ATLAS RESISTANCE Pier Foundation Systems - Intech Anchoring Systems

Transcription

ATLAS RESISTANCEPier FoundationSystems

Foundation Repair Systemsfor Civil Construction Applications:Residential, Commercial, IndustrialAtlas Resistance Piers have been used to restore and/or stabilize homes andcommercial structures that had settled due to a wide variety of soil problems.Foundation settlement and movement can becaused by building on expansive clay, compressibleor improperly compacted fill soils, or impropermaintenance around foundations. Whatever the cause,settlement can destroy the value of structures andrender them unsafe.For sample specs,technical library,case histories anddistributors, go towww.atlassys.comInstallation by smoothhydraulic pressureextends pier to reachcompetent end-bearingsoil stratum.Properly installed, Atlas Resistance Piers can preventsettlement, stabilize foundations and restore settled structures nearly totheir original positions, often closing structural defects such as cracks anddeformities caused by the the settlement. Because the solution is bothpermanent and economically attractive, thestructures retain or recover their value.Cost-effective rapid piersfit your job requirementsTrue end-bearing Atlas Resistance Piers aresold and installed only by contractors trainedby Atlas and authorized to recommend andprovide appropriate solutions to a widerange of soil problems.Design professionals may request a Chance Civil Construction Technical Design Manualon CD from their Distributor or TerritoryManager listed on our web sites: www.atlassys.com or www.abchance.com.Verifiable factor of safety achievedon each pier as installed Reach competent soil below active zone Extendable in 31/2-ft. sections No excavation or spoils to remove Loads may be immediately applied Installs in limited access Installs in any weather conditionPier Bracket Systems Applications*DesignUnder Continuous Plate Pre-Drilled Helical TieCapacity Dia. Footing Liftback Combo0 - 35 kip0 - 45.5 kip0 - 55 kip0 - 70.5 kip227 8"31 2"4"41 2"Page 3Page 3Page 3Page 3Page 4Page 4Page 4Page 4Page 5Page 5Page 5Page 5Page 6Page 6Page 6Page 6Page 7Page 7Page 7––––––*Based on a Safety Factor of 2 for pier ultimate mechanical strength.

Atlas Resistance PiersUnder Footing Bracket Systems For lifts up to 4" Standard-Series and N-Series modelsUnder Footing Bracket Atlas Resistance Piers have 27 8" to 41 2" diameter pier sections with 0.165" to 0.237"wall thickness. Two-stage hydraulic installation develops end-bearing piers with a verifiable factor of safety.Multiple finishes and brackets are available. For more details, see the Chance Civil Construction TechnicalDesign Manual, Bulletin 01-0605.Foundation stem FootingBracketConcretefootingMounting bolts(2, not included)Pier pinsBuilding code structuralTop pierprovisions are met byplatformsome models of AtlasResistance Pier UnderFooting Bracket Systemswhich comply with thePier pipemost recent editions ofsectionsBOCA National Code,ICBO Uniform Code,SBCCI Standard Codeand 2000 InternationalFrictionBuilding and ResidentialreductionCode as detailed incollarICC Evaluation ServiceLegacy Report NER-579.See Appendix C of the Chance Civil ConstructionTechnical Design Manual, Bulletin 01-0605.Under Footing Bracket Systems*DesignCapacity Atlas Resistance Pier Sizes0 - 30 kip0 - 35 kip0 - 42.5 kip0 - 45.5 kip0 - 49 kip0 - 70.5 kip27 8" Pier Diameter27 8" Pier Diameter, Modified with reinforcing sleeve31 2" Pier Diameter31 2" Pier Diameter, Modified with reinforcing sleeve4" Pier Diameter41 2" Pier Diameter*Based on a Safety Factor of 2 for pier ultimate mechanical strength.3

Atlas Resistance PiersContinuous Lift Systems For lifts exceeding 4", bracket fits under footing Exceptional, extended lift capabilitiesContinuous Lift Bracket Atlas Resistance Piers have 27 8" to 4" diameter piersections with 0.165" to 0.219" wall thickness. Two-stage hydraulic installationdevelops end-bearing piers with a verifiable factor of safety.Multiple finishes are available. For more details, see the Chance CivilConstruction Technical Design Manual, Bulletin 01-0605.Continuousthread barFoundation stem wallContinuousLift BracketConcretefootingFor sample specs,technical library,case histories anddistributors, go towww.atlassys.comMounting bolts(4, not included)Cap plateassemblyTop pier sleevePier pipesectionsFrictionreductioncollarContinuous Lift Plate Bracket Atlas Resistance Pier Systems also are availableby special order. See page 5 for general information on Plate Bracket Systems.*DesignCapacity0 - 20 kip0 - 30.5 kip0 - 50 kip4Continuous Lift Bracket SystemsAtlas Resistance Pier Sizes27 8" Pier Diameter31 2" Pier Diameter4" Pier Diameter*Based on a Safety Factor of 2 for pier ultimate mechanical strength.

Atlas Resistance PiersPlate Bracket Systems Easy surface mount installation Also for round columns (custom manufactured) For lifts up to 4"Plate Bracket Atlas Resistance Piers have 27 8" to 41 2" diameter pier sections with 0.165" to 0.237" wallthickness. Two-stage hydraulic installation develops end-bearing piers with a verifiable factor of safety.Multiple finishes are available. For more details, see the Chance Civil Construction Technical Design Manual,Bulletin 01-0605.Foundationstem wallPlateBracketMounting bolts(8, not included)Pier pinsConcrete footingTop pier platformPier pipesectionsFriction reductioncollarContinuous Lift PlateBracket Atlas Resistance Pier Systems also areavailable by specialorder (see page 4). Pre-Drilled Plate Bracket Atlas Resistance Pier Systems also areavailable by special order (see page 6).*DesignCapacity0 - 35 kip0 - 45 kip0 - 51.5 kip0 - 56 kipPlate Bracket SystemsAtlas Resistance Pier Sizes27 8" Pier Diameter31 2" Pier Diameter4" Pier Diameter41 2" Pier Diameter*Based on a Safety Factor of 2 for pier ultimate mechanical strength.5

Atlas Resistance PiersPre-Drilled Systems For lifts up to 4" For penetrating unsuitable rock near surface For digger head clearance, drilled hole eccentricitymay be 63 4" from wall to pipe centerlinePre-Drilled Bracket Atlas Resistance Piers have 27 8" to 41 2" diameter piersections with 0.165" to 0.237" wall thickness. Two-stage hydraulic installationdevelops end-bearing piers with a verifiable factor of safety.Multiple finishes are available. For more details, see the Chance CivilConstruction Technical Design Manual, Bulletin 01-0605.Concrete footingFor sample specs,technical library,case histories anddistributors, go towww.atlassys.comFoundation stem wallMountingbolts(4, notincluded)Pier pinsDrilling throughshallow rocklayer permitsthis Pre-DrilledPier BracketSystem to reachload-bearingstratum below.UnsuitableRock stratumor ”floater”Foundationstem wallTop pierplatformTop pierplatformPier pipesectionsPier oncollarPre-Drilled Plate Bracket Atlas Resistance Pier Systems also are available byspecial order with capacities matching those listed below.See page 5 for general information on Plate Bracket Systems.*DesignCapacity0 - 29 kip0 - 31 kip0 - 38 kip0 - 46 kip6Pre-Drilled Bracket SystemsAtlas Resistance Pier Sizes27 8" Pier Diameter31 2" Pier Diameter4" Pier Diameter41 2" Pier Diameter*Based on a Safety Factor of 2 for pier ultimate mechanical strength.

Atlas Resistance PiersAtlas Resistance Pier & Helical Tieback Combo For lateral support needed in conjunction with Atlas Resistance PierWhere site conditions and load requirements warrant, this system combines Chance helical tieback anchorswith Atlas Resistance Piers. The helical anchors contribute lateral support to the piers providing verticalsupport. This unique combination forms a fast, effective solution for challenges beyond the capabilities ofother systems.Components for a single unit include:Concrete footing Atlas Resistance Modified Pier and Bracket Chance Helical Tieback Anchor Bearing Plate Bevel Washer All-Thread Rebar and Nut Square Shaft-to-Threaded Bar Transition CouplingFoundationstem wallAtlas Resistance Two-PieceModified Pier BracketChance Helical Tieback AnchorLead Section and ExtensionTransition couplingAll-threadrebarand nutBevelwasherBearingplateTop pierplatformPier pipesectionsTypical application —Atlas Resistance 2-PieceModified Pier and Bracket withintegrated Chance HelicalTieback AnchorFrictionreductioncollar Typic al A pplic ation U sing A tlas Re sist anc e 2-P iece M odifi ed P iers*Pier DesignCapacity0 - 35 kip0 - 45.5 kip0 - 55 kipPier and Tieback Combo Bracket Systems w ith Integr ated C hanc e Hel ic al Tieba ck An c hors.Atlas Resistance Modified PiersChance Helical Tieback Anchors2 8" Pier Diameter, reinforced top section31 2" Pier Diameter, reinforced top section4" Pier Diameter, reinforced top section11 4" RC Square Shaft SS125 Series11 2" RC Square Shaft SS5 and SS150 Series11 2" RC Square Shaft SS5 and SS150 Series13 4" RC Square Shaft SS175 Series*Based on a Safety Factor of 2 for pier ultimate mechanical strength.77

Anchoring the WorldWith both the CHANCE and ATLAS brands, Chance Civil Construction is theinternational leader in earth anchoring and structural mitigation. CHANCE Helicalpiles and ATLAS Resistance piers are used worldwide to secure residential andcommercial buildings, tower foundations, heavy equipment foundations and manyother deep foundation applications.Engineered for dependability and long-term stability, our systems featureexclusive anchoring techniques, tools, designs and sizes that make other foundationmethods a thing of the past.Selected by application, our systems are your first line of defense against poor soilconditions, floods and time.Demand ABetter FoundationWith nearly 400 dealers and distributors nationwide and in Canada, we are ready toprovide you everything you need to get the job done right. We offer engineeringguidance, field supervision, accessibility, warehouses, material traceability, AWCcertified welders, technical support and complete documentation.Ask a distributor near you for our comprehensive design manual (hardcopy orCD) or download a complete Sample Specification Guide online. Demand a betterfoundation today. Locate your nearest distributor at our web sites below.Down. Right. Solid.Our tagline is our promise. Our foundation and anchoring products go down with powerinto the ground and are accurate, level and right the first time. The result is solid stability.www.abchance.comwww.atlassys.com210 North Allen StreetCentralia, MO 65240Tel. (573) 682-8414Fax (573) 682-8660Because Hubbell has a policy of continuous product improvement, we reserve the right to change design and specifications without notice. Copyright 2008 Hubbell, Inc. / Printed in USA / A&J10M03/08 / Bulletin 01-0701

Design Manual, Bulletin 01-0605. Concrete footing Top pier platform Pier pipe sections Friction reduction collar Mounting bolts (2, not included) Pier pins Foundation stem wall Atlas Resistance Piers N-Series Under Footing Bracket Standard Series Under Footing Bracket See Appendix C of the Chance Civil Construction Technical Design Manual .