Building Permit Checklist - Palm Coast, Florida

Transcription

Information package for obtaining a building permitTo apply for a building permit, you must be a licensed contractor or the legal propertyowner. (Commercial permits may be obtained by an owner if the job does not exceed 75,000 and property is an individual’s name)Electrical, Mechanical, Plumbing and the Roofing subcontractors must be listed at thetime of application. Contractors/subcontractors must be registered with the BuildingDepartment. The permit application must be signed by the licensed contractor(instructions can be found on our website)Powers of Attorney are NOT accepted for the permit application.If you apply as an owner/builder, the building must be for your own use and occupancy.It may not be for sale or lease. If you sell or lease the building you have built as anowner builder within (1) one year after construction is completed, the law will presumethat you have built it for sale or lease, which is a violation of Florida State Statute489.103 (7).It is the owner/builders responsibility to make sure the employees working for themhave the required licenses from the state and/or county municipal licensing ordinances.Any person working on the building who is not licensed must work under theowner/builders direct supervision and must be employed by them. The owner/buildermust provide worker’s compensation as prescribed by Florida law as well as complywith the IRS requirements concerning F.I.CA. and withholding taxes.You may not hire an unlicensed contractor to perform the work.Homeowners who hire unlicensed contractors face several potentially costly penalties.The Department of Business and Professional Regulation can issue an order to stopconstruction and can levy a five-thousand dollar ( 5,000.00) fine for aiding and abettingunlicensed contractors.1

City of Palm Coast Important Phone NumbersArea Code 386Community Development Department(land development, planning, zoning questions, plats, generalBuilding Division(general permitting, plan review and inspections – including986-3736property questions)986-3780fire)Inspection Request Line986-4747Zoning Division(setbacks, aesthetic requirements, landscaping)986-3751Construction Management and Engineering986-3794(commercial development, right of way, driveways, drainage, roadways)Code Enforcement986-3764(enforcement of ordinances, tree removal, wildfire mitigation, animal control, NOT building codes,)Business Tax Receipt986-3766St Johns River Water Management DistrictCompliance support@sjrmd.com(SJRWMD encourages you to contact themprior to any clearing of your ***************In addition to the requirements of a permit, there may beadditional restrictions applicable to this property that may befound in the public records of this county, (including covenantsand restrictions; there may be additional permits required fromother governmental entities such as water management districts,state agencies or federal *******2

Table of Contents for Requirements.Patio / Slab / PaversPage 16Single family/DuplexPage 4Shed/Accessory structurePage 17Green Build Single Family / DuplexPage 5SignsPage 18Additions/RenovationsIncluding screen enclosuresIrrigationPage 19Page 6RoofingPage 20Hurricane ShuttersPage 21DrivewayPage 22GeneratorPage 23Gas Propane/pipingPage 24Fire PermitsPage 25Telecommunication towersPage 26CommercialPages 27 & 28Lot clearing/ re-gradingPage 29 & 30Screen Enclosure/AluminumWindows/Doors /Garage doorsElectric/Mechanical/P lumbingDemolitionPage 7Page 7Pools, Spas and SolarPages 9 & 10Fence/WallsPage 11Docks/Boathouse/BoatliftsPage 12SeawallPage 13Beautification Right Of WayPage 14DeckPage 15When a survey is required:The foundation survey must provide indicate setbacks and finished floor elevation.The final survey must provide setbacks, finished floor elevations, and topographic information.3

Single family Residence / Duplex (see next page for green building) Permit application – signed by the licensedcontractor if a contractor is hired. Construction Drawings - One set of signed andsealed construction drawings. (Include trusspackage, layout and fastening schedule) Product Approval Spec Sheet (detail/installationsheets to be in field at time of inspections) Color/Material information - Provide colors of allarchitectural features on elevation plans or on aseparate attached paper, complete with manufacturername and color description (including, but notlimited to roof, exterior wall, trim, door, garage,brick, quoins, stone/rock, decorative shutters). Energy Calculationscalculations.- One set of energy Water and Sewer Receipt with stamped approvedsite plan attached. (prior approval from utility) Roofing worksheet Warranty Deed - One copy of a recorded warrantydeed Construction Lien Law affidavit (provided bycontractor if job is valued over 2500.00) Owner/Builder disclosure – this is required whenan owner is obtaining a permit. Early Power Affidavit Notice of Commencement – a certified copy of therecorded notice of commencement is required forany job 2500.00 or greater prior to the firstinspection. (it is not required to submit for thepermit) Site Plans - One site plan indicating the dimensionsand setbacks from all structures to the property lines.Include patios, driveways, walkways, (materials andsurface treatments). Boundary Survey - One copy of a sealed boundarysurvey indicating current flood zone by a licensedsurveyor.4 Elevation Certificate – required if property lieswithin an “A” flood zone Landscape Detail Plans - One landscape detailplans showing the location of existing historic,specimen, understory, shade trees, and proposedtrees. Include tree sizes, sod type, shrub size, type,and automatic irrigation system (if required). Plansmust include foundation plantings for front, sidestreet and rear structures facing saltwater canals,freshwater canals, lakes, golf courses and publicright of ways. Tree Survey - One tree survey. (Survey to be nomore than 24 months old and shall identify allprotected trees by species name, and the size of thetrunk measured a the diameter at breast height). One driveway detail plans equivalent in detail to theCity of Palm Coast residential culvert detailavailable on the city website. (DWG NO 002270605). One sealed topographic surveys referencing1988 NAVD datum/lot grading plan (seeStormwater req.) The survey should include thedriveway width at the property line and at theedge of pavement and the distance from theproposed driveway flare to any road intersectionwithin 75feet. Grade elevation profile drawing is requiredwhen the proposed structure is on a saltwatercanal lot.A foundation survey is required prior tovertical constructionA final survey is required prior to finalinspectionBoundary Survey, Landscape DetailPlans, and Tree Survey may be inclusiveon one plan and must be labeled as suchand is to be separate from theconstruction drawings.

GREEN BUILDING - Single family Residence / Duplex Permit application – signed by the licensedcontractor if a contractor is hired. Construction Drawings - One set of signed andsealed construction drawings. Include productapproval. Green Home Certification Checklist– FloridaGreen Building Coalition, Inc. Schedule A , Version6.00 Color/Material information - Provide colors of allarchitectural features on elevation plans or on aseparate attached paper, complete with manufacturername and color description (including, but not limited toroof, exterior wall, trim, door, garage, brick, quoins, stone/rock,decorative shutters). Energy Calculationscalculations. Site Plans - One site plan indicating the dimensionsand setbacks from all structures to the property lines.Include patios, driveways, walkways, (materials andsurface treatments). Boundary Survey - One copy of a sealed boundarysurvey indicating current flood zone by a licensedsurveyor. Landscape Detail Plans - One landscape detailplans showing the location of existing historic,specimen, understory, shade trees, and proposedtrees. Include tree sizes, sod type, shrub size, type,and automatic irrigation system (if required). Plansmust include foundation plantings for front, sidestreet and rear structures facing saltwater canals,freshwater canals, lakes, golf courses and publicright of ways.- One sets of energy Water and Sewer Receipt Roofing worksheet Warranty Deed - One copy of a recorded warrantydeed Construction Lien Law affidavit (provided bycontractor if job is valued over 2500.00) Owner/Builder disclosure – this is required whenan owner is obtaining a permit. Early Power Affidavit Notice of Commencement – a certified copy of therecorded notice of commencement is required forany job 2500.00 or greater prior to the firstinspection. (it is not required to submit for thepermit) Tree Survey - One tree survey. (Survey to be nomore than 24 months old and shall identify allprotected trees by species name, and the size of thetrunk measured a the diameter at breast height). One driveway detail plans equivalent in detail to theCity of Palm Coast residential culvert detailavailable on the city website. (DWG NO 002270605). Three (3) sealed topographic surveys referencing1988 NAVD datum/lot grading plan (seeStormwater req.) The survey should include thedriveway width at the property line and at theedge of pavement and the distance from theproposed driveway flare to any road intersectionwithin 75feet. Grade elevation profile drawing is requiredwhen the proposed structure is on a saltwatercanal lot.A foundation survey is required prior to vertical constructionA final survey is required prior to final inspection5

Additions/Renovations/ Screen Enclosures with solid roof(screening existing porches/sunrooms/Florida rooms)If the slab is existing, a letter from an engineer must be submitted verifying theexisting slab is adequate to support the new structure Permit application – signed by the licensedcontractor if a contractor is hired. Construction Drawings - One set of signed andsealed construction drawings to include trusspackage, layout and fastening schedule. Plansmust include the elevation drawings of any/allsides being aesthetically changed by theaddition. Existing floor plan and the proposedfloor plan labeling all rooms including theintended ‘use’ of the proposed area, (plansMUST display means of egress) wall sections,bearing and shear walls, footings and reenforcement, roof slope, overhang and methodof ventilations mechanical diagram, (if no AC itto be provided, indicate method of heating)electrical diagram (including interconnectedsmoke detectors) door and window loadcalculations from the manufacturer. Product Approval Spec Sheet Color/Material information - Provide colorsof all architectural features on elevation plans oron a separate attached paper, complete withmanufacturer name and color description(including, but not limited to roof, exterior wall,trim, door, garage, brick, quoins, stone/rock,decorative shutters). Energy Calculations - One set of energycalculations if area is to be heat/cooled. Warranty Deed – must be recorded. Construction Lien Law affidavit (provided bycontractor if job is valued over 2500.00) Owner/Builder disclosure– this is requiredwhen an owner is obtaining a permit. Notice of Commencement – a certified copy ofthe recorded notice of commencement is required forany job 2500.00 or greater prior to the firstinspection. (it is not required to submit for thepermit) Site Plans - One site plan indicating the size,dimensions and locations of the proposedaddition and the setback dimensions from allexisting structures to the property lines. Includepatios, driveways, walkways, material andsurface treatments. Landscape Detail Plans – One landscape detailplan indicating tree protection or removalrequirements. If trees are not to be removed,you must write “No trees to be removed”. Atree removal permit may be required. Planttypes, sizes, quantities, and locations (ifapplicable) sodded, mulched and undisturbedareas.The plans must include existing andproposed foundation plantings for front, sidestreet and rear structures facing saltwater canals,freshwater canals, lakes, golf courses, andpublic right of ways. Roofing worksheetIf a foundation survey for the concrete involved in your project is not on file in ouroffice, a foundation survey will be required prior to any vertical construction.6

A final survey will be required prior to the final inspection.Screen Enclosure/AluminumIf the slab is existing, a letter from an engineer must be submitted verifying theexisting slab is adequate to support the new structure. Permit Application - signed by the licensed contractor if contractor is to obtain permit. Recorded Warranty Deed Construction Drawings - One set of signed and sealed engineering drawings. All drawings must includethe House/addition elevation drawings of any/all sides being aesthetically changed by the addition. Includeintended use of proposed area. Construction lien law affidavit (provided by contractor if job is valued over 2500.00) Notice of Commencement – a certified copy of the recorded notice of commencement is required for any job 2500.00 or greater prior to the first inspection. (it is not required to submit for the permit) Owner/Builder disclosure – this is required when an owner is obtaining a permit. Site Plan - One site plan indicating the size, dimensions, and proposed location. Include setbackdimensions from all existing structures to the property lines. Include patios, driveways, walkways, materialsand surface treatments to be used. Landscape Plan – One landscape detail plan indicating tree protection or removal requirements. If treesare not to be removed, you must write “No trees to be removed”. A tree removal permit may be required.Plant types, sizes, quantities, and locations (if applicable) sodded, mulched and undisturbed areas. Theplans must include existing and proposed foundation plantings for front, side street and rear structuresfacing saltwater canals, freshwater canals, lakes, golf courses, and public right of ways.If a foundation survey for the concrete involved in your project is not on file in ouroffice, a foundation survey will be required prior to any vertical construction.7

Window/Door/Garage Door replacement Permit Application - signed by the licensed contractor if contractor is to obtain permit.Product Approval Spec Sheet (detail/installation sheets to be in field at time of inspections) Recorded Warranty Deed Floor layout indicating locations of replacement(s) Construction lien law affidavit (provided by contractor if job is valued over 2500.00) Notice of Commencement – a certified copy of the recorded notice of commencement is required for any job 2500.00 or greater prior to the first inspection. (it is not required to submit for the permit) Owner/Builder disclosure – this is required when an owner is obtaining a permit.Electrical/Mechanical/Plumbing Permit Application - signed by the licensed contractor if contractor is to obtain permit. Recorded Warranty Deed Two sets of Drawings (AC Equipment change-outs must submit system verification (AHRI)) Site Plan – one site plan if necessary Construction lien law affidavit (provided by contractor if job is valued over 2500.00, Mechanical if over 7500.00) Notice of Commencement – a certified copy of the recorded notice of commencement is required for anyelectric/plumbing job 2500.00 or greater and any mechanical job 7500.00 or greater, prior to the first inspection. (itis not required to submit for the permit) Owner/Builder disclosure – this is required when an owner is obtaining a permit.Demolition Permit Application - signed by the licensed contractor if contractor is to obtain permit. Recorded Warranty Deed One set of Construction Drawings (not needed for disconnect / reconnects, AC change outs) Site Plan –One site plan indicating area to be demolished Construction lien law affidavit (provided by contractor if job is valued over 2500.00) Notice of Commencement – a certified copy of the recorded notice of commencement is required for anyelectric/plumbing job 2500.00 or greater and any mechanical job 7500.00 or greater, prior to the first inspection. (itis not required to submit for the permit) Owner/Builder disclosure – this is required when an owner is obtaining a permit.8

Swimming Pools Permit application - signed by the licensed contractor if contractor is to obtain permit. Warranty Deed Construction Drawings - One set of construction drawings. Signed and sealed drawings for poolconstruction may be filed in a master file. This will eliminate the need to submit signed and sealeddrawings individually when submitting for a permit. (one time 225.00 charge) Total Dynamic Head Calculation Worksheet OR signed and sealed calculations. Aluminum Enclosure Drawings - One set of enclosure plans if the pool is to be enclosed. Signed andsealed drawings for the aluminum enclosure may be filed in a master file. This will eliminate the need tosubmit signed and sealed drawings individually when submitting for a permit. (one time 225.00 charge) Construction Lien Law affidavit (provided by contractor if job is valued over 2500.00) Notice of Commencement – a certified copy of the recorded notice of commencement is required for any job 2500.00 or greater prior to the first inspection. (it is not required to submit for the permit) Owner/Builder disclosure – this is required when an owner is obtaining a permit Site Plan – One site plan indicating the size, deck dimensions, the overall deck square footage (includingpool area) and setback dimensions from pool deck/enclosure to the property lines. Site plans must includeall equipment and door pads. Individual structures such as mechanical equipment and umps shall bescreened by property owner with visual buffer planting, when visible from right of ways, parking areas, oradjacent properties. In lieu of a visual buffer planting, solid decorative fencing or walls may be installed toscreen from public view. Plants used shall be native or shall be vegetarian that conserves water, is adaptableto local conditions, and is drought tolerant. Landscape Plan – One landscape detail plans indicating tree protection or removal requirements. If treesare not to be removed, you must write “No trees to be removed”. A tree removal permit may be required.Plant types, sizes, quantities, and locations (if applicable) sodded, mulched and undisturbed areas. Theplans must include existing and proposed foundation plantings for front, side street and rear structuresfacing saltwater canals, freshwater canals, lakes, golf courses, and public right of ways. No larger than 8 ½ x14 Topographic Survey - One signed and sealed topographic survey – (less than 12 months old) using 1988NAVD Datum, with a lot grading plan to comply with Stormwater Requirements effective November 1,2007.A final survey to include topographic (to include drainage) information must besubmitted prior to the final inspection.9

Above Ground Pools Permit application Site Plan - One site plans indicating the setback dimensions from pool deck/enclosure to the property lines.No larger than 8 ½ x 14o Water meter pit and pep tank panel located on site plano If a fence is to be included with the permit, the location, color, material, and height of fence mustbe included on the site plan. Screening for fences along rear or side lot lines abutting a right ofway, golf course, or saltwater canal shall be facilitated by setting the fence back a minimum ofthree (3) feet from the property line and installing shrubs or vines on the outside of the fence forsoftening and enhancement. This requirement also applies to any fence facing the front or sidecorner of the property. This requirement applies to all types of fencing. Manufacturer’s Drawings - One copy of the manufactures’ drawings for the pool assembly. Construction Lien Law affidavit (provided by contractor if job is valued over 2500.00) Warranty Deed Notice of Commencement – a certified copy of the recorded notice of commencement is required for any job 2500.00 or greater prior to the first inspection. (it is not required to submit for the permit) Owner/Builder disclosure – this is required when an owner is obtaining a permit.Solar Permit Application Manufacturer Drawings – Two set of plans / Manufactures Specifications Owner/Builder disclosure – this is required when an owner is obtaining a permit Warranty Deed Notice of Commencement – a certified copy of the recorded notice of commencement is required for any job 2500.00 or greater prior to the first inspection. (it is not required to submit for the permit) Construction Lien Law affidavit (provided by contractor if job is valued over 2500.00)If solar panels are located on the ground, the panels must be completely screenedby landscaping or an opaque fence.10

Fence/Wall Permit Application Two copies Site Plano Indicate water meter pit and pep tank panel. The fence must be 3’ from the pep panel.o Indicate the location of the pep tank.o One site plan which indicate the property lines, roadways, waterways, easements, all existingstructures, and proposed fence location, color, height and material, location, size and swing ofany/all gates, with the setback measurements to the property line. Indicate tree protection orremoval requirements. If trees are not being removed, you must write “no trees to be removed”.If trees are to be removed, a tree removal permit may be required. Screening for fences alongrear or side lot lines abutting a right of way, golf course, or saltwater canal shall be facilitated bysetting the fence back a minimum of three (3) feet from the property line and installing shrubs orvines on the outside of the fence for softening and enhancement. This requirement also applies toany fence facing the front or side corner of the property. This requirement applies to all types offencing. Construction Drawings - Walls will require two sets of plans signed and sealed by a licensed FloridaArchitect or Engineer. Plans must include the linear square footage, dimensions, column spacing andfinished cap. Construction Lien Law affidavit (provided by contractor if job is valued over 2500.00) Warranty Deed - One copy of a recorded warranty deed Tenant Affidavit - this is required if property owner is NOT the applicant. Notice of Commencement – a certified copy of the recorded notice of commencement is required for any job 2500.00 or greater prior to the first inspection. (it is not required to submit for the permit) Owner/Builder disclosure – this is required when an owner is obtaining a permit.11

Docks and Boathouses/Boat LiftsIn accordance with the Palm Coast Restrictive Covenant and Easements you may not extend into the waterbodymore than 12’ unless such waterbody is 100’ or more in width. If so, same may extend 16’, in both instances asmeasured at right angles to and from the property line abutting the waterbody. Permit Application - signed by the licensed contractor if contractor is to obtain permit. Construction Drawings - One set of signed and sealed construction drawings (if lift station for boat, a copyof the electrical drawing and power source is required. Drawings must be cleaned and concise, drafted toscale, showing all types of materials, sizes, dimensions and locations. Include any other details necessary toconvey design/construction intent. Brochures or photographs which include all dimension and materialinformation are acceptable to show design. ALL DOCKS MUST HAVE A HIP STYLE ROOF. Site Plan - One set of the site plan which must include a drafted to scale professional drawing to show thelot, property lines, proposed structure location and width of the canal. All dimensions must be included onthe site. Warranty Deed Construction Lien Law affidavit (provided by contractor if job is valued over 2500.00) Notice of Commencement – a certified copy of the recorded notice of commencement is required for any job 2500.00 or greater prior to the first inspection. (it is not required to submit for the permit) Owner/Builder disclosure – this is required when an owner is obtaining a permit.The Intracoastal Waterway must require all appropriate state and federal permits prior topermit submittal (Army Corps. Engineers, DEP, SJRWMD, SFRWMD). In addition, adatabase search from Florida Natural Areas Inventory, US Fish and Wildlife Services tolist plant and animal species that have potential to occur on property.12

Seawall Permit Application - signed by the licensed contractor if contractor is to obtain permit. Warranty Deed Construction Drawings - One sets of signed and sealed scaled drawings to include detailed construction ofthe proposed bulkhead or coquina riprap. Site Plan – One set of the site plan which must indicate a drafted to scale professional drawing to show thelot, property lines, proposed bulkhead/riprap location and width of canal. All dimensions must be includedon this site plan. Right of Way Access Application Construction Lien Law affidavit (provided by contractor if job is valued over 2500.00) Notice of Commencement – a certified copy of the recorded notice of commencement is required for any job 2500.00 or greater prior to the first inspection. (it is not required to submit for the permit) Owner/Builder disclosure – this is required when an owner is obtaining a permit.13

Beautification Right of Way(To clear property belonging to the city that abuts your property) Permit Application - signed by the licensed contractor if contractor is to obtain permit. Right of Way Access Application Site plan indicating measurements from both sides of the rear property line to the waters edge,measurements from both side property lines to the proposed ROW. The 20’ ROW must be shown and theamount of type of trees that are to be removed. Owner/Builder disclosure – this is required when an owner is obtaining a permit. Notice of Commencement – a certified copy of the recorded notice of commencement is required for any job 2500.00 or greater prior to the first inspection. (it is not required to submit for the permit)Requirements:Must be set back 10’ from side property linesROW may be anywhere between both side property line setbacksAll work in ROW must be done by hand. (no heavy equipment permitted)Any disturbed areas must be stabilized immediatelyAll areas outside the BROW are to remain naturalSampleWaters ---15'ROW--------20'--------15'-----------Property lines----------------------S haded area's are 10' set back-------------------14

Deck(Wooden with no roof) Permit Application Construction Drawings –One set of signed and sealed construction drawings (by licensed Florida Architector Engineer) Recorded Warranty Deed Site Plan – One signed and sealed survey which indicates the property lines, easements, size, dimension andlocations of proposed and all existing structures with the setback dimensions to the property lines. No Landscape Plan – One landscape detail plan indicating tree protection or removal requirements. If treesare not to be removed, you must write “No trees to be removed”. A tree removal permit may be required.Plant types, sizes, quantities, and locations (if applicable) sodded, mulched and undisturbed areas. Theplans must include existing and proposed foundation plantings for front, side street and rear structuresfacing saltwater canals, freshwater canals, lakes, golf courses, and public right of ways. Construction Lien Law affidavit (provided by contractor if job is valued over 2500.00) Notice of Commencement – a certified copy of the recorded notice of commencement is required for any job 2500.00 or greater prior to the first inspection. (it is not required to submit for the permit) Owner/Builder disclosure – this is required when an owner is obtaining a permit.15

Slab/Patio(Concrete only– no roof) Permit application Recorded Warranty Deed Construction Drawings – One set of engineereddrawings.Required if slab is to structural (withfooters). Site Plans - One site plan which indicates theproperty lines, all existing structures and proposedstructures location with the setback dimensions tothe property lines. Site plans must include thelocation of the water meter pit. Landscape Plan –One landscape detail planindicatingtreeprotectionorremovalrequirements. If trees are not to be removed, youmust write “No trees to be removed”. A treeremoval permit may be required. Plant types,sizes, quantities, and locations (if applicable)sodded, mulched and undisturbed areas.Theplans must include existing and proposedfoundation plantings for front, side street and rearstructures facing saltwater canals, freshwatercanals, lakes, golf courses, and public right ofways. Construction lien law affidavit (provided bycontractor if job is valued over 2500.00) Notice of Commencement – a certified copy ofthe recorded notice of commencement is required forany job 2500.00 or greater prior to the firstinspection. (it is not required to submit for thepermit) Owner/Builder disclosure– this is requiredwhen an owner is obtaining a permit.A foundation survey will be required if a structural patio is poured. Permit applicationPaver Installation Recorded warranty deed Site Plans - One site plan which indicate the property lines, all existing structures and proposed structures locationwith the setback dimensions to the property lines. Site plans must include the location of the water meter pit. Nolarger than 8 ½ x 14 Landscape Plan – One landscape detail plan indicating tree protection or removal requirements. If trees are not to beremoved, you must write “No trees to be removed”. A tree removal permit may be required. Plant types, size s,quantities, and locations

City of Palm Coast Important Phone Numbers Area Code 386 Community Development Department 986-3736 (land development, planning, zoning questions, plats, general property questions) Building Division 986-3780 (general permitting, plan review and inspections - including fire)