PLUMBING SYMBOLS & ABBREVIATIONS

Transcription

PLUMBING SYMBOLS & ABBREVIATIONSNOTE: NOT ALL SYMBOLS ARE USED ON THIS PROJECTANNOTATION ABBREVIATIONSGPMGALLONS PER MINUTEACABOVE CEILINGAFFABOVE FINISHED FLOORGCGENERAL CONTRACTORBASBUILDING AUTOMATION SYSTEMHAPHIGH AS POSSIBLEBFBELOW FLOORHBHOSE BIBB (INTERIOR)BGBELOW GRADEHSHOSE STATIONBHBOOSTER HEATERBFPBACKFLOW PREVENTION DEVICEHWCPHWSHOT WATER RECIRCULATION PUMPHANDWASHING SINKBJBETWEEN JOISTSIMICE MAKERBOPBOTTOM OF PIPELLAVATORYBTUHBRITISH THERMAL UNITS PER HOURCFCOMBINATION FIXTURECONDLTMBHLAUNDRY TUBTHOUSANDS OF BTU PER HOURPLUMBING SYMBOLOGYPIPING SYSTEMVACUUM RELIEF VALVECACDPCOMPRESSED AIRCONDENSATE DRAINPROPANE GASBACKFLOW PREVENTEROSTOWPDSTWOVERFLOW STORMOIL WASTEPUMP DISCHARGESTORMSANITARY WASTEOVVOIL VENTSANITARY VENTCWNPCWDOMESTIC COLD WATERNONPOTABLE COLD WATERHOSE BIBB / WALL HYDRANTAUTOMATIC AIR VENTPRESSURE GAUGETHERMOMETERFFLOW SWITCHPPRESSURE SWITCHTTEMPERATURE SWITCHMCMECHANICAL CONTRACTORCONDENSATE PUMPMSBMOP SINK BASINCLINICAL SERVICE SINKNTSNOT TO SCALEPIPE SLOPE ARROWCVCONTROL VALVEORDOVERFLOW ROOF DRAINFLOW ARROWORFLOOR DRAIN - ROUND OR SQUAREDFDRINKING FOUNTAINPUMPCONCENTRIC REDUCERORFLOOR CLEANOUT - ROUND OR SQUAREDNDOWNPCPLUMBING CONTRACTORECCENTRIC REDUCERCOSUSPENDED CLEANOUTDWDISHWASHERPRVPRESSURE RELIEF VALVE3-WAY CONTROL VALVEWCOWALL CLEANOUTECELECTRICAL CONTRACTORRDROOF DRAINANGLE GATE VALVEPIPE CAPEMERGENCY EYE WASHRPZREDUCED PRESSURE BFPANGLE GLOBE VALVEPIPE TURNING DOWNCSSEEWPSEWAGE EJECTORBALANCING/SHUTOFF VALVEPIPE TURNING UPESEJECTOR SUMPSFSQUARE FOOTBALL VALVETEE UPETEXPANSION TANKSHSHOWERBUTTERFLY VALVETEE DOWNEWCELECTRIC WATER COOLERSKSINKCALIBRATED BALANCING VALVEDROP AND RUNEWHELECTRIC WATER HEATERSPSUMP PUMPCHECK VALVEDROP AND TURNFAFROM ABOVESSSERVICE SINKCONTROL VALVETEE OFF TOPFBFROM BELOWTFATO FLOOR ABOVEGAS COCKTEE OFF BOTTOMTO BELOWGATE VALVECROSS AND RISERTO FLOOR BELOWGLOBE VALVEPLAN 90 ELBOWPIPE TEEFURNISHED BY OTHERSFCOFLOOR CLEANOUTTBTFBFLOOR DRAINTMVTHERMOSTATIC MIXING VALVEPLUG VALVEFFAFROM FLOOR ABOVETOPTOP OF PIPEPRESSURE REDUCING VALVE (WATER)FLEXIBLE PIPE CONNECTORFFBFROM FLOOR BELOWVBVACUUM BREAKERPRESSURE REGULATOR (GAS)PIPE ANCHORFPCFIRE PROTECTION SUBCONTRACTORVTRVENT THRU ROOFQUICK OPEN VALVEPIPE GUIDESFLOOR SINKWCWATER CLOSETSAFETY RELIEF VALVEWCOWALL CLEANOUTSOLENOID VALVEFDFSGCOYARD CLEANOUTGROUP4755 FORGE ROAD, SUITE 150COLORADO SPRINGS, COLORADO 80907(719) 590-9194 / info@f-w.comPLUMBING EQUIPMENT DESIGNATION###DETAIL OR SECTION MARKDETAIL MODULE NUMBERSHOWN ON DRAWINGPUMPSEFBOL1WYE STRAINER W/DRAIN VALVEDOMESTIC HW RECIRCULATIONCOMB. EMERGENCY EYE WASH/SHOWEREEWSHPLUMBING KEYNOTEWYE STRAINERHWDOMESTIC HOT WATERHW 140 DOMESTIC HOT WATER (OTHER TEMP.)HWC#PIPE UNIONCONDENSATECPANNOTATION SYMBOLOGYMELEVEN MILE PHASE 1BID SETPLUMBING SYMBOLS & ABBREVIATIONSWATER METERPROJECT 0.1

PLUMBING GENERAL NOTESA.WORK SHALL BE PERFORMED BY A LICENSED PLUMBER OF THE STATE OF COLORADO.B.MATERIALS, INSTALLATION AND TESTING SHALL BE IN ACCORDANCE WITH THE LATEST ADOPTED EDITION OFSTATEANDLOCAL CODE PROCEDURES, METHODS AND REQUIREMENTS, INCLUDING THE MOST STRINGENT OFHEALTH ANDSAFETY STANDARDS AS REQUIRED AND AS INTERPRETED BY THE AUTHORITY HAVING JURISDICTION.MINIMUMCODE AND STANDARDS REQUIRED, BUT NOT LIMITED TO THE FOLLOWING:"COLORADO STATE PLUMBING CODE" (2017 EDITION)"INTERNATIONAL PLUMBING CODE" (2015 EDITION)"NFPA 54 - NATIONAL FUEL GAS CODE"APPLICABLE LOCAL AND MUNICIPAL CODES AND ORDINANCES.C.MEANING AND INTENT OF DRAWINGS: DRAWINGS ARE DIAGRAMMATIC. PIPING IS SHOWN IN SCHEMATICFORM. SCALES INDICATED ARE FOR ARCHITECTURAL REFERENCE ONLY. IT IS NOT INTENDED THAT THEDRAWINGS SHOW EVERY WASTE, VENT, WATER PIPE, FITTING, SUPPORTS, ETC., AND IT IS UNDERSTOODTHAT THE DRAWINGS MUST BE FOLLOWED AS CLOSELY AS CIRCUMSTANCES WILL PERMIT, THE PROPERINSTALLATION ACCORDING TO THE TRUE INTENT AND MEANING OF THE DRAWINGS, LOCAL CODES ANDSTANDARD PRACTICES SHALL BE PROVIDED. PLUMBING CONTRACTOR SHALL FIELD VERIFY ALL EXISTINGCONDITIONS PRIOR TO INSTALLATION. REPORT ANY PROBLEMS OR CONFLICTS TO THEARCHITECT/ENGINEER. NOTED DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. DO NOTSCALE DRAWINGS. ANY MINOR CHANGES IN LOCATION OF EQUIPMENT, WASTE VENT, WATER PIPE, ETC.,FROM THOSE LOCATIONS SHOWN ON THE DRAWINGS, SHALL BE MADE WITHOUT EXTRA COST, IF SODIRECTED BY THE ARCHITECT/ENGINEER BEFORE THE INSTALLATION IS MADE. A MINOR CHANGE INLOCATION IS CONSIDERED TO BE WITHIN 5'-0" OF THE ORIGINAL INDICATED LOCATION. THE EQUIPMENTINDICATED ON THESE DRAWINGS INCLUDE ONLY THE MAJOR EQUIPMENT REQUIREMENTS.NOT WITHSTANDING, THE DETAILS PRESENTED IN THESE DRAWINGS VERIFY THE COMPLETENESS OF THEMATERIALS LISTS AND SUITABILITY OF DEVICES TO MEET THE INTENT OF THIS PROJECT. ANY ADDITIONALEQUIPMENT OR MATERIAL REQUIRED, EVEN IF NOT SPECIFICALLY MENTIONED HEREIN SHALL BE PROVIDEDWITHOUT CLAIM FOR ADDITIONAL PAYMENT; IT BEING UNDERSTOOD THAT A COMPLETE AND OPERATIONALPLUMBING SYSTEM, SATISFACTORY TO THE ARCHITECT/ENGINEER AND THE OWNER SHALL BE PROVIDED.USE ONLY THE MANUFACTURER'S TESTED ASSEMBLIES.D.ALL GENERAL NOTES ARE PART OF THIS CONTRACT.E.ALL EXPENSES CARRIED BY THE ARCHITECT/ENGINEER IN TROUBLESHOOTING SYSTEM(S) PROBLEMSCAUSED BY INADEQUATE WORKMANSHIP, LACK OF TECHNICAL EXPERTISE OR OTHER FORMS OF POORPERFORMANCE ON THE PART OF A CONTRACTOR, SHALL BE BORN BY THAT CONTRACTOR.F.PLUMBING CONTRACTOR IS RESPONSIBLE FOR ALL SERVICES IN BUILDING AND TO 5'-0" BEYOND THEBUILDING CONSTRUCTION LINE. SITE UTILITY CONTRACTOR IS RESPONSIBLE FOR ALL OTHER PIPING.G.COORDINATE ROUTING OF PIPING WITH ALL OTHER TRADES AND STRUCTURAL CONDITIONS TO AVOID ANYCONFLICTS AND ADVISE ARCHITECT/ENGINEER OF ANY POSSIBLE CONFLICTS. VERIFY EXACT LOCATIONS,ELEVATIONS, AND DIMENSIONS OF STRUCTURAL MEMBERS AND OPENINGS.H.MAINTAIN A MINIMUM CLEARANCE OF 3'-0" IN FRONT OF ELECTRICAL PANELS AND 1'-0" EITHER SIDE FROMSTRUCTURE TO STRUCTURE AND FLOOR TO STRUCTURE. ROUTE PIPING AROUND AND NOT DIRECTLYABOVE ELECTRICAL PANELS. VERIFY CLEARANCE REQUIREMENTS WITH ELECTRICAL CONTRACTOR PRIORTO INSTALLING PIPE.I.INCLUDE IN BID, ALL LICENSE, PERMIT, INSPECTION AND OTHER FEES REQUIRED BY UTILITY COMPANIES ORAUTHORITIES HAVING JURISDICTION REQUIRED FOR COMPLETION OF WORK SO THAT NO UNEXPECTEDADDITIONAL EXPENSES ARE INTRODUCED TO OWNER.GROUP4755 FORGE ROAD, SUITE 150COLORADO SPRINGS, COLORADO 80907(719) 590-9194 / info@f-w.comJ.PROMPTLY INFORM THE ENGINEER, IN WRITING, OF ANY DEVIATIONS IN THE CONTRACT DOCUMENTS FROMREQUIREMENTS OF LOCAL UTILITIES, MUNICIPALITIES, STATE OR FEDERAL LAWS AND REGULATIONS.PERFORM THE WORK IN ACCORDANCE WITH SUCH REQUIREMENTS AT NO ADDITIONAL COST TO THEOWNER.K.PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, ETC. REQUIRED FOR COMPLETE AND FUNCTIONALSYSTEM AS SPECIFIED AND INDICATED ON THE DRAWINGS.L.DURING CONSTRUCTION PROCEDURES, THE ENTIRE WORK AREA SHALL BE CLEAN OF ALL DUST, DIRT ANDOTHER DEBRIS BEFORE APPLICATION OF ANY NEW MATERIALS.M.ALL VENTS FROM HORIZONTAL SOIL OR WASTE PIPE SHALL COME OFF TOP OR AT 45 DEGREE VERTICALLYFROM CENTER OF PIPE BEFORE OFFSETTING HORIZONTALLY TO RISER.N.ALL VENT TERMINATIONS SHALL BE COORDINATED WITH BUILDING OPENINGS, AIR INTAKES AND AIREXHAUST OPENINGS. ADJUST VENT THROUGH ROOF LOCATIONS TO COMPLY WITH APPLICABLE CODE ANDTO BE IN THE LEAST VISIBLE EXTERIOR VIEWPOINT.O.SUPPORT ALL NEW PIPING AND EQUIPMENT FROM STRUCTURE ABOVE AS REQUIRED. PLUMBINGCONTRACTOR SHALL PROVIDE ALL SUPPLEMENTAL STEEL TO SPAN BETWEEN PRIMARY BUILDINGSTRUCTURAL MEMBERS. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE DESIGN OFSUPPLEMENTAL STEEL AND PIPE SUPPORTS, INCLUDING REACTION LOADS TO PRIMARY BUILDINGSTRUCTURAL MEMBERS.P.PLUMBING CONTRACTOR TO PROVIDE AND INSTALL NAIL PLATES WHERE PIPING PASSES THROUGH STUD(S)WITHIN 2" OF NAILING SURFACE TO PROTECT PIPE FROM NAILS OR DRYWALL SCREWS.Q.PLUMBING CONTRACTOR SHALL INSTALL HOT WATER DISTRIBUTION LOOP AND BRANCH SUPPLY PIPING ASCLOSE AS POSSIBLE TO THE HOT WATER INLET SIDE OF POINT OF USE THERMOSTATIC MIXING VALVE,INCLUDING FIXTURES WITH INTEGRAL MIXING VALVES, SO THAT THERE IS NO MORE THAN 10 LINEAR FEETDISTANCE. THIS SHALL BE IN SINGLE FIXTURE APPLICATIONS. LAVATORY HOT WATER PIPING SHALL BEINSTALLED SO THAT THERE IS A MAXIMUM DISTANCE OF 2 FT FROM THE THERMOSTATIC MIXING VALVE TOTHE HOT WATER DISTRIBUTION PIPING PER C404.5 OF THE 2015 IECC. IN MULTIPLE FIXTURE APPLICATIONSBATTERIED IN WALL OR PIPE CHASES, THE HOT WATER SUPPLY PIPING SHALL BE AS CLOSE AS REASONABLYPOSSIBLE TO THE FIXTURE CONNECTIONS.R.ALL P-TRAPS FOR FLOOR DRAINS AND FLOOR SINKS SHALL BE DEEP SEAL TRAP FILLED WITH WATER.2" TRAPS SHALL HAVE A 4" MINIMUM WATER SEAL, 3" AND LARGER SHALL HAVE A 5" WATER SEAL.S.PLUMBING CONTRACTOR TO INSTALL, TEST, AND FIELD BALANCE APPROVED EQUIPMENT PERMANUFACTURER'S WRITTEN INSTRUCTIONS AND RECOMMENDATIONS.ELEVEN MILE PHASE 1BID SETPLUMBING GENERAL NOTESPROJECT 0.2

KEYED NOTESGENERAL NOTES4.CONNECT TO MECHANICAL EQUIPMENTHERE. REFER TO MECHANICAL PLANSFOR ADDITIONAL INFORMATION.1-1/2" CW TO SITEDISTRIBUTION SYSTEM2UH-1(ON MEZZ.)S-1BREAK ROOM103PRV-1OFFICE1021" CW11 WSFU& 5 GPM61"P1"P3/4" HW3/4" CW8 WSFUEEW-11" HW31/2" HWCL-1OFFICE101(3/4" P TO UH-1ON 23/4" PWH-1443/4" P1"CWC.SEAL ALL EXTERIOR WALLPENETRATIONS AIR AND WATER TIGHT.D.ROUTE ALL PIPING THROUGHSTRUCTURAL ELEMENTS. COORDINATEPENETRATION SIZES AND LOCATIONSWITH STRUCTURAL. LOCATE ALLVALVES IN-BETWEEN JOISTS ANDPROVIDE ACCESS PANELS FOR FULLVALVE ACCESSIBILITY. REFERENCESTRUCTURAL DRAWINGS.E.SEE PLUMBING FIXTURE SCHEDULE FORPIPE SIZING TO INDIVIDUAL PLUMBINGFIXTURES.1" PF.INSULATE ALL DOMESTIC WATER PIPINGPER TABLE C403.2.10 OF THE 2015 IECC.REFER TO SPECIFICATIONS FORADDITIONAL INSULATIONREQUIREMENTS.1"P18114VEHICLE BAYS111WC-1TOILETS1061 11WH-1NORTHSCALE: 1/8" 1'-0"GROUPPLUMBING CONTRACTOR SHALLINSTALL APPROVED WATER HAMMERARRESTORS IN WATER LINES, BOTH HOTAND COLD, SERVING BATTERY ANDBACK TO BACK FIXTURE INSTALLATIONSIN PIPE SPACE AND PIPE CHASES ANDSHALL BE ACCESSIBLE.1"P91"PDOMESTIC PLUMBING PLAN4755 FORGE ROAD, SUITE 150COLORADO SPRINGS, COLORADO 80907(719) 590-9194 / info@f-w.comB.3/4" P1"P1"PSS-13/4" CW3 WSFU & 5 GPM3/4" HW3/4" CW41 111" CW20 WSFU1/2" HWC1-1/2" CW15 WSFU& 5 GPMSANITARY WASTE PIPING SHALL BESLOPED AT 1/8-INCH PER FOOT MINIMUMFOR ALL PIPING 4-INCH AND LARGERAND AT 1/4-INCH PER FOOT MINIMUMFOR ALL PIPING 3-INCH AND SMALLER.12. 3/4"PROPANE TO UH-1 ON MEZZANINE.EWH-1LOCKERS1051/2" HWC3/4" HW1" P3/4"PP-110A.4RPZ-11-1/2" CW35 WSFU& 15 GPM3512EVIDENCE1043/4" CW4 WSFU11. PROVIDE ISOLATION AND HIGH POINTVENT VALVES IN RISER TO ALLOW FORWINTER DRAIN DOWN OF WALLHYDRANT.1-1/2" CW FROM SITE7WELL SYSTEMBURY PIPINGCLOSET109RWB-11ROUTE PROPANE PIPING UP TO GASFURNACE ON MEZZANINE LEVEL ANDCONNECT.ROUTE 1" PROPANE LINE TIGHT TOINTERIOR OF EXTERIOR WALL HERE.10. REFER TO SHEET P5.2.ROUTE PROPANE PIPING TIGHT TOSTRUCTURE IN OVERHEAD ABOVE THEINFRARED HEATERS. COORDINATEMECHANICAL EQUIPMENT HEATERCLEARANCES WITH MECHANICALCONTRACTOR PRIOR TO PURCHASE ANDINSTALLATION.1"P16.9.1"PSET CALIBRATED BALANCE VALVES TOAPPROXIMATELY 0.5 GPM.8.PROVIDE MIN 1000GAL PROPANE TANKMIN 10 FT FROM BLDG EDGE.COORDINATE EXACT LOCATIONREQUIREMENTS AND RECOMMENDEDSIZE WITH PROPANE PROVIDER.IR-23.7.IR-1REFER TO WATER ENTRY DIAGRAM FORADDITIONAL INFORMATION.WELD ALL PROPANE PIPING INTERNALTO BUILDING. EXTERIOR PIPING MAY BETHREADED. PAINT EXTERIOR PIPING TOMATCH BUILDING EXTERIOR. PAINTEXPOSED INTERIOR PIPING TO MATCHCEILING IN EACH SPACE.3/4"P2.5.10' MINROUTE DOMESTIC PIPING ON INTERIORSIDE OF INSULATION ON EXTERIORWALL.IR-11.ELEVEN MILE PHASE 1BID SETDOMESTIC PLUMBING PLANPROJECT 1.1

GENERAL NOTES2"WCO-1S-113"WEVIDENCE1044"WBREAK CE101VEHICLE BAYS1112"VELECTRICAL1074"WDWV PLUMBING PLANGROUPD.ROUTE ALL PIPING THROUGHSTRUCTURAL ELEMENTS. COORDINATEPENETRATION SIZES AND LOCATIONSWITH STRUCTURAL. LOCATE ALLVALVES IN-BETWEEN JOISTS ANDPROVIDE ACCESS PANELS FOR FULLVALVE ACCESSIBILITY. REFERENCESTRUCTURAL DRAWINGS.E.SEE PLUMBING FIXTURE SCHEDULEFOR PIPE SIZING TO INDIVIDUALPLUMBING FIXTURES.F.REFER TO SPECIFICATIONS FORADDITIONAL INFORMATION ANDINSTRUCTIONS.1.4" W APPROX. 30" B.F.F., ROUTED ININSULATED TRENCH TO (E) SEPTIC.REFER TO SITE PLAN.2.2" W UP TO 2" FD IN THE MEZZANINEMECHANICAL EQUIPMENT ROOM FORCONDENSATE. LOCATE FD FOR EASEOF MAINTENANCE ACCESS ANDADJACENT TO GAS FURNACE. 2"VENTING FROM FD IS TO BE ROUTEDUNDER ROOF AND CONNECTED TONEAREST MIN 2" V PIPING PRIOR TOROOF PENETRATION.NORTHSCALE: 1/8" 1'-0"4755 FORGE ROAD, SUITE 150COLORADO SPRINGS, COLORADO 80907(719) 590-9194 / info@f-w.comSEAL ALL EXTERIOR WALLPENETRATIONS AIR AND WATER TIGHT.4"WCO-1WC-11C.GENERAL NOTESL-1TOILETS106PLUMBING CONTRACTOR SHALLINSTALL APPROVED WATER HAMMERARRESTORS IN WATER LINES, BOTHHOT AND COLD, SERVING BATTERYAND BACK TO BACK FIXTUREINSTALLATIONS IN PIPE SPACE ANDPIPE CHASES AND SHALL E102SHOP1102"V2"V4"W1/4" PER FTSLOPESANITARY WASTE PIPING SHALL BESLOPED AT 1/8-INCH PER FOOTMINIMUM FOR ALL PIPING 4-INCH ANDLARGER AND AT 1/4-INCH PER FOOTMINIMUM FOR ALL PIPING 3-INCH ANDSMALLER.2" V PIPING TO MIN 3" SIDE WALL VENT. TERMINATEVENT MIN. 10 FT ABOVE EXTERIOR GRADE ANDPROVIDE WITH INSECT RESISTANT SCREEN.3"FS-1CLOSET109A.ELEVEN MILE PHASE 1BID SETDWV PLUMBING PLANPROJECT 2.1

TO ELECTRICAL POWER SOURCE(PROVIDED BY ELECTRICAL CONTRACTOR)HW SUPPLY(SEE PLANS FOR CONT.)CW SUPPLY (SEE PLANS FOR CONT.)TEMPERATURE GAUGESIZE INDICATED ON DRAWINGSPRESSURE GAUGEBALL VALVE (TYP 2)THERMOMETER (TYP)SIZE INDICATEDON DRAWINGSCHECK VALVE (TYP 2)LINE SIZEDWATER METERVACUUM RELIEF VALVEPROVIDE ISOLATIONVALVE MIN 36" AFF1-1/2" CW FOR BUILDING DISTRIBUTIONFROM SITE HYDRO-ACCUMULATOR TANK. SEE P5.2.1-1/2" CWRPZ-1PRV-1ADJUST FOR MAXIMUM 60 PSIGDOWNSTREAM OF RPZ-1EXPANSION TANKAMT

plumbing symbols & abbreviations note: not all symbols are used on this project bas building automation system bfp backflow prevention device bj between joists bop bottom of pipe btuh british thermal units per hour cond condensate cp condensate pump cv control valve dn down fpc fire protection subcontractor annotation abbreviations fs floor sink water closet vent thru roof vacuum breaker .