DELIVERY STORAGE AND HANDLING SPECIFICATION Prepared For .

Transcription

LOW ACTIVITY WASTE PRETREATMENT SYSTEMProject No. 31269 (T5L01)Document No. 15-2-105CSI Section 01 66 00Safety RelatedNon-Safety RelatedDELIVERY STORAGE AND HANDLINGSPECIFICATIONPrepared forWashington River Protection Solutions, LLCRevision: BStatus: Preliminary

Project Number: 31269 (T5L01)Doc. No.: 15-2-105Date: January 23, 2017Revision: BREVISION PAGEProject Name:LAWPSDiscipline:Client:Washington River Protection SolutionsProject Number: 31269 (T5L01)MechanicalLatest Revision: BREVISION SIGNATURESS. Baker1/23/17D. Skeath1/23/17Prepared byDateApproved by (SDE/Lead)DateB. Severson1/23/17P. Bell1/23/17Checked byDateApproved by (QA)DateB. Atherton1/23/17Approved by (PEM)DateN/AVerified by (if required)DateStatusRev. No. DatePrepared ByPagesDescription of ChangesPreliminaryB1/23/17S. Baker20Issued for 60% Design ReviewPreliminaryA8/31/15S. Baker17Issued for input into Packaged SpecificationsSafety Related:YesNoQuality Level:TBDFull QAEnhanced QAPage ii of vCommercial QA

Project Number: 31269 (T5L01)Doc. No.: 15-2-105Date: January 23, 2017Revision: BTABLE OF CONTENTS1.02.03.04.0PART 1 - GENERAL . 11.1Section Scope. 11.2Related Sections . 11.3Codes and Standards . 11.4System Descriptions . 21.5Submittals . 21.6Delivery, Storage & Handling . 31.7Quality Assurance . 111.8Site Conditions . 12PART 2 - PRODUCTS . 132.1Manufacturers (Not Used) . 132.2Materials (Not Used) . 132.3Equipment (Not Used) . 132.4Components (Not Used) . 132.5Fabrication (Not Used) . 132.6Shop Quality Control (Not Used) . 13PART 3 - EXECUTION. 143.1Preparation (Not Used) . 143.2Erection, Installation & Application (Not Used). 143.3Field Quality Control (Not Used). 143.4Adjusting And Cleaning (Not Used) . 143.5Demonstration (Not Used) . 143.6Protection (Not Used) . 14LIST OF APPENDICES . 15Page iii of v

Project Number: 31269 (T5L01)Doc. No.: 15-2-105Date: January 23, 2017Revision: BLIST OF TERMSAbbreviations and AcronymsTermDefinitionASMEAmerican Society of Mechanical EngineersBTHBelow the HookCQACommercial Quality AssuranceDOEDepartment of EnergyEQAEnhanced Quality AssuranceFQAFull Quality AssuranceLAWPSLow Activity Waste Pretreatment SystemPOPurchase OrderPSSHPackaging, Storage, Shipping, and HandlingQAQuality AssuranceUnitsNOT USEDDefinitionsAVS PROCUREMENT QUALITY CLAUSES (QA Clauses) – Procurement quality clauses are tobe used for the acquisition of items and services. The clauses establish contractual obligationsfor quality program systems, identification, traceability, documents submittals, testing, reporting,qualification, special process controls, inspections, etc.BUYER – The company for whom the VENDOR is performing work or services.COMMERCIAL QUALITY ASSURANCE (CQA) – Level of controls for those items, services. Orprocesses where, based on an evaluation of risk or nuclear safety, no additional quality controlsbeyond the provider’s published or stated attributes of the item, service, or process is required.ENHANCED QUALITY ASSURANCE (EQA) – Level of controls for those items, services, orprocesses where, based on an evaluation of risk or nuclear safety, additional controls beyond theproviders published or stated attributes of the item, service, or process are needed to verifycritical attributes.FULL QUALITY ASSURANCE (FQA) – Level of controls applied for items, services, orprocesses that are commensurate with the controls invoked under ASME NQA-1-2008/2009A“Quality Assurance (QA) Requirements for Nuclear Facility Applications” or other appropriatenational consensus standards.Page iv of v

Project Number: 31269 (T5L01)Doc. No.: 15-2-105Date: January 23, 2017Revision: BHANDLING – The movement or transportation of items following receipt from offsite/ projectlocations. This includes movement within storage areas and movement/transportation fromreceipt or storage areas to field locations. Handling requirements include the need for specialhandling tools and equipment, restrictions on material composition of surfaces in contact with theitem, protection against damage or deterioration, which could occur during movement andplacement, protection against physical damage due to excessive shock or vibration, andprotection against entry of dirt, water, or other contaminants.MORE CONSERVATIVE – “More conservative” shall be interpreted as “more protective of thehealth, safety and well-being of Site workers and facilities, the public, and environment, asapplicable.”SHALL / MUST – Denotes project requirements, compliance is requiredSHOULD – Denotes recommendation or expectation, compliance is expected.SPECIFICATION – Refers to any design, fabrication or supply specification.SHIPPING – The movement of items from an off-site/project location (VENDOR, warehouse, etc.)to an on-site/project location, or movement from an onsite/ project location to an off-site/projectlocation. Shipping requirements include packaging and securing of items to protect againstdamage or deterioration which could occur during movement and transportation, protectionagainst physical damage due to excessive shock or vibration, protection against entry of dirt,water, or other contaminants, and protection against other environmental conditions such astemperature or humidity.STORAGE – Holding of items in areas that address: the probable maximum period to be held,the inherent physical limitations of the item itself, and required protection from potential hazardssuch as fire, corrosion, chemical attack and environmental conditions. Storage also includes therequirements for maintaining the integrity and operability of items through routine maintenance,cleaning, or other means of preservation.VENDOR – The company responsible for the supply of equipment or servicesPage v of v

Project Number: 31269 (T5L01)Doc. No.: 15-2-105Date: January 23, 2017Revision: B1.0PART 1 - GENERAL1.1Section ScopeThis specification provides the generic requirements related to delivery, storage, and handling forall equipment associated with the Low Activity Waste Pretreatment System (LAWPS).In addition to the requirements herein refer to the appropriate equipment-specific sub-sections foradditional requirements.1.2Related Sections01 25 00Substitutions and Design Changes01 33 00Submittals01 40 00Quality Requirements01 60 00Labeling1.3Codes and StandardsWork shall be performed in accordance with the referenced codes, standards, and documents forthis specification.The following documents, of the exact issue shown, form a part of the Buyer basis of design tothe extent specified in the applicable sections of this document and establish the Codes ofRecord. In the event of a conflict between documents referenced herein and the requirements ofthis specification, the requirements of this specification shall take precedence only when thisspecification’s requirements are more stringent or conservative. If the Code date is not defined,apply the latest Code as of April 16th 2015.This document list is applicable to this specification only; please refer to the equipmentspecifications for codes and standards that apply to the equipment being supplied.1.3.1Government DocumentsUS Department of Energy (DOE) Procedures–1.3.2DOE/RL-92-36, 2016, Hanford Site Hoisting and Rigging Manual Revision 80Non-Government DocumentsAmerican Society of Mechanical Engineers (ASME)–ASME NQA-1-2008/2009A, Quality Assurance Requirements for Nuclear FacilityApplicationsPage 1 of 15

Project Number: 31269 (T5L01)Doc. No.: 15-2-105Date: January 23, 2017Revision: B–1.3.3Non-Code of Record Documents/Related Documents/Drawings––1.4ASME BTH-1 (2014), Design of Below-The-Hook Lifting DevicesRPP-8360 Revision 4 (2013), Lifting Point Evaluation ProcessTFC-ENG-STD-06 Revision C-9 (2013), Design Loads for Tank Farm FacilitiesSystem DescriptionsRefer to the appropriate equipment-specific sub-sections for equipment-specific descriptions andrequirements.1.5Submittals1.5.1Submittals that are listed within this section shall be prepared and processed in accordance withrequirements of related Section 01 33 00 “Submittals” and shall include all of the required QualityAssurance documentation in accordance with related Section 01 40 00 “Quality Assurance”.1.5.2Packaging, Handling, Shipping, and Storage Plan1.5.2.11.5.3VENDOR shall submit a Packaging, Storage, Shipping, and Handling (PSSH) Plan inaccordance with QA Clause B85. The PSSH plan shall include all plans, procedures,and drawings that address how items will be packaged (Section 1.6.3), stored(Section 1.6.5), delivered (Section 1.6.6), and handled (Section 1.6.4) in accordancewith the requirements described throughout this specification with the exception oftopics already covered by the Lift and Rigging Plan described in Section 1.6.4.1.Additional requirements may be described in equipment-specific specifications.Summary of SubmittalsThe following is a list of submittals described by this specification. Refer to equipment-specificspecification documents for additional submittal details.Table 1.5-1 – Standard Submittals for Delivery, Storage and HandlingSECTIONSUBMITTAL TITLE1.5.2.1PACKAGING, STORAGE, SHIPPING, AND HANDLING (PSSH) PLAN (INCLUDING DRAWINGS)1.6.3.3CLEANING RECORDS1.6.4.1LIFT AND RIGGING PLAN (INCLUDING DRAWINGS)1.6.4.6SITE ASSEMBLY INSTRUCTIONS (INCLUDING UNPACKING AND INSTALLATION DRAWINGS)Page 2 of 15

Project Number: 31269 (T5L01)Doc. No.: 15-2-105Date: January 23, 2017Revision: B1.6Delivery, Storage & Handling1.6.1General1.6.21.6.31.6.1.1All LAWPS hoisting, rigging, and transport activities shall comply with DOE-RL-92-36Hanford Site Hoisting and Rigging Manual, RPP-8360 Lifting Point EvaluationProcess, and TFC-ENG-STD-06 Design Loads for Tank Farm Facilities.1.6.1.2VENDOR shall receive, clean, package, store, preserve, handle, and ship Structures,Systems and Components to protect against physical damage, or any effect thatwould affect quality or cause deterioration at all times while items are located on theVENDOR’s premises. Any such activities associated with Full Quality Assurance(FQA) items shall also meet the requirements of ASME NQA-1-2008/2009A, QualityAssurance Requirements for Nuclear Facility Applications, Part II, Subpart 2.2.Classification of FQA items and packaging will follow the guidelines of ASME-NQA-1.1.6.1.3VENDOR shall follow manufacturer’s recommendations for storage and handling ofall purchased items.Transportability1.6.2.1All components, unless specified otherwise in this section or related sections, shallbe compatible with being transported by public roadway to contract specifieddestination unless otherwise specified or allowed by equipment specific designdocuments. Items shall either be self-supporting or provided with packing anddunnage so as to ensure their stability and protection from damage. Refer toequipment-specific specifications and procurement documents for limits on weight,size, disassembly, protective capability and long term storage.1.6.2.2Equipment shall be packaged, supported, and secured to the transport vehicle in amanner so it can withstand a 0.8g (forward) hard-braking stop, and rearward orlateral acceleration of 0.5g, as well as, shock and vibration loads associated withtransportation. Calculations that demonstrate compliance with these requirementsshall be included in the PSSH plan described in Section 1.5.2.1. Note that this is theminimum requirement; if a supplier has more stringent requirements, the supplier’srequirements shall be applied. Where equipment is braced inter

– ASME BTH-1 (2014), Design of Below-The-Hook Lifting Devices 1.3.3 Non-Code of Record Documents/Related Documents/Drawings – RPP-8360 Revision 4 (2013), Lifting Point Evaluation Process – TFC-ENG-STD-06 Revision C-9 (2013), Design Loads for Tank Farm Facilities 1.4 System Descriptions Refer to the appropriate equipment-specific sub-sections for equipment-specific