Technical Conditions of Contract (TCC) for Piling and foundationWorks08 Feb2019VOLUME - IATechnical Conditions of Contract (TCC) for Piling andfoundation worksFORIOCL Paradip-Standby SRU (525TPD) TrainprojectBHARAT HEAVY ELECTRICALS LIMITEDTCC No: HY/PE&SD/SC-PROJECTS/2020-21/TCC/IOCL-Paradip/ Piling/01, Rev.00Bharat Heavy Electrical Limited, Project Engineering & System Division, RC Puram, Hyd-32.1 Page

Technical Conditions of Contract (TCC) for Piling and foundationWorksCOPYRIGHT AND CONFIDENTIALThe information on this document is the property of BHARAT HEAVY ELECTRICALSLIMITED,It must not be used directly or indirectly in any way detrimental to the interest of thecompany.Technical Conditions Of Contract (TCC)PROJECT ENGINEERING & SYSTEMS DIVISIONHYDERABADRevisions:Refer to record of revisionsRef No:HY/PE&SD/Projects/TCC/202021/Piling/01Rev. No.00TECHNICAL CONDITIONS OF CONTRACT (TCC)FORPILING AND FOUNDATION WORKSFORIOCL PARADIP-STANDBY SRU (525TPD) TRAIN PROJECTPrepared By:Checked By:Approved By:Date02.01.2021Yash Pal SinghD NagarajuK Ravi KumarTCC No: HY/PE&SD/SC-PROJECTS/2020-21/TCC/IOCL-Paradip/ Piling/01, Rev.00Bharat Heavy Electrical Limited, Project Engineering & System Division, RC Puram, Hyd-32.2 Page

Technical Conditions of Contract (TCC) for Piling and foundationWorksSl. No.DescriptionChapter NoVolume-IAPart-I: Contract specific details1Project InformationI2Scope of WorksII3Facilities in the scope of Contractor/BHEL (Scope Matrix)III4T&Ps to be deployed by ContractorIV5Time ScheduleV6Statutory RegulationsVI7Field quality control planVIIVolume-IAPart-II : Technical Specifications1Scope of workI2Technical specification and drawings for informationII3Preamble for schedule of quantitiesIII4Free Issue of Materials to the nnexure-IV9Annexure-V: Indicative plot planTCC No: HY/PE&SD/SC-PROJECTS/2020-21/TCC/IOCL-Paradip/ Piling/01, Rev.00Bharat Heavy Electrical Limited, Project Engineering & System Division, RC Puram, Hyd-32.3 Page

Technical Conditions of Contract (TCC) for Piling and foundationWorksVolume IAPart IContract specific detailsTCC No: HY/PE&SD/SC-PROJECTS/2020-21/TCC/IOCL-Paradip/ Piling/01, Rev.00Bharat Heavy Electrical Limited, Project Engineering & System Division, RC Puram, Hyd-32.4 Page

Technical Conditions of Contract (TCC) for Piling and foundationWorksChapter I- Project Information1.01234567111213CustomerProject InformationLocationAddress DetailNearest Railway StationRoad ApproachNearest Air PortAmbient Air Temperature(Average)Average Relative HumidityClimatic Condition::::::::::Project DetailsIOCL, Paradip, OdishaIOCL Paradip-Standby SRU (525TPD) Train projectParadip, OdishaIOCL, Paradip, Jagatsinghpur District, Odisha, IndiaParadip Railway Station118KM from Bhubaneswar via Cuttack and NH 53Biju Patnaik Airport, Bhubaneswar, Odisha, 125KMa) Maximum: 390 Cb) Minimum: 160 C71 %Tropical ClimateBidder is advised to visit the project site and appraise himself about the local conditions andinfrastructure available in the area for fulfilling their commitments under the contract. BHEL willnot admit any claims whatsoever on account of Contractor’s non-familiarization of local conditions.TCC No: HY/PE&SD/SC-PROJECTS/2020-21/TCC/IOCL-Paradip/ Piling/01, Rev.00Bharat Heavy Electrical Limited, Project Engineering & System Division, RC Puram, Hyd-32.5 Page

Technical Conditions of Contract (TCC) for Piling and foundationWorksChapter II- Scope of Work1.0Piling and foundation work: The work will involve:a)Installation & Testing of 500 dia. bored cast-in situ piles of approximately 22m long and12m long from pile cut-off. Pile cut-off length shall be about 2m to 4m from NGL.b)The scope will cover all works, connected with installations and Testing of Bored Cast-insitu socket piles including mobilizations of rigs and other equipment, their erection/dismantling/ transportation/ assembling and erecting from one area to another within theplant, preparation of firm ground as required for supporting the pile rigs, supply of materials,sampling and testing of materials consumables, labors, transportation etc. All work asrequired for the proper and satisfactory completion of the job.I.Piling works for the following structure equipment, pits and tanks etci. Technological structureii. Pipe rackiii. Incinerator Stackiv. Incinerator Fansv. Blowdown coolervi. Acid Gas KO Drum Pumpsvii. SWS Acid Gas KO Drum Pumpsviii. Degassing Pumpsix. Sulfur Pitx. Sulfur Pit Pumpsxi. Condensate Pumpsxii. Seal Cooling Water Sump Pumpsxiii. Any other structures/foundations/pit etc that required to complete the project but not listedhere.II.i).ii).iii).iv).v).vi).Construction of following servicesStrengthening of existing roads for crane movement if required.Maintenance and erection approach roads/ by strengthening of roads.Preparation of basic/ detailed engineering drawings for construction, and getting approval ofthe same from PMC/ Owner/ Licensor.Any temporary activities required to complete the work.Approval from statutory and local authorities to complete the work.The plot for construction area/ fabrication yard/ field office/ construction stores has to bedeveloped by the contractor of its own and the Client shall only identify the space on as inwhere is basis. All the infrastructure facilities, which include roads, approaches, drainagesystem, pavements etc., shall be developed & provided by the contractor of its own.TCC No: HY/PE&SD/SC-PROJECTS/2020-21/TCC/IOCL-Paradip/ Piling/01, Rev.00Bharat Heavy Electrical Limited, Project Engineering & System Division, RC Puram, Hyd-32.6 Page

Technical Conditions of Contract (TCC) for Piling and foundationWorks2. Splitting of work scope: Scope of work under this tender shall be split between twocontractors in the following manner:i) Piling package I: Approximately 70 % of the total scope of work on the SRU-3 packageside of plot plan (Annexure-V).ii) Piling package II: Approximately 30% of the total scope of work on the TGTU-2(Incinerator side) package side of the plot plan (Annexure-V).Work shall be executed as per the instructions of BHEL site engineer. In case of any dispute,decision of BHEL site engineer shall be final and binding on contractor.TCC No: HY/PE&SD/SC-PROJECTS/2020-21/TCC/IOCL-Paradip/ Piling/01, Rev.00Bharat Heavy Electrical Limited, Project Engineering & System Division, RC Puram, Hyd-32.7 Page

Technical Conditions of Contract (TCC) for Piling and foundationWorksChapter III- Facilities in the scope of BHEL/ContractorDescriptionS. No.PART UCTIONPURPOSE:Open space for office (as peravailability)Open space for storage (as peravailability)Construction of bidder’s office,canteen and storage building includingsupply of materials and other servicesBidder’s all office equipment, office /store / canteen consumablesCanteen facilities for the bidder’s staff,supervisors and engineers etc.Firefighting equipment like buckets,extinguishers etc.Fencing of storage area, office, canteenetc. of the bidderFOR LIVING PURPOSES OF THEBIDDEROpen space for labor colony (as peravailability)Labor Colony with internal roads,sanitation, complying with statutoryrequirementsELECTRICITYScope / to betaken care byRemarksBHEL 33.3.0Electricity For construction purposesElectricity for the office, stores,canteen etc. of the bidderElectricity for living accommodationof the bidder’s staff, engineers,supervisors etc.WATER SUPPLYElectricity shall be provided byIOCL at one point onchargeablebasis.Furtherdistribution shall be done bycontractor.YesYesTCC No: HY/PE&SD/SC-PROJECTS/2020-21/TCC/IOCL-Paradip/ Piling/01, Rev.00Bharat Heavy Electrical Limited, Project Engineering & System Division, RC Puram, Hyd-32.8 Page

Technical Conditions of Contract (TCC) for Piling and foundationWorksDescriptionS. No.PART IFor construction .8.0abWater supply for bidder’s office,stores, canteen etc.Water supply for Living PurposeLIGHTINGFor construction work (supply of allthe necessary materials)1. At office/storage area2. At the preassembly area3. At the construction site /areaFor construction work (execution ofthe lighting work/ arrangements)1. At office/storage area2. At the preassembly areaAt the construction site /areaProviding the necessary consumableslike bulbs, switches, etc. during thecourse of project workLighting for the living purposes of thebidder at the colony / quartersCOMMUNICATION FACILITIESFOR SITE OPERATIONS OF THEBIDDERTéléphone, fax, internet, intranet, email etc.COMPRESSED AIR whereverrequired for the workDemobilization of all the abovefacilitiesTRANSPORTATIONFor site personnel of the bidderForbidder’sequipmentandconsumables (T&P, Consumables etc.)Scope / to betaken care byRemarksBHEL BidderWater shall be provided byIOCL at one point onYeschargeablebasis.Furtherdistribution shall be done bycontractor.YesYesYesYesYesYesYesYesYesYesYesTCC No: HY/PE&SD/SC-PROJECTS/2020-21/TCC/IOCL-Paradip/ Piling/01, Rev.00Bharat Heavy Electrical Limited, Project Engineering & System Division, RC Puram, Hyd-32.9 Page

Technical Conditions of Contract (TCC) for Piling and foundationWorksDescriptionSl. NoScope / to betaken care byPART IIRemarksBHELBidder3.9.0 CONSTRUCTION FACILITIES3.9.1Engineering works for construction:aProviding the construction drawings for all theYesworks covered under this scopeDrawing schedule shallbe finalized at the timeof kick off meetingbDrawings for construction methodsNAcdefghijAs-built drawings – where ever deviationsobserved and executed and also based on thedecisions taken at site- example – routing of smallbore pipesShipping lists etc. for reference and planning theactivitiesPreparation of construction (Concreting B/W, etc.)schedules and other input requirementsReview of performance and revision of siteconstruction schedules in order to achieve the end Yesdates and other commitmentsWeekly construction schedules based on S. No. e.hard copy to Construction manager, by email toHO.Daily construction / work plan based on S. No. g.hard copy to Construction manager, by email toHO.Periodic visit of senior official of the bidder to siteto review the progress so that works are completedas per schedule. It is suggested this review by thesenior official of the bidder should be done once inevery two Weeks.Arranging the materials required for WorkIn consultationBHELwithIn consultationBHELIn consultationBHELwithYesIn consultationBHELwithYesIn consultationBHELwithYesIn consultationBHELwithYesYesYeswithYesYesTCC No: HY/PE&SD/SC-PROJECTS/2020-21/TCC/IOCL-Paradip/ Piling/01, Rev.00Bharat Heavy Electrical Limited, Project Engineering & System Division, RC Puram, Hyd-32.10 P a g e

Technical Conditions of Contract (TCC) for Piling and foundationWorksDescriptionSl. NoScope / to betaken care byPART IIRemarksBHELkl3.103.9.0 CONSTRUCTION FACILITIESCoordination for inspection & checking andgetting clearance from customerPreparation of formats for completion of activitiesWork Permits, gate pass etc. from customer formanpower, machinery and materialBidderYesYesYesTCC No: HY/PE&SD/SC-PROJECTS/2020-21/TCC/IOCL-Paradip/ Piling/01, Rev.00Bharat Heavy Electrical Limited, Project Engineering & System Division, RC Puram, Hyd-32.11 P a g e

Technical Conditions of Contract (TCC) for Piling and foundationWorksChapter IV- Tools & plants to be deployed by ContractorLIST OF TOOLS AND PLANT:The following tools and equipment but not limited to, are required for the efficient execution ofthe civil works. The contractor shall make them available for construction purposes, including allconsumables likely to be used at his own cost at the time of mobilization.S.No.DescriptionMinimum QuantityRemarks1.Hydraulic rotary piling rigs2.Concrete batching plant(Stationary/Movable) Optional in case ofuse of RMC not neededNeedle Vibrator ( Needle type 40mm )Needle Vibrator ( Needle type 25mm )Surface VibratorConcrete PumpDewatering PumpEarth CompactorReinforcement steel cutting & BendingmachineWelding MachineGrinding MachineExcavatorTheodolite with staffDumpy level with staffCompression testing machine ( forconcrete cubes )Cube mould (15cm x 15cm x 15cm)Sieve analysis sieve sets for coarse & fineaggregatesJar/Beaker for Bulk density test of sand2 nos. for package 1 & 1no. for package-21 no. for each packageNeed Based3.4.5.6.7.8.9.10.11.12.13.14.15.15.16.17.4 nos. for each package2 nos. for each package1 no. for each package1 no. for each package2 nos. for each package2 nos. for each package2 nos. for each package2 nos. for each package4 nos. for each package1 no. for each package1 no. for each package1 no. for each package1 no. for each packageNeed basedNeed based6 nos. for each package1 set for each package1 no. for each packageBHEL will not provide any tool, plants, facilities or any testing facility/apparatus for the work. Itwill be contractor’s responsibility to arrange all required tools, plants and other testing apparatus,etc. at their own cost. The prices quoted & finalized are inclusive of the charges towards providingsuch T&P. No extra payment will be entertained because of this.However, subject to availability, BHEL may provide few T&P to the contractor for expediting andin larger interest of the project. In case any such facility is provided to the contractor, BHEL willmake necessary recovery in the running account/final bills towards the hire charges. Adepartmental charge @ 5% will also be affected such cases. The decision of BHEL on the hirecharges will be final and binding on contractor.TCC No: HY/PE&SD/SC-PROJECTS/2020-21/TCC/IOCL-Paradip/ Piling/01, Rev.00Bharat Heavy Electrical Limited, Project Engineering & System Division, RC Puram, Hyd-32.12 P a g e

Technical Conditions of Contract (TCC) for Piling and foundationWorksChapter V- Time Schedule5.1 TIME SCHEDULE5.1.1The entire work of piling and foundation work as detailed elsewhere in the Tender Specification shall becompleted within 05 Months (04 month for execution 01 month for mobilization, handing over &demobilization) from the date of commencement of work at site.5.1.2During the total period of contract, the contractor has to carry out the activities in a phased manner asrequired by BHEL and the program of milestone events.5.1.3The work shall be commenced on the mutually agreed date between the bidder and BHEL engineer. Thedecision of BHEL in this regard shall be final and binding on the contractor. The scope of work under thiscontract is deemed to be completed only when so certified by the site Engineer.5.2 COMMENCEMENT OF CONTRACT PERIODThe date of commencement of contract period shall be the mutually agreed date between the bidder andBHEL engineer to start the work. In case of discrepancy, the decision of BHEL engineer will be final.5.3 MOBILISATION5.3.1The activities for piling and foundation work shall be started as per directions of Construction manager ofBHEL.5.3.2The contractor should mobilize man power in order to complete the work in 05 Months (04 months forexecution 01 month for mobilization, handing over & demobilization).5.3.3Requisite Material, men and machinery should be arranged in order to complete the project within stipulatedtime.5.3.4The contractor has to augment his resources in such a manner that following major milestones of the projectare achieved on specified schedules:In order to meet above schedule in general, and any other intermediate targets set, to meet project, contractorshall arrange & augment all necessary resources from time to time on the instructions of BHEL.5.4 CONTRACT PERIODFor the purpose of contract, the period shall be taken as 05 Months (04 month for execution 01 month formobilization, handing over & demobilization). Completion of the work shall be as per BHEL Bar ChartsTCC No: HY/PE&SD/SC-PROJECTS/2020-21/TCC/IOCL-Paradip/ Piling/01, Rev.00Bharat Heavy Electrical Limited, Project Engineering & System Division, RC Puram, Hyd-32.13 P a g e

Technical Conditions of Contract (TCC) for Piling and foundationWorksrevised from time to time. In order to expedite the work, the contractor has to deploy manpower as per siterequirement without any extra cost to BHEL.5.5 GUARANTEE PERIODThe guarantee period of twelve months shall commence from the date of completion of all works as certifiedby the BHEL site engineer.5.6 PROTECTION OF WORKThe contractor shall have total responsibility for protecting his works until it is taken over by the Employer.No claim will be entertained by the Employer or the representative of the Employer for any damage or lossto the Contractor’s works and the Contractor shall be responsible for complete restoration of the damagedworks to original conditions to comply with the specification and drawings. Should any such damage to theContractor’s Works occur because of other party not being under his supervision or control, the Contractorshall make his claim directly with the party concerned.If disagreement, conflict, or dispute develops between the Contractor and the other party or partiesconcerned regarding the responsibility for damage to the Contractor’s Works the same shall be rectified.The Contractor shall not cause any delay in the repair of such damaged Works because of any delay in theresolution of such disputes. The Contractor shall proceed to repair the Work immediately and no causethereof will be assigned pending resolution of such disputes.5.7 Tentative scheduleSl No123DescriptionMobilization of resources at site and commencement ofworkCompletion of(i) 330 Nos of piles in all aspects for piling workspackage I(ii) 140 Nos of piles in all aspects for piling workspackage IICompletion of all piling works, demobilization andhanding overPeriod From15 Days from issue of LOA75 Days from issue of LOA150 Days from issue of LOATCC No: HY/PE&SD/SC-PROJECTS/2020-21/TCC/IOCL-Paradip/ Piling/01, Rev.00Bharat Heavy Electrical Limited, Project Engineering & System Division, RC Puram, Hyd-32.14 P a g e

Technical Conditions of Contract (TCC) for Piling and foundationWorksChapter VI- Statutory Regulation6.1 not used6.2 not used6.3 not used6.4 BUILDING & OTHER CONSTRUCTION WORKERS (REGULATION OF EMPLOYMENT ANDCONDITIONS OF SERVICE) ACT, 1996 (BOCW Act) AND RULES OF 1998 READ WITHBUILDING & OTHER CONSTRUCTION WORKERS CESS Act, 1996 & CESS RULES, 1998 andINTER-STATE MIGRANT WORKMEN ACT, 1979 (IN CASE BIDDER ENGAGE MANPOWERFROM OTHER STATE)In case any portion of work involves execution through building or construction workers and/or inter-statemigrant workers, then compliance to the above titled Acts as applicable shall be ensured by the contractorand contractor shall obtain license and deposit the cess under the Act. In the circumstances, it may beensured as under:It shall be the sole responsibility of the contractor in the capacity of employer to forthwith (within aperiod of 15 days from the award of work) apply for a license to the Competent Authority under theBOCW Act and/or ISMW Act as applicable and obtain proper certificate thereof by specifying the scopeof its work. It shall also be responsibility of the contractor to furnish a copy of such certificate of license /permission to BHEL within a period of one month from the date of award of contract.It shall be the sole responsibility of the contractor as employer to ensure compliance of all the statutoryobligations under these acts and rules including that of payment / deposit of cess as per the applicabilityunder above referred Acts within a period of one month from the receipt of payment.It shall be the responsibility of the sub-contractor to furnish the receipts / challans towards deposit of thecess together with the number, name and other details of beneficiaries (building/Inter-state Migrantworkmen) engaged by the sub-contractor during the preceding month.It shall be the absolute responsibility of the sub-contractor to make payment of all statutory payments &compensations to its workers including that is provided under the Workmen’s Compensation Act, 1923.TCC No: HY/PE&SD/SC-PROJECTS/2020-21/TCC/IOCL-Paradip/ Piling/01, Rev.00Bharat Heavy Electrical Limited, Project Engineering & System Division, RC Puram, Hyd-32.15 P a g e

Technical Conditions of Contract (TCC) for Piling and foundationWorksChapter VI- Field quality control plan1. Work shall be executed as per approved field quality control plan (FQCP). Indicative qualitycontrol plan of IOCL is attached as Annexure-IV. Contractor shall prepare, submit the fieldquality control plan in line with IOCL QCP.Submitted FQCP shall be reviewed and approved by BHEL/IOCL/ TECHNIP.TCC No: HY/PE&SD/SC-PROJECTS/2020-21/TCC/IOCL-Paradip/ Piling/01, Rev.00Bharat Heavy Electrical Limited, Project Engineering & System Division, RC Puram, Hyd-32.16 P a g e

Technical Conditions of Contract (TCC) for Piling and foundationWorksVolume IAPart IITechnical SpecificationTCC No: HY/PE&SD/SC-PROJECTS/2020-21/TCC/IOCL-Paradip/ Piling/01, Rev.00Bharat Heavy Electrical Limited, Project Engineering & System Division, RC Puram, Hyd-32.17 P a g e

Technical Conditions of Contract (TCC) for Piling and foundationWorksChapter-I: SCOPE OF WORK2.0PILING & FOUNDATION WORK :The work will involve:c) Installation & Testing of 500 dia. bored cast-in situ piles of approximately 22m longand 12m long from pile cut-off. Pile cut-off length shall be about 2m to 4m fromNGL.d) The scope will cover all works connected with installations and Testing of BoredCast-in-situ socket piles including mobilizations of rigs and other equipments g and erecting from one area toanother within the plant, preparation of firm ground as required for supporting thepile rigs, supply of materials, sampling and testing of materials consumables,labours, transportation etc. all complete as required for the proper and satisfactorycompletion of the job.e) Construction of pile cap, pedestal etc including providing and installing foundationbolts, templates, inserts, lugs, pockets etc for equipment foundation and structurefoundations etc. as per drawings.III.Piling, pile cap and pedestal works for the following structure equipment, pitsand tanks etcxiv. Technological structurexv. Pipe rackxvi. Incinerator Stackxvii. Incinerator Fansxviii. Blowdown coolerxix. Acid Gas KO Drum Pumpsxx. SWS Acid Gas KO Drum Pumpsxxi. Degassing Pumpsxxii. Sulfur Pitxxiii. Sulfur Pit Pumpsxxiv. Condensate Pumpsxxv. Seal Cooling Water Sump Pumpsxxvi. Any other structures/foundations/pit etc which required to complete the project butnot listed here.TCC No: HY/PE&SD/SC-PROJECTS/2020-21/TCC/IOCL-Paradip/ Piling/01, Rev.00Bharat Heavy Electrical Limited, Project Engineering & System Division, RC Puram, Hyd-32.18 P a g e

Technical Conditions of Contract (TCC) for Piling and nstruction of following servicesStrengthening of existing roads for crane movement if required.Maintenance and erection approach roads/ by strengthening of roads.Preparation of basic/ detailed engineering drawings for construction, and gettingapproval of the same from PMC/ Owner/ Licensor.Any temporary activities required to complete the work.Approval from statutory and local authorities to complete the work.The plot for construction area/ fabrication yard/ field office/ construction stores has tobe developed by the contractor of its own and the Client shall only identify the spaceon as in where is basis. All the infrastructure facilities which include roads, approaches,drainage system, pavements etc. shall be developed & provided by the contractor of itsown.CIVIL WORKSThe scope covers all Civil works within the battery limits. The important workscovered are as below.a) Preparation of bar bending schedules for all reinforced concrete work and gettingthem approved by the BHEL Engineer.b) Supply of all equipment/ instruments and personnel for conducting necessary testsat site as specified/as directed by the Engineer.4.0GENERALa) The drawings enclosed with this tender are intended to give the tenderer a generalidea of the type and extent of work involved. The drawings are as such onlyindicative and not to be considered as the exact construction drawings.Further this is to be noted that the drawings and the documents furnished alongwith this specification are the sole property of BHEL. It must not be useddirectly or indirectly in any way detrimental to the interest of the company.b) The scope of work will also include such other related works although they may notbe specifically mentioned in the above paragraph and all such incidental items notspecified but reasonably imply and necessary for completion of the job as a wholeall as desired and as directed by the engineer.c) The detail scope of work covered above is not a comprehensive list of items of workinvolved. The detail scope of work may vary considerably depending on the actualconstruction requirements.5.0ALSO INCLUDED IN THE SCOPETCC No: HY/PE&SD/SC-PROJECTS/2020-21/TCC/IOCL-Paradip/ Piling/01, Rev.00Bharat Heavy Electrical Limited, Project Engineering & System Division, RC Puram, Hyd-32.19 P a g e

Technical Conditions of Contract (TCC) for Piling and foundationWorksUnless otherwise specified, the work to be provided by the contractor for the items mentionedin the “Schedule of items”, shall include but not be limited to the following.a) Furnishing all labour, materials, supervision, construction plans, equipment,supplies, transport, to and from the site, fuel, electricity, compressed air, water,transit and storage insurance and all other incidental items and temporary works notshown on specified but reasonably implied or necessary for the proper completion,maintenance and handling over the works, except in accordance with the stipulationslaid down in the contract documents and additional stipulations as may be provideby the engineer during the course of works.b) Furnishing samples of all materials required by the engineers for testing/inspectionand approval for use in the works. The samples may be retained by the engineer forfinal incorporation in the works.c) Furnishing test reports for the products used or intended to be used, if called for thespecifications or if so desired by the engineer.d) Giving all notices, paying all fees, taxes etc., in accordance with the generalconditions of contract, that are required for all works including temporary works.e) Arranging manufacturer’s supervision for items of work done as per manufacturer’sspecifications when so specified.f)Providing all incidental items not shown or specified but reasonably implied ornecessary for the successful completion of the work in accordance with contract.g) On completion of work, all the temporary buildings, structures, pipe lines, cables etc.shall be dismantled and leveled and debris shall be removed as per instructions ofBHEL by the contractor at his cost. In the event of his failure to do so, theexpenditure towards clearance of the same will be recovered from the contractor.The decision of BHEL Engineer in this regard is final.6.0WORK BY OTHERSNo work under the specification will be provided by any agency other than the contractorunless specifically mentioned elsewhere in the contract.TCC No: HY/PE&SD/SC-PROJECTS/2020-21/TCC/IOCL-Paradip/ Piling/01, Rev.00Bharat Heavy Electrical Limited, Project Engineering & System Division, RC Puram, Hyd-32.20 P a g e

Technical Conditions of Contract (TCC) for Piling and foundationWorksChapter-II: TECHNICAL SPECIFICATIONS & DRAWINGS FOR INFORMATION.SECTIONDESCRIPTIONSECTION – ALIST OF TECHNICAL SPECIFICATIONSSECTION – BLIST OF TENDER DRAWINGSNOTE: Contractor has to make himself well conversant with the customerspecification. In case of ambiguity between BHEL and customer specification,customer specification shall prevail.TCC No: HY/PE&SD/SC-PROJECTS/2020-21/TCC/IOCL-Paradip/ Piling/01, Rev.00Bharat Heavy Electrical Limited, Project Engineering & System Division, RC Puram, Hyd-32.21 P a g e

Technical Conditions of Contract (TCC) for Piling and foundationWorksSECTION-ALIST OF TECHNICAL SPECIFICATIONS.TCC No: HY/PE&SD/SC-PROJECTS/2020-21/TCC/IOCL-Paradip/ Piling/01, Rev.00Bharat Heavy Electrical Limited, Project Engineering & System Division, RC Puram, Hyd-32.22 P a g e

Technical Conditions of Contract (TCC) for Piling and foundationWorksSECTION-A.LIST OF TECHNICAL RREVPAGESGENERAL SCOPE.PEDC/STD.SPEC/001042PROPERTIES. STORAGE&HANDLING OF COMMONBUILDING MATERIALS.PEDC/STD.SPEC/0020534EARTHWORK INEXCAVATION & BACKFILLING.CEMENT CONCRETE-PLAIN& 65PILING.PEDC/STD.SPEC/040-a0(b) PART II - GENERAL SPECIFICATIONS.PEDC/STD.SPEC/0040-b04(c) PART III - SPECIFIC REQUIREMENTS.PEDC/STD.SPEC/0040-c18(d) PILING PART-IV – MATERIAL FOR REINFORCEDCONCRETE PILESPEDC/STD.SPEC/0040-d08(e) PILING PART-V -TESTING OF CONCRETE PILESPEDC/STD.SPEC/0040-e011(f) PILING PART-VI -CONSTRUCTION ANDINSTALLATION OF RCC BORED CAST IN-SITU PILESPEDC/STD.SPEC/0040-f08Note: Please refer annexure-I for all the specifications mentioned above.TCC No: HY/PE&SD/SC-PROJECTS/2020-21/TCC/IOCL-Paradip/ Piling/01, Rev.00Bharat Heavy Electrical Limited, Project Engineering & System Division, RC Puram, Hyd-32.23 P a g e

Technical Conditions of Contract (TCC) for Piling and foundationWorksSECTION-BLIST OF DRAWINGSTCC No: HY/PE&SD/SC-PROJECTS/2020-21/TCC/IOCL-Paradip/ Piling/01, Rev.00Bharat Heavy Electrical Limited, Project Engineering & System Division, RC Puram, Hyd-32.24 P a g e

Technical Conditions of Contract (TCC) for Piling and foundationWorksSECTION-BLIST OF DRAWINGSS.NO.TITLE1PLOT PLAN (TENDER PURPOSE ONLY)2ALL RELEVANT Technip FMC/ IOCL SPEC &STD. DRAWINGSDRAWING nexure-II

Technical Conditions of Contract (TCC) for Piling and foundation Works TCC No: HY/PE&SD/SC-PROJECTS/2020-21/TCC/IOCL-Paradip/ Piling/01, Rev.00