Powder House Boulevard Water Main And Resurfacing Project

Transcription

Powder House BoulevardWater Main andResurfacing ProjectMayor Joseph A. CurtatoneRich Raiche, Director of EngineeringBrad Rawson, Director of Transportation & InfrastructureMay 15, 2017

Agenda Project Details Project Description Water Main Preliminary Schedule Repaving Details and Preliminary Schedule Restriping Options Discussion

Water Main Project Details Clean & line the 12-inch water main in sidewalk onnorth side of Powder House Boulevard from NorthStreet to Mason Street Contractor: Umbro & Sons Construction Corporation ofBoston, MA Experience in Boston, Brookline & Woburn Engineering consultant: Kleinfelder of Cambridge, MA Experience in Somerville & Cambridge City contact: Peter Violette pviolette@somervillema.gov 617.625.6600 x5414

Water Main Cleaning and Lining Removes corrosion buildup and restorescapacity Prevents further corrosion Less disruptive than replacement 5-foot opening every 500 to 600 feet or atbends, valves, or hydrants

Water Main Preliminary Schedule Pre-construction meeting: May 17th Notifications: May 22nd Umbro mobilization/site prep: May 30th Cleaning & lining work: June 19th Work complete: July 29th Post-winter repairs: Spring 2018

Repaving Details and Schedule From Powder House rotary to Burnham Street Under contract with D&R, work deferred due togas main replacement Includes sidewalk & curb in-place, ADAcompliance Anticipated schedule: June through July Burnham Street to Alewife Brook Parkway Top of priority list Bid this summer for Fall 2017 or Spring 2018construction

Restriping Options Restriping to occur after resurfacing for each section Rotary to Burnham Street section done beforeBurnham Street to Alewife Brook Parkway section Constraints No changes to curb lines About 40 feet curb-to-curb Options Restripe as-is Single bicycle lane in uphill directions Two-way separated bike lane along Tufts campus

Uphill Bicycle Lane OptionNorth Street to Hardan Road

Uphill Bicycle Lane OptionHardan Road to Curtis StreetWest Somerville Neighborhood School

Uphill Bicycle Lane OptionCurtis Street to Mason StreetBike lane switches directions

Uphill Bicycle Lane OptionMason Street to Leonard Street

Uphill Bicycle Lane OptionLeonard Street to Powder House Circle

Two-way Separated Bike Lane OptionPackard Avenue to Mason Street

Two-way Separated Bike Lane OptionMason Street to Leonard Street

Two-way Separated Bike Lane OptionLeonard Street to Powder House Circle

Discussion

Water Main Cleaning and Lining Removes corrosion buildup and restores capacity Prevents further corrosion Less disruptive than replacement 5-foot opening every 500 to 600 feet or at bends, valves, or hydrants . Water Main Preliminary Schedule Pre-construction meeting: May 17th