Verification And Validation Of Subsea Connectors

Transcription

Verification and Validationof Subsea ConnectorsAPI 17TR7 DraftTask Group Status UpdateDr. Jim Kaculi, P.E.Vice President – EngineeringDril Quip Inc.SC17 2016 Winter Meeting – January 13, 2016

Technical Report ScopeThe purpose of this technical report is to provide a methodology forpresenting the load capacity charts and outline testing validationrequirements of subsea connectors along the vertical centerline of subseahardware and subsea wellhead; i.e. tree, tubing head, tree cap, treerunning tool, WCP and EDP connectors and the completion/workover riserfor API 17D and API 17G applications.Scope includes: Hydraulic Connectors Flanged Connectors Radial Bolt Connectors Collet Connectors Segmented Clamp Connectors

Status Update First Meeting July 30, 2015 Meetings were held on monthly basis – 7 meetings total Last Meeting held on December 12, 2015 Next Meeting scheduled for January 26, 2016 Total membership 43 (20 companies) Progress has been made on the following topics: Capacity Chart: Normal/Extreme/Survival Combined Loading Requirements Gasket/Sealability Hub Separation Definition Fatigue Analysis Methodology Validation Testing Requirements Test Acceptance Criteria

Membership Total Members: 43 Number of Companies: 20 4 Work Group Leads: Verification – Andrew Grohmann (Dril-Quip) Validation – Ainsworth Gidden (FMC) Sealability – Jay Leonard (BP) Fatigue – Mike Campbell (2H Offshore)API 17TR7 Task GroupChair: Jim KaculiNameCompanyE-Mail AddressCategory1Mike Campbell2H Offshoremike.campbell@2hoffshoreinc.com3P2Gwo-Ang ChangABSgchang@eagle.org3P3Harish PatelABShpatel@eagle.org3P4Menglung (Ryan) LiuABSmlliu@eagle.org3P5Jeff GoetzAnadarkoJeff.Goetz@anadarko.comO6Jay LeonardBPJay.Leonard@bp.comO7Man PhamBPMAN.PHAM@bp.comO8Christy LanBSEEchristy.lan@bsee.govR9Trang VuBSEEtrang.vu@bsee.govR10Jeffrey DullBSEEJeffrey.Dull@bsee.govR11Paul BunchCameronPaul.Bunch@c-a-m.comM12James MillerChevronJames.Miller@chevron.comO13Vamsee S. AchantaConsultantachantav@gmail.com3P14Rajil SaraswatDNVGLRajil.Saraswat@dnvgl.com3P15Brian HealyDNVGLBrian.Healy@dnvgl.com3P16Jim KaculiDril-Quipjim kaculi@dril-quip.comM17Bruce WitwerDril-Quipbruce witwer@dril-quip.comM18Andrew GrohmannDril-Quipandrew grohmann@dril-quip.comM19Justin MorseDril-Quipjustin morse@dril-quip.comM20Chris StewartEnscocstewart@enscoplc.comO21Xiaochun ShenEnscoxshen@enscoplc.comO22Chris comO23Brian SkeelsFMCTIbrian.skeels@fmcti.comM24Paul BeynonFMCTIPaul.Beynon@fmcti.comM25Scott ColtmanFMCTIScott.Coltman@fmcti.comM26Graham RobinsonFMCTIGraham.Robinson@fmcti.comM27Roy D. WhitemanFMCTIroy.whiteman@fmcti.comM28Ainsworth GiddenFMCTIAinsworth.gidden@fmcti.comM29Barry StewartFMCTIBarry.Stewart@fmcti.comM30Daniel FieldFMCTIdan.field@fmcti.comM31Xichang ZhangGE Oil&Gasxichang.zhang@ge.comM32Philip PotterGE Oil&Gasphil.potter@ge.comM33Perry StokesGE Oil&Gasperry.stokes@ge.comM34Shafiq KhandokerHESSskhandoker@hess.comO35Parth PathakOneSubseaParth.Pathak@OneSubsea.comM36Scott rius von ea art c ChauSRP Subseaeric.chau@srpsubsea.comM41Finn KirkemoStatoilfkir@statoil.comO42Ramón San PedroStress Eng.Ramon.SanPedro@stress.com3P43Dan PetersStructural Integritydpeters@structint.com3P

Plans for 2016 Continue with regular monthly meetings Work with four major sub-groups Verification Analysis Validation Testing Sealability Fatigue Continue alignment efforts with 17G (Roy Whiteman and FinnKirkemo), 16A (Jim Kaculi), 17D, etc. Have first draft of the document ready for industry ballot andcomments by Summer 2016

Thank You!Questions?Jim KaculiVice President – EngineeringDril-Quip Inc.6401 N. Eldridge Pkwy, Houston TX 77041Tel. 1-713-939-7711E-mail: Jim Kaculi@Dril-Quip.com

Name Company E-Mail Address Category 1 Mike Campbell 2H Offshore mike.campbell@2hoffshoreinc.com 3P 2 Gwo-Ang Chang ABS gchang@eagle.org 3P 3 Harish Patel ABS hpatel@eagle.org 3P 4 Menglung (Ryan) Liu ABS mlliu@eagle.org 3P 5 Jeff Goetz Anadarko Jeff.Goetz@anadarko.com O 6 Jay Leonard BP Jay.Leonard@bp.com O 7 Man Pham BP MAN.PHAM@bp.com O