Disclaimer - Alberta

Transcription

DisclaimerThis Report, including the data and information contained in this Report, is provided to you on an“as is” and “as available” basis at the sole discretion of the Government of Alberta and subject to theterms and conditions of use below (the “Terms and Conditions”). The Government of Alberta hasnot verified this Report for accuracy and does not warrant the accuracy of, or make any otherwarranties or representations regarding, this Report. Furthermore, updates to this Report may notbe made available. Your use of any of this Report is at your sole and absolute risk.This Report is provided to the Government of Alberta, and the Government of Alberta has obtaineda license or other authorization for use of the Reports, from:Shell Canada Energy, Chevron Canada Limited. and Marathon Oil Canada Corporation, forthe Quest Project(collectively the “Project”)Each member of the Project expressly disclaims any representation or warranty, express orimplied, as to the accuracy or completeness of the material and information contained herein, andnone of them shall have any liability, regardless of any negligence or fault, for any statementscontained in, or for any omissions from, this Report. Under no circumstances shall the Governmentof Alberta or the Project be liable for any damages, claims, causes of action, losses, legal fees orexpenses, or any other cost whatsoever arising out of the use of this Report or any part thereof orthe use of any other data or information on this website.Terms and Conditions of UseExcept as indicated in these Terms and Conditions, this Report and any part thereof shall not becopied, reproduced, distributed, republished, downloaded, displayed, posted or transmitted in anyform or by any means, without the prior written consent of the Government of Alberta and theProject.The Government of Alberta’s intent in posting this Report is to make them available to the publicfor personal and non-commercial (educational) use. You may not use this Report for any otherpurpose. You may reproduce data and information in this Report subject to the followingconditions: any disclaimers that appear in this Report shall be retained in their original form andapplied to the data and information reproduced from this Reportthe data and information shall not be modified from its original formthe Project shall be identified as the original source of the data and information, while thiswebsite shall be identified as the reference source, andthe reproduction shall not be represented as an official version of the materials reproduced,nor as having been made in affiliation with or with the endorsement of the Government ofAlberta or the Project

By accessing and using this Report, you agree to indemnify and hold the Government of Alberta andthe Project, and their respective employees and agents, harmless from and against any and allclaims, demands, actions and costs (including legal costs on a solicitor-client basis) arising out ofany breach by you of these Terms and Conditions or otherwise arising out of your use orreproduction of the data and information in this Report.Your access to and use of this Report is subject exclusively to these Terms and Conditions and anyterms and conditions contained within the Report itself, all of which you shall comply with. You willnot use this Report for any purpose that is unlawful or prohibited by these Terms and Conditions.You agree that any other use of this Report means you agree to be bound by these Terms andConditions. These Terms and Conditions are subject to modification, and you agree to review themperiodically for changes. If you do not accept these Terms and Conditions you agree to immediatelystop accessing this Report and destroy all copies in your possession or control.These Terms and Conditions may change at any time, and your continued use and reproduction ofthis Report following any changes shall be deemed to be your acceptance of such change.If any of these Terms and Conditions should be determined to be invalid, illegal or unenforceablefor any reason by any court of competent jurisdiction then the applicable provision shall be severedand the remaining provisions of these Terms and Conditions shall survive and remain in full forceand effect and continue to be binding and enforceable.These Terms and Conditions shall: (i) be governed by and construed in accordance with the laws ofthe province of Alberta and you hereby submit to the exclusive jurisdiction of the Alberta courts,and (ii) ensure to the benefit of, and be binding upon, the Government of Alberta and yourrespective successors and assigns.

4321NOTES:V-24701COMPRESSOR SUCTION KO DRUM8"-VA-248002-PJB(0.4)14"x8"3/4"FREE 501001002004502UC SIGNALIANTI-SURGECONTROLLERI005001LPERMISSIVE8TH BLOWOFFVALVECONTROLLER6TH BLOWOFFVALVECONTROLLERUC001BUC001C(V)UC001ATO/FROM UV-003UC SIGNAL13988247.006PERFORMANCECONTROLLERFREE DRAININGFROM RV-24700610"ET 1050CSC5PC023UY001HUQI001AUTO/MAN247.010N/A ET 25H9HLL 700 mmMAGLT001GAP2"ON/OFFD3"x2"SAMPLE 2IFC – Issued for ConstructionTO E-24701BJul 30, 2013(v)PZSC023C-24701AE /08/13ISSUED FOR CONSTRUCTIONGBKBKHSL---BB-202/01/13ISSUED FOR CONSTRUCTIONGBKBKHSL---EM-110/31/12ISSUED FOR CONSTRUCTIONGBKBKHSL---EM-0A07/25/12RE-ISSUED FOR PHA---------009/15/11ISSUED FOR DESIGNGBKBKHCMF---EMMDG07/11/11ISSUED FOR PHA IIIF04/20/11ISSUED FOR PEM 938E14(v)32"3"3"FCTO V-24606PDIT02936"x32" RS2"2"3PP1003LLL 250 mmTIT003EMERGENCY STOPET 10382"-DM-247001-PJB(0.4)1:500 MINPIT004PX023 BE5013/4"L3/4"12626LV0212"KO LIQUIDS246.033VPY023PX023 1CSCD3/4"PI004IA3/4"ULB PJB(0.4)SWINGELBOW2"HHLL 800 mmE14001FROM -UP12808PTE0022"L33"3/4"30013V-24701V3/4"ANALYZER FAST LOOP1/2" TUBING (FAST LOOP)PPVDLTE002NCET 10N/AMAG2"GWR3TS12"3"0213/4"PI002SD36"9E021GAP DLC HN/AET 10SP001CSCMINSP02500133/4"53HHHHE3/4"LGLT021ET 25N/A332"13165FROM AX-001PP3/4"FROM 46001-PJB(0.4)DO NOT POCKET246.006VET 103812368V3ANALYZER FAST LOOP1/2" TUBING (FAST LOOP)3/4"ET 10N/A3/4"CO22"FCSP002SP032836"3/4"732"1:500 MINHHLL 800 mmHLL 700 mmLLL 250 mm3FREE DRAININGDO NOT POCKETNNF3/4"SP029S-46FOFREE DRAININGET 1075TO )1247124"-GC-247001-PJB(0.4)246.0323/4"24"CO2 VENTPV00136"-GC-247004-PJB(0.4)PT001(v)(v)ET 4588CPIT0343/4"TIT002FROM E0402"x1"CE600247.010DO NOT POCKETRS300124"-GC-247045-PJB(0.4)FREE DRAININGPERMISSIVEHITI001PI034PI04012569ANTI SURGE SPILL BACKET 25882"x1" 1"FROM V-248033FROM PIT-0213/4"248.003DPIT B(0.4)DO NOT POCKET12331FROM TIT-0573/4"FLASHED CO2TO/FROM UV-001TIT SIGNALB247.010ET 10ET 25VTO/FROM UV-004UC SIGNAL12571247.010MASS FLOWLIMITER3N/A ET CSO /FPCO2 RELIEF13973H1114"-VA-247002-PJB(0.4)CO2 RELIEF / VENTPDI029DSHELL CANADAQUEST CCS PROJECTET 1038AFROM AX-246001R2"-WP-247002-PJB(0.4)TRENCH43C-24701ACO2 COMPRESSOR 1st STAGERATED FLOW:DIFF PRESSURE:DRIVER :MATERIAL:INSULATION TYPE/THK:84255 Sm 3/hr12229 kPa316500 kW304 SSPP/2PIPING AND INSTRUMENT DIAGRAMQUEST CCS PROJECTUNIT 247 - COMPRESSIONCO2 COMPRESSOR 1ST STAGESCALE: NONESHELL DWG CKFLOW6R8SET@385 kPa-g12"-GC-247003-PJB(0.4)TO REE DRAININGFROM UV-004N/AET 106"-VA-247017-PJB(0.4)247.00614032V12"x6"CO2 VENT3/4"FROM RV-248002/RV-2480041 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATIONGENERAL NOTES & CONNECTION DETAILS.2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISESTATED.3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FORTHE COMPRESSOR.4 . ELECTRIC TRACE (ET 10) WITH 50 mm INSULATION THICKNESS TO HLL.5 . VALVE TO BE LOCATED AT SAFE ACCESSIBLE LOCATION.6 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.7 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.8 . MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM.9 . MEASUREMENT POINTS AVAILABLE FOR ON-SITE COMPRESSOR PERFORMANCETEST.10. GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.11. FUNCTIONS ARE CONTAINED IN COMMON COMPRESSOR CONTROL PLC.12. ONE PUSH BUTTON LOCATED IN FIELD IN COMPRESSOR AREA. SECOND PUSHBUTTON LOCATED IN CONTROL ROOM.13. E-600 IS PART OF THE FIRE AND GAS SYSTEM. A PAH WILL BE TREATED THE SAMEAS A CO2 POINT DETECTOR ALARM. REFER TO FIRE AND GAS DETECTION SYSTEMP&ID 246.0000.000.041.040.14. METAL MESH GUARD FOR PERSONNEL PROTECTION. THE DISTANCE BETWEENMETAL MESH GUARD AND BARE SURFACE, IN mm, IS SPECIFIED IN THE SYMBOL.3500 mm ID x 3400 mm T/T385 kPa-g @ 150 C / FV @ 150 CCS 3 mm 304L SS CLAD/ 316L SSH / 38 47\247.001.pid MODEL DATE:7/17/2013 11:26:16 AM BY:bes29451FREE DRAINING248.00113933SIZE:DESIGN PR. & TEMP:MATERIAL(VESSEL/INTERNALS):INSULATION TYPE/THK:TRIM:INSIDEOUTSIDECO2 RELIEF

43V-24702COMPRESSOR 2nd STAGE KO DRUMSIZE:DESIGN PR. & TEMP:MATERIAL(VESSEL/INTERNALS):INSULATION TYPE/THK:TRIM:2E-24701COMPRESSOR 1st STAGE COOLERRATED DUTY:SURFACE AREA:TEMA TYPE:2800 mm ID x 3000 mm T/T385 kPa-g @ 115 C / FV @ 150 CCS 3 mm 304L SS CLAD/ 316L SSH / 38 mm4VT-247002-PJB(0.4)NOTES:E-24702COMPRESSOR 2nd STAGE COOLERRATED DUTY:SURFACE AREA:TEMA TYPE:2.8 MW420.0 m 2BXUSHELL385 kPa-g / HV130 C / 150 CCS 3mm 304L SS CLADH / 50 mmET-247001-PJB(0.4)DESIGN PRESS:DESIGN TEMP:MATERIAL:INSULATION TYPE/THK:TRIM:1TUBE1200 kPa-g /358 C /DUPLEX 2205 0.5 mm CA/7ET-247022-UABDESIGN PRESS:DESIGN TEMP:MATERIAL:INSULATION TYPE/THK:TRIM:2.5 MW502.0 m 2BJUSHELL530 kPa-g / HV130 C / 150 CCS 3 mm 304L SS CLADPP / 25 mmET-247016-PJB(0.4)1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATIONGENERAL NOTES & CONNECTION DETAILS.2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISESTATED.3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FORTHE COMPRESSOR.4 . ELECTRIC TRACE (ET 10) WITH 50 mm INSULATION THICKNESS TO HLL.5 . MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM.6 . GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.7 . ELECTRIC TRACE (ET 10) WITH 50 mm INSULATION THICKNESS.8 . VANED ELBOW.9 . METAL MESH GUARD FOR PERSONNEL PROTECTION. THE DISTANCE BETWEENMETAL MESH GUARD AND BARE SURFACE , IN mm, IS SPECIFIED IN THE SYMBOL.TUBE1200 kPa-g /358 C /DUPLEX 2205 0.5 mm CA/7ET-247002-UABDD3ET 0247.001D33ET PJB(0.4)CSOCO21-1/2"14028FROM 025CWSOUTSIDEINSIDE140291:500 MINET 518830"-GC-247007-PJB(0.4)20"39RSBACK FLUSHC2"6"PP100TWO PHASE FLOW30"-GC-247006-PJB(0.4)C20"24"x20"4"ET BACK FLUSHD24"x20"RS6"2"24"2"6"24"24"VRS2"VD4"FREE DRAINING6R.S.5ET ABCO224"-GC-247009-PJB(0.4)TWO PHASE FLOWFREE DRAINING12310247.003TO V-247033E001H38FREE H2"TIT006PI006PIT0063/4" IFC – Issued for ConstructionLTE004V-24702Jul 30, ISSUED FOR CONSTRUCTIONGBKBKHSL---BB-202/01/13ISSUED FOR CONSTRUCTIONGBKBKHSL---EM-110/30/12ISSUED FOR CONSTRUCTIONGBKBKHLMF---EM-0A07/25/12RE-ISSUED FOR PHA---------009/15/11ISSUED FOR DESIGNGBKBKHSD---EMMDG07/11/11ISSUED FOR PHA IIIF04/20/11ISSUED FOR PEM CLIENTAPP2"x1-1/2"2"x1-1/2"3"x2"D3"DSHELL CANADAQUEST CCS PROJECTARPIPING AND INSTRUMENT DIAGRAMQUEST CCS PROJECTC-24701BCO2 COMPRESSOR 2nd STAGE4384255 Sm 3/hr12229 kPa316500 kW304 SSPP/UNIT 247 - COMPRESSIONCO2 COMPRESSOR 2ND STAGESCALE: NONESHELL DWG NO.:2247.0000.000.041.0021REV.3247.002RATED FLOW:DIFF PRESSURE:DRIVER :MATERIAL:INSULATION id MODEL DATE:7/18/2013 2:01:42 PM BY:bes29451DFCTWO PHASE FLOWFLUORMDTMINET 10382"28"3"TO 44824"MWLLL 250 mmLV003246.006SP02030"x24"CSCH1-1/2"KO LIQUIDS4MAGON/OFFLC003RS2"3/4"GAPFLUOR MDTCSCHLL 700 mmV3/4"HHLL 800 mmCSC2"3/4"2"2"1-1/2"3/4"V

432V-24703COMPRESSOR 3rd STAGE KO DRUMSIZE:DESIGN PR. & TEMP:MATERIAL(VESSEL/INTERNALS):INSULATION TYPE/THK:TRIM:1NOTES:E-24703COMPRESSOR 3rd STAGE COOLERRATED DUTY:SURFACE AREA:TEMA TYPE:2500 mm ID x 2600 mm T/T530 kPa-g @ 100 C / FV @ 150 CCS 3 mm 304L SS CLAD / 316L SSH / 38 mm4VT-247003-PJB(0.4)DESIGN PRESS:DESIGN TEMP:MATERIAL:INSULATION TYPE/THK:TRIM:3.1 MW434.0 m 2BEUSHELL1200 kPa-g / HV130 C / 150 CCS 3 mm 304L SS CLADPP / 25 mmET-247003-PJB(0.4)1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATIONGENERAL NOTES & CONNECTION DETAILS.2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISESTATED.3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FORTHE COMPRESSOR.4 . ELECTRIC TRACE (ET 10) WITH 50 mm INSULATION THICKNESS TO HLL.5 . MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM.6 . GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.TUBE1200 kPa-g /358 C /DUPLEX 2205 0.5 mm CA/8ET-247017-UAB7 . RELIEF VALVE NOZZLE. RELIEF VALVE NO LONGER REQUIRED AS SYSTEM ISPRETECTED BY OPPSD (REFERENCE DOCUMENT A6GT-R-1071-OPPSD TECHNICALJUSTIFICATION AND BASIS).DD8. ELECTRIC TRACE (ET 10) WITH 50 mm INSULATION THICKNESS.9 . VANED ELBOW.10. METAL MESH GUARD FOR PERSONNEL PROTECTION. THE DISTANCE BETWEENMETAL MESH GUARD AND BARE SURFACE, IN mm, IS SPECIFIED IN THE SYMBOL.3ET /4"V2"HHLL 800 mm2"3/4"2"PI007HPI008PIT00832"TIT0093/4"VFLUOR MDTHLL 700 "1-1/2"GAPBACKFLUSHT.S.TI0093FREE DRAININGPPDET x16"FREE DRAININGD3RSFROM 9-PJB(0.4)TWO PHASE FLOW6"3VCO2V3PP1005V2"61-1/2"RSFREE DRAINING3D2"ET 12-PJB(0.4)OUTSIDEINSIDE1:500 MIN2"3CO220"-GC-247013-PJB(0.4)TWO PHASE FLOW12320247.004 TO V-24704IFC – Issued for ConstructionJul 30, 4"CSC3/4"3/4"D07/08/13ISSUED FOR CONSTRUCTIONGBKBKHSL---BB-202/01/13ISSUED FOR CONSTRUCTIONGBKBKHSL---EM-110/31/25ISSUED FOR CONSTRUCTIONGBKBKHSL---EM-0A07/25/12RE-ISSUED FOR PHA---------009/15/11ISSUED FOR DESIGNGBKBKHSD---EMMDG07/11/11ISSUED FOR PHA IIIF04/20/11ISSUED FOR PEM CLIENTAPPSHELL CANADAQUEST CCS PROJECTARC-24701CCO2 COMPRESSOR 3rd STAGERATED FLOW:DIFF PRESSURE:DRIVER :MATERIAL:INSULATION TYPE/THK:84255 Sm 3/hr12229 kPa16500 kW304 SSPP/PIPING AND INSTRUMENT DIAGRAMQUEST CCS PROJECTUNIT 247 - COMPRESSIONCO2 COMPRESSOR 3RD STAGE3SCALE: NONESHELL DWG AWINGS\CO2\247\247.003.pid MODEL DATE:7/18/2013 10:30:56 AM BY:bes29451TWO PHASE FLOWD3247.003TO V-24602DMIN13033ET 1038D3"246.0062"-P-247003-PJB(0.4)2"LV0053/4"KO LIQUIDSDCSC3/4"D1-1/2"LLL 250 mm3/4"ON/OFF2"

432V-24704COMPRESSOR 4th STAGE KO DRUMSIZE:DESIGN PR. & TEMP:MATERIAL(VESSEL/INTERNALS):INSULATION TYPE/THK:TRIM:1E-24704COMPRESSOR 4th STAGE COOLERRATED DUTY:SURFACE AREA:TEMA TYPE:2100 mm ID x 3300 mm T/T1200 kPa-g @ 110 C / FV @ 150 CCS 3 mm 304L SS CLAD / 316L SSH / 38 mm4VT-247004-PJB(0.4)DESIGN PRESS:DESIGN TEMP:MATERIAL:INSULATION TYPE/THK:TRIM:NOTES:2.3 MW311.0 m 2BEUSHELL2200 kPa-g / HV130 C / 150 CCS 3 mm 304L SS CLADPP / 25 mmET-247004-PJE(0.4)1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATIONGENERAL NOTES & CONNECTION DETAILS.2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISESTATED.3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FORTHE COMPRESSOR.4 . ELECTRIC TRACE (ET 10) WITH 50 mm INSULATION THICKNESS TO HLL.5 . MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM.6 . GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.7. VANED ELBOW.8 . ELECTRIC TRACE (ET10) WITH 50 mm INSULATION THICKNESS.9 . METAL MESH GUARD FOR PERSONNEL PROTECTION. THE DISTANCE BETWEENMETAL MESH GURAD AND BARE SURFACE, IN mm, IS SPECIFIED IN THE SYMBOL.TUBE1700 kPa-g /358 C /DUPLEX 2205 0.5 mm CA/8ET-247018-UABDD3ET /2"FREE DRAINING CSO/FP20"3/4"ET 518820"-GC-247015-PJB(0.4)2"RSRSOUTSIDEINSIDEFREE DRAININGBDBACK 4"FLUSH39C6ET 10505T.S.2"TI01120"2"3/4"HHLL 900 mmGAPHLL 800 mmMAGHLT007LLG0072"3/4"BJul 30, 2013VLI008SP021FLUOR MDTPJB(0.4) PJE(0.4)20"x14"RS14"14"07/08/13ISSUED FOR CONSTRUCTIONGBKBKHSL---BB-202/01/13ISSUED FOR CONSTRUCTIONGBKBKHSL---EM-110/31/12ISSUED FOR CONSTRUCTIONGBKBKHSL---EM-0A07/25/12RE-ISSUED FOR PHA---------KO LIQUIDS009/15/11ISSUED FOR DESIGNGBQCKHSD---EMMD12346G07/11/11ISSUED FOR PHA IIIF04/20/11ISSUED FOR FLUORMDTET 1038D2"-P-247006-PJB(0.4)247.005TWO PHASE FLOWFROM V-24705D3DESCRIPTIONPEM CLIENTAPP3/4"3ET 10383"3KO LIQUID2"-P-247010-PJB(0.4)247.009TWO PHASE FLOW12372FROM V-247073"1-1/2"FCTWO PHASE FLOW MIN3"x1-1/2"3/4"TO V-24602SP026D2"x1-1/2"TO V-247053/4"PIT010DLV007ET 1038247.005IFC – Issued for ConstructionLLL 250 O216"-GC-247017-PJE(0.4)TWO PHASE FLOWCSCV-24704VE001LTE0083/4"RS2"2"PIT0093/4"ET 1038PI0092"KO LIQUIDSFREE DRAININGH383FREE DRAININGLC0072"TIT012CSCFROM 247013-PJB(0.4)TWO PHASE FLOW3/4"PP31-1/2"CO2DRSCSO CWS-246014-UABDDET 1038KO LIQUID2"-P-247005-PJB(0.4)TWO PHASE FLOW247.00612353FROM V-24706SHELL CANADAQUEST CCS PROJECTARC-24701DCO2 COMPRESSOR 4th STAGERATED FLOW:DIFF PRESSURE:DRIVER :MATERIAL:INSULATION TYPE/THK:PIPING AND INSTRUMENT DIAGRAMQUEST CCS PROJECT84255 Sm 3/hr12229 kPa316500 kW304 SSPP/UNIT 247 - COMPRESSIONCO2 COMPRESSOR 4TH STAGESCALE: NONESHELL DWG NO.:2432247.0000.000.041.0041REV.3247.004TO S-246031:500 MIN6"FILE:\\F:\1025\DRAWINGS\CO2\247\247.004.pid MODEL DATE:7/16/2013 7:54:10 AM 73ET 10383/4"247.0013E-24704PP2"x1-1/2"CO2 1-1/2F2SET@1200 kPa-g2"16"-GC-247016-PJE(0.4)V16"D

432V-24705COMPRESSOR 5th STAGE KO DRUMSIZE:DESIGN PR. & TEMP:MATERIAL(VESSEL/INTERNALS):INSULATION TYPE/THK:TRIM:1E-24705COMPRESSOR 5th STAGE COOLERRATED DUTY:SURFACE AREA:TEMA TYPE:1900 mm ID x 2200 mm T/T2200 kPa-g @ 100 C / FV @ 150 CCS 3 mm 304L SS CLAD / 316L SSH / 38 mm4VT-247005-PJE(0.4)DESIGN PRESS:DESIGN TEMP:MATERIAL:INSULATION TYPE/THK:TRIM:NOTES:2.7 MW255.0 m 2BEUSHELL4200 kPa-g / HV130 C / 150 CCS 3 mm 304L SS CLADPP / 25 mmET-247005-PJG(0.4)1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATIONGENERAL NOTES & CONNECTION DETAILS.2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISESTATED.3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FORTHE COMPRESSOR.4 . ELECTRIC TRACE (ET 25) WITH 75 mm INSULATION THICKNESS TO HLL.5 . MAXIMIZE LENGH OF PIPING THAT FREE DRAINS TO KO DRUM.6 . GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.TUBE3300 kPa-g /358 C /DUPLEX 2205 0.5 mm CA/8ET-247019-UAB7 . RELIEF VALVE NOZZLE. RELIEF VALVE NO LONGER REQUIRED AS SYSTEM ISPROTECTED BY OPPSD (REFERENCE DOCUMENT: A6GT-R-1071 - OPPSDTECHNICAL JUSTIFICATION AND BASIS.DD8 . ELECTRICAL TRACE (ET 10) WITH 50 mm INSULATION THICKNESS.9 . METAL MESH GUARD FOR PERSONNEL PROTECTION. THE DISTANCE BETWEENMETAL MESH GUARD AND BARE SURFACE, IN mm, IS SPECIFIED IN THE SYMBOL.3ET UTSIDEINSIDE31:500 MIN16"10"2"7E0012"2"HLL 700 " IFC – Issued for ConstructionSP02710"12"x10"24"MWFLUOR10" MDTDDDCSC3/4"DD307/08/13ISSUED FOR CONSTRUCTIONGBKBKHSL---BB-202/01/13ISSUED FOR CONSTRUCTIONGBKBKHSL---EM-110/31/12ISSUED FOR CONSTRUCTIONGBKBKHSL---EM-0A07/25/12RE-ISSUED FOR PHA---------009/15/11ISSUED FOR DESIGNGBQCKHSD---EMMDG07/11/11ISSUED FOR PHA IIIF04/20/11ISSUED FOR PEM FFDLLL 250 mmBJul 30, 201342"TO 4"3/4"LC009123503VHHLL 800 mmGAPHCO214"-GC-247021-PJG(0.4)TWO PHASE FLOWSP026V-247052"H383/4"PPGWR LTE010VTIT015HH16"VHTI01514"x10"FREE DRAININGFROM E-247042"TIT0143/4"16"-GC-247017-PJE(0.4)TWO PHASE FLOW3MDTPJG(0.4)H38FREE OR1-1/2" "-CWS-246015-UABSP008PPLI010ET 10503VFROM SEAL GAS HEADER 2D65247.021BACK 4"FLUSHCOUTSIDEINSIDEFREE DRAININGSEAL GAS6"3ET 517516"-GC-247019-PJE(0.4)14"2"CRS9D2"x1"ET 2538FC2"x1"D3"x2"3"DSHELL CANADAQUEST CCS PROJECTARC-24701ECO2 COMPRESSOR 5th STAGERATED FLOW:DIFF PRESSURE:DRIVER :MATERIAL:INSULATION TYPE/THK:PIPING AND INSTRUMENT DIAGRAMQUEST CCS PROJECT84255 Sm 3/hr12229 kPa316500 kW304 SSPP/UNIT 247 - COMPRESSIONCO2 COMPRESSOR 5TH STAGESCALE: NONESHELL DWG AWINGS\CO2\247\247.005.pid MODEL DATE:7/18/2013 10:54:13 AM BY:bes29451TWO PHASE FLOW1"247.005TO 47007-PJE(0.4)3/4"KO LIQUIDSPJB(0.4) PJE(0.4)ET 10 ET 25ET 1038LV009

4321NOTES:V-24706COMPRESSOR 6th STAGE KO DRUMSIZE:DESIGN PR. & TEMP:MATERIAL(VESSEL/INTERNALS):INSULATION TYPE/THK:TRIM:1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATIONGENERAL NOTES & CONNECTION DETAILS.2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISESTATED.3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FORTHE COMPRESSOR.4 . ELECTRIC TRACE (ET 25) WITH 75 mm INSULATION THICKNESS TO HLL.5 . MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM.6 . GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.7 . THE CV OF LV-011 AFFECTS THE SIZING OF RV-006 FOR THE VAPOURBLOWTHROUGH CASE.8 . FLOW MEASUREMENT AND ADDITIONAL INSTRUMENTS ARE REQUIRED FORON-SITE COMPRESSOR PREFORMANCE TESTING.9 . VANED ELBOW.10 . RELIEF VALVE NOZZLE. RELIEF VALVE NO LONGER REQUIRED AS SYSTEM ISPROTECTED BY OPPSD (REFERENCE DOCUMENT: A6GT-R-1071 - OPPSD TECHNICALJUSTIFICATION AND BASIS).11. METAL MESH GUARD FOR PERSONNEL PROTECTION. THE DISTANCE BETWEENMETAL MESH GUARD AND BARE SURFACE, IN mm, IS SPECIFIED IN THE SYMBOL.1700 mm ID x 2000 mm T/T4200 kPa-g @ 105 C / FV @ 150 CCS 3 mm 304L SS CLAD / 316L SSH / 38 mm4VT-247006-PJG(0.4)3DD3UC SIGNAL247.001UZT004TO/FROM UC-001COI001UYE004CUZSO0046"CO2 VENTH386"-VA-247017-PJB(0.4)FREE DRAININGTO S-24603FO CSOC-1PJB(0.4) PJG(0.4)UV004CSO3FDI011FT SIGNAL247.009FROM REE SEFREE DRAINING00114"LTE012V-247062"2"3/4"2"HHLL 800 mmTO V-24704D3"x2"3/4"D3"ISSUED FOR CONSTRUCTIONGBKBKHSL---BB-202/01/13ISSUED FOR CONSTRUCTIONGBKBKHSL---EM-110/31/25ISSUED FOR CONSTRUCTIONGBKBKHSL---EM-0A07/25/12RE-ISSUED FOR PHA---------009/15/11ISSUED FOR DESIGNBGQCKHSD---EMMDG07/11/11ISSUED FOR PHA IIIF04/20/11ISSUED FOR PEM CLIENTAPPC-24701FDDET 253812"x8"LLL 250 TWO 42"FLUOR MDT14"x10" 10"x6"924"MW32"2"LV011PJB(0.4) PJG(0.4)1"ET 10 ET 25ET 102"x1"382"DD3/4"KO LIQUIDPI01542"2"-P-247005-PJB(0.4)VCSCLHLL 700 mmLG01132"3/4"LT0112"CSCHBJul 30, 20133/4"LC011MAGIFC – Issued for Construction3/4"GAP33/4"3PIT015 OM E-2470514"-GC-247021-PJG(0.4)TWO PHASE FLOWTO 310"PP100INSIDE13567FROM PIT-0181-1/2"1:500 MINET 517514"PIT016247.009HTI018CPIT SIGNALH6"-GC-247097-PJG(0.4)FI005OUTSIDE INSIDE14098DSHELL CANADAQUEST CCS PROJECTARC-24701FCO2 COMPRESSOR 6th STAGERATED FLOW:DIFF PRESSURE:DRIVER :MATERIAL:INSULATION TYPE/THK:84255 Sm 3/hr12229 kPa16500 kW304 SSPP/PIPING AND INSTRUMENT DIAGRAMQUEST CCS PROJECTUNIT 247 - COMPRESSIONCO2 COMPRESSOR 6TH STAGE3SCALE: NONESHELL DWG AWINGS\CO2\247\247.006.pid MODEL DATE:7/17/2013 11:53:46 AM BY:bes2945114032OsUZSC004247.001UZL004247.00614033

432E-24706COMPRESSOR 6th STAGE COOLERRATED DUTY:SURFACE AREA [FINNED]:TUBE DESIGN PR. & TEMP:TUBE MATERIAL:DRIVER & Nos.:WINTERIZATION:INSULATION TYPE/THK:TRIM:1NOTES:E-24708A /B /CCOMPRESSOR 6th STAGE COOLER SPACE HEATERS2.3 MW6474.0 m 26500 kPa-g @ 130 C / FV @ 150 C304L SS 0.5 mm CA18.6 kW & 33TYPE 3, MODE CPP /ET-247006-PJG(0.4)RATED DUTY:TYPE:MATERIAL:INSULATION TYPE/THK:TRIM:1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATIONGENERAL NOTES & CONNECTION DETAILS.2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISESTATED.3 . SWITCH LOCATED AT PLATFORM LEVEL.4 . MINIMUM VFD SETTING IS 30% SPEED.0.2 MWRUFFNECK304 SSPP /ET-247007-SABET-247008-SABET-247009-SAB5 . METAL MESH GUARD FOR PERSONNEL PROTECTION. THE DISTANCE BETWEEN METALMESH GUARD AND BARE SURFACE, IN mm, IS SPECIFIED IN THE 0.4)FROM C-24701F(v)TV021 BTX021 BFC38"8"(v)E-24706TV021 ATX021 47031-PJG(0.4)FREE DRAINING TWO PHASE FLOWMIN 10D1-1/2"12314247.009TO V-247073MANUALMANUALCFAN NO. 2FAN NO. 133ETI021 A501E001246.02912447TX021LTT021 AAVG RTD SENSOR (V)TI021CTT021CAVG RTD SENSOR (V)TI021 BTT021 BAVG RTD SENSOR (V)TC0192"HLE001E2"501E502HET 10LP STEAM32"-SL-246011-SABC3E502TC021TT019FAN NO. 32"VFD4IIVFD44VFDIH38FROM HEADERSI026VXLXA026026LOCAL/ OAN/A2"x1"ET 1033/4"ISSUED FOR CONSTRUCTIONGBKBKHSL---BB-FC202/01/13ISSUED FOR CONSTRUCTIONGBKBKHSL---EM-(v)110/30/12ISSUED FOR CONSTRUCTIONGBKBKHSL---EM-0A07/25/12RE-ISSUED FOR PHA---------009/15/11ISSUED FOR DESIGNGBQCKHSDEMMDR/SG07/11/11ISSUED FOR PHA IIIF04/20/11ISSUED FOR ONMCPDPAPEPEM CLIENTAPPHOA3ET 10N/AET 1033/4"DHOASP03307/08/13TN/ATET 103HIS02632"x1"3TSP033HS003 A3TV021 GR/SHIS003I002ET 10ET 10FC2"x1"I002HS002 A2"x1"SP033R/S2"x1"HIS002IFC – Issued for ConstructionR/STV021 E2"x1"TV021 F(v) Jul 30, 2013FC(v)(v)TV021 D2"-SL-247002-SAB2"-SL-247001-SABTX021 D3/4"DDSHELL CANADAQUEST CCS PROJECTA3246.02912455TO HEADER33ET 10382"-SCL-247002-SABRTWO PHASE FLOWTX021 FTX021 ETX021 GPIPING AND INSTRUMENT DIAGRAMQUEST CCS PROJECTUNIT 247 - COMPRESSIONCOMPRESSOR 6TH STAGE COOLERSCALE: NONESHELL DWG FILE:\\F:\1025\DRAWINGS\CO2\247\247.007.pid MODEL DATE:7/18/2013 10:59:12 AM BY:bes294513FREE XA003FAULT3/4"TV021 CXLXA002002LOCAL/ FAULTREMOTEFREE DRAININGTX021 CSI001FREE DRAINING3(V)3/4"33

32V-24707TEG INLET SCRUBBERNOTES:V-24708COMPRESSOR 7th STAGE KO DRUM959 mm ID x 3300 mm T/F6500 kPa-g @ 105 C /FV @ 150 CCS 3 mm 304L SS CLAD / 316L SSH / 38 mm5VT-247007-PJG(0.4)1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATIONGENERAL NOTES & CONNECTION DETAILS.2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISESTATED.3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FORTHE COMPRESSOR.4 . ELASTOMERS SHALL NOT BE USED FOR DENSE PHASE CO2 SERVICE.5 . ELECTRIC TRACE (ET 25) WITH 75 mm INSULATION THICKNESS TO HLL.6 . DEHYDRATION UNIT BYPASS.7 . SAMPLE TAKE-OFF POINT TO BE ACCESSIBLE.8 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.SIZE: 959 mm ID x 3400 mm T/FDESIGN PR. & TEMP: 6500 kPa-g @ 105 C /FV @ 150 CMATERIAL(VESSEL/INTERNALS): CS 3 mm 304L SS CLAD / 316L SSINSULATION TYPE/THK: H / 38 mm5TRIM: VT-247008-PJG(0.4)V9D1-1/2"HET 25SIZE:DESIGN PR. & TEMP:MATERIAL(VESSEL/INTERNALS):INSULATION SODO NOT POCKETET 25 H12376248.001B6CSC10"3ET 257512. RELIEF VALVE NOZZLE. RELIEF VALVE NO LONGER REQUIRED AS SYSTEM ISPROTECTED BY OPPSD (REFERENCE DOCUMENT: A6GT-R-1071 - OPPSD TECHNICALJUSTIFICATION AND BASIS).13. GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.9HHGCFI008 A AT-001 SAMPLELFI008 B AT-002 SAMPLELFI008 C ATE-003 SAMPLELAX001 AET LLL 250 S6"6"307/08/13ISSUED FOR CONSTRUCTIONGBKBKHSL---BB-202/01/13ISSUED FOR CONSTRUCTIONGBKBKH----EM-110/31/12ISSUED FOR CONSTRUCTIONGBKBKHSL---EM-0A07/25/12RE-SSUED FOR PHA---------009/15/11ISSUED FOR DESIGNGBQCKHSDEMMDG07/11/11ISSUED FOR PHA IIIF04/20/11ISSUED FOR PEM CLIENTAPPC-24701GDD4DLZTE0153"MINET 0152"2"LLL 350 V015ET 25382"x1"3D15KO TEGET 102"-KP-247002-PJB(0.4)3812373TWO PHASE FLOW TO V-24803NNF248.003SHELL CANADADET 25 ET 25PJG(0.4) PJG(0.4)QUEST CCS PROJECTARPIPING AND INSTRUMENT DIAGRAMQUEST CCS PROJECTC-24701GCO2 COMPRESSOR 7th STAGERATED FLOW:DIFF PRESSURE:DRIVER :MATERIAL:INSULATION TYPE/THK:4384255 Sm 3/hr12229 kPa316500 kW304 S

auto/man do not pocket nnf do not pocket do not pocket do not pocket nnf 6 . sample take-off points to be accessible. 3 . driver power and differential pressure depicted are the total for the compressor. 2 . all instrument tag numbers are prefixed by "247" unless otherwise stated. 1 . see drawings 200.0000.000.041.007 thru 016 for symbol .