Rehabilitation Of The Corning Centerway Arch BridgeArch Bridge

Transcription

Rehabilitation of the CorningCenterway Arch BridgeChristineChi ti SharkeySh kEmily Smith, PE

Presentation Outline¾¾¾¾¾History of Centerway BridgeProject ComponentsIInspectionti ProgramPRepair RecommendationsCConstructionttiPhPhaseCorning

Project LocationCorning

Bridge Street(1937)CenterwayArch Bridge(1922)CorningP i t dPaintedPost HighSchoolBriscoBridge(1987)

CorningPainted PostHigh SchoolBriscoBridgeCenterway ArchBridgeFlooding

1928 Bridge Elevation

Original Construction

Flooding

1972 - Agnes

1989 – Deck Modifications

Centerway as a Pedestrian Bridge3636’

Key Project Partnership

Key Project Components¾¾Bridge RehabilitationMaintain HistoricIntegrity

Centerway Arch Bridge¾¾¾ConstructedCt t d iin 19227 – 92 ft. (clear) spans720 ftft. overall length

Arch Section¾C ti lCast-in-placeearth-filledth fill d reinforcedi fd concretet archh

Preliminary Engineering¾ InIn-depthdepth Bridge Inspection– Define repair scope & quantities to get the most accuratecost estimates¾ Testing– Non-destructive testing: impact echo, GPR, LIDAR,concrete sounding– Concrete coring for chlorides, petrographic analysis,strength¾ Reports–––––Inspection Condition ReportGPR (deck)Concrete Coring and Powder testingPetrographic AnalysisService Life Assessment

Inspection ComponentsParapetsD kDeckSpandrel WallsArchPiers

In-depth Bridge Inspection¾Bestt way toBt defined fi repairi scope & quantitiestiti tto gett thethmost accurate cost estimates

Spandrel Walls

Abutments and Piers

Reflective Markings from Sounding

Assembling of Field Markings

Testing¾¾IImpactt EchoE h (NDT)Concrete Coring & Testing

Alkalai-Silica Reaction (ASR) in Petrograph

GPR on Deck¾D l i tiDelaminations/Voids/V id

Condition Summary¾¾¾ConcreteCt iin AbAbutments,tt Wingwalls,Will anddSSpandreld lWWallsllshow spalling, advanced concrete degradation due tomoisture retention from coatingg appliedppin 1989 due toAlkali-Silica Reaction (ASR).Concrete Arches were not coated, but exhibited advancedASR crackingASR,cracking, and some delaminationdelamination.Complete loss of integrity from ASR. Restoration/overlayis not feasible due to condition.

Recommended Repairs: Piers and Abutments¾¾RehabilitationRh bilit ti att upstream/downstreamt/dtendsd ddue ttospalling/cracking of surface.Repair cracks and perform partial depth concrete repairs;seal surfaces.

Recommended Repairs: Spandrel Walls¾RResurfacefwithith PPrecasttPanels and reinforce toobtain desired design life:minimum 25 years.¾ Provide surface texturingi panelsinl tto evokekhistoric façade.¾ Precast concreteparapets removed andreplaced in-kind. Bumpouts removed andreplaced in-line for newlighting.gg

Recommended Repairs: Arch¾¾StrengtheningStth i recommendedd d tto maintaini t i minimumi i25 yr.life expectancy.Undersides: Repair cracks and perform partial depthconcrete repairs as necessary.

Bridge Design Section

Project Costs¾TOTAL 5,530,021 5 530 021¾Inspection, Investigation and Design: 521,000Inspection 521 000Final Construction Cost: 4,356,021Construction Inspection:p 653,000 ,¾¾

Construction Timeline¾¾¾¾¾Bid AdAdvertisementtit – MayM 3131, 2012Bid Opening – June 28, 2012Award – July 2323, 2012Substantial Completion - August 1, 2013Final Completionp- October 30,, 2013

Construction Access From Approaches

Construction Access From Deck

Construction Access From Scaffolding

Construction Access From Suspended Platforms

Construction Access From Suspended Platforms

Construction Access From Suspended Platforms

Weather Impacts: Hurricane Sandy

Pier Reconstruction

Pier Reconstruction: Match Existing Texturing

Concrete Arch Beam

Arch Reinforcement

Winter Arch Construction

Self-Consolidating Concrete

Vacuum Injection Crack Repairs

Parapet Removal

Spandrel Walls

Prep for Precast Wall Panels

Wall Reinforcement

Precast Panel Fabrication

Precast Panel Placement

Parapet Construction

Membrane, Drainage and Electrical

Completed Bridge Elevation

Deck Treatment

Center Span Maze

Finished Product

Learning Assessment Questions¾¾¾Whatt ttestingWhti methodsth d were usedd tto evaluatel t ththe existingi ticondition of the bridge?What was determined to be the cause of most of thedamage to the structure?What treatment was used to restore the spandrel walls?

Questions

Repair Recommendations Ct tiPhCons truc tion Ph ase Corning. Project Location Corning. Bridge Street (1937) Corning Pitd Centerway Arch Bridge (1922) Painted Post High School Brisco . Arch St th i d d t i t i i i 25Strengthening recommendedto maintain minimum 25 yr. life expectancy. Undersides: Repair cracks and perform partial depth .