Rev 07-06-2022 Title - Moval

Transcription

Rev 07-06-2022Title

City of Moreno ValleySchedule of City Fees, Charges and RatesFiscal Year 2022-23Section 1 - Development FeesCommunity DevelopmentBuilding and SafetyPlanningFinancial & Management ServicesSpecial DistrictsFirePublic WorksElectric UtilityLand DevelopmentTransportation EngineeringParks & Community ServicesParks ProjectsDevelopment Impact FeesQuimby In-Lieu Fees1 220 2627 383948 5051Section 2 - Parks & Community Services Fees53Recreation Programs 54Facility Rental 58 6566 67 6872 7373737475 76 7778798181Commercial Cannabis Permit Fees Miscellaneous Fees and Charges 83Penalties and Delinquent Fee Schedule for Parking Violations 84Conduit Financing Fees 87Section 3 - Miscellaneous FeesCity ClerkCity ManagerCable TV Administration and ProgrammingCommunity DevelopmentAnimal ServicesCode and Neighborhood ServicesFinancial & Management ServicesFinancial OperationsFinancial ResourcesTreasury OperationsSpecial DistrictsPurchasing-Solid WasteFireOffice of Emergency Management and Volunteer ServicesParks & Community ServicesMilitary Appreciation ProgramLibrary ServicesPolicePublic WorksAdministrationMaintenance and OperationsContents5282

DEVELOPMENT FEES

Community DevelopmentBuilding and SafetyUnitCurrent FeeWater Heater PermitEach 60.00Water Heater Permit Re-inspectionEach 60.00Water Heater ReplacementEach 60.00Dev-Com Dev-Building & Safety

Community DevelopmentBuilding and SafetyCurrent FeeNEW CONSTRUCTION MODIFIER TABLES:Plan CheckInspectionCommercial Uses - Structural (All newly constructed or added space for non-residential occupancies classified as CBC Group IIIB, VA, VB classified as CBCgroup A, B,E, F, I, M, S, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule)Square Footage:0 - 1,999per project base @ 2,000 s.f.2,000 - 4,999per project base @ 2,000 s.f.5,000 - 9,999per project base @ 5,000 s.f.10,000 - 24,999per project base @ 10,000 s.f.25,000 - 49,999per project base @ 25,000 s.f.50,000 plusper project base @ 50,000 s.f. 50,000 add cost per sq. ft. modifier below to project ba per s.f.Modifier for 50,000 sfper s.f. 315.000.17 465.000.13Commercial Uses - Structural (All newly constructed or added space for non-residential occupancies classified as CBC Group IIB, IIIA, IV classified as CBC groupA, B,E, F, I, M, S, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule)Square Footage:0 - 1,999per project base @ 2,000 s.f.2,000 - 4,999per project base @ 2,000 s.f.5,000 - 9,999per project base @ 5,000 s.f.10,000 - 24,999per project base @ 10,000 s.f.25,000 - 49,999per project base @ 25,000 s.f.50,000 plusper project base @ 50,000 s.f. 50,000 add cost per sq. ft. modifier below to project ba per s.f.Modifier for 50,000 sfper s.f. 0,390.000.21 080.000.16Commercial Uses - Structural (All newly constructed or added space for non-residential occupancies classified as CBC Group IA, IB, IIA classified as CBC groupA, B,E, F, I, M, S, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule)Square Footage:0 - 1,999per project base @ 2,000 s.f.2,000 - 4,999per project base @ 2,000 s.f.5,000 - 9,999per project base @ 5,000 s.f.10,000 - 24,999per project base @ 10,000 s.f.25,000 - 49,999per project base @ 25,000 s.f.50,000 plusper project base @ 50,000 s.f. 50,000 add cost per sq. ft. modifier below to project ba per s.f.Modifier for 50,000 sfper s.f.Dev-Com Dev-Building & Safety 15,590.000.31 2,125.000.24

Community DevelopmentBuilding and SafetyCurrent FeePlan Check InspectionResidential and Multifamily Residential Uses - (All newly constructed or added space for residential occupancies construction type IIIB, VA, VB classifiedas CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule)Square Footage:0 - 1,999per project base @ 2,000 s.f.2,000 - 4,999per project base @ 2,000 s.f.5,000 - 9,999per project base @ 5,000 s.f.10,000 - 24,999per project base @ 10,000 s.f.25,000 - 49,999per project base @ 25,000 s.f.50,000 plusper project base @ 50,000 s.f. 50,000 add cost per sq. ft. modifier below to project ba per s.f.Modifier for 50,000 sf 005.000.12 018,475.000.37Residential and Multifamily Residential Uses - (All newly constructed or added space for residential occupancies construction type IIB, IIIA, IVclassifiedas CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule)Square Footage:0 - 1,999per project base @ 2,000 s.f.2,000 - 4,999per project base @ 2,000 s.f.5,000 - 9,999per project base @ 5,000 s.f.10,000 - 24,999per project base @ 10,000 s.f.25,000 - 49,999per project base @ 25,000 s.f.50,000 plusper project base @ 50,000 s.f. 50,000 add cost per sq. ft. modifier below to project ba per s.f.Modifier for 50,000 sf 505.000.15 023,090.000.46Residential and Multifamily Residential Uses - (All newly constructed or added space for residential occupancies construction type IA, IB, IIA classified asCBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule)Square Footage:0 - 1,999per project base @ 2,000 s.f.2,000 - 4,999per project base @ 2,000 s.f.5,000 - 9,999per project base @ 5,000 s.f.10,000 - 24,999per project base @ 10,000 s.f.25,000 - 49,999per project base @ 25,000 s.f.50,000 plusper project base @ 50,000 s.f. 50,000 add cost per sq. ft. modifier below to project ba per s.f.Modifier for 50,000 sfDev-Com Dev-Building & Safety 1,260.000.23 034,640.000.69

Community DevelopmentBuilding and SafetyCurrent FeePlan Check InspectionHazardous Use - (All newly constructed or added space for hazardous use occupancies Copnstruction types IIIB, VA, VB classified as CBC Group H.Square Footage:0 - 1,999per project base @ 2,000 s.f. 2,615.00 2,000 - 4,999per project base @ 2,000 s.f. 2,615.00 5,000 - 9,999per project base @ 5,000 s.f. 3,385.00 10,000 - 24,999per project base @ 10,000 s.f. 4,465.00 25,000 - 49,999per project base @ 25,000 s.f. 6,775.00 50,000 plusper project base @ 50,000 s.f. 9,235.00 50,000 add cost per sq. ft. modifier below to project ba per s.f. 9,235.00 Modifier for 50,000 sf 0.18 465.000.13Hazardous Use - (All newly constructed or added space for hazardous use occupancies Copnstruction types IIB, IIIA, IV classified as CBC Group H.Square Footage:0 - 1,999per project base @ 2,000 s.f. 3,270.00 2,000 - 4,999per project base @ 2,000 s.f. 3,270.00 5,000 - 9,999per project base @ 5,000 s.f. 4,235.00 10,000 - 24,999per project base @ 10,000 s.f. 5,580.00 25,000 - 49,999per project base @ 25,000 s.f. 8,465.00 50,000 plusper project base @ 50,000 s.f. 11,545.00 50,000 add cost per sq. ft. modifier below to project ba per s.f. 11,545.00 Modifier for 50,000 sf 0.23 080.000.16Hazardous Use - (All newly constructed or added space for hazardous use occupancies Copnstruction types IA, IB, IIA classified as CBC Group H.Square Footage:0 - 1,999per project base @ 2,000 s.f. 4,905.00 2,000 - 4,999per project base @ 2,000 s.f. 4,905.00 5,000 - 9,999per project base @ 5,000 s.f. 6,350.00 10,000 - 24,999per project base @ 10,000 s.f. 8,370.00 25,000 - 49,999per project base @ 25,000 s.f. 12,700.00 50,000 plusper project base @ 50,000 s.f. 17,320.00 50,000 add cost per sq. ft. modifier below to project ba per s.f. 17,320.00 Modifier for 50,000 sf 0.35 12,125.000.24Dev-Com Dev-Building & Safety

Community DevelopmentBuilding and SafetyCurrent FeePlan Check InspectionShell Buildings for all Commercial Uses - (The enclosure for all newly constructed or added space for non-residential occupanciesconstruction type IIIB, VA, VB classified as CBC Group A, B, E, F, I, M, S, or other commercial occupancies not specificallyaddressed elsewhere in this Fee Schedule where the interior is not completed or occupiable)Square Footage:0 - 1,999per project base @ 2,000 s.f.2,000 - 4,999per project base @ 2,000 s.f.5,000 - 9,999per project base @ 5,000 s.f.10,000 - 24,999per project base @ 10,000 s.f.25,000 - 49,999per project base @ 25,000 s.f.50,000 plusper project base @ 50,000 s.f. 50,000 add cost per sq. ft. modifier below to project ba per s.f.Modifier for 50,000 sf 540.000.11 850.000.08Shell Buildings for all Commercial Uses - (The enclosure for all newly constructed or added space for non-residential occupanciesconstruction type IIB, IIIA, IV classified as CBC Group A, B, E, F, I, M, S, or other commercial occupancies not specificallyaddressed elsewhere in this Fee Schedule where the interior is not completed or occupiable)Square Footage:0 - 1,999per project base @ 2,000 s.f.2,000 - 4,999per project base @ 2,000 s.f.5,000 - 9,999per project base @ 5,000 s.f.10,000 - 24,999per project base @ 10,000 s.f.25,000 - 49,999per project base @ 25,000 s.f.50,000 plusper project base @ 50,000 s.f. 50,000 add cost per sq. ft. modifier below to project ba per s.f.Modifier for 50,000 sf 925.000.14 810.000.10Shell Buildings for all Commercial Uses - (The enclosure for all newly constructed or added space for non-residential occupanciesconstruction type IA, IB, IIA classified as CBC Group A, B, E, F, I, M, S, or other commercial occupancies not specificallyaddressed elsewhere in this Fee Schedule where the interior is not completed or occupiable)Square Footage:0 - 1,999per project base @ 2,000 s.f.2,000 - 4,999per project base @ 2,000 s.f.5,000 - 9,999per project base @ 5,000 s.f.10,000 - 24,999per project base @ 10,000 s.f.25,000 - 49,999per project base @ 25,000 s.f.50,000 plusper project base @ 50,000 s.f. 50,000 add cost per sq. ft. modifier below to project ba per s.f.Modifier for 50,000 sfDev-Com Dev-Building & Safety 0,390.000.21 215.000.14

Community DevelopmentBuilding and SafetyCurrent FeePlan Check InspectionTenant Improvement - (Remodeled space for non-residential occupancies Construction Type: IIIB, VA, VB classified as CBC Group A, B, E, F, I, M, S, or othercommercial occupancies not specifically addressed elsewhere.)Square Footage:0 - 1,999per project base @ 2,000 s.f.2,000 - 4,999per project base @ 2,000 s.f.5,000 - 9,999per project base @ 5,000 s.f.10,000 - 24,999per project base @ 10,000 s.f.25,000 - 49,999per project base @ 25,000 s.f.50,000per project base @ 50,000 s.f. 50,000 add cost per sq. ft. modifier below to project baseModifier per s.f. 310.000.09 310.000.09Tenant Improvement - (Remodeled space for non-residential occupancies Construction Type: IIB, IIIA, IV classified as CBC Group A, B, E, F, I, M, S, or othercommercial occupancies not specifically addressed elsewhere.)Square Footage:0 - 1,999per project base @ 2,000 s.f.2,000 - 4,999per project base @ 2,000 s.f.5,000 - 9,999per project base @ 5,000 s.f.10,000 - 24,999per project base @ 10,000 s.f.25,000 - 49,999per project base @ 25,000 s.f.50,000per project base @ 50,000 s.f. 50,000 add cost per sq. ft. modifier below to project baseModifier per s.f. 390.000.11 390.000.11Tenant Improvement - (Remodeled space for non-residential occupancies Construction Type: IA, IB, IIA classified as CBC Group A, B, E, F, I, M, S, or othercommercial occupancies not specifically addressed elsewhere.)Square Footage:0 - 1,999per project base @ 2,000 s.f.2,000 - 4,999per project base @ 2,000 s.f.5,000 - 9,999per project base @ 5,000 s.f.10,000 - 24,999per project base @ 10,000 s.f.25,000 - 49,999per project base @ 25,000 s.f.50,000per project base @ 50,000 s.f. 50,000 add cost per sq. ft. modifier below to project baseModifier per s.f.Dev-Com Dev-Building & Safety 080.000.16 080.000.16

Community DevelopmentBuilding and SafetyCurrent FeePlan Check InspectionTenant Improvement - Hazardous Use (Remodeled space for non-residential occupancies IIIB, VA, VB classified as CBC Group H.Square Footage:0 - 1,999per project base @ 2,000 s.f. 1,845.002,000 - 4,999per project base @ 2,000 s.f. 1,845.005,000 - 9,999per project base @ 5,000 s.f. 2,155.0010,000 - 24,999per project base @ 10,000 s.f. 2,465.0025,000 - 49,999per project base @ 25,000 s.f. 3,540.0050,000per project base @ 50,000 s.f. 4,620.00 50,000 add cost per sq. ft. modifier below to project base 4,620.00Modifier per s.f. 0.09 620.000.09Tenant Improvement - Hazardous Use (Remodeled space for non-residential occupancies IIB, IIIA, IV classified as CBC Group H.Square Footage:0 - 1,999per project base @ 2,000 s.f. 2,310.002,000 - 4,999per project base @ 2,000 s.f. 2,310.005,000 - 9,999per project base @ 5,000 s.f. 2,695.0010,000 - 24,999per project base @ 10,000 s.f. 3,080.0025,000 - 49,999per project base @ 25,000 s.f. 4,425.0050,000per project base @ 50,000 s.f. 5,775.00 50,000 add cost per sq. ft. modifier below to project base 5,775.00Modifier per s.f. 0.12 775.000.12Tenant Improvement - Hazardous Use (Remodeled space for non-residential occupancies IA, IB, IIA classified as CBC Group H.Square Footage:0 - 1,999per project base @ 2,000 s.f. 3,465.002,000 - 4,999per project base @ 2,000 s.f. 3,465.005,000 - 9,999per project base @ 5,000 s.f. 4,040.0010,000 - 24,999per project base @ 10,000 s.f. 4,620.0025,000 - 49,999per project base @ 25,000 s.f. 6,640.0050,000per project base @ 50,000 s.f. 8,660.00 50,000 add cost per sq. ft. modifier below to project base 8,660.00Modifier per s.f. 0.17 660.000.17Dev-Com Dev-Building & Safety

Community DevelopmentBuilding and SafetyCurrent FeePlan Check InspectionOne and Two Family Dwellings -(All newly constructed space for residential occupancies Construction Type: IIIB, VA, VB classified as CBC Group R-3, orother similar residential occupancies not specifically addressed elsewhere in this Fee Schedule. This category includes the model home or a custom home project)Square Footage:0 - 999per project base @ 1,000 s.f.1000 - 2,499per project base @ 1,000 s.f.2,500 - 3,999per project base @ 2.500 s.f.4,000 - 5,999per project base @ 4,000 s.f.6,000 - 7,999per project base @ 6,000 s.f.8,000per project base @ 8,000 s.f. 8,000 add cost per sq. ft. modifier below to project baseModifier per s.f. 695.000.46 310.000.54One and Two Family Dwellings -(All newly constructed space for residential occupancies Construction Type: IIB, IIIA, IV classified as CBC Group R-3, or othersimilar residential occupancies not specifically addressed elsewhere in this Fee Schedule. This category includes the model home or a custom home project)Square Footage:0 - 999per project base @ 1,000 s.f.1000 - 2,499per project base @ 1,000 s.f.2,500 - 3,999per project base @ 2.500 s.f.4,000 - 5,999per project base @ 4,000 s.f.6,000 - 7,999per project base @ 6,000 s.f.8,000per project base @ 8,000 s.f. 8,000 add cost per sq. ft. modifier below to project baseModifier per s.f. 620.000.58 390.000.67One and Two Family Dwellings -(All newly constructed space for residential occupancies Construction Type: IA, IB, IIA classified as CBC Group R-3, or othersimilar residential occupancies not specifically addressed elsewhere in this Fee Schedule. This category includes the model home or a custom home project)Square Footage:0 - 999per project base @ 1,000 s.f.1000 - 2,499per project base @ 1,000 s.f.2,500 - 3,999per project base @ 2.500 s.f.4,000 - 5,999per project base @ 4,000 s.f.6,000 - 7,999per project base @ 6,000 s.f.8,000per project base @ 8,000 s.f. 8,000 add cost per sq. ft. modifier below to project baseModifier per s.f.Residential Repeat / Subsequent Lot Plan CheckDev-Com Dev-Building & Safetyper project 925.000.87 305.00 080.001.01

Community DevelopmentBuilding and SafetyCurrent FeePlan Check InspectionResidential Remodels and Additions - (All newly constructed additions to, or remodeled areas of, residential occupancies Construction Type: IIIB, VA, VBclassified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule)Square Footage:0-199per project base @ 200 s.f.200 - 599per project base @ 200 s.f.600 - 999per project base @ 600 s.f.1,000 - 1,499per project base @ 1,000 s.f.1,500 - 1,999per project base @ 1,500 s.f.2,000per project base @ 2,000 s.f. 2,000 add cost per sq. ft. modifier below to project baseModifier per s.f. 1.23 001.15Residential Remodels and Additions - (All newly constructed additions to, or remodeled areas of, residential occupancies Construction Type: IIB, IIIA, IVclassified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule)Square Footage:0-199per project base @ 200 s.f.200 - 599per project base @ 200 s.f.600 - 999per project base @ 600 s.f.1,000 - 1,499per project base @ 1,000 s.f.1,500 - 1,999per project base @ 1,500 s.f.2,000per project base @ 2,000 s.f. 2,000 add cost per sq. ft. modifier below to project baseModifier per s.f. 001.54 001.44Residential Remodels and Additions - (All newly constructed additions to, or remodeled areas of, residential occupancies Construction Type: IA, IB, IIAclassified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule)Square Footage:0-199per project base @ 200 s.f.200 - 599per project base @ 200 s.f.600 - 999per project base @ 600 s.f.1,000 - 1,499per project base @ 1,000 s.f.1,500 - 1,999per project base @ 1,500 s.f.2,000per project base @ 2,000 s.f. 2,000 add cost per sq. ft. modifier below to project baseModifier per s.f.Dev-Com Dev-Building & Safety 620.002.31 330.002.16

Community DevelopmentBuilding and SafetyCurrent FeePlan Check InspectionMiscellaneous Permit FeesMISCELLANEOUS PLAN CHECK FEE IS AS FOLLOWS, OR IF OUTSOURCED THE FEE IS THE CURRENT RATE CHARGEDBY THE THIRD PARTY.Accessory and Utility Uses (U Occupancy)500 s.f. or less501 s.f. or more 616.00924.00 924.00924.00 924.00924.00 462.00693.00Awning/Canopy 308.00 115.00Carport 462.00 385.00 115.00115.0051.00 628.00AntennaEquipment Shelter (All Trades)Cellular/Mobile Phone (All Trades)Certificate of Occupancy InspectionResidentialCommercialChange of OwnershipEachEachEachTemporary Certificate of Occupancy (Non-Service Item)Combination Wall (City Stnd) first 50 L.F.Combination Wall (City Stnd) Each Addtl 50 L.F.Combination Wall - first 50 L.F.Combination Wall - Each Addtl 50 L.F.EachEachEachEach 42.0042.00153.0042.00 466.0076.00466.0076.00Commercial TrailerEach 305.00 229.00Deck - ground floorDeck - (City Standard) second story and aboveDeck - second story and aboveEachEachEach 153.0042.00229.00 229.00305.00305.00DemolitionEach 153.00 347.00Dev-Com Dev-Building & Safety

Community DevelopmentBuilding and SafetyCurrent FeePlan Check InspectionMiscellaneous Permit Fees (Cont.)Freestanding Wall (wood frame) 5'9" in heightPp to 100LFEach additional 100 LF 458.00- 119.0042.00Freestanding Masonary Garden Wall (City Stnd) 3 FT in heightUp to 100LFEach additional 100 LF 42.00- 305.0076.00 153.00- 305.0076.00Freestanding Wall (masonry or concrete) 3 FT in heightUp to 100LFEach additional 100 LFFireplaceMasonryPre-fabricated/MetalEachEach 305.00305.00 458.00347.00Flag PoleEach 305.00 229.00Garage/ Workshop (all trades included) (U Occ.)Up to 1,000 SF (U Occ.)1,001 - 3,000 SF (U Occ.)EachEach 924.001,232.00 693.00924.00Greenhouse (All Trades)Each 619.00 229.00Light Pole (All Trades)Each additional poleEachEach 610.00- 229.00110.00Mobile Home Set UpPerm FoundationInstallationSite PrepEachEachEach 305.00153.00153.00 458.00305.00153.00 153.00 381.00 - 110.00 153.00 347.00 41.0074.00 230.0054.00Partition - Commercial, Interior up to 30 LFEach additional 30 LFEachPartition - Residential, interiorPatio Cover Non-Enclosed (City Stnd)Non-Enclosed (City Stnd)Up to 300 SFEach additional 300 SFDev-Com Dev-Building & SafetyEachEach

Community DevelopmentBuilding and SafetyCurrent FeePlan Check InspectionMiscellaneous Permit Fees (Cont)Non-Enclosed All TypesUp to 300 SFEach additional 300 SFEachEach 155.0074.00 230.0054.00Enclosed, all typesUp to 300 SFEach additional 300 SFEachEach 230.0074.00 385.0054.00Photovoltaic System (Commercial) (All Trades)Up to 50 kw 50 kwEachEach 277.00616.00 471.001,232.00Photovoltaic System (Residential) (All Trades)No Fire ReviewWith Fire ReviewEach additional hourEachEachper Hour 118.00127.00- 314.00157.00153.00Replacement Lien Release (Non-Service Item)Each 153.00 -Retaining Wall (City Stnd)First 50 LFEach additional 50 LFEachEach 42.00- 381.0077.00Retaining Wall/Foundation Repair and ReplacementFirst 50 l.f.Each additional 50 l.f.EachEach 153.0042.00 381.0076.00EachEach 41.0041.00 155.00230.00 459.0041.00 385.00115.00Re-RoofRe-Roof No sheathingRe-Roof with SheathingRoof Structure Replacement (Residential)Up to 1,500 SFEach additional 500 s.f.Sales Office ConversionEach 153.00 305.00Sauna - SteamEach 229.00 458.00Seismic Retrofit/Strengthening per PlanEach 153.00 458.00Dev-Com Dev-Building & Safety

Community DevelopmentBuilding and SafetyCurrent FeePlan Check InspectionMiscellaneous Permit Fees (Cont)Signs (All Trades)Wall MountedMonumentEachEach 153.00153.00 119.00229.00EachEach 153.00153.00 229.00347.00Spa or Hot TubEach 153.00 347.00Special Events Permit Carnivals, etc.Each 153.00 153.00 153.0042.00 119.00119.00SkylightLess than 10 SFGreater than 10 SF. or structuralStorage/High Pile RacksFirst 100 LFEach Additional 100 LFSwimming Pool/Spa (All Trades)Pre-fabricated (vinyl)Custom-built (gunite)Commercial PoolEachEachEach 153.00305.00610.00 576.00805.001,076.00Trash EnclosureEach 229.00 534.00Window or Door ReplacementUp to 5Over 5 (Each 5) 76.0042.00 229.00119.00New Window (requires structural)Up to 5Over 5 (Each 5) 305.0076.00 576.0042.00Dev-Com Dev-Building & Safety

Community DevelopmentBuilding and SafetyMechanical, Plumbing and Electrical PermitsPermit Processing / Filing Fee - StandardPlan Review/InspectionCurrent FeePlan Check Inspectionper projectper hour 51.00154.00 154.00Simple Project Inspection (includes up to 3 items marked as"Simple in the following list of project types): 230.00Simple Project Inspection - each additional item after 3 51.00Complex Project Inspection (per individual item marked asOther Mechanical, Plumbing, or Electrical Inspections not otherwis per hour 153.00 230.00 229.00 347.00Mechanical Permit FeesInstall/Relocate each HVAC forced air or gravity-type furnace orburner (including compressor, attached ducts, and vents) up toComplexand including 100,000 Btu/hrRepair/alteration/addition to each heating appliance,refrigeration unit, cooling unit, absorption unit or each heating,cooling, absorption or evaporative cooling system, includinginstallation of controls regulated by code.SimpleInstall, relocate each boiler or compressor, up to and including 3HP, or each absorption system up to and including 100,000Btu/hrComplexEach air-handling unit, including attached ducts. (Note: this feeshall not apply to an air-handling unit which is a portion of afactory-assembled appliance, cooling unit, evaporative cooler, orabsorption unit for which a permit is required elsewhereComplexDev-Com Dev-Building & Safety

Community DevelopmentBuilding and SafetyCurrent FeePlan CheckInspectionMechanical, Plumbing and Electrical Permits (Cont.)Each ventilation system which is not a portion of any heating orair conditioning system authorized by a permit.SimpleResidential - installation of each hood which is served bymechanical exhaust, including the ducts for such hoodSimpleCommercial - installation of each hood which is served bymechanical exhaust, including the ducts for such hoodComplexEach appliance or piece of equipment regulated by this code butnot classed in other appliance categories, or for which no otherfee is listed in the code 270.00 340.00 45.00 381.00 45.00 458.00SimplePlumbing and Gas Permit FeesEach plumbing fixture or trap or set of fixtures on one trap(including water, drainage, piping, and backflow protectiontherefore)SimpleEach building sewerSimpleEach building sewer - SepticEach water heater and/or ventEach industrial waste pretreatment interceptor including its trapand vent, excepting kitchen-type grease interceptors functioningas fixture trapsComplexSimpleComplexInstallation, alteration, or repair of water piping and/or watertreating equipmentSimpleInstallation, alteration, or repair of gas piping and/or gas treatingequipmentSimpleRepair or alteration of drainage or vent pipingSimpleBackflow devices not included in other fee services (e.g., buildingsewer) each unitSimpleGas testSewer lateral testSimpleSimpleDev-Com Dev-Building & Safety

Community DevelopmentBuilding and SafetyCurrent FeePlan Check InspectionMechanical, Plumbing and Electrical Permits (Cont.)Electrical Permit FeesSwimming PoolsAll other types of swimming pools, therapeutic whirlpools, spas,and alterations to existing swimming poolsSimple - - 119.00Temporary Power ServiceTemporary service power pole or pedestal, including all pole orpedestal-mounted receptacles and groundingTemporary distribution system and temporary lighting andreceptacle outlets for construction sites, decorative lighting,Christmas tree sales lots, etc.15 or 20 amp - first 10 circuitsover 10 circuits25 to 40 amp circuits50 to 175 amp circuitsReceptacle, switch and lighting outlets at which current is used orFirst 10 (or portion thereof)Each additional 10 (or fraction thereof)SimpleComplex SimpleSimpleSimpleSimpleSimpleSimpleResidential AppliancesFixed residential appliances or receptacle outlets for same,including wall-mounted electric ovens, counter mounted cookingtops, electric ranges, self-contained room console or through-wallair conditioners, space heaters, food waste grinders, dishwashers,washing machines, water heaters, clothes dryers, or other motoroperated appliances not exceeding one horsepower (HP) inrating.Dev-Com Dev-Building & SafetySimple34.00

Community DevelopmentBuilding and SafetyCurrent FeePlan Check InspectionMechanical, Plumbing and Electrical Permits (Cont.)Non-residential AppliancesResidential appliances and self-contained factory-wirednonresidential appliances, including medical and dental devices,food, beverage, and ice cream cabinets; illuminated show cases,drinking fountains, vending machines, laundry machines, orotherSimplePower ApparatusMotors, generators, transformers, rectifiers, synchronousconverters, capacitors, industrial heating, air conditioners andheat pumps, cooking or baking equipment, and other apparatus,as follows: Note: these fees include all switches, circuit breakSimpleBuswaysTrolley and plug-in-type busways - each 100 l.f. or fractionthereof (An additional fee will be required for lighting fixtures,motors and other appliances that are connected to trolley andplug-in type busways. No fee is required for portable tools.Signs, Outline Lighting, and MarqueesSigns, Outline Lighting, or Marquees supplied from one branchAdditional branch circuits within the same sign, outlinelighting system or marqueeNew Services or Additional Panels600 volts or less and not over 200 amperes in rating600 volts or less and over 200 amperes in rating600 volts or over 1,000 amperes in ratingDev-Com Dev-Building & SafetySimpleSimpleSimpleComplexComplexComplex 74.0074.00

City of Moreno Valley Schedule of City Fees, Charges and Rates Fiscal Year 2022-23 Office of Emergency Management and Volunteer Services Section 3 - Miscellaneous Fees Section 1 - Development Fees Section 2 - Parks & Community Services Fees Contents : DEVELOPMENT FEES: Building and Safety: