regular testing or maintenance of theemergency lighting system.Exits and Exit AccessProperly Marked withExit SignageYesEmergency PowerIPSBatteryEmergency Lighting forExits & Exit AccessYesRegular Inspection,Testing, & Maintenance?NoExemplar emergency exit signElevatorsThere are no elevators installed in the dyeing Shed.Exemplar emergency lighting

Accord - Bangladesh RMG Fire Safety InspectionPage 13Multifabs LtdGeneratorsThe generator is located on the ground floor of the Production Building. It does not require firerated separations. Sprinklers and heat detectors, interconnected with a centralized fire panel,have been planned.Location(s)Ground floor of Production Building.Inside Fuel StorageNoFire Rated SeparationsProvided?NoBoilersThe boiler is located on the ground floor adjacent to the Dyeing Shed. It does not have therequired fire rated separations. It has an insufficient number of smoke alarms. Sprinklers andheat detectors, interconnected with a centralized fire panel, have been planned.Location(s)Ground floor adjacent to dyeing shed

Accord - Bangladesh RMG Fire Safety InspectionPage 14Multifabs LtdFire Rated SeparationsProvided?NoMain boilerBoiler room unprotected openingTransformersNo transformers are present at this factory. All power comes from the generators.Storage AreasProcess areas larger than 250 square feet and more than 8 feet in height do not have therequired fire rated separations.Fire Rated SeparationsProvided?NoOpen to Factory Floors?YesOpen to Exit Discharge?No

Accord - Bangladesh RMG Fire Safety InspectionPage 15Multifabs LtdAdditional InformationIn addition to the buildings listed in this report, there is a 4-story support structure, whichcontains a chemical store. There was not adequate separation between incompatible materials,specifically oxidizers and flammables. The child care was located on floor 1 of the adminbuilding and had direct access to an exit stair.

Accord - Bangladesh RMG Fire Safety InspectionPage 16Multifabs LtdGeneral Building Information - Production BuildingNo. of Stories Below /Above Grade0/7High RiseYesHigh Rise Comments:The height of the floor of the highest occupiable floor is 79 feet.Occupancy ClassificationG2 IndustrialFloor Plans AvailableYesGround floor layoutMezzanine layout

Accord - Bangladesh RMG Fire Safety InspectionPage 17Multifabs LtdFloor 1 layoutFloor 2, 3, 4 layoutDate Of Construction2006Major RenovationsNoOther TenantsNoFloors Occupied ByFactoryAllFloorG123456UseOccupant struction FeaturesNon-CombustibleYes315190650710830410250

Accord - Bangladesh RMG Fire Safety InspectionMultifabs LtdFire-ResistiveYesBuilding SurroundingsNorthApproximately 30 foot separationSouthApproximately 10 foot separation to 5 story admin buildingEastNo separation at ground floorWestCovered alley to Dyeing shed, 4 story godownVertical OpeningsStairs Enclosed in FireRated Construction?YesUnsealed Penetrations inStairsNoUnprotected OpeningsFrom StairsYesShafts Enclosed in FireRated ConstructionNoFloors withOpenings/PenetrationsNoOther Vertical OpeningsNoPage 18

Accord - Bangladesh RMG Fire Safety InspectionPage 19Multifabs LtdEgress FeaturesTwo (2) exit stairs serve the building. Egress from the ground floor is provided by two (2) exits.Floors 2, 3, and 4 had an inadequate number of exits and insufficient exit capacity (493) basedon occupant load (650, 710, and 830, respectively). All other floors had an adequate number ofexits with sufficient exit capacity based on occupant load. All exits were remotely located. Allexits discharge to the exterior of the building except the East stair, which discharges inside thebuilding at the ground floor. All exit stairs were open on all floors due to unprotected openings.Sliding gates were used at building exits, exit stairs, and exit discharge. Egress doors withlocking features were present at building exits, exit stairs, and exit discharge. All gates wereopen and unlocked during the inspection. On the ground floor, in the North stairwell,combustible materials were stored. Emergency evacuation plans were located at floorentrances. Fire drills are conducted monthly, records were provided during the inspection.There was a shaft connecting multiple floors that was not enclosed in fire rated construction.FloorOccupant LoadG123456315190650710830410250GeneralNumber of ExitsAdequateNoExits RemoteYesExit DoorsSliding Gates/DoorsUsed?YesEgress Doors SwingCorrectly?YesNo. Exits2222222Exit Capacity493493493493493493493

Accord - Bangladesh RMG Fire Safety InspectionMultifabs LtdEgress Doors Lockable?YesExit StairsAll Stairs Discharge tothe Exterior?YesHandrails on at least OneSide?YesStorage Located inStairs?YesExit Access From Factory AreasStorage in Egress Paths?NoEgress Paths ofAdequate Width?YesExcessive TravelDistances, CPT, DE'sNoEmergency PlanningEmergency EvacuationPlans Provided?YesFire Drills ConductedYesRecords MaintainedYesPage 20

Accord - Bangladesh RMG Fire Safety InspectionPage 21Multifabs LtdExemplar emergency plansFire Protection FeaturesSprinkler SystemThere is no sprinkler system installed. One is required be caused the height of the floor of thehighest occupiable story is 79 feet. A fire system has been designed that provides detectionthroughout the factory, sprinklers in the store rooms and offices, and a fire pump.Fire Hose SystemFour (4) fire hoses are provided on each floor of the building, with one located at each stairwelland additional ones throughout the floor.Hose Size(s) Provided1 in.LocationsAt least 4 locations per floor.

Accord - Bangladesh RMG Fire Safety InspectionPage 22Multifabs LtdExemplar hose reelFire Water SupplyThe water supplying the standpipes comes from a deep well. The water is pumped into anunderground reservoir with a reported capacity of 500,000 liters. It is then piped to a cistern ofa reported 100,000 liter capacity on the roof. This tank provides fire water for the main buildingin addition to the two sheds. There is no fire pump and pressure is supplied solely by gravity. Anew centralized, automatic fire pump has been 0 litersFire PumpNoFire Alarm SystemA fire alarm system was provided in the factory building. It consists of manual alarm switches,sirens and beacon units installed near the entrances to each floor. The activation switches oneach floor reportedly trigger the fire alarm for the entire building, but are not connectedbetween all buildings in the complex. No functional test was conducted on the system duringthe inspection. There is no fire alarm panel or system supervision.Type of SystemManual Fire Alarm (Audible and Visible)

Accord - Bangladesh RMG Fire Safety InspectionPage 23Multifabs LtdFire Panel LocationNoneVisible NotificationAppliances?YesAudible NotificationAppliances?YesAlarm AnnunciationManualWhole BuildingFunctional TestConductedNoRegular Inspection,Testing, & Maintenance?NoExemplar fire alarmExemplar fire alarm switchFire Detection SystemSingle station smoke alarms are provided above each electrical distribution board. There arean insufficient number smoke alarms elsewhere. Heat detectors, interconnected to the firealarms and an addressable fire panel have been planned.Type of DetectorsSingle Station Smoke Alarms

Accord - Bangladesh RMG Fire Safety InspectionMultifabs LtdRegular Inspection,Testing, & Maintenance?YesExemplar smoke alarmPortable Fire ExtinguishersCO2 and dry chemical fire extinguishers are sufficient in number and spacing.Types ProvidedCO2, dry chemicalAdequateNumber/Spacing?YesPage 24

Accord - Bangladesh RMG Fire Safety InspectionPage 25Multifabs LtdExemplar fire extinguisherManual Fire Fighting EquipmentThe manual fire fighting equipment was conveniently located and well maintained.Types of EquipmentProvidedBeaters, hooks, buckets, gloves, gumboots, fire blankets, hardhats, ropeLocation of EquipmentAt each stairwell on each floor.Other FeaturesEmergency Lighting & Exit SignsThere were multiple fluorescent lights that are serviced by either an alternate “Instant PowerSupply” (IPS) or battery backup located inside and outside the exit enclosure walls as well asthroughout the factory floor on each floor. Based on the quantity and placement of emergencylighting on the ground floor, adequate illumination levels are not anticipated along egressroutes. Each floor had a number of illuminated exit signs (a mix of directional andnondirectional) located along the exit access and at exits. The factory reports that these are allserviced by normal electricity as well as by an “Instant Power Supply” (IPS) unit. There were norecords or assertions of regular testing or maintenance of the emergency lighting system.Exits and Exit AccessProperly Marked withExit SignageYesEmergency PowerIPSBattery

Accord - Bangladesh RMG Fire Safety InspectionPage 26Multifabs LtdEmergency Lighting forExits & Exit AccessYesRegular Inspection,Testing, & Maintenance?NoExemplar emergency exit signExemplar emergency lightingElevatorsTwo elevator are installed on opposite sides of the building. They have neither fire controls norautomatic recall.Automatic RecallNoFire Fighter FeaturesNoElevator LobbyNo

Accord - Bangladesh RMG Fire Safety InspectionPage 27Multifabs LtdElevatorGeneratorsThe generator is located on the ground floor. Sprinklers and heat detectors, interconnected witha centralized fire panel, have been planned.Location(s)Ground floorInside Fuel StorageNoFire Rated SeparationsProvided?No

Accord - Bangladesh RMG Fire Safety InspectionPage 28Multifabs LtdBoilersThe boiler is located on the ground floor adjacent to the Dyeing Shed. It does not have therequired fire rated separations. It has an insufficient number of smoke alarms. Sprinklers andheat detectors, interconnected with a centralized fire panel, have been planned.Location(s)Ground floor adjacent to dyeing shedFire Rated SeparationsProvided?NoMain boilerBoiler room unprotected openingTransformersNo transformers are present at this factory. All power comes from the generators.Storage AreasStorage rooms and process areas larger than 250 square feet and more than 8 feet in heightlocated on multiple floors do not have the required fire rated separations.Fire Rated SeparationsProvided?No

Accord - Bangladesh RMG Fire Safety InspectionPage 29Multifabs LtdOpen to Factory Floors?YesOpen to Exit Discharge?NoAdditional InformationIn addition to the buildings listed in this report, there is a 4-story support structure, whichcontains a chemical store. There was not adequate separation between incompatible materials,specifically oxidizers and flammables. The child care was located on floor 1 of the adminbuilding and had direct access to an exit stair.

Accord - Bangladesh RMG Fire Safety InspectionPage 31Multifabs LtdFindings & RecommendationsTables 1 - 2 summarizes the major fire safety issues identified during the inspection.Recommendations have been provided to address each issue.An implementation schedule shall be developed by the factory to remediate each of thefindings. The specific timing of improvements, including any requested extensions due todesign / installation constraints, shall be submitted to the Accord for approval.

Accord - Bangladesh RMG Fire Safety InspectionPage 31Multifabs LtdTable 1. Findings And Recommendations - Dyeing ShedNo.F-1CategoryFindingFire RatedConstructionProcess areasthroughout the buildingused for combustiblestorage are notseparated by fire-ratedconstruction.RecommendationProvide dedicated storagerooms separated by minimum1-hr fire-rated construction.Where separate storagerooms are not feasible,provide defined storage areasand limit the storagearrangement as follows:- Maximum height of 2.4m andmaximum area of 23m2- If sprinkler protected:maximum height of 3.66m andmaximum area of 93m2Separate areas of unenclosedcombustible storage by aminimum clear distance of 3m.RemediationTimeframeWithin 3months

Accord - Bangladesh RMG Fire Safety InspectionPage 32Multifabs LtdF-2EgressEgress doors and gates Remove locking features fromwith locking features are all egress doors / gates.provided throughout thestairwells.If locks are required forsecurity reasons, utilizespecial door locking featurescomplying with NFPA 101.F-3EgressCollapsible gates andsliding doors areprovided throughout thebuilding.Replace all gates and slidingdoors along the means ofegress with side-hinged,swinging egress doors.If locks are required forsecurity reasons, utilizespecial door locking featurescomplying with NFPA 101.ImmediateWithin 1month

Accord - Bangladesh RMG Fire Safety InspectionPage 33Multifabs LtdF-4Fire Protection The fire alarm system isantiquated, not a listedsystem, and does notprovide alarm andnotification featuresconsistent withacceptable standards.Replace the fire alarm systemwith a new, listed addressablefire alarm system inaccordance with NFPA 72.Designwithin 4months,installwithin 9monthsF-5Fire Protection Inspection, testing, andmaintenance for the firealarm system was not inaccordance with NFPA72.Inspect, test and maintain thefire alarm system, and keepwritten records on-site, inaccordance with NFPA 72.Within 3months

Accord - Bangladesh RMG Fire Safety InspectionPage 34Multifabs LtdF-6Fire Protection The building is notequipped with smokealarms.Provide automatic smokedetection throughout thebuilding in accordance withNFPA 72.Within 6monthsF-7EgressLightingInspect, test and maintain theemergency lighting system inaccordance with TheACCORD standard. Keepwritten records on-site.Within 3monthsInspection, testing, andmaintenance records forthe emergency lightingsystem were notavailable.

Accord - Bangladesh RMG Fire Safety InspectionPage 35Multifabs LtdTable 2. Findings And Recommendations - Production BuildingNo.F-1CategoryFindingFire RatedConstructionStorage rooms andprocess areasthroughout the buildingused for combustiblestorage are notseparated by fire-ratedconstruction.RecommendationProvide dedicated storagerooms separated by minimum1-hr fire-rated construction.Where separate storagerooms are not feasible,provide defined storage areasand limit the storagearrangement as follows:- Maximum height of 2.4m andmaximum area of 23m2- If sprinkler protected:maximum height of 3.66m andmaximum area of 93m2Separate areas of unenclosedcombustible storage by aminimum clear distance of 3m.RemediationTimeframeWithin 3months

Accord - Bangladesh RMG Fire Safety InspectionPage 36Multifabs LtdF-2Fire RatedConstructionThe exit stairs are notseparated from workareas on each floor byfire-rated construction.Provide minimum 1.5-hr firerated doors and seal allunprotected openings toseparate the exit stairs fromwork areas and other buildingspaces on all floor levels.Ensure that the fire doors areself-closing and positivelatching and that they areprovided with fire exit (panic)hardware where servingproduction floors.Within 3monthsIf fire doors are required to beheld open for functionalreasons, provide automaticclosing devices tied to the firealarm system.F-3Fire RatedConstructionThe boiler room is notseparated by fire-ratedconstruction from theDyeing Shed.Separate the boiler room by aminimum 2-hr fire-ratedconstruction. Seal and/orprotected all openings tomaintain the required fireseparationsWithin 3months

Accord - Bangladesh RMG Fire Safety InspectionPage 37Multifabs LtdF-4Fire RatedConstructionUnsealed penetrationsand openings arelocated in the fire-ratedfloor/ceiling assemblies,specifically the electricalshaft, which connects allfloors.Provide a minimum 2-hr firerated shaft to separate theutility risers from each floorlevel.Seal all penetrations andopenings in floor/ceilingassemblies to maintain the fireseparation.Within 3months

Accord - Bangladesh RMG Fire Safety InspectionPage 38Multifabs LtdF-5EgressThe exit capacity of 493is not adequate for theoccupant loads on floors2, 3, and 4 (650, 710,and 830, respectively).Immediately reduce occupantload to not more than availableexit capacity.ImmediateIf possible, provide additionalexits in the future to provideadditional exit capacity.F-6EgressEgress doors and gates Remove locking features fromwith locking features are all egress doors / gates.provided throughout thestairwells.If locks are required forsecurity reasons, utilizespecial door locking featurescomplying with NFPA 101.F-7EgressCollapsible gates andsliding doors areprovided throughout thebuilding.Replace all gates and slidingdoors along the means ofegress with side-hinged,swinging egress doors.If locks are required forsecurity reasons, utilizespecial door locking featurescomplying with NFPA 101.ImmediateWithin 1month

Accord - Bangladesh RMG Fire Safety InspectionPage 39Multifabs LtdF-8Fire Protection The fire alarm system isantiquated, not a listedsystem, and does notprovide alarm andnotification featuresconsistent withacceptable standards.Replace the fire alarm systemwith a new, listed addressablefire alarm system inaccordance with NFPA 72.Designwithin 4months,installwithin 9monthsF-9Fire Protection Inspection, testing, andmaintenance for the firealarm system it was notin accordance withNFPA 72.Inspect, test and maintain thefire alarm system, and keepwritten records on-site, inaccordance with NFPA 72.Within 3months

Accord - Bangladesh RMG Fire Safety InspectionPage 40Multifabs LtdF-10Fire Protection The high-rise buildinghas an occupied floorgreater than 23m (75 ft)and is not provided withautomatic sprinklerprotection. The largeoccupant loads, heavyfuel loading, andanticipated extendedegress times warrantsprinkler protection.Provide automatic sprinklerprotection throughout thebuilding in accordance withNFPA 13.Within 3monthsF-11Fire Protection The building is equippedwith single-stationsmoke alarms. Smokealarm activation soundsonly a local alarm anddoes not provideautomatic fire alarmnotification ofoccupants.Remove single-station smokealarms. Provide automaticsmoke detection throughoutthe building in accordancewith NFPA 72.Within 6months

Accord - Bangladesh RMG Fire Safety InspectionPage 41Multifabs LtdF-12EgressLightingBased on the numberand location ofemergency lightsobserved, adequateillumination levels arenot anticipated alongegress routes on theground floor.Test the emergency lightingsystem on each floor andprovide additional emergencyfixtures to provide adequateillumination along the meansof egress. Provide a minimumillumination of 10 lux at thefloor level within exit stairs andexit discharge paths andminimum 2.5 lux along exitaccess aisles.Within 3months

Accord - Bangladesh RMG Fire Safety InspectionPage 42Multifabs LtdF-13EgressLightingInspection, testing, andmaintenance records forthe emergency lightingsystem were notavailable.Inspect, test and maintain theemergency lighting system inaccordance with TheACCORD standard. Keepwritten records on-site.Within 3months

Accord - Bangladesh RMG Fire Safety Inspection Multifabs Ltd Page 3 Factory name(s): Dyeing Shed Production Building Factory Address: Kashimpur, Nayapara Points of Contact: Abdul Quddus,Executive Director Multifabs 88 01713-015656 Quddus@multi-fans.com Bivuti Hira,Manager of Compliance Multifabs 88 01730-734-892 Compliance@multi-fans.com