2022 Cost Data(January — March)Compiled By:Cost Estimating Services Unit of theConstruction Engineering Services BranchJuly 5, 2022

2022 Cost Data: ConstructionTable of ContentsNumberof PagesList of 2022 Bid Projects .2Bridge Cost per Square Feet .1Item Unit Costs by Projects . 173

Colorado Cost DataForewordThe Colorado Department of Transportation’s Cost Estimating ServicesUnit of the Construction Engineering Services Branch publishes the CostData Book annually. A joint effort has been made between CDOT’s sectionsand the Cost Estimating Services Unit to gather and record cost data forthis publication.The following data includes weighted average prices for items on highwayconstruction projects that were bid during the 2022 calendar year. Cautionshould be used in applying these historical averages to specific projects.Allowances for varying geographic, climatic, social, economic conditionsand type of project should be made.Changes and improvements are continually being made to update andincrease the usefulness for future issues. Comments and suggestionsfor improvements for users of this publication are welcome.

Colorado Department of Transportation09:26 Tuesday, July 5, 202212022 Cost DataPROJECTS BID FROM 01/01/22 THROUGH OR/LETTINGPROJECT NUMBERLOCATIONDIST TERRAINBIDSAWARDED NNAN SAND AND GRAVEL, LLC4 4,704,411.40 106.92NHPP2873-189US 287 (FEDERAL BLVD) - 021720220217202202242022030320220310STURGEON ELECTRIC COMPANY, INCITS0703-477ITS EQUIPMENT UPGRADE AT EJMT00MROADSAFE TRAFFIC SYSTEMS, INCMTCE R500-2185UStraight Stripe Painting, Inc.MTCE R500-2195RINTERMOUNTAIN SLURRY SEAL, INC.STR0505-0502PAMES CONSTRUCTION, INC.NHPP0702-383I-70 EB AUX FRISCO TO SILVERTH3MTRICON 2, LLCNH0504-910US50B L-24-B MIN REP AT MP 4062PROADSAFE TRAFFIC SYSTEMS, INCMTCER400-391VARIOUS HIGHWAY SEGMENTS ACROS4RMyers & Sons Construction, LLCSTA0252-4591RA and S CONSTRUCTION CO.NHPP1601-0835RCC ENTRPRS TRAFFIC CONTROL SPECIALISTSMTCER300-2623MMCATEE CONSTRUCTION CO.C0762-0554RMCATEE CONSTRUCTION CO.STR0141-0313MOLDCASTLE SW GROUP, INC.STR133A-0513ROLDCASTLE SW GROUP, INC.NHPP0063-0633U2R1UA and S CONSTRUCTION CO.STA 067A-048BRANNAN SAND AND GRAVEL, LLCNHPP0703-472Hwy 67A MP 0.00 TO MP 11.05 IN1 8,447,636.00163.492 1,168,613.0087.753 2,256,065.00102.193 2,019,305.0091.605 26,917,300.00119.308 1,697,000.0080.814 1,564,170.00101.463 6,297,433.64131.202 21,890,679.16120.853 1,742,097.0082.964 13,997,628.23109.363 5,420,000.0092.363 1,540,725.10123.762 9,208,179.50125.313 4,623,000.00102.734 8,027,827.75101.50

Colorado Department of Transportation09:26 Tuesday, July 5, 202222022 Cost DataPROJECTS BID FROM 01/01/22 THROUGH OR/LETTINGPROJECT NUMBERLOCATIONDIST TERRAINBIDSAWARDED TIRON CONSTRUCTORS, INC.8 25,426,004.4587.29C0761-2391RNHPP 0761-238I-76 DAHLIA TO MA, A Joint VentureNHPP0253-275I-25 EXPRESS LANES SEGMENT 5 &4RIHC Scott, Inc.CR100-3621UKIEWIT INFRASTRUCTURE CO.ER007A-0354MKSK, LLCSTR R500-171Various locations on SH 141 an5ROLDCASTLE SW GROUP, INC.STR160A-034US160A LA VETA PASS EAST SURFA2MMyers & Sons Construction, LLCBRC040-0572UOLDCASTLE SW GROUP, INC.STR092A-0313R1UMORTON ELECTRIC, INC.MP0503-0982UCASTLE ROCK CONST. CO. OF COLO, LLCNHM765-0072UABCO CONTRACTING, INC.C0703-4991MKRAEMER NORTH AMERICA, LLCM R100-351FY22 R1 SIGN STRUCTURE REPLACEEJMT GROUT BED REPAIR AND PANETOTALS1 6,514,608.17111.891 4,644,427.21100.001 5,520,588.70107.473 1,400,000.0086.602 8,614,391.1699.024 4,120,979.48124.881 7,346,956.3497.352 1,217,455.60101.452 646,748.0077.923 13,605,608.18102.302 1,341,361.00148.29 87 201,921,199.07 107.22

Colorado Department of Transportation09:26 Tuesday, July 5, 202212022 Cost DataBRIDGE COST PER SQUARE FOOT(01/01/22 THROUGH ----------------------------------------PROJECT NUMBER/TERR/TOTALTOTALCOST PERDATE LETPROJECT LOCATIONBRIDGE IDLENGTHWIDTHSQUARE FTCOSTSQUARE -----------------------------------BRIDGE REPAIR220317STR R500-171RVarious locations on SH 141 an 00002895.8243.650024.00005847.6WEIGHTED AVERAGE COST:NEW STRUCTURES11561.4 133,594 109,396 202,464 47.41 37.78 34.62 445,454 38.53

COLORADO DEPARTMENT OF TRANSPORTATION09:57 Tuesday, July 5, 20221ITEM UNIT COSTS BY PROJECTS -- 2022 COST -----------------------------------ITEM NUMBER/ITEM DESCRIPTION/UNIT/PROJECT NUMBERPROJECT LOCATIONDATE LETQUANTITYENGR. EST.AVERAGE BIDAWARDED ---------------------------------- 201-00000Clear and NHPP0063-063CR100-362BRC040-057M R100-351I-70 EB AUX FRISCO TO SILVERT /17/22FY22 R1 SIGN STRUCTURE REPLAC 03/17/22WEIGHTED AVERAGE FOR THE FIRSTLUMP SUM QUARTERWEIGHTED AVERAGE FOR THE YEAR 201-00001Clear and GrubNHPP 0761-238C0761-239I-76 DAHLIA TO YORKWEIGHTED AVERAGE FOR THE FIRSTAcre 03/10/22Rem StructureNHPP 0761-238C0761-239NHM765-007I-76 DAHLIA TO YORK03/10/22QUARTERWEIGHTED AVERAGE FOR THE YEAR 202-00002Rem of Structure (Spec)03/31/22QUARTERWEIGHTED AVERAGE FOR THE YEAR 202-00009Tree 002505.03238.74-------------- --------------- --------------- --------------4.0019425.002592.42804.06 ------------ --------------- --------------- --------------5.00500.002452.92100.06 5.00500.002452.92100.06LUMP SUM NHM765-00703/31/22WEIGHTED AVERAGE FOR THE FIRST33058.05Each NHM765-007WEIGHTED AVERAGE FOR THE FIRST8000.00Each 03/31/22WEIGHTED AVERAGE FOR THE FIRST1.00-------------- --------------- --------------- --------------1.008000.0033058.0520000.00 1.008000.0033058.0520000.00QUARTERWEIGHTED AVERAGE FOR THE YEAR 2000.001.0020000.002704.501709.00-------------- --------------- --------------- --------------8.0057028.1686341.0658332.51 8.0057028.1686341.0658332.51QUARTERWEIGHTED AVERAGE FOR THE YEAR1.007200.0011419.133735.30-------------- --------------- --------------- --------------1.007200.0011419.133735.30 1.007200.0011419.133735.30

COLORADO DEPARTMENT OF TRANSPORTATION09:57 Tuesday, July 5, 20222ITEM UNIT COSTS BY PROJECTS -- 2022 COST -----------------------------------ITEM NUMBER/ITEM DESCRIPTION/UNIT/PROJECT NUMBERPROJECT LOCATIONDATE LETQUANTITYENGR. EST.AVERAGE BIDAWARDED ---------------------------------- 202-00010Rem TreeSTA 067A-048Hwy 67A MP 0.00 TO MP 11.05 I 03/03/22WEIGHTED AVERAGE FOR THE FIRSTEach QUARTERWEIGHTED AVERAGE FOR THE YEAR 202-00015Rem HeadwallNHPP0702-383I-70 EB AUX FRISCO TO SILVERT 01/13/22WEIGHTED AVERAGE FOR THE FIRSTEach QUARTERWEIGHTED AVERAGE FOR THE YEAR 202-00019Rem InletNHPP0702-383NHPP 0761-238C0761-239NHM765-007I-70 EB AUX FRISCO TO SILVERT 01/13/22I-76 DAHLIA TO YORK03/10/22QUARTERWEIGHTED AVERAGE FOR THE YEAR 202-00021Rem Manhole03/31/22QUARTERWEIGHTED AVERAGE FOR THE YEAR 202-00023Rem Emb Prot Ty 3NHPP 0761-238C0761-239I-76 DAHLIA TO YORKWEIGHTED AVERAGE FOR THE 00.0019.001000.001416.631073.33-------------- --------------- --------------- --------------31.001086.131569.781209.46 31.001086.131569.781209.46Each NHM765-007WEIGHTED AVERAGE FOR THE FIRST1.001500.002916.214981.95-------------- --------------- --------------- --------------1.001500.002916.214981.95 1.001500.002916.214981.95Each 03/31/22WEIGHTED AVERAGE FOR THE FIRST6.00500.001147.661200.00-------------- --------------- --------------- --------------6.00500.001147.661200.00 ------------- --------------- --------------- --------------3.002000.002186.513299.39 3.002000.002186.513299.39Each 03/10/22QUARTERWEIGHTED AVERAGE FOR THE YEAR5.001000.001328.45850.00-------------- --------------- --------------- --------------5.001000.001328.45850.00 5.001000.001328.45850.00

COLORADO DEPARTMENT OF TRANSPORTATION09:57 Tuesday, July 5, 20223ITEM UNIT COSTS BY PROJECTS -- 2022 COST -----------------------------------ITEM NUMBER/ITEM DESCRIPTION/UNIT/PROJECT NUMBERPROJECT LOCATIONDATE LETQUANTITYENGR. EST.AVERAGE BIDAWARDED ---------------------------------- 202-00024Rem Emb Prot Ty 5NHPP 0761-238C0761-239I-76 DAHLIA TO YORKWEIGHTED AVERAGE FOR THE FIRSTEach 03/10/22Rem S and D PaveNHPP 0761-238C0761-239I-76 DAHLIA TO YORKWEIGHTED AVERAGE FOR THE FIRSTRem RiprapNHPP 0761-238C0761-239I-76 DAHLIA TO YORKWEIGHTED AVERAGE FOR THE ------- --------------- --------------- --------------1,252.0025.0020.3827.00 1,252.0025.0020.3827.00QUARTERSq Yard 03/10/22QUARTERWEIGHTED AVERAGE FOR THE YEAR 202-00035Rem PipeNHPP0702-383NHPP1601-083NHPP0063-063NHPP 0761-238C0761-239NHM765-007I-70 EB AUX FRISCO TO SILVERT 01/13/2202/03/2202/24/22I-76 DAHLIA TO YORK03/10/22209.0040.0032.7015.00-------------- --------------- --------------- --------------209.0040.0032.7015.00 209.0040.0032.7015.00Lin Foot 03/31/22WEIGHTED AVERAGE FOR THE FIRST1264.00Sq Yard WEIGHTED AVERAGE FOR THE YEAR 202-00027500.00-------------- --------------- --------------- --------------2.00500.001264.001050.00 2.00500.001264.001050.00QUARTERWEIGHTED AVERAGE FOR THE YEAR 202-000262.00QUARTERWEIGHTED AVERAGE FOR THE YEAR 202-00037Rem of End SectionNHPP0702-383I-70 EB AUX FRISCO TO SILVERT 30.0054.4749.62-------------- --------------- --------------- --------------2,343.0034.2758.8956.27 2,343.0034.2758.8956.27Each 5.00430.00709.42800.00

COLORADO DEPARTMENT OF TRANSPORTATION09:57 Tuesday, July 5, 20224ITEM UNIT COSTS BY PROJECTS -- 2022 COST -----------------------------------ITEM NUMBER/ITEM DESCRIPTION/UNIT/PROJECT NUMBERPROJECT LOCATIONDATE LETQUANTITYENGR. EST.AVERAGE BIDAWARDED ---------------------------------- 202-00037NHPP1601-083NHPP 0761-238C0761-239Rem of End Section02/03/2203/10/22I-76 DAHLIA TO YORKWEIGHTED AVERAGE FOR THE FIRST-------------- --------------- --------------- --------------15.00476.67760.17560.00 15.00476.67760.17560.00QUARTERWEIGHTED AVERAGE FOR THE YEAR 202-00040Rem Elec ConduitNHPP0702-383NHPP 0761-238C0761-239I-70 EB AUX FRISCO TO SILVERT 01/13/22I-76 DAHLIA TO YORK03/10/22WEIGHTED AVERAGE FOR THE FIRSTLin Foot 202-00055Rem of FO CableNHPP0702-383I-70 EB AUX FRISCO TO SILVERT 01/13/2210.0016.0051.5652.1158.0012.00Lin Foot QUARTERWEIGHTED AVERAGE FOR THE YEAR 202-00090Rem 1-031STA 067A-048NHPP US50B L-24-B MIN REP AT MP 40 01/13/22I-70 EB AUX FRISCO TO SILVERT 01/13/2202/03/2202/17/22Hwy 67A MP 0.00 TO MP 11.05 I 03/03/22I-76 DAHLIA TO YORK03/10/224,775.005.002.883.00-------------- --------------- --------------- --------------4,775.005.002.883.00 4,775.005.002.883.00Each 03/10/2203/17/2203/31/22WEIGHTED AVERAGE FOR THE FIRST202.00100.00-------------- --------------- --------------- --------------302.0011.9951.8042.77 302.0011.9951.8042.77QUARTERWEIGHTED AVERAGE FOR THE YEARWEIGHTED AVERAGE FOR THE FIRSTEach ERWEIGHTED AVERAGE FOR THE .009.009.0022.009.0033.2929.64-------------- --------------- --------------- --------------2,432.007.3412.8310.44 2,432.007.3412.8310.44

COLORADO DEPARTMENT OF TRANSPORTATION09:57 Tuesday, July 5, 20225ITEM UNIT COSTS BY PROJECTS -- 2022 COST -----------------------------------ITEM NUMBER/ITEM DESCRIPTION/UNIT/PROJECT NUMBERPROJECT LOCATIONDATE LETQUANTITYENGR. EST.AVERAGE BIDAWARDED ---------------------------------- 202-00170Grinding And Texturing Conc PvmtC0762-05502/17/22WEIGHTED AVERAGE FOR THE FIRSTQUARTERWEIGHTED AVERAGE FOR THE YEAR 202-00172Diamond Grinding Concrete PavementSTA0252-45902/03/22WEIGHTED AVERAGE FOR THE FIRSTQUARTERWEIGHTED AVERAGE FOR THE YEARSq Yard 133,975.004.504.684.25-------------- --------------- --------------- --------------133,975.004.504.684.25 133,975.004.504.684.25Sq Yard 60,000.005.507.955.00-------------- --------------- --------------- --------------60,000.005.507.955.00 60,000.005.507.955.00 202-00190Rem of Conc Median Cover MatlSq Yard NHPP0702-383NHPP0063-063NHPP 0761-238C0761-239NHM765-007I-70 EB AUX FRISCO TO SILVERT 01/13/2202/24/22I-76 DAHLIA TO YORK03/10/2264.001,756.00200.0003/31/22WEIGHTED AVERAGE FOR THE FIRSTQUARTERWEIGHTED AVERAGE FOR THE YEAR 202-00195Rem of Median CoverNHPP2873-189US 287 (FEDERAL BLVD) - COLFA 01/06/22WEIGHTED AVERAGE FOR THE 438.0010.009.852.70-------------- --------------- --------------- --------------5,458.0010.3011.516.19 5,458.0010.3011.516.19Sq Yard QUARTERWEIGHTED AVERAGE FOR THE YEAR 202-00200Rem SidewalkNHPP2873-189NHPP0702-383US 287 (FEDERAL BLVD) - COLFA 01/06/22I-70 EB AUX FRISCO TO SILVERT 01/13/2232.0014.0052.2044.92-------------- --------------- --------------- --------------32.0014.0052.2044.92 32.0014.0052.2044.92Sq Yard 904.00707.0036.0050.0047.0824.1344.9216.00

COLORADO DEPARTMENT OF TRANSPORTATION09:57 Tuesday, July 5, 20226ITEM UNIT COSTS BY PROJECTS -- 2022 COST -----------------------------------ITEM NUMBER/ITEM DESCRIPTION/UNIT/PROJECT NUMBERPROJECT LOCATIONDATE LETQUANTITYENGR. EST.AVERAGE BIDAWARDED ---------------------------------- 202-00200NHPP0063-063NHPP 0761-238C0761-239CR100-362STR092A-031NHM765-007Rem Sidewalk02/24/2203/10/22I-76 DAHLIA TO YORK03/14/2203/17/2203/31/22WEIGHTED AVERAGE FOR THE FIRSTQUARTERWEIGHTED AVERAGE FOR THE YEAR 202-00201Rem CurbNHPP2873-189C0762-055NHPP0063-063NHPP 0761-238C0761-239BRC040-057NHM765-007US 287 (FEDERAL BLVD) - COLFA 01/06/2202/17/2202/24/22I-76 DAHLIA TO YORK03/10/22QUARTERWEIGHTED AVERAGE FOR THE YEAR 202-00202NHPP0063-063NHPP 0761-238C0761-239NHM765-007Rem 0023.00199.0012.0015.047.02-------------- --------------- --------------- --------------24,218.005.976.625.03 24,218.005.976.625.03Lin Foot 02/24/2203/10/22I-76 DAHLIA TO YORK03/31/22WEIGHTED AVERAGE FOR THE 95.0020.0049.994.83-------------- --------------- --------------- --------------6,856.0061.3146.0556.47 6,856.0061.3146.0556.47Lin Foot 03/17/2203/31/22WEIGHTED AVERAGE FOR THE FIRSTSq Yard EIGHTED AVERAGE FOR THE YEAR 202-00203Rem Curb and GutterNHPP2873-189NHPP0702-383NHPP0063-063NHPP 0761-238US 287 (FEDERAL BLVD) - COLFA 01/06/22I-70 EB AUX FRISCO TO SILVERT 01/13/2202/24/22I-76 DAHLIA TO 00129.0015.0017.527.02-------------- --------------- --------------- --------------284.0016.6913.7812.97 284.0016.6913.7812.97Lin Foot .478.618.339.3714.977.008.007.00

COLORADO DEPARTMENT OF TRANSPORTATION09:57 Tuesday, July 5, 20227ITEM UNIT COSTS BY PROJECTS -- 2022 COST -----------------------------------ITEM NUMBER/ITEM DESCRIPTION/UNIT/PROJECT NUMBERPROJECT LOCATIONDATE LETQUANTITYENGR. EST.AVERAGE BIDAWARDED ---------------------------------- M765-007Rem Curb and GutterLin Foot 03/14/2203/17/2203/17/2203/31/22WEIGHTED AVERAGE FOR THE FIRSTQUARTERWEIGHTED AVERAGE FOR THE YEAR 202-00206Rem Conc Curb RampNHPP2873-189NHM765-007US 287 (FEDERAL BLVD) - COLFA 01/06/2203/31/22WEIGHTED AVERAGE FOR THE FIRSTSq Yard QUARTERWEIGHTED AVERAGE FOR THE YEAR 202-00210STA0252-459NHPP0063-063NHPP 0761-238C0761-239CR100-362STR092A-031NHM765-007Rem Conc 4-------------- --------------- --------------- --------------1,810.0033.1645.4438.57 1,810.0033.1645.4438.57Sq Yard 02/03/2202/24/2203/10/22I-76 DAHLIA TO HTED AVERAGE FOR THE 20.0012.445.21-------------- --------------- --------------- --------------41,212.0021.3411.3912.55 41,212.0021.3411.3912.55Rem Conc Pvmt (Planing) (Spec)Sq Yard WEIGHTED AVERAGE FOR THE FIRST --------- --------------- --------------- --------------41,874.0010.398.327.77 GHTED AVERAGE FOR THE FIRSTQUARTERWEIGHTED AVERAGE FOR THE YEAR 202-00220Rem Asphalt MatNHPP2873-189US 287 (FEDERAL BLVD) - COLFA 01/06/222,329.0025.0049.0018.00-------------- --------------- --------------- --------------2,329.0025.0049.0018.00 2,329.0025.0049.0018.00Sq Yard 33.0012.0092.63200.37

COLORADO DEPARTMENT OF TRANSPORTATION09:57 Tuesday, July 5, 20228ITEM UNIT COSTS BY PROJECTS -- 2022 COST -----------------------------------ITEM NUMBER/ITEM DESCRIPTION/UNIT/PROJECT NUMBERPROJECT LOCATIONDATE LETQUANTITYENGR. EST.AVERAGE BIDAWARDED ---------------------------------- -083STA0252-459STR0141-031NHPP0063-063NHPP R092A-031NHM765-007Rem Asphalt Mat01/13/22US50B L-24-B MIN REP AT MP 40 01/13/22I-70 EB AUX FRISCO TO SILVERT 01/13/2202/03/2202/03/2202/17/2202/24/22I-76 DAHLIA TO 22WEIGHTED AVERAGE FOR THE FIRSTQUARTERWEIGHTED AVERAGE FOR THE YEAR 202-00226Rem of Asph Mat (Special)NHM765-007QUARTERWEIGHTED AVERAGE FOR THE YEAR 202-00240Rem Asphalt Mat -055STR0141-031NHPP0063-063STA 067A-048NHPP STR R500-171STR092A-031NHM765-007US 287 (FEDERAL BLVD) - COLFA 01/06/22I-70 EB AUX FRISCO TO SILVERT 01/13/2202/03/2202/17/2202/17/2202/24/22Hwy 67A MP 0.00 TO MP 11.05 I 03/03/22I-76 DAHLIA TO YORK03/10/2203/10/2203/15/22US160A LA VETA PASS EAST SURF 03/17/22Various locations on SH 141 a 03/17/2203/17/2203/31/22WEIGHTED AVERAGE FOR THE FIRSTQUARTERWEIGHTED AVERAGE FOR THE 2.0013.616.03-------------- --------------- --------------- --------------145,268.0010.767.496.63 145,268.0010.767.496.63Sq Yard 03/31/22WEIGHTED AVERAGE FOR THE FIRSTSq Yard -------- --------------- --------------- --------------15,032.0020.009.988.73 15,032.0020.009.988.73Sq Yard -------------- --------------- --------------- --------------1,496,572.002.372.992.45 1,496,572.002.372.992.45

COLORADO DEPARTMENT OF TRANSPORTATION09:57 Tuesday, July 5, 20229ITEM UNIT COSTS BY PROJECTS -- 2022 COST -----------------------------------ITEM NUMBER/ITEM DESCRIPTION/UNIT/PROJECT NUMBERPROJECT LOCATIONDATE LETQUANTITYENGR. EST.AVERAGE BIDAWARDED ---------------------------------- 202-00246Rem Asphalt Mat TR R500-17102/03/2202/17/2203/17/22Various locations on SH 141 a 03/17/22WEIGHTED AVERAGE FOR THE FIRSTQUARTERWEIGHTED AVERAGE FOR THE YEAR 202-00250Rem Pavement 063-063STA 067A-048NHPP R R500-171STR092A-031NHM765-007US 287 (FEDERAL BLVD) - COLFAUS50B L-24-B MIN REP AT MP 40VARIOUS HIGHWAY SEGMENTS ACROI-70 EB AUX FRISCO TO SILVERT03/10/2203/14/2203/15/22Various locations on SH 141 a 03/17/2203/17/2203/31/22QUARTERWEIGHTED AVERAGE FOR THE YEAR 202-00254Rem of Pvmt Mkg (12 20.74-------------- --------------- --------------- --------------1,092,077.001.020.820.67 1,092,077.001.020.820.67Sq Foot STA0252-45902/03/22WEIGHTED AVERAGE FOR THE ------- --------------- --------------- --------------4,029.0023.8118.4312.07 4,029.0023.8118.4312.07Sq Foot /17/2202/17/2202/24/22Hwy 67A MP 0.00 TO MP 11.05 I 03/03/22I-76 DAHLIA TO YORK03/10/22WEIGHTED AVERAGE FOR THE FIRSTSq Yard QUARTERWEIGHTED AVERAGE FOR THE YEAR 202-00400Rem BridgeNH0504-910US50B L-24-B MIN REP AT MP 40 01/13/225,000.001.361.571.25-------------- --------------- --------------- --------------5,000.001.361.571.25 5,000.001.361.571.25Each 1.0050000.0033552.9818750.00

COLORADO DEPARTMENT OF TRANSPORTATION09:57 Tuesday, July 5, 2022 10ITEM UNIT COSTS BY PROJECTS -- 2022 COST -----------------------------------ITEM NUMBER/ITEM DESCRIPTION/UNIT/PROJECT NUMBERPROJECT LOCATIONDATE LETQUANTITYENGR. EST.AVERAGE BIDAWARDED ---------------------------------- 202-00400NHPP 0761-238C0761-239Rem BridgeI-76 DAHLIA TO YORKWEIGHTED AVERAGE FOR THE FIRST03/10/22-------------- --------------- --------------- --------------3.0096666.6795774.1372916.67 3.0096666.6795774.1372916.67QUARTERWEIGHTED AVERAGE FOR THE YEAR 202-00420Rem Ped RailNHPP0702-383I-70 EB AUX FRISCO TO SIL

Colorado Cost Data Foreword The Colorado Department of Transportation's Cost Estimating Services Unit of the Construction Engineering Services Branch publishes the Cost Data Book annually. A joint effort has been made between CDOT's sections and the Cost Estimating Services Unit to gather and record cost data for this publication.