Cranes And Monorails (With Underhung Trolley Or Bridge)

Transcription

This is a preview of "ASME B30.17-2015". Click here to purchase the full version from the ANSI store.ASME B30.17-2015(Consolidation of ASME B30.11 and B30.17)Cranes and Monorails(With UnderhungTrolley or Bridge)Safety Standard for Cableways,Cranes, Derricks, Hoists, Hooks,Jacks, and SlingsA N A M E R I C A N N AT I O N A L STA N DA R D

This is a preview of "ASME B30.17-2015". Click here to purchase the full version from the ANSI store.ASME B30.17-2015(Consolidation of ASME B30.11 and B30.17)Cranes and Monorails(With UnderhungTrolley or Bridge)Safety Standard for Cableways,Cranes, Derricks, Hoists, Hooks,Jacks, and SlingsA N A M E R I C A N N AT I O N A L S TA N D A R DTwo Park Avenue New York, NY 10016 USA

This is a preview of "ASME B30.17-2015". Click here to purchase the full version from the ANSI store.Date of Issuance: March 9, 2016The next edition of this Standard is scheduled for publication in 2020. This Standard will becomeeffective 1 year after the Date of Issuance.ASME issues written replies to inquiries concerning interpretations of technical aspects of thisStandard. Interpretations are published on the ASME Web site under the Committee Pages athttp://cstools.asme.org/ as they are issued. Interpretations will also be included with each edition.Errata to codes and standards may be posted on the ASME Web site under the Committee Pages toprovide corrections to incorrectly published items, or to correct typographical or grammatical errorsin codes and standards. Such errata shall be used on the date posted.The Committee Pages can be found at http://cstools.asme.org/. There is an option available toautomatically receive an e-mail notification when errata are posted to a particular code or standard.This option can be found on the appropriate Committee Page after selecting “Errata” in the “PublicationInformation” section.ASME is the registered trademark of The American Society of Mechanical Engineers.This code or standard was developed under procedures accredited as meeting the criteria for American NationalStandards. The Standards Committee that approved the code or standard was balanced to assure that individuals fromcompetent and concerned interests have had an opportunity to participate. The proposed code or standard was madeavailable for public review and comment that provides an opportunity for additional public input from industry, academia,regulatory agencies, and the public-at-large.ASME does not “approve,” “rate,” or “endorse” any item, construction, proprietary device, or activity.ASME does not take any position with respect to the validity of any patent rights asserted in connection with anyitems mentioned in this document, and does not undertake to insure anyone utilizing a standard against liability forinfringement of any applicable letters patent, nor assumes any such liability. Users of a code or standard are expresslyadvised that determination of the validity of any such patent rights, and the risk of infringement of such rights, isentirely their own responsibility.Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted asgovernment or industry endorsement of this code or standard.ASME accepts responsibility for only those interpretations of this document issued in accordance with the establishedASME procedures and policies, which precludes the issuance of interpretations by individuals.No part of this document may be reproduced in any form,in an electronic retrieval system or otherwise,without the prior written permission of the publisher.The American Society of Mechanical EngineersTwo Park Avenue, New York, NY 10016-5990Copyright 2016 byTHE AMERICAN SOCIETY OF MECHANICAL ENGINEERSAll rights reservedPrinted in U.S.A.

This is a preview of "ASME B30.17-2015". Click here to purchase the full version from the ANSI store.CONTENTSForeword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Committee Roster . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B30 Standard Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Summary of Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .vviiixxiiChapter 17-0Section 17-0.1Section 17-0.2Section 17-0.3Section 17-0.4Scope, Definitions, References, and Personnel Competence . . . . . . . . . . . . . . .Scope of B30.17 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Personnel Competence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11145Chapter 17-1Section 17-1.1Section 17-1.2Section 17-1.3Section 17-1.4Section 17-1.5Section 17-1.6Section 17-1.7Section 17-1.8Section 17-1.9Section 17-1.10Section 17-1.11Section 17-1.12Section 17-1.13Section 17-1.14Section 17-1.15Section 17-1.16Section 17-1.17Section 17-1.18Section 17-1.19General Construction and Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Markings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Clearances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .General Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Track Switches, Track Openers, and Interlocks . . . . . . . . . . . . . . . . . . . . . . . . .Vertical Drop or Lift Sections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Cabs — Normal or Skeleton (If Provided) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Lubrication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Service Platforms (Footwalks) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Stops and Bumpers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Rail Sweeps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Guards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Drop Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Brakes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Electrical Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Hoisting Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Warning Devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Trolleys (Carriers) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1515151617171718181819202020212223232323Chapter 17-2Section 17-2.1Section 17-2.2Inspection and Testing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .292930Chapter 17-3Section 17-3.1Section 17-3.2323217-3.317-3.417-3.517-3.617-3.7Operator Training and Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Operator Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Training for Persons Other Than Crane and Monorail SystemOperators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Planned Engineered Lifts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Signals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Miscellaneous . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Equipment Lockout/Tagout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .323234353636Chapter 17-4Section 17-4.1Section 17-4.2Maintenance Training and Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Maintenance Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Equipment Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .383838Figures17-0.2-117-0.2-2Examples of Styles of Electrification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Cab-Operated Crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .67SectionSectionSectionSectionSectioniii

This is a preview of "ASME B30.17-2015". Click here to purchase the full version from the ANSI 117-1.18-217-3.5.3-1Cantilever Gantry Crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Floor-Operated Cranes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Gantry Crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Wall-Supported Jib Crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Portable Gantry Crane (A-Frame) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Semigantry Crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Underhung Bridge Crane With Top Running Trolley . . . . . . . . . . . . . . . . . . .Drop Section (Lift Section) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Interlocking System for Underhung Crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Example of One Type of Enclosed Track and Support Bracket . . . . . . . . . .Cab-Operated Trolley . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Recommended Arrangement of Controllers or Master Switches(Three-Motion Crane) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Recommended Arrangement of Controllers or Master Switches(Four-Motion Crane) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Recommended Arrangement of Controllers (Pendant Push-ButtonStation Arrangements) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Recommended Arrangement of Controllers (Radio Crane ControlTransmitter Lever Arrangements) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Trolley Wheel Configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Recommended Trolley Fit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Standard Hand Signals for Cranes and Monorails . . . . . . . . . . . . . . . . . . . . . .iv8910101111121213131424252626272837

ASME B30.17-2015 (Consolidation of ASME B30.11 and B30.17) Cranes and Monorails (With Underhung Trolley or Bridge) Safety Standard for Cableways, Cranes