Supplier Quality & Development Manual - Dana

Transcription

Supplier Quality & Development Manuali. IntroductionDana suppliers are expected to demonstrate their commitment to excellence in every aspect of theirperformance in the global vehicular supply chain. This Supplier Quality & Development Manual(“Manual”) is designed to set forth many of the expectations and requirements that Dana has of itssuppliers. Our business relationship will be based on the requirements set forth in this manual as well asthe contract or purchase order terms and conditions that are specific to your transaction(s) with Dana. Inthe event of any inconsistency between this manual and the specific contract or Dana’s purchase orderterms and conditions, the contract or purchase order will control.To meet our customers’ world-class expectations, Dana has established appropriate standards to ensurethe quality of our products and the integrity of our operations. This Manual is the quality standard forevery Dana supplier worldwide. This common global Manual allows Dana to evaluate all suppliers acrossall product groups around the world based on common expectations and performance standards.This online Manual supersedes all other prior versions and this version is the only officially recognizedrelease of this document. Once downloaded and printed this manual becomes an uncontrolled document.

ii. Business ConductDana is committed to doing business in an ethical manner and with respect for our people and thecommunities in which they live. We expect the same of our suppliers. In support of this objective, Danahas established a “Supplier’s Guide to Business Conduct” which is part of every supply agreementbetween Dana and its suppliers. To access and review Dana Suppliers' Business Conduct Guide pleaseutilize the following Link http://supplier.dana.com/Dana/ethics.asp

iii. Supplier RegistrationAll Production suppliers must be registered to Dana 1 Source in order to gather your critical contact andorganizational data. Registration is required for each of your supplying locations in order to businesswith Dana. To register suppliers should work with their Dana Buyer to register and receive the requiredlog in and password. Once registered you will be required to supply additional data in the system andkeep it current such as, but not limited to, all Quality & Environmental System Registration Certificatesalong with all applicable AIAG CQI Assessment documents. http://dana.livesource.com

1. Quality ObjectivesThe requirements and processes contained in this Manual provide a foundation for the achievement ofworld-class performance, superior business results and accomplishment of specific Dana customerrequirements. This Manual places an emphasis on ‘Performance Based Partnership’ meaning thatsuppliers will be empowered to achieve established performance objectives.In order for Dana and its suppliers to meet our mutual and end customer expectations, there arefundamental objectives that we must build into our business system related to: Quality Zero Quality Incidents Zero Quality Incidents Per Million Parts (IPM) Zero Quality Defects Per Million Parts (PPM)Delivery Performance 100% On TimeLean Manufacturing and Lean Processing Best- In- Class Cost Best-In-Class Technology Successful Product Launches Supplier Driven APQP Process 100% 1st time, On Time, PPAP acceptance 100% Safe Launch Process Compliance (SD110)Business Conduct and Commercial Standards Suppliers Guide to Business Conduct Capacity / Contingency Planning Zero supply termination without prior Dana approval Diversity Sourcing in regions where applicable Respect for the Environment: Suppliers are encouraged to obtain ISO registration fortheir Environmental SystemsIn our pursuit of the elimination of waste in the supply chain, we encourage our suppliers to providefeedback and constructive criticism of the processes identified in this Manual or elsewhere. To that end, ifyou have any comments or improvement suggestions please contact your Supply Chain ManagementRepresentative.

2. Supplier Assessment Processes2.1 Supplier Systems Assessment: The objective of Dana’s Supplier System Assessment is to identifypotential suppliers who have operational systems and controls which are compatible and complimentaryto Dana and to periodically evaluate current suppliers to ensure those systems and controls are beingsustained.The purpose of the system assessment is to identify potential performance or supply risk to Dana or itsend customers prior to sourcing. Key system factors evaluated include quality, safety, process, logistics /packaging, APQP, design, change management, people, leadership, cost, special processes modulesand AIAG Supplier Self-Assessments critical to producing Dana product. The special processesaddressed include casting, safety, machining, stamping, tubing, forging, formed gears, taper rollerbearings, ISO 26262 processes, steel and aluminum mill processing. AIAG Supplier Self-Assessmentsinclude heat treat (CQI-9), plating (CQI-11), coating (CQI-12), welding (CQI-15), soldering (CQI-17),molding (CQI-23) and casting (CQI-27). Suppliers must ascertain an Approved Status to the baseassessment, all applicable special process modules and upload all applicable AIAG Supplier SelfAssessments to their profile page at http://dana.livesource.com to become an approved supplier toDana.Dana’s Supplier Assessment Process applies to Tier 1 suppliers to Dana. Sub-tier suppliers to Dana areonly audited when a significant potential risk to Dana has been identified. Steel Mills, Aluminum Mills andRaw Casting suppliers, may require a Dana Supplier Assessment prior to sourcing.Dana Supplier System Assessments are reviewed prior to sourcing and/or according to our AuditGuideline. Suppliers whose Quality Performance, as shown in our Supplier Performance FeedbackSystem, has conformed to Dana’s specified requirements for a minimum of five consecutive years, will beconsidered to complete and submit a Self-assessment audit. Self-assessment audit requirements are reevaluated on an annual basis.2.2 Process Series Review: The purpose is a focused analysis on a single production line and partnumber (or part family). It encompasses a thorough review of a supplier’s capacity, special characteristiccapability, control and documentation to ensure the resultant product is in complete compliance to allDana drawing, specification requirements and the quoted contractual volume.

3. APQPSuppliers, upon completion of a Program Technical Review, are required to comply with the latest editionof the AIAG Advance Product Quality Planning Manual, located at http://www.aiag.org for a Programintroduction of a new or significantly modified production product to Dana.3.1 APQP Workbook to Supplier: The Buyer or designated Product Group representative willcommunicate the required APQP Workbook to your organization. It is Dana’s expectation that yourorganization will review this information and develop their timeline for each element of the APQP StatusSheet, contained within the workbook, and identify any issues on the included Open Issues status Report(OISR). Suppliers shall submit the applicable documentation required according to their committedtimeline.For designated Projects Supplier Development will provide an APQP Workbook with Program Milestones.Suppliers are required to add their specific timing to the APQP Elements and submit the requiredobjective evidence per the program timing schedule.3.2 APQP Status Element Review: The Dana Regional Supplier Development personnel, ProgramManagement or the Dana Facility Quality Team will review your updates submitted and verify theirconformance to program requirements. All outstanding issues shall be documented, with responsibility &timing, on the OISR in the APQP Workbook. Any APQP requirement that yields product not meetingDana specifications requires the supplier to submit the Supplier Change / Deviation Request. for Danaapproval prior to receipt of that product by Dana.3.3 PPAP and Supplier Launch Criteria: Once all Supplier APQP Elements have been completed, yourorganization will submit a PPAP documentation package at the requested level of submission and theAPQP Workbook to the Dana Facility and SupplierDevelopment@dana.com. For Asia Pacific Programsforward submissions to supplierdevelopmentap@dana.com.As outlined in APQP Workbook the Supplier shall conform to the Safe Launch requirements for both newand carryover parts for the specified duration.3.4 System Improvement: One of the goals of the APQP process is to improve itself over time. Theeffectiveness of the APQP process is measured on its ability to meet the goal of successful launches. Theefficiency of the APQP process (i.e. the effective use of resources) to successfully launch a new productwill be improved through suggestions and findings of its participants. At any stage in the program yourorganization may submit improvement ideas through your Supply Chain Management Representative.

4. Dana Specific Requirements4.1 Quality System: Dana’s requirement standard for our supply base is registration to the latest editionof IATF 16949 or ISO 9001. Exceptions to the Dana standard will be evaluated on their individual merits.Organizations shall notify Dana of any change in their 3rd party certifications and more specifically,immediately for a certificate withdrawal or a certificate cancellation without replacement.Suppliers shall document their process to ensure that purchased products, processes, and servicesconform to the current applicable statutory and regulatory requirements in the country of receipt, thecountry of shipment, and the Dana –identified country of destination, if provided.If Dana defines special controls for certain products with statutory and regulatory requirements, suppliersshall ensure they are implemented and maintained as defined, including throughout their supply base.Suppliers shall maintain a copy of their current Quality System Registration Certificate and all applicablecurrent AIAG Supplier Self-Assessment documents as referenced in 2.1 in their supplier profile pagewithin http://dana.livesource.com. Specifically, as applicable, the process assessments included inAIAG Special Process documents - CQI-9 Heat Treat, CQI-11 Plating, CQI-12 Coating, CQI-15 Welding,CQI-17 Soldering, CQI-23 Molding, and CQI-27 Casting – require inclusion in the suppliers’ internalaudits programs and are to be conducted annually. If there are questions regarding applicability, pleasecontact the appropriate Dana representative.Off Highway Driveline Technologies – Please refer to the Off-Highway Product Group SpecificRequirements GQG-22. Contact your Off-Highway Purchasing representative for a copy.Suppliers must also adhere to any Dana end customer specific requirements.Those end customer specific requirements can be found at: http://www.iatfglobaloversight.org4.2 Supplier’s Quality Manuals: Quality Manual(s) from your organization may be reviewed by Dana atany reasonable time. In such case, you are required to allow your manual to be reviewed by therequesting Dana representative subject to reasonable confidentiality requirements.4.3 Engineering Specifications: Engineering Specifications are provided during the request for quoteprocess. Suppliers are required to ensure they have received and fully understand the requirements of allEngineering Standards related to the product(s) that they furnish Dana. Any missing and / or questionsrelated to the understanding of the intent of Dana Engineering Standards shall be communicated to yourSupply Chain Management Representative prior to initiating supply to Dana.4.4 Record Retention: All records related to the manufacture of Dana parts shall be retained for ten (10)years from the date of creation (15 years for safety designated items) or such longer period as may berequired by Dana’s end customer.4.5 Special Characteristics: The special characteristics defined on Dana drawings and / or in DanaEngineering Standards shall conform to the Dana Special Characteristics requirements. Suppliers shallbe able to produce evidence that statistical process control is being continuously used, when requiredand/or appropriate, to assure stable and capable processes.4.5.1 Prototype Sample Special Characteristics: All prototype samples furnished by suppliers shallconform to the following requirements for their applicable Dana Product Group.

Off Highway Driveline Technologies – Refer to the Off-Highway Product Group Specific RequirementsGQG-22. Contact your Off-Highway Purchasing representative for a copy.Power Technologies Product Group - As delineated on the Prototype Purchase Order.Commercial Vehicle & Light Vehicle Driveline Technologies - Each part is to be serialized on a non-criticalsurface (consult with the applicable Engineering Group for non-critical surface identification). Thepreferred identification is Part Number and Consecutive Dash Number. (Example: Part Number -1, -2,etc.).An inspection report is to be furnished for each serialized part for all critical / significant dimensions asdesignated on either the Dana Drawing or Engineering Specification.At minimum, the inspection report shall include - date inspected, Inspector's signature, part & serial dashnumber, revision level, part name, purchase order number, part dimension / tolerance/actual dimension &the Gage R&R reports for all inspection tools utilized( for CMM submit a copy of the current CalibrationCertificate).The inspection report shall be in pdf file format and named with the Dana Program, Part Number andDate. (Example: Program Name Part Number Month-Day-Year.pdf).The inspection report shall be shipped with the prototype samples. Prototype samples received withoutthe accompanying inspection report will be rejected.Any Metallurgical/Heat Treat/Physical Test results available for the prototype parts should be includedwith the inspection report furnished.Any additional inspection requireme

AIAG Special Process documents - CQI-9 Heat Treat, CQI-11 Plating, CQI-12 Coating, CQI-15 Welding, CQI-17 Soldering, CQI-23 Molding, and CQI-27 Casting – require inclusion in the suppliers’ internal audits programs and are to be conducted annually. If there are questions regarding applicability, please