AUDIT CRITERIA Issued July 1996 Revision Date 10-JUL-2017 .

Transcription

AC7004 REV FAUDIT CRITERIAΔ1Issued July 1996Revision Date 10-JUL-2017161Thorn Hill RoadWarrendale, PA 15086-7527Editorial ‘Δ’ Date 22-JAN-2018Superseding AC7004 Rev ENadcapAUDIT CRITERIA FORQUALITY MANAGEMENT SYSTEM*TO BE USED ON AUDITS STARTING ON OR AFTER 31-DEC-2017*1.SCOPEThis audit criteria (AC) is to be used to verify compliance with Nadcap Quality Systemrequirements in conjunction with another Nadcap commodity audit. Upon satisfactorycompletion of both this audit and the commodity audit in accordance with PRI PD 1100, approvalto AC7004 will be granted. PRI AC7004 accreditation is designed to support at least oneNadcap commodity accreditation.No sections can be excluded from this checklist; all questions must be answered.The scope of this checklist does not include quality system requirements for design anddevelopment. If the facility is responsible for design, AS/EN/JISQ 9100 or AS/EN 9110accreditation may be 4TABLE OF CONTENTSGENERAL INSTRUCTIONS . . . . ORGANIZATIONAL INFORMATION . . .CONTEXT OF THE ORGANIZATION . Understanding the Organization and its Context . . Understanding the Needs and Expectations of Interested Parties .Determining the Scope of the Quality Management System . . Quality Management System and its Processes . . .LEADERSHIP . Leadership and Commitment . . .Customer Focus . . . Policy . . Establishing the Quality Policy . . . Communicating the Quality Policy . . . Organizational Roles, Responsibilities, and Authorities . . 357777899910101010PRI operating procedures provide that "This report is published by PRI to advance the state of technical, engineering, and qualitysciences. The use of this report is entirely voluntary, and its applicability and suitability for any particular use, including any patentinfringement arising there from, is the sole responsibility of the user."PRI values your input. To provide feedback on this document, please contact the appropriate commodity staff engineer.(Contact information is located at http://www.eauditnet.com under “Contact Us”.)Copyright 2018 Performance Review Institute. All rights reserved.t-frm-1511-JAN-2018

on F Δ1PLANNING . . Actions to Address Risks and Opportunities . . . Quality Objectives and Planning to Achieve Them . Planning of Changes . . . . . SUPPORT . . Resources . . . . People . Infrastructure . . . . . . .Environment for the Operation of Processes . . . .Monitoring and Measuring Resources . . .Measurement Traceability . . . . . Competence . . .Awareness . . Documented Information . .General . .Creating and Updating . . . .Control of Documented Information . . .OPERATION . .Operational Planning and Control Configuration Management . . Requirements for Products and Services . . Customer Communication . . . .Determining the Requirements for Products and Services . . . Review of the Requirements for Products and Services . Changes to Requirements for Products and Services . Control of Externally Provided Processes, Products, and Services . . . General . . . .Type and Extent of Control . . .Information for External Providers . .Production and Service Provision . . .Control of Production and Service Provision . . Control of Equipment, Tools, and Software Programs . . . Validation and Control of Special Processes . . . Production Process Verification . . . .Identification and Traceability . . . .Property Belonging to Customers or External Providers . Preservation . . . .Release of Products and Services . Control of Nonconforming Outputs . . .PERFORMANCE EVALUATION . Monitoring, Measurement, Analysis, and Evaluation . . . .Internal Audit . . . Management Review . . .General . . .Management Review Inputs . . . .Management Review Outputs . . . IMPROVEMENT . General . . .Nonconformity and Corrective Action . . 2

PRIAC70042.GENERAL INSTRUCTIONS2.1Instructions for the AuditorsRevision F Δ1-3-In completing this assessment, auditors are instructed to respond with a YES or NO to addresscompliance with each statement of requirement. For any negative responses, the auditor mustclearly indicate if the NO reflects noncompliance with respect to existence, adequacy, and/orcompliance, where existence relates to the lack of evidence of a documented procedure orpolicy, adequacy relates to the lack of completeness of the procedure or policy, and compliancerelates to the lack of evidence of effective implementation.“NOTEs” are included from the AS/EN/JISQ 9100 Standard.“Audit Notes” are guidance on the use of the not-applicable (NA) response.All negative responses require a non-conformance (NCR) or explanation. All NA responsesmust be explained.For any NCR that requires special attention or is of concern, a note shall be placed in the Auditornotes field.The audit report should not include any customer proprietary information since it may be viewedby any Nadcap Subscriber.At the conclusion of the audit, a copy of the audit findings shall be provided to the organization.2.2Instructions for the Organization2.2.1Prior to the AuditIn addition to the instructions provided with the commodity checklists supporting this checklist,the organization shall complete a self-audit using this checklist in preparation for theaccreditation audit. The self-audit is to be completed with the related documentname(s)/procedure number(s) along with paragraph reference marked next to the checklistquestion where applicable. For those nonconformances identified through the self-audit andwhen containment is not implemented prior to the Nadcap audit, an NCR shall be written by theNadcap Auditor.All NO and NA answers must be explained and nonconformances marked accordingly.Nonconformances of a technical nature found during the actual audit will, at the Task Group'sdiscretion, require a follow-up audit at the organization’s expense.All documentation submitted prior to the audit must be in English.Self-Audit: In preparation for the audit, the supplier must complete a self-audit utilizing theChecklist(s) applicable at the time of the Nadcap audit. Nadcap recommends: self-audits beperformed 90-120 days prior to the scheduled audit. Per OP 1114 “Task Group Operation”Nadcap requires each paragraph of the completed self-audit to identify where means ofcompliance or evidence* of compliance may be found. (* procedure, checklist, physical locationof evidence, etc.).

PRIAC7004Revision F Δ1-4-In accordance with OP 1105 Audit Process, the organization shall make the self-audit availableto the assigned auditor at least 30 days prior to the scheduled start of the on-site audit. The selfaudit shall be uploaded into eAuditNet.A Word version of the AC 7004 checklist can be found in Resources – Documents – PublicDocuments – Aerospace Quality System – Word Copies of ChecklistThere is an Audit Handbook available for the AQS AC7004 checklist. Resources – Documents –Public Documents – Aerospace Quality System – Handbook and Guides2.2.2During the AuditThe organization should provide for an in-briefing/opening meeting with the Auditor. Keymembers of the organization's staff should attend so the audit purpose, methods, andassessment processes can be discussed.The audit will be conducted in English, unless otherwise approved by the Auditor.Working space/equipment for the Auditor are to be provided as required. This could includedesk or table, chair, copier, printer, scanner, and internet access, as necessary.A final out-briefing will be conducted at the completion of the audit. Each nonconformance willbe reviewed and the organization will be given the opportunity to discuss.2.2.3Following the AuditSupplier feedback must be completed to allow submission of NCR responses. If there are zero(0) NCRs found during the audit, the organization has 3 business days from the date of SupplierReview email notification to complete and submit the Supplier Feedback in eAuditNet.All responses and evidence must be in English.The organization has 21 calendar days from the date of Supplier Review email notification tosubmit corrective action for each NCR. The responsibility for meeting this due date rests on theorganization. Failure to comply with specified dates will result in significant delays in theorganization’s accreditation or may result in failure, per OP 1110.The response must address the root cause of the nonconformance from a systems managementapproach and the actions taken or to be taken to preclude reoccurrence in accordance with thedefined requirements.The AQS Task Group may, upon review, change the auditor's determination of a finding. Theorganization must provide a written response to each nonconformance identified by the auditor.PRI Staff or the Task Group may, after review of the organization’s audit report, requireadditional information or may elect to issue additional findings.NOTE: Final authority over the audit report, acceptability of corrective actions, and accreditationrecommendation rests with the Task Group.

PRIAC70043.ORGANIZATION INFORMATION3.1General InformationRevision F Δ1-5-Identify the Nature of the BusinessIndicate the Type of Work Performed3.1.1Captive House or Accepts Outside WorkTotal Number of EmployeesNumber of QA PersonnelFacility Size (square footage)Number of Operating ShiftsAudit ContactsIdentify the Primary Contact(s) for the Audit, including ConsultantsNAME3.2TITLEApprovals (Quality System, Subscriber, Other)Certifying AgencyApproval CriteriaCertificate Issue DateCertificate Expiration Date

PRIAC7004Revision F Δ13.3Verification3.3.1Did the Auditee make a copy of their completed self-audit available to theauditor at least 30 days prior to the audit date - utilizing the version of thechecklist(s) applicable to this audit?-6-YESNOGuidance: Nadcap recommends the self-audit be performed 90- 120 daysprior to the scheduled audit. In the event of checklist revisions, Nadcappublishes the checklist(s) and sends out a notification 90 days prior to thechecklist(s) becoming effective. In this case, an audit against the changesis acceptable if it supplements the existing self-audit performed prior to therelease of the revised checklist(s).3.3.2For each question in the checklist, has the supplier identified where themeans of compliance or evidence* of compliance may be found?(* procedure, checklist, physical location of evidence, etc.)YESNO3.3.3Does the self-audit include job audits as required by the TG?YESNONAYESNONAYESNONAGuidance: Task Group job audit requirements are defined in the checklistor the OP-1114 Appendix.NA applies for AQS checklists that do not require job audits.3.3.4If this is a reaccreditation audit, has the supplier informed PRI of anychanges to audit contact or address of the facility?Audit Note: NA would only apply if there were no changes made or this isan initial audit.3.3.5Have corrective actions from the previous audit been verified and found tobe effective?Audit Note: NA would apply for initial audits and where the previous audithad zero (0) NCRs.

PRIAC7004Revision F Δ1-7-4.CONTEXT OF THE ORGANIZATION4.1Understanding the Organization and its Context4.1.1Has the organization determined external and internal issues that arerelevant to its purpose and its strategic direction and that affect its ability toachieve the intended result(s) of its quality management system?YESNO4.1.2Does the organization monitor and review information about these externaland internal issues?YESNONOTE 1: Issues can include positive and negative factors or conditions forconsideration.NOTE 2: Understanding the external context can be facilitated byconsidering issues arising from legal, technological, competitive, market,cultural, social, and economic environments, whether international,national, regional, or local.NOTE 3: Understanding the internal context can be facilitated byconsidering issues related to values, culture, knowledge, and performanceof the organization.4.2Understanding the Needs and Expectations of Interested Parties4.2.1Due to their effect or potential effect on the organization’s ability toconsistently provide products and services that meet customer andapplicable statutory and regulatory requirements, has the organizationdetermined:4.2.1.1the interested parties that are

Checklist(s) applicable at the time of the Nadcap audit. Nadcap recommends: self-audits be performed 90120 days prior to the scheduled audit. Per OP 1114 “Task Group Operation” - Nadcap requires each paragraph of the completed self-audit to identify where means of compliance or evidence* of compliance may be found. (* procedure, checklist, physical location of evidence, etc.). PRI AC7004 .