New Bartolomeo ExternalPlatform on its Pathway to Space8th Annual International Space Station Research andDevelopment Conference – 2019-C-15Dr. Christian Steimle, Bill Corley30 July 2019

Official UseFlightdirection230 July 2019New Bartolomeo External Platform on its Pathway to SpaceColumbusModule

Official amNadir330 July 2019New Bartolomeo External Platform on its Pathway to SpaceOptical Data Link

Official UseColumbusModuleZenithArgUS Multi-PayloadAdapterBartolomeoRamNadir430 July 2019New Bartolomeo External Platform on its Pathway to SpaceOptical Data Link

Bartolomeo Concept of Operations530 July 2019New Bartolomeo External Platform on its Pathway to Space

Official UsePayload LaunchUnpressurized payload launch inISS visiting vehicle trunk630 July 2019New Bartolomeo External Platform on its Pathway to Space[Image credit: NASA]Pressurized payload launch in ISSvisiting vehicle pressurized compartment

[Image credit: NASA]Official UsePayload InstallationPayload installationby ISS RoboticManipulation SystemPayload transferthrough either ISSpayload airlock[Image credit: NASA][Image credit: NanoRacks]730 July 2019New Bartolomeo External Platform on its Pathway to Space

Official UsePayload RetrievalPayload / sampleretrieval optionthrough the payloadairlock[Image credit: NASA]830 July 2019New Bartolomeo External Platform on its Pathway to Space

Official UsePayload OperationsCOLTDRSSKu-Band LinkNear Real Time Datadownlink (1 Mbps)USOSMPCCHigh capacity datadownlinkBTLPayload 1LANSWTM/TC linkPayload 2OBC 12 2Payload 121CustomersLaserOSIRISv3VPNUser WebConsoleOGS1OGS2 OGS8ISS GSWWW930 July 2019COL-CCBTL-CCNew Bartolomeo External Platform on its Pathway to SpaceLinkNRT LinkHC LinkDownlink1-10 Mbps2.5 TB/dayUplink1 MbpsNoneLatencybelow 1 sN/A

Official UseBartolomeo Platform Design and Capabilities1030 July 2019New Bartolomeo External Platform on its Pathway to Space

Official UsePayload AccommodationRobotic standard interface used for allpayload / platform interfacesPayloadsideESA AntennaZenithESA Antenna1130 July 2019LaserterminalGeneral-purpose OceaneeringLatching Device-2 (GOLD-2)8 (Nadirfacing)New Bartolomeo External Platform on its Pathway to SpacePlatformsideNadirFlight

Official UsePayload ResourcesPayload AccommodationField of All Nadir and Zenith view Some slots Ram viewviewSize3 U 1000 x 800 x 700 mmMass4 kg 450 kgPower up to 800 W @ 120 VDC up to 400 W @ 28 VDC onArgUS Survival power for heatersData1 Mbit/s 2 TByte/dayESA AntennaZenithESA Antenna1230 July 2019Laserterminal8 (Nadirfacing)New Bartolomeo External Platform on its Pathway to SpaceNadirFlightArgUS Multi-Payload Adapter

Official UsePayload AccommodationSLOT POSITION1A1B2A2B345Axxx5B6A6B78xx[Option to combine slots]800 WPower400 Wxx180 Wxx[Ram]Field [Operation of safety-criticalpayloads enabled]30 July 2019x[Nadir][Port/Starboard]13xxxNew Bartolomeo External Platform on its Pathway to SpacexxxxxPlatform capabilities havebeen upgraded to offermore 400 W slotsSome payload slots allowthe operation of safetycritical payloads throughtwo-fault tolerant designagainst inadvertent switchonArgUS Multi-PayloadAdapter can be installedon any slot

Official UsePayload Fields of ViewPayload viewing qualitySlot 3 Zenith View[image credit: NASA]1430 July 2019New Bartolomeo External Platform on its Pathway to SpaceSlot 3 Nadir View[image credit: NASA]Slots Nadir Zenith1A1B2A2B345A5B6A6B78Ram

Official UseBroadband Data Downlink (Upgrade)Useable field ofviewISS Nadir rangeOptical Ground SegmentCommercial ground stations distributed worldwide will be usedSome field of view restrictions exist due to visiting vehicles and solar arraysConservative achievable mean data throughput 1.375 TB / day, maximumachievable 2.5 TB / dayGround segment can provide around 100 GB within 45 minutes of downlink1530 July 2019New Bartolomeo External Platform on its Pathway to SpaceOSIRISv3 Field of ViewThroughput Analysis ParametersOSIRISv3 max. channel rate10 GbpsBuffer size500 GBNumber of ground stations8Minimum elevation angle15 deg

Official UseThe final steps to Space1630 July 2019New Bartolomeo External Platform on its Pathway to Space

Official UseMaster ScheduleAll mechanical systems qualification testinghas been successfully completedAvionics System qualification ongoing with QMand FM parallel MAITPlatform final assembly sequence has startedEnd-to-end testing scheduled for midSeptember together with European AstronautCentreSystem validation testing on the Columbussimulator early NovemberModifications to Columbus (trunnions,additional internal cables) ongoing / scheduledfor 11/19COL MDB Update scheduled for 12/19Launch scheduled on SpX-20 (03/20)Platform commissioning expected for 05/201730 July 2019New Bartolomeo External Platform on its Pathway to Space[Image credit: NASA]

Official UseAll mechanisms are qualifiedHinge Mechanisms 2 independentmotor-gearchains Self-lockingwhen extended EVA override Identical designused 4 times onthe platformTrunnion Clamps 2 independentmotor-gearchains Self-lockingwhen closed EVA override Identical designused 2 times onthe platform1830 July 2019Avionics Boxes Replaceable bySPDM/OTCM Smallest andmost compactORU 600 pin electricalconnection Magnesium alloyhousingLaunch Locks Re-use of FRAMmechanismprinciple Fault tolerantdesignNew Bartolomeo External Platform on its Pathway to Space

Official UseOn-board harnesses are readyCOL-PAPOS toCPLSW Harness Internalconnectionbetween COLPAPOS interfaceand CPLSWOn-board Harness Power and dataconnectionprovided to all 13payload positions(includingOsirisV3) Gigabit LANconnectionbetween allpayloads1930 July 2019New Bartolomeo External Platform on its Pathway to Space

Official UseFirst preparation EVA has been performed SecondaryTrunnion Slip-OffPrevention(TSOP) installedsuccessfully inEVA #54 Primary TSOP tofollow later thisyear[Image credit: NASA]2030 July 2019[Image credit: NASA]New Bartolomeo External Platform on its Pathway to Space

Official UseRemoteSensingExplorationPreparationBartolomeo at a lsionTestingIn-orbitDemoRoboticsTesting2130 July 2019New Bartolomeo External Platform on its Pathway to Space Unconstrained view into Ram,Zenith and Nadir directions (Almost) unconstrainedpayload volume Accommodation of all payloadsizes Easy to implement and costefficient GOLD-2 interface Sample / payload returnpossible Payload slots available at 18months mission lead time

Thank you.Copyright Airbus DS Space Systems, Inc.

VPN. OSIRISv3 . TM/TC link . Near Real Time Data downlink (1 Mbps) High capacity data downlink . Link . NRT Link : HC Link : Downlink . 1-10 Mbps ; 2.5 TB/day ; Uplink ; 1 Mbps . NASA] 21 30 July 2019 New Bartolomeo External Platform on its Pathway to Space Remote Sensing Astrophysics Atmospheric Research In-orbit Demo Robotics Testing .