Smart Project Delivery With SAP Solution Manager Focused Build

Transcription

Smart Project Delivery with SAP SolutionManager Focused Build

Focused Build in a nutshellFocused Build enables SAP Solution Manager for projectsFocused Build for SAP Solution Manager 7.2 as tool , together with SAP Activate asmethodology, perfectly support you in innovation projects such as SAP S/4HANAimplementations.Focused Build Is an add-on solution for SAP Solution Manager 7.2 containingpreconfigurations for agile project usageSAP DBS Model CompanySAP Activate Enables you to jump-start SAP Solution Manager for yourinnovation project.LoB or industry solutionMethodology and best practices Provides best practice content, workflow-supportedmethodology for all project phases and project transparencyabout all activities. Requires license per user OR activation via services forPremium customers (only until end of 2019 (!) ) 2019 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLICSAP s smart delivery platform to manageimplementations end-to-endwith Focused Build2

Focused Build for SAP Solution ManagerFocused Build is preconfigured, standardized solutions, made for immediateconsumption in projects.Ready-to-run. Highly preconfigured and automated. Delivers all you need: Process workflow,features, documentation, services Based on SAP Solution Manager. Available to all customers.Here is an example from our daily lives: Having DinnerCook your own meal Decide what you want to eatFind a recipeMake a shopping listShop ingredientsPrepare ingredientsSet the tableEatWash the dishesYou define & set up your own project processesin SAP Solution Manager Standard or other toolsand spend time and money until you can start with it. 2019 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLICORGo out to dine Decide what you want from the menuOrderEatGo homeFocused BuildYou take Focused Build and start immediatelyto roll it out to your project team.3

What Is Included in Focused Build?Focused Build Add onRole-based / Training UnitsDashboards3rd party integration(scrum tools)StandaloneEnhancementsUI5 ApplicationsTurn-Key Process Configuration and IntegrationPrepareExploreRealizeDeployRunSAP Solution Manager 7.2Portfolio agement:Configurable baseline engines of SAP Solution Manager 2019 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLICChange ControlManagementReleaseManagementTestSuite: preconfigured and ready to use Focused Build add ons4

Focused Build in SAP Solution Manager 7.2 is fantastic for Build SAPProduct Highlights (1)BPMN modellingbased on SAP bestpractice processesTest and deploymentautomations toreduce risks andincrease efficiency 2019 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLICWorkflow basedSAP UI apps foreach project roleReal time projecttransparency withPMO dashboards5

Focused Build in SAP Solution Manager 7.2 is fantastic for Build SAPProduct Highlights (2)Support all project phases with preconfigured SAP Solution Manager 7.2Focused on Business processesAgile Agile release and software engineering with optional JIRAStart with Best-practice processes and documentationAlways up-to-date with SAP s One Content CloudIntegrated BPMN Process Modelling capabilitiesAny build activity is always referenced to a Business processMultilevel library structure for proper solution documentationintegration or Scrum Board extension Follow SAP Activate based Requirement to Deploy methods Continuous feedback & test loops with the business Incremental delivery of solution with an agile Release concept tomanage multiple projects in parallelProcess guidanceOut-Task Proven SAP project experiences have influenced the E2E Automated visibility of solution readiness against due dates toFocused Build process Automated test planning, deployment & checks to reduce manualefforts and to avoid errors SAP UI5 based application assure the adoption and acceptancefrom project team Build what the business needs with iterated workflow processesmanage risks and exceptions Efficient management of distributed development teamsthrough packaged work and standardized processes Automated real-time dashboards for testing, project management,or deployments replace spreadsheets Improved collaboration and quality assurance with SAP in astandardized project delivery 2019 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC6

Benefits for all stakeholdersUse of SAP Solution Manager with agile Focused Build approach will be appreciated on each level ofproject deliveryCustomer / Project sponsorProgram ManagementProject team Transparency Guidance Reduced time to value Measurement Content Improved efficiency Best Practices Usability Business process focus Harmonized content - tool –methodology Automation Early results Smooth Handover to operation Assured quality Stabilized data deployment Better Predictions High quality Customer satisfaction One single source of truth 2019 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC7

What are Your Immediate Benefits?How would customers benefit from Focused Build For SAP / non-SAP or on premise/hybrid Project types such asDigital Transformation projects including Custom Code adjustments, Implementation of new business processes,Extension of existing business processes, Integration of additional applications No coding / configuration costSAP delivers a standard solution. This also replaces the variety of processes by a standardized reference process.One tool to reduce the zoo on application and the interfaces for your project. Significantly less training costSAP delivers all training material required with the focused solution and services to enable and support through theproject lifecycle No upgrade riskSAP delivers standard upgrades. This means that you license the focused solution once and SAP promises to keepthis solution running with regular support packages and new features. Start immediateUse your existing SAP Solution Manager 7.2. The Focused Build add-on can be used in parallel to existingprocesses. Or even start immediately with a Focused Build Cloud Appliance Library (CAL) solution and transfer later. No handover to operations issuesSAP delivers Focused Solutions based on the proven SAP Solution Manager capabilities. Needless to say, projectscan be fully integrated in existing SAP Solution Manager 7.2 scenarios after go-live. 2019 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC8

Focused Build for SAP Solution Manager 7.2Follow the Getting Started Guide – available at the FAQ pageAwarenessUnderstandGet Buy-inProject PreparationScope ProjectPrepareSystemUsage in ProjectInteract withSAPFocused Build in anutshellExecutive summaryFind implementationsupportPlan your SAP SolutionManager landscapeInteract with SAP throughtool coachUnderstand the usecasesFind out about the usagerightsPlan and scheduleservicesSet up FB and projectadministrationProvide customerreferenceDiscover process & toolWhat are your immediatebenefits?Project approach withSAP Best PracticesImportant SAP hintsGet supportGet a first hands-on toolexperienceGet experts on demandInstall a FB coachGet Focused BuildTrain your projectmembersAdministrationtopicsRenew your licenses (forSTD and ES customers)FAQs & Communities 2019 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC9

Focused Build Learning materialFocused Build Introduction OverviewFunctional & ConceptualoverviewsRole based usage trainingmaterial How to get started Deployment and Release Role-specific training curriculum Release notes Project Management Cloud trial system Whitepaper Process Management Requirement and Change Role specific Demos in MediaCenter 2019 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC10

Demo System Landscapefor SAP Solution Manager (including Focused Build !)Media CenterYou are searching demo material forvarious SAP Solution Managerfunctionalities and features?Internet Demo SystemPrivate Cloud SystemYou want to play with a preconfigured public demo system?You want to experience SAP SolutionManager in private cloud? Navigate through a virtual demo environment at yourown pace Use the Internet Demo System to play with SAPprovided data on a pre-configured public demosystem in the internet. Use the SAP Cloud Appliance Library (SAP CAL) apre-configured private demo system in the cloud. Discover new functionality ofSAP Solution Manager 7.2 Experience a fully-configured SAP Solution Manager7.2 including Focused Build and Focused Insights. Practice when and as often as you want Understand how SAP Solution Manager 7.2 interactswith SAP S/4HANA. Free trial unlimited, without any additional costs. Free trial unlimited, without any additional costs. Regular system refresh, system governed by SAP. Test the content activation before executing theupgrade to 7.2. Prepare and explore the transition to SAP S/4HANAand transfer results to your SAP Solution Manager. Get a 30-day free trial. In addition, you need a cloudprovider account (Amazon Web Services (AWS) orMicrosoft Azure). No system refresh, system governed by yourself. 2019 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC11

SAP Solution Manager Focused BuildWhen should Focused Build be considered Is it a business process driven project, e.g. based on Model Company or SAP BestPractice content or customer given process structure There are many ( 100) WRICEFs or gaps expected which has to be realized bydevelopment and consulting teams Is the project team distributed over several locations or remote delivery is expected If a Value Assurance Package is involved, as Focused Build services could be involved inthe deliverables PMO wants to use a project tool which supports standardized activities in the project starting from target business process modelling, requirement backlog, developing, projectdocumentation, testing.- If there is a SAP Solution Manager in use or planned to be used in the operation after theGo-live. If the project approach wants to follow basic agile principles or SAP Activatemethodology? If the project starts soon and there is a need for a holistic implementation tool asap? 2019 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC* If any one of these conditions are met, Focused Build should be considered12

Focused Build capabilities & factsRequirement to Deploy (R2D) Focused Build is using functionalities which base on thestandard functionalities of SAP Solution Manager 7.2 The existing features of the Standard functionalities inSAP Solution Manager can be used with Focused Buildtoo. Focused Build brings additional features , UIs anddashboards in each of the scenarios which are onlyavailable with the Focused Build stack and license. Focused Build-only functionalities can not be usedstandalone, with the exception of the features in TestSuite. There are separated Standalone features which can beused independent from R2D to support single standardfunctionalities of SAP Solution Manager. Neverthelessthey need the installation of ST-OST200 and usage rightsextension (e.g. licenses). Process Management Project Management Deployment & Release Management Requirement & Build Management Test Suite External Integrations DashboardsStandalone functionalities Standalone features for Charm Standalone features for Testing Standalone features for ITSM 2019 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC13

Thank you.

Focused Build enables SAP Solution Manager for projects Focused Build Is an add-on solution for SAP Solution Manager 7.2 containing preconfigurations for agile project usage Enables you to jump-start SAP Solution Manager for your innovation project. Provides best practice content, workflow-supported