Aboveground Storage Tanks(AST)Enhanced Vapor Recovery(EVR)Presented on 04/16/09

TopicsOverviewRegulationsAST EVR DeadlinesStanding Loss Control OverviewStanding Loss Control CertificationPhase I AST CertificationPhase II and ISD AST Certification04/16/09Summary2

OOverviewiof AST ProgramBoard approved new vapor recoverycertification requirements to reduceemissions from AST’s in 2007Standing Loss Control CertificationNew to the Certification MatrixPhase I AST CertificationFueling of aboveground storage tanksPhase II and ISD AST CertificationRefueling of vehicle fuel tanks04/16/09SSimilarl to theh existingEVR requirements forUSTs3

Rl tiRegulations(current)Adopted by the Board on May 2, 2008CP-206 – Certification Procedure for Vapor Recovery Systems atGDFs Using Aboveground Storage Tanks (references to CP 201)AST Test Procedures:TP-206.1 – Determination of Emission Factor for Standing LossControlTP-206.2 – Determination of Emission Factor for Standing LossControl Using ProcessorsTP 206 3 – DeterminationTP-206.3D ti ti off StStaticti PressurePPerformanceP foff VaporV04/16/09Recovery Systems at GDF with ASTs4

AST EVR DeadlinesExecutive Order G-70-213 issued on December31, 2009 extended all the AST EVR deadlinesO g a eOriginaleffectiveect e aandd opeoperativeat e date wasas JaJanuaryua y 1,, 2009009Extensions were necessary since there were no systemscommercially availableNew effective and operative dates are as follows:StandingStdi LossLControl:C t l AAprilil 11, 2009Phase I: January 1, 2010Phase II and ISD: January 1, 2011Major modification and/or replacement of ASTsrequire upgrading to current EVR specificationsExisting ASTs have four years from the neweffective dates above to comply04/16/095

Standing Loss Control OverviewStanding Loss ControlControls emissions during idle periods – Heating of they the sun causes the fuel to volatize and vent intotanks bythe atmosphereStanding Loss Control is certified based on oneof the following approaches:Performance – Tests all GDF components as a system,components are certified together as a systemDesign – Tests GDF components independently.independently Once thecomponents are certified, they are added to a consolidatedEO. Mixing and matching of components is allowed.04/16/096

Standing Loss Control Overview(cont.)Standing Loss Control specifications andrequirementsExistingg Installations ((P/V Valve and approvedppppaint or shade)) –Emission Factor Requirement of 2.26 lbs/1000 gallonsullage/dayNew Installations (P/V Valve and insulation) – Emission FactorRequirement of 0.57 lbs/1000 gallons ullage/dayStanding Loss Control certificationrequirementsMinimumMiirequirementsit – 30 consecutiveti ddays dduringi ththe summermonths (June1 – September 30), at least seven of the 30-daysshall have a peak temperature between 90 F - 105 F. Testingoutside of the above dates may be approved by ARB if thetemperature criteria are met04/16/097

Standing Loss Certification(typical setup)04/16/098

S di LossStandingLControlClCCertificationifi iExecutive OrdersVR-301-A - Standing Loss Control Vapor Recovery Systemfor Existing Installations of Aboveground Storage TanksApproved by Board on April 2, 2009White Paint (OPW is the Applicant) for Existing ASTsExisting SuperVault MH Series and Fireguard ASTs(Modern Custom Fabrication, Inc and Steel Tank Institute are the applicants respectively)Available soon at http://www.arb.ca.gov/vapor/ast/ast.htmVR-302-A – Standing Loss Control Vapor Recovery Systemfor New Installations of Aboveground Storage TanksApproved by Board on April 22, 2009New Installations of SuperVault MH Series and Fireguard ASTs(Modern Custom Fabrication, Inc and Steel Tank Institute are the applicants respectively)Available soon at http://www.arb.ca.gov/vapor/ast/ast.htm04/16/099

S di LossStandingLControlClCCertificationifi iCurrent Test SiteConVault ASTsLocation: Denair, CaliforniaSystem: Husky 5885 PV Valve installed on a 250250-gallongallonprotected ConVault ASTStatus: 30-day operational test period completed.Standing Loss Certification completed outside the summermonthth requirementsit sett forthf th ini CP-206.CP 206Alternative Test Procedure was submitted by applicant andapproved by ARB to allow the use of an environmentallypcontrolled chamber to meet the ambient temperaturerequirements set forth in CP-206.Temperature profile from this test site is similar to otherStanding Loss Certifications that were conducted during thesummer month04/16/0910

ConVault Standing Loss ControlDenair, CA04/16/0911

Phase I AST EVR CertificationDifferences between Phase I AST andPhase I USTEmergency ventsOver-fill prevention valveNon-rotatable vapor and product adaptorsMechanical tank gauge04/16/0912

PhPhaseI AST EVR CertificationC tifi tiCurrent Test SiteOPW Phase I EVR for ASTLLocation:tiFiFirebaugh,bh CCalifornialif iSystem: OPW Phase I EVR, Husky 5885 PV Valveinstalled on a 550-gallon single-wall AST painted with anapproved white paint listed in VR-301-ASeal Date: January 9, 2009Status: Within 180-day operational test period04/16/0913

OPW Phase I EVR: Firebaugh, CA04/16/0914

Phase II and ISD AST EVRCertificationVarious Phase II manufacturers havepinterest in certifyingy g theirexpressedsystems.Can’t Start Phase II until Phase I is completed04/16/0915

Questions?04/16/0916

ContactsSam Vogt(916) 322-8922svogt@arb ca govsvogt@arb.ca.govDonielle Jackson(916) 445-9308dljackso@arb.ca.govTahir Muhammad(916) 449-5289tmuhamma@arb.ca.gov@g04/16/0917

ConVault ASTs Location: Denair, California System: Husky 5885 PV Valve installed on a 250System: Husky 5885 PV Valve installed on a 250-gallon protected ConVault AST Status: 30-day operational test period completed. Standing Loss Certification completed outside the summer month i t t f th i CPth requirements set forth in CP-206.