ZJCZ.E159216 Flexible Cord - Mouser

Transcription

ZJCZ.E159216Flexible CordFlexible CordSee General Information for Flexible CordSHENZHEN BAO HING ELECTRIC WIRE & CABLE MFR CO LTDE159216BUCHONG TONGFUYU INDUSTRY AREASHAJING RD SHAJING STBAOAN DISTRICTSHENZHEN, GUANGDONG 518104 CHINAPVC parallel cord with -R suffix, Type SPT-2-R.PVC jacketed cords with -R suffix, Types SVT-R, SJT-R.Parallel cords, Types SPE-1, SPE-2, SPE-3, SPT-1, SPT-2, SPT-3, NISPT-1, NISPT-2, NISPE-1, NISPE-2.Jacketed cords, Types SVE, SJE, SVT, SJT, ST, SJTW, STW.Tinsel cords, Types TPT, TST.Miscellaneous cord, Type Clock cord.Single or Twisted Decorative Cord, Type CXTW.Last Updated on 2011-03-30Copyright 2011 Underwriters Laboratories Inc. The appearance of a company's name or product in this database does not in itself assure that productsso identified have been manufactured under UL's Follow-Up Service. Only those products bearing theUL Mark should be considered to be Listed and covered under UL's Follow-Up Service. Always look forthe Mark on the product.UL permits the reproduction of the material contained in the Online Certification Directory subjectto the following conditions: 1. The Guide Information, Designs and/or Listings (files) must bepresented in their entirety and in a non-misleading manner, without any manipulation of the data(or drawings). 2. The statement "Reprinted from the Online Certifications Directory with permissionfrom Underwriters Laboratories Inc." must appear adjacent to the extracted material. In addition,the reprinted material must include a copyright notice in the following format: "Copyright 2011Underwriters Laboratories Inc. "

NOTICE OF AUTHORIZATION TO APPLY THE UL MARK05/10/2010Shenzhen Bao Hing Electric Wire & Cable Mfr Co LtdMr. Jiadong LuoBuchong Tongfuyu Industry AreaShajing Rd Shajing StBaoan DistrictShenzhen Guangdong 518104, CnOur Reference:File E159216, Vol. 1Your Reference:MS. LUO ACCEPTED ON 30 APR 10Project Number10CA22625Project Scope:UL/CUL: TPE Flexible Cord, Types SVE, SVT, SJE, SJT, NISPE-1, NISPT-1 NISPE-2 andNISPT-2, 18 AWG conductor, may employ rayon yarns with 200-500 denier within copperconductor strandsDear Mr. Jiadong Luo:UL's investigation of your product(s) has been completed under the above Reference Number and the product wasdetermined to comply with the applicable requirements.This letter temporarily supplements the UL Follow-Up Services Procedure and serves as authorization to apply the ULMark only at authorized factories under UL's Follow-Up Service Program.To provide the manufacturer with the intended authorization to use the UL Mark, the addressee must send a copy of thisnotice to each manufacturing location currently authorized in File E159216, Vol. 1.This authorization is effective from the date of this Notice and only for products at the indicated manufacturing locations.Records in the Follow-Up Services Procedure covering the product are now being prepared and will be sent in the nearfuture. This letter authorizes application of the UL Mark for 90 days from the date of this letter.Products that bear the UL Mark shall be identical to those that were evaluated by UL and found to complywith UL’s requirements. If changes in construction are discovered, appropriate action will be taken forproducts not in conformance with UL’s requirements and continued use of the UL Mark may be withdrawn.UL may elect to withdraw use of the UL Mark if the Applicant or Manufacturer fails to comply with UL’srequirements including ongoing compliance of the product, under UL’s Follow-Up Service.This is an electronically generated letter. Signatures are not required for this document to be valid.Page 1 of 2

Notice of Authorization - 10CA22625Any information and documentation provided to you involving UL Mark services are provided on behalf of UnderwritersLaboratories Inc. (UL) or any authorized licensee of UL.The contents of this Letter are intended solely for the use of UL and the Applicant. The opinions andfindings of UL represent its judgment given with due consideration to the necessary limitations of practicaloperation in accordance with UL’s objectives and purposes. UL shall not otherwise be responsible for theuse of or reliance upon the contents of this letter by anyone. UL shall not incur any obligation or liability forany loss, expense or damages, including incidental, consequential or punitive damages, arising out of or inconnection with the use or reliance upon the contents of this letter to anyone other than the Applicant asprovided in the agreement between UL and Applicant. Any use or reference to UL’s name or certificationmark(s) by anyone other than the Applicant in accordance with the agreement is prohibited without theexpress written approval of UL.Very truly yours,Reviewed by:Jacky Lam 852 2276 9296EngineerJacky.Lam@hk.ul.comDan Chan 852 2276 9573Project EngineerDan.Chan@hk.ul.comGUZCAE9-242C58This is an electronically generated letter. Signatures are not required for this document to be valid.Page 2 of 2

FileE62405SPVol1Auth. Page 1Issued:Revised:1982-01-062012-12-06FOLLOW-UP SERVICE PROCEDURE(TYPE R)UNLISTED COMPONENTATTACHMENT PLUGS, FUSELESS(AXUT3,AXUT9)Manufacturer:SEE ADDENDUM FOR MANUFACTURER LOCATIONSApplicant:(337951-004)68781 (Party Site)VOLEX (ASIA) PTE LTD35 TAMPINES ST 92SINGAPORE 528880 SINGAPOREThis Follow-Up Service Procedure authorizes the above Manufacturer(s) to use the markingspecified by UL LLC, or any authorized licensee of UL LLC, including the UL ContractingParty, only on products when constructed, tested and found to be in compliance with therequirements of this Follow-Up Service Procedure and in accordance with the terms of theapplicable service agreement with UL Contracting Party and any applicable Service Terms. TheUL Contracting Party for Follow-Up Services is listed on addendum to this Follow-Up ServiceProcedure ("UL Contracting Party"). UL Contracting Party and UL LLC are referred to jointlyherein as "UL."UL further defines responsibilities, duties and requirements for both Manufacturers and ULrepresentatives in the document titled, "UL Mark Surveillance Requirements" that can belocated at the following web-site: http://www.ul.com/fus and in the document titled "UL andSubscriber Responsibilities" that can be located at the following website:http://www.ul.com/responsibilities. Manufacturers without Internet access may obtain thecurrent version of these documents from their local UL customer service representative or ULfield representative. For assistance, or to obtain a paper copy of these documents or theapplicable Service Terms, please contact UL's Customer Service tactus, select a location and enter yourrequest, or call the number listed for that location.The Applicant and the specified Manufacturer(s) in this Follow-Up Service Procedure mustagree to receive Follow-Up Services from UL Contracting Party. If your applicable agreementis a Global Services Agreement ("GSA") with an effective date of January 1, 2012 or laterand this Follow-Up Service Procedure is issued on or after that effective date, theApplicant and the specified Manufacturer(s) will be bound to a Service Agreement for FollowUp Services upon the earliest by any Subscriber of use of the prescribed UL Mark, acceptanceof the factory inspection, or payment of the Follow-Up Service fees which will incorporatesuch GSA, this Follow-Up Service Procedure and the Follow-Up Service Terms which can beaccessed by clicking here: . In all otherevents, Follow-Up Services will be governed by and incorporate the terms of your applicableservice agreement and this Follow-Up Service Procedure.

FileE62405SPVol1Auth. Page 2Issued:Revised:1982-01-062012-12-06It is the responsibility of the Manufacturer to make sure that only the products meeting theaforementioned requirements bear the authorized Marks of UL LLC, or any authorized licenseeof UL LLC.This Follow-Up Service Procedure contains information for the use of the aboveManufacturer(s) and representatives of UL and is not to be used for any other purpose. It isprovided to the Manufacturer with the understanding that it will be returned upon requestand is not to be copied in whole or in part.This Follow-Up Service Procedure, and any subsequent revisions, is the property of UL and isnot transferable. This Follow-Up Service Procedure contains confidential information for useonly by the above named Manufacturer(s) and representatives of UL and is not to be used forany other purpose. It is provided to the Subscribers with the understanding that it is notto be copied, either wholly or in part unless specifically allowed, and that it will bereturned to UL, upon request.Capitalized terms used but not defined herein have the meanings set forth in the GSA and theapplicable Service Terms or any other applicable UL service agreement.UL shall not incur any obligation or liability for any loss, expense or damages, includingincidental, consequential or punitive damages arising out of or in connection with the useor reliance upon this Follow-Up Service Procedure to anyone other than the aboveManufacturer(s) as provided in the agreement between UL LLC or an authorized licensee of ULLLC, including UL Contracting Party, and the Manufacturer(s).UL LLC has signed below solely in its capacity as the accredited entity to indicate thatthis Follow-Up Service Procedure is in compliance with the accreditation requirements.William R. CarneyDirectorNorth American Certification Program

FileE62405SPVol1Addendum ToPageAuthorization Page1Issued:Revised:LOCATION433003 (Party Site)VOLEX CABLE ASSEMBLY (SHENZHEN) CO LTDVOLEX BLDG1173 SHENHUI RDBAO'AN, HENGGANGSHENZHENGUANGDONG 518115 CHINAFactory ID:SM or HGUL Contracting Party for above site is:UL AG(106395-001)31812 (Party Site)P T VOLEX INDONESIAKAWASAN INDUSTRISEKUPANGBATAM RIAU. INDONESIAFactory ID:BUL Contracting Party for above site is:(221809-001)UL AG67739 (Party Site)VOLEX CABLE ASSEMBLY (VIETNAM) CO LTDD-5B THANG LONG INDUSTRIAL PARKDONG AHH DISTRICTHANOI VIET NAMFactory ID:VHUL Contracting Party for above site is:UL AG(342882-001)171879 (Party Site)VOLEX INTERCONNECT (INDIA) PVT LTD22-1A 1ST STKHAZURA GARDENNEELANGARAICHENNAI TN 600041 INDIAFactory ID:VCUL Contracting Party for above site is:UL India Private Limited(788163-001)1982-01-062012-12-06

FileE62405SPVol1Addendum ToPageAuthorization Page2LOCATION200782 (Party Site)VOLEX DE MEXICO S AAVE 32 SUR NUM 8950INTERIOR EDIFICIO G1, D, E, FPARQUE INDUSTRIAL LA MESA, FRACC RUBIO22650 TIJUANABC MEXICOFactory ID:TIUL Contracting Party for above site is:UL AG(902299-002)196799 (Party Site)VOLEX CABLE ASSEMBLY (ZHONGSHAN) COLTDZHONGSHAN TORCH HI TECH IND DEV ZONE2 SINTA N STZHONGSHANGUANGDONG 528437 CHINAFactory ID:SM1 OR SMIUL Contracting Party for above site is:UL AG(918517-001)Issued:Revised:1982-01-062012-12-06

File E62405SPVol. 1IndexPage T PLUG:ModelsSectionReport Date11976-12-23Unlisted component, Attachment-Plug Cap! Cat.No.ME301.NEMA CONFIGURATIONCat. No.ME301, -D, P, -S, -R, RP230619-001USJ15ME302, -B, PME302GRUS115LS, LPS, -S926926SR926NPSR926BSRDS15EPS2US115SC, PSCUS15B, -PUS15S2USJ15BMP128(EMI)VP129(EMI)US515SC(EMI)185, -FCX-490, -4953323(Hosp)3317AEC60(Hosp)PS204, -B, DPS204AUS515A,USI515APS206PS206APS515MP204USD15A, S15APS520Config.1-15Cord AWG20,18,17,16/2Electrical 2018,16, 18,16,14,12/314,12/310,13,18,20/125310YesYes

File E62405SPVol. 1IndexPage 1AIssued:Revised:1989-07-112012-11-11ATTACHMENT PLUG: (Cont’d)NEMA CONFIGURATIONCat. 007PS206AUS650A, -301-151-155-156-50Cord 6,14,12/314,12/312/318/214/318,16/312/3Electrical 3/12525/2505-151-15L6-205-155-1518/318, 6/318, 17, 23222232232Note: (A.C.1) – ALTERNATE CONSTRUCTION NO. ESYesYesYesYesYE

Shenzhen Bao Hing Electric Wire & Cable Mfr Co Ltd Mr. Jiadong Luo Buchong Tongfuyu Industry Area Shajing Rd Shajing St Baoan District Shenzhen Guangdong 518104, Cn Our Reference: File E159216, Vol. 1 Project Number 10CA22625 Your Reference: MS. LUO ACCEPTED ON 30 APR 10 Project Scope: UL/CUL: TPE Flexible Cord, Types SVE, SVT, SJE, SJT, NISPE-1, NISPT-1 NISPE-2 and NISPT-2,