Environmental Impact Report On Relocation Engineering (To Be Issued)

Transcription

Public Disclosure AuthorizedPublic Disclosure AuthorizedE1720 v1Environmental Impact Report on Pusteel Relocation Engineering of BaosteelShanghai Pudong Iron & Steel Co Ltd. Baoshan Steel GroupEnvironmental Impact Report on RelocationEngineeringPublic Disclosure AuthorizedPublic Disclosure Authorized(To be issued)Shanghai Academy of Environmental SciencesCertificate No. : National Environmental Impact AssessmentCertificate Grade A, No.1801March, 2005PDF created with pdfFactory Pro trial version www.pdffactory.com

Environmental Impact Report on Pusteel Relocation Engineering of BaosteelShanghai Pudong Iron & Steel Co Ltd. Bao Shan Steel GroupReport on Environmental Impact of Relocation ProjectCompilation Unit:Shanghai Academy of Environmental SciencesEIA Certificate No. National Environmental Impact AssessmentCertificate Grade A, No.1801Compilation Unit:Beijing United Environmental AssessmentCompanyEIA Certificate No.:National Environmental Impact AssessmentCertificate Grade A, No.1013Compilation Unit: Shanghai Metallurgical Design & ResearchInstituteEIA Certificate No.:National Environmental Impact AssessmentCertificate Grade B, No.1801PDF created with pdfFactory Pro trial version www.pdffactory.com

Environmental Impact Report on Pusteel Relocation Engineering of BaosteelReport CompilersNameCertificateNumberYu WenxiDu JingWangBiaoZhangChuanxiuJobsProject rganize and coordinate the ace/1 General Provisions7 Survey and evaluation of the environmentalquality status11 Analysis of affection on solid waste disposal22 Assessment on the Environmental Influence ofDock Construction16 Analysis of emissions eral situation of construction project4. Engineering analysis5 Clean Production Analysis11 Analysis of affection on solid waste 8080022 Retrospection of environment protection .B1808003Engineering analysis and relevant No.JA10130012 Retrospection of environment protection byPusteel (audit)3.General situation of construction project (audit)4.Engineering analysis (audit)5 Clean Production Analysis (audit)23ConclusiononEnvironmentalImpactAssessment – suggestions (audit)15 Technical and economic appraisal ofenvironment protection measuresPDF created with pdfFactory Pro trial version www.pdffactory.comSignature

Environmental Impact Report on Pusteel Relocation Engineering of 1801002613 Assessment of ecological environment 801001014 Assessment of social environment effects21 Measures to Mitigate Environment ImpactXiao QingEIAQualificationCertificateNo.A180100299 Prediction and assessment of impact on waterenvironment10 Evaluation effects of the noise on theenvironment12 Environment risk analysis17. Consistency Analysis of Industrial Policies 801005318 Analysis of environment economic gain or loss20. Environmental Management and o.A180100436 Regional environmental status and investigationon pollution sources19 Public eNo.A180100558 Evaluation of atmospheric environment 0015Audit the ReportThe numerical results of Prediction and assessment of impact on water environment, andassessment of dock spilling accident risk are offered by Lin Weiqing, the chief engineer inShanghai Academy of Environmental Sciences.PDF created with pdfFactory Pro trial version www.pdffactory.com

Environmental Impact Report on Pusteel Relocation Engineering of BaosteelPrefaceOn December 3rd, 2002, with the official announcement from Monte Carlo, Monaco,Shanghai Finally was elected as the host of World EXPO in 2010, which is the glory ofChina, also the glory of Shanghai. People in Shanghai, supported by government, will holdit as the most successful, most wonderful, and most unforgettable international fair inhistory. At present, State has set up the organizing committee and executive committee ofShanghai World Expo 2010 and Shanghai has set up the World Expo Bureau and theWorld Expo Group. The preparation for World Expo 2010 in the full-scale has been startedin a full swing. Recently, the former Secretary Chen Liangyu said that holding the WorldExpo 2010 is a significant historical opportunity for both China and for Shanghai. ShanghaiCity should fully understand the heavy task undertaken; then lead by the organizingcommittee, extend the deploy and requirements from the central government in detail, andseriously prepare for and run Shanghai World Expo 2010, accelerating the development ofShanghai, further enhancing the service level of Shanghai to the whole country as well asall-around construction of a well-off society.The site of World Expo 2010 will be located in the waterfront between Lupu Bridge andNanpu Bridge with the area of 5.28 km 2, which main body will be finished before the end of2007.Pusteel and the other two big factories—Jiangnan Shipyard (Group) Co., Ltd andNanshi Power Plate, occupied the area of 2.18 km 2 accounting for 40 percentage of landfor World Expo, should entirely be moved out this area in 2006.Jiangnan Shipyard (Group)Co., Ltd will be relocated in Changxing Island, and take advantage of its deep watershoreline to carry out the construction; however, Nanshi Power Plate will be closed, notbeing constructed in another place. Pusteel is planned to move to Luojing, Baoshan and,together with Baoshan Steel, No 1 Steel and No 5 Steel, form a major steel base withrespective features.On April 28th, on the host of Shanghai Municipality, Pusteel respectively sign “FrameworkAgreement on the Purchase and Compensation of the Right to Use State-owned Land”with the Shanghai EXPO 2010 Land Banking Center, and “Framework Agreement on theAllocation Commission of the Pusteel’s New Location in Luojing” with BaoshanGovernment. For supporting and assisting the construction and holding of Shanghai WorldExpo, Pusteel, considering the general situation, have already started the removal and theland expropriation.In the view of the fact that there are some sensitive water environment objects, asChenhang Reservoir, Baosteel Reservoir and Fubei Reservoir to be constructed, in thenorthwest of the place where Pusteel to be relocated, the destination of wastewaterdischarged is to be further discussed. It is the fact that the local ambient air quality index,1PDF created with pdfFactory Pro trial version www.pdffactory.com

Environmental Impact Report on Pusteel Relocation Engineering of Baosteelas TSP yearly average concentration, have exceeded the Grade two of StandardsMoreover, after finishing, Pusteel will also produce dust, gas dust, SO2, wastewater, wasteresidue and noise. According to the regulations in “Law of the People’s Republic of Chinaon Environment Impact Assessment” and “Regulations on the Administration ofConstruction Project Environmental Protection”, Decree No.253 of the State Council, all thenew construction project, reconstruction and extension construction projects are subject toimplementing impact assessment on the environment, and making report of impact on theenvironment, which are used for clarifying the impact of the construction project on thesurrounding environment, and ensuring the strategic target for social, economicenvironmental sustainable development. On March 26th, 2004, Pusteel officially consignedthe compilation of “Report on Environmental Impact of Project to be Relocated to Luojing ofPusteel of Baosteel Group” to Shanghai Academy of Environmental Sciences (hereinafterreferred to as SAES) and Shanghai Metallurgical Design &Research Institute(hereinafter referred to as SMDRI).According to Pusteel’s requirements, the compilation of the report is divided into two stages.The first stage is the compilation of “Elementary Analysis of Environmental Impacts of SiteSelection” finished in July, 2004. On July 19th 2004, Shanghai Environmental ProtectionBureau put forward requirements on the environmental assessment report of this project toMunicipal Development and Reform Commission in the letter of reply.The second stage is the compilation of “General Outline for Environmental Assessment ofthe Project” and “Report on the Environmental Impact of the Project”.After being completed, “General Outline for Environmental Assessment of the Project” shallbe delivered to the State Environmental Protection Administration in Beijing for assessingand approving. Due to the reform of Administration Approval System for projectestablishment, the monitoring and management section in the State EnvironmentalProtection Administration does not assess the General Outline for EnvironmentalAssessment any longer, but assessing units are required to work together and unifiedstrong-strong.Pusteel has invited Beijing United Environmental Assessment Company to join in thecompilation work of the Report, mainly focusing on “Engineering Analysis” and its contentconcerned engineering. From September on, complying to “Technical Guidelines forEnvironmental Impact Assessment issued by the State Environmental ProtectionAdministration and other relevant documents, and according to the content of “EngineeringAnalysis”, the three parties charging the compilation of the Report started to write the“Report on Environmental Impact of Project to be Relocated to Luojing of Pusteel ofBaosteel Group”, on the basis of carefully reading and researching on relevant documents.Pusteel had required the assessment shall have been finished on October 20th, 2004, the2PDF created with pdfFactory Pro trial version www.pdffactory.com

Environmental Impact Report on Pusteel Relocation Engineering of Baosteeltime for the reference of starting the assessment. On October 20th, 2004, the first draft ofthe Report was submitted to the construction unit for approving.On October 26th, 2004, Shanghai Environment Protection Bureau confirmed and ratifiedthe relevant standards adopted in this environmental assessment, by the “Reply letter ofimplementation standards on environmental impact assessment for project to be relocatedto Luojing by Pusteel of Baosteel Group”, No. [2004] 380,October 9th to 10th, China International Engineering Consulting Corporation held the ExpertPanel Discussion on the “Report on Environmental Impact of Project to be relocated toLuojing of Pusteel of Baosteel Group”, totally 40 people including Xu Kuangdi, Li Ming, ShiQirong, Xie Qihua and other experts and leaders presenting. Experts and leaders attendingthe meeting adequately demonstrated the feasibility of the relocating project of Pusteel. Itwas their consensus that the relocation is imperative under the situation of World Expo,and that relocation should be connected with reconstruction, for example, the dischargingamount of pollutants would be reduced largely by adopting the advanced COREXsteel–making technology. Parts of equipments in Pusteel should be moved to No. 5 Steel toproduce the special steel with more sound quality in No.5 steel favor.In order to carrying out the spirit of Expert Panel Discussion, the content of Pusteelrelocation project has been revises drastically. The revised content listed in the followingtable:3PDF created with pdfFactory Pro trial version www.pdffactory.com

Environmental Impact Report on Pusteel Relocation Engineering of BaosteelTable-1 the Construction and Change of Pusteel relocation ProjectNo.1234ConstructionContentStock Construction ContentConstruction ContentProjectafter revisedafter revised2 stackers, 32reclaimersreclaimersreclaimers4250 thousand t/a5450 thousand t/a4250 thousandt/a4Finishedproducts pierCorexOriginalsteelmakingberthsforships of 5000stackers,22stackers,4 berths for ships of5000 10000 ton 10000 tonC2000 2C3000 1C3000 15Oxygen PlantNone60000 260000 26LimekilnNone300 t/d 2300 t/d 21 setNone1 setNone150t/d 1150t/d )30t/d 2100t/d 1100t/d 110CCPPNone125MV 2125MV 111Converter120t/d 2NoneNone12RH LFNone150 1 150 1150 1 150 213LF VD120 1 120 1100 1 100 1None1300mm 1NoneNoneNone400mm 1None250mm 1250mm 14200/4200mm4200/4200mmNone1470/1,470mmNone14Slab asterHeavy16SlabContinuousCaster1718Heavy Plate MillSteckel MillOnemachineone strand x2Another Project to beSetIn order to promote the project, Pusteel of Baosteel Group held a meeting of the design4PDF created with pdfFactory Pro trial version www.pdffactory.com

Environmental Impact Report on Pusteel Relocation Engineering of Baosteelunits and the environmental assessment units on November 3rd, and put forwardrequirements that the revised relocation project approval report and environmentalassessment report should have been finished respectively on November 12th and onNovember 20th.3 environmental assessment units and 3 design units worked together tomake the Report according to the time schedule, which meet the requirements ofconstruction unit as much as possible. On October 25th, 2004, the first draft of the Reportwas finished and submitted to construction unit for approving; on October 10th, the Reportdraft for approving was finished.Through the pre-evaluation, the Environmental Engineer Assessment Center in the StateEnvironmental Protection Administration put forward 7 first draft opinions on the Reportdraft for approving. According to experts’ advises, the team supplemented and revised theReport seriously.On March 3rd, 2005, the Environmental Engineer Assessment Center in the StateEnvironmental Protection Administration hosted a technology assessment meeting about“Report on Environmental Impact of Relocation Project of Pusteel of Baosteel Group” inShanghai. In “Expert Assessment Advise”, there were 8 more subjects being put forward-“content needed to be revised and improved in the Report”. According to experts’ advises,the team revised and improved the Report seriously again. See Appendix.This Report is compiled by three environmental assessment units.5PDF created with pdfFactory Pro trial version www.pdffactory.com

Environmental Impact Report on Pusteel Relocation Engineering of BaosteelTable-2 Chapters in the ReportChapterUnit ofUnit ofChapterCompilationCompilationPreface/1 General Provisions6 Regional environmental status2 Retrospection of environmentand investigation on pollutionprotection by Pusteelsources7 Survey and evaluation of the3 General situation of constructionenvironmental quality statusproject8 Evaluation of atmosphericBeijing UnitedEnvironmental4 Engineering analysisenvironment impact9 Prediction and assessment ofAssessmentCompany5 Clean productionimpact on water environment& SMDRI10 Evaluation of the effects of the11 Impact analysis of solid wastenoise on the environmentdisposal11 Impact analysis of solid wastedisposal12 Environment risk analysisSAES1513 Assessment of ecologicalTechnicalandeconomicappraisal of environment protectionenvironment y14 Assessment of socialenvironment effects18 Analysis of environment16 Analysis of emissions controleconomic gain or loss1719 The public participationConsistencyAnalysisIndustrial Policies and Plans20 Environmental Management23 Conclusions and SuggestionsBeijing Unitedof EnvironmentalAssessmentCompany21 Measures to Mitigate& SMDRIEnvironment Impact& SAES22 Environmental ImpactAssessment of Dock Construction23 Conclusions and Suggestions6PDF created with pdfFactory Pro trial version www.pdffactory.com

Table of Contents1.General Provisions ··········1-11.1Project Background And Geographic Location ······· 1-11.2Assessment Purpose And Principle ······················· 1-11.2.1Assessment Purpose ··················· 1-11.2.2Rule Of Assessment ···················· 1-51.3.Criteria For Preparation Of Report ························· 1-61.3.1.Attorney Letter ···· 1-61.3.2.Relevant Documents Issued By Shanghai Environment Protection Bureau ··············· 1-61.3.3.Environmental Protection Laws And Regulations Of �················· 1-61.3.4.Environment Protection �···· 1-71.3.5.Technical Documents For Environmental Impact ··············· 1-71.3.6.Documentations For Project · 1-81.4.Environment Protection And Environment Sensitive �··············· 1-81.4.1.Environment Protection Objects ··· 1-81.4.2.Environmentally Sensitive �··· 1-81.5.Environmental Impact Identification And Assessment Factors Selection ···················· 1-91.5.1Identification Of Environmental Impact �·········· 1-91.5.2Selection Of Assessment Factors · 1-111.6.Determination Of Technical Index For ······ 1-111.6.1Assessment Grade ······················ 1-121.6.2Assessment �························ 1-131.6.3Assessment �····················· 1-131.6.4Focus Of Assessment ·················· 1-161.7Assessment Procedures ·············· 1-162.Review Of Environmental Protection By �·················2-12.1.General ·············· 2-12.2.Current Situation Of Pusteel ········· 2-12.2.1.General Situation Of Pusteel ········ 2-12.2.2.General Situations Of The · 2-42.3.Main Pollution Source, Pollutants And �························ 2-102.3.1.Exhaust �········ 2-102.3.2.Wastewater ········ � 2-132.3.4.Comprehensive Utilization Of Solid Waste ············· 2-142.4.Total Pollutant �·················· 2-162.4.1.Exhaust �········ 2-162.4.2.Wastewater ········ 2-172.5.main environmental issues in the existing project ··· 2-173.General Situation Of Construction Project 1PDF created with pdfFactory Pro trial version www.pdffactory.com

3.1.Dock Facilities ···· 3-63.1.1.Raw Material ······················ 3-63.1.2.Finished Products Wharf ·············· 3-63.2.Stock Yard ·········· 3-73.3.Iron Making System ····················· 3-83.3.1.Corex Iron ·· 3-83.3.2.Iron Making By Direct Reduction (In Phase Ii) ········ 3-133.4.Continuous Casting System For �·············· 3-153.4.1.Steelmaking System ···················· 3-153.4.2.Continuous Casting System ········· 3-193.5.Steel Rolling System ···················· 3-213.5.1.4200mm Wide & Heavy Plate ···················· 3-213.5.2.3500/2800mm Coil Workshop (Constructed In Phase �··················· 3-233.6.Active Lime ······················ 3-243.7.Ccpp Generating �··················· 3-253.8.Oxygen Station ··· 3-263.9.Thermal ····· 3-263.10.Air Compressing �·················· 3-263.11.Other Construction Items ············· 3-263.12.General Layout Plan ···················· 3-263.13.Afforestation Of Plant Area ··········· 3-273.14.Construction Investment And Project ··········· 3-273.15.Summary Of Main Raw And Auxiliary Materials Consumed In Whole Plant ··············· 3-284Engineering analysis ·······4-14.1Dock ··········· 4-14.2Stock yard ·········· 4-14.2.1Pollution sources and pollutants ··· 4-14.2.2Pollution control measures ··········· 4-24.3Ironmaking · 4-24.3.1Corex ironmaking system ············· 4-24.3.2Shaft furnace ironmaking system (In Phase II) ······· 4-84.4Continuous casting system for �················· 4-134.4.1Analysis of pollution sources ········ 4-134.4.2Control measures of exhaust gas · 4-144.4.3Wastewater treatment ·················· 4-154.4.4Noise control ······ 4-164.4.5Comprehensive utilization of solid �·················· 4-164.5Steel rolling system ······················ 4-174.5.14200/4200mm heavy plate ························· 4-174.5.23500/2800mm hot rolling coil ····················· 4-244.6Lime ······· 4-274.6.1Pollution sources and pollutants ··· 4-274.6.2Pollution control measures ··········· 4-28PDF created with pdfFactory Pro trial version www.pdffactory.com

4.7CCPP generating �··················· 4-284.7.1Pollution sources and pollutants ··· 4-284.7.2Pollution control measures ··········· 4-284.8Oxygen �······· 4-304.8.1Pollution sources and pollutants ··· 4-304.8.2Pollution control measures ··········· 4-304.9Air compressing station ················ 4-304.9.1Pollution sources and pollutants ··· 4-304.9.2Pollution control measures ··········· 4-304.10Central wastewater treatment �························ 4-314.11Main material balance and water balance ·············· 4-334.11.1Material balance from main production shop ·········· 4-334.11.2Water balance of the whole �···· 4-344.11.3Gas balance of the whole �······· 4-394.11.4Steam balance sheet of the whole �··················· 4-404.11.5Sulphur balance of the whole plant ························ 4-424.11.6F balance of smelting system ······· 4-444.12Total discharge amount of ·· 4-444.12.1Air ············ 4-444.12.2Water pollutants ·· 4-534.12.3Solid �··········· � 4-565Clean production ·············5-15.1General descriptions ···················· 5-15.2Advanced production process ······ 5-25.3Other main designed measures for clean ··· 5-55.4Energy-saving analysis ················ 5-75.5Analysis of cleaner production level ······················· 5-86Regional environmental status and investigation on pollution sources ·····6-16.1Natural �· 6-16.1.1Geographic location ····················· 6-16.1.2Geology and topography ·············· 6-16.1.3The feature of the �················ 6-26.1.4Water system and hydrology ········ 6-36.2Socio-economical development ···· 6-66.2

Environmental Impact Report on Pusteel Relocation Engineering of Baosteel Shanghai Pudong Iron & Steel Co Ltd. Baoshan Steel Group Environmental Impact Report on Relocation Engineering (To be issued) Shanghai Academy of Environmental Sciences Certificate No. :National Environmental Impact Assessment Certificate Grade A, No.1801 March, 2005