Design Services For Wiles Road - Broward

Transcription

Design Services for Wiles RoadBroward County Project #104026Design Services for Wiles Road from University Driveto Riverside Drive - Solicitation# R2113749P1

ORGANIZATIONAL CHARTDesign Services for Wiles Road from University Driveto Riverside Drive - Solicitation# R2113749P1

THE CGA TEAMFirmServicesKey StaffCBECalvin, Giordano & Associates, Inc.Roadway, Lighting,Landscape Architecture,Signalization, Drainage andOther AssociatedImprovements.Jenna Martinetti, P.E.; NicholasMahon, P.E; David Frodsham, P.E; EricCzerniejewski, P.E., Env SP; SandraLee, AICP CEP, LEED AP BC D;Michael Conner, RLA; Robert Roush,PE; Steve Watts, PSM; Jon Cooper,P.E.--HBC Engineering CompanyUtility Coordination andSigning & Pavement MarkingAdebayo Coker, P.E.Mohan V. Thampi, P.E., R.E.M.CBEFlorida Engineering & Testing, Inc.EnvironmentalEngineering SupportMark A. Mesiano, PECBELakdas/Yohalem Engineering, Inc.Structural EngineeringLakdas Nanayakkara, P.E.CBERadise International, L.C.Geotechnical EngineeringGregory Stelmack, PEThomas Mullin, PECBEAerial Cartographics of America(ACA), Inc.PhotogrammetryIarelis Hall, PSMCBEDickey Consulting, Inc.Public InvolvementSheryl DickeyCBEDesign Services for Wiles Road from University Driveto Riverside Drive - Solicitation# R2113749P1CGA hasa 21%CBE goalfor thisproject.

PROJECT MANAGER JENNA MARTINETTI, PE Over 13 years of engineeringexperience Started as a roadway designer Senior PM for roadway, stormwater,water, sewer, land development, andpark design projects Experience includes FEMA grants,LAP/JPA and FDOT projects, andCounty Incentive Grant Projects Advanced Traffic Control CertificationDesign Services for Wiles Road from University Driveto Riverside Drive - Solicitation# R2113749P1

TEAM EXPERIENCE FDOT Pre-qualified MPO/Complete Streets Experience: Community Incentive Grant Program(CIGP) experience Davie Rd Phase 1College AvenueNova Drive FDOT LAP projects Davie Rd Ph. 2Andrews AvenueTamarac Bike Lanes Broward County Mast Arm Conversion 35 Intersections UpgradedDesign Services for Wiles Road from University Driveto Riverside Drive - Solicitation# R2113749P1

PROJECT CHALLENGESWidening reduces/eliminates swales and requirescurb & gutter Key elements: Analyze existing profile to confirm 0.3% min.longitudinal slope Overbuild/reconstruct where needed Reduce existing lane widths Install exfiltration trench for water quality Similar Experience: Davie Rd Ph. 1 – widened for new travel and bike lane,added curb & gutter, reconstruction and overbuild,modifications to the drainage systemDesign Services for Wiles Road from University Driveto Riverside Drive - Solicitation# R2113749P1

PROJECT CHALLENGESWidening encroaches on existing trees Key elements: Obtain tree survey Review horizontal clearance Coordination with landscape architect for impact totrees, need for root barriers Site triangles for side streets to be verifiedSimilar Experience: Davie Rd Ph. 1 – widening required relocation of over45 large royal palms within the R/W as well asremoval, replacement or relocation of other species oftrees. Davie Rd Ph. 2 – root barriers had to be installedwhere trees were adjacent to new sidewalk Nova Dr – trees within the swales utilized decorativeretaining walls.Design Services for Wiles Road from University Driveto Riverside Drive - Solicitation# R2113749P1

PROJECT CHALLENGESWidening encroaches on side street anddevelopment median noses Key elements: Verify R/W information Minimize impacts Modify where needed Coordinate with the individual condo associations aspart of public outreach Verify site triangles for sides streetsSimilar Experience: Davie Rd Ph. 1 – Driveways were modified toaccommodate widening impacts and bring to ADAcomplianceDesign Services for Wiles Road from University Driveto Riverside Drive - Solicitation# R2113749P1

PROJECT CHALLENGESWidening impacts existing irrigation and existingbus stops Key elements: Specify proper maintenance or repairs to the existingirrigation system, including notes regarding privatesystems encountered during construction Coordinate with BCT to meet requirements for 8’ widepad Coordinate any future bus stop, shelter or padupgrades.Similar Experience: Davie Rd Ph. 1 – multiple irrigation systems existedrequiring replacement. Bid documents included a lineitem to pay for this. BCT coordination allowed forremoving sidewalk from the project to avoid BCTdamaging and replacing it months later with the futureshelter/pad project.Design Services for Wiles Road from University Driveto Riverside Drive - Solicitation# R2113749P1

PROJECT CHALLENGESLighting location Key elements: Obtain available safety study Review horizontal clearance of existing poles Photometric analysis taking existing trees and newlane into account Coordination with FPL for additional hardeningprojects Potential for pedestrian scale lightingSimilar Experience: Davie Rd Ph. 1 & 2 – existing lighting wassupplemented by proposed fixtures SR 870/Commercial Blvd – areas around theintersections were upgrades to have lighting. Andrews Ave – upgrading to LEDDesign Services for Wiles Road from University Driveto Riverside Drive - Solicitation# R2113749P1

PROJECT CHALLENGESExisting conditions at the Coral Springs Nursery Key elements: Coordinate early with City and owner to determinesite needs and code requirements Review grades for installation of valley gutter tomaintain stormwater on public R/WSimilar Experience: Tamarac Bike Lanes – community club house parkingrequires modification due to bike lane widening.Parking is being relocated to a side street as a separatecontract.Design Services for Wiles Road from University Driveto Riverside Drive - Solicitation# R2113749P1

PROJECT CHALLENGESGrade differential at R/W line Key elements: Review areas where R/W is higher than adjacentprivate property Review areas where adjacent property is higher. Provide handrail or gravity wall where requiredSimilar Experience: SR 870 – gravity wall was required at the R/W line dueto adjacent backyards being too low.Design Services for Wiles Road from University Driveto Riverside Drive - Solicitation# R2113749P1

PROJECT CHALLENGESOverhead utility lines Key elements: Early coordination with UAO’s, particularly FPL Consider constructability, as well as final placement ofmast arms and uprights near FPLSimilar Experience: SR 870 – FPL transmission and distribution surroundedand crossed the intersection. Transmission lines hadto be de-energized for the installation of the new mastarms. Utility work schedules were provided as part ofthe bid documents.Design Services for Wiles Road from University Driveto Riverside Drive - Solicitation# R2113749P1

PROJECT CHALLENGESRight Turn Lane Impact Additional R/W not available at existing right turn lanesNew turn lanes constructed where R/W availableCoordination with Broward County and property ownersDrainage District Permitting Sunshine Water Control DistrictNorth Springs Improvement DistrictComplete Streets/Bike Lane Buffers R/W may not be available through out the corridor toprovide the 2’ buffer the County prefersStriping buffer can be provided and meet the County’s 4’minimum bike lane widthDesign Services for Wiles Road from University Driveto Riverside Drive - Solicitation# R2113749P1

WHY the CGA TEAM? INTEGRATED APPROACH Engage all stakeholders in the planning, design, andconstruction of the project.Multiple Services in-house allowing for expedited design tomeet the project schedule.Experience on similar projectsWell defined QA/QC processClear and efficient communication.EXPERIENCE, PERFORMANCE & SATISFACTIONDesign Services for Wiles Road from University Driveto Riverside Drive - Solicitation# R2113749P1

QUESTIONS?Design Services for Wiles Road from University Driveto Riverside Drive - Solicitation# R2113749P1

Design Services for Wiles Road from University Drive to Riverside Drive - Solicitation# R2113749P1 PROJECT MANAGER JENNA MARTINETTI, PE Over 13 years of engineering experience Started as a roadway designer Senior PM for roadway, stormwater, water, sewer, land development, and