SAFETY METHOD STATEMENTForWaste and Recycling CollectionsAtThe CustomerDate: 17th December 2018Page 1 of 10
Contents n Contractor DetailsClients NameSite address and exact location of worksDescription of task / activity / project to be undertakenBrief description of siteProvisions & arrangements by clientLegislationStatutory notices, surveys and preliminariesAccess & egress arrangementsResponsible personnelSite induction & ProceduresSub-Contracted Elements & ControlClient or site specific safety rules that apply to the projectPersonnel involved including managers, supervisors & operativesWelfare facilitiesWaste containmentDisposal of waste materials (non hazardous)Scope of worksVehicles to be used on siteSequence of operationsHot WorksCompletion arrangementsAmendmentsSite SafetyEnvironmental Considerationsa. Noiseb. Dustc. Escape of wasteDocumentation to be present on siteEmergency PreparednessEmergency Proceduresa. Falls from Heightb. Discovering non-compliant materialsc. Fire & First AidFirst AidNearest HospitalCOSHH hazardous substances likely to be usedPPE RequirementsMethod Statement Briefing RecordQuality AssurancePage 2 of 10
Work method and risk assessment for Waste and Recycling CollectionsThis method statement and risk assessment is for securing the health and safety of all those who arecarrying out the waste collections and all others who may be affected by it.Before commencement on site each employee is informed on the general health and safety plan andprocedures.The works will be carried out by two-man crews, one of which will be a senior operative. ASupervisor/transport manager will have day to day control of the collections.Prepared by Patrick Roche17th December 20181.Main Contractordetails:Company Name:Max RecycleAddress:Hawthorne HouseBlackthorn WaySedgeletch Industrial EstateFencehousesTyne & WearProject Manager:Patrick Roche – Operations DirectorTel:0101 3851300E-mail:patrick@maxrecycle.comPerson in Chargeof service delivery:David Tate – Senior Transport Manager2.Clients name:The Customer3.Site address and exactlocation of work:The Customer’s address.4.Describe thetask/activity or projectbeing undertaken:Collection of General Waste and recycling waste fromThe Customer locations.5.Brief Description ofSite:As per customer address6.Provisions &Arrangements byClient:Dedicated collection points including waste compound.7.Legislation:During the course of the project all regulations and approved codes of practice to follow shall beadhered to at all times whilst on site: Start / Finish date:As per scheduleStart / Finish TimeAs per scheduleHealth and Safety at Work Act 1994Manual Handling Operations Regulations 1992Lifting Operations and Lifting Equipment Regulations 1998The Management of Health and Safety at Work Regulations 1998Personal Protective Equipment at Work Regulations 2002Control of Substances Hazardous to Health Regulations 2002Control of Noise at Work Regulations 2005Page 3 of 10
Environmental Protection Act 1990Section 34 EPA 1990Hazardous Waste Regulations 2005WISH Waste 25 – general public in waste containers8.Statutory Notices,Surveys andPreliminaries:No Statutory Notices are required for the works undertaken; however, a full survey of all TheCustomer sites will be undertaken prior to the commencement of any work.9.Access & egressarrangements to/fromsite and the workingplace(s)Access and egress will be as per the Customer signage, as directed by The Customer staff andPublic Highway requirements.10. ResponsiblePersonnel:Personnel directly responsible for carrying out the works:NamePatrick RocheDonna IngramDavid TateNatalie Ewing11. Site Induction & Procedures:PositionOperations DirectorFinancial DirectorTransport ManagerAccount ManagerContact LocationOfficeOfficeOfficeOfficeContact Number0191 38513000191 38513000191 38513000191 3851300All personnel are to receive a site specific induction to be undertaken by MaxRecycle in conjunction with the relevant Customer personnel. During the course ofthe induction areas to be covered which is not exhaustive shall include: Waste compound/bin store locationsAccess/egressProceduresSite Rules and Requirements i.e. PPE etcHealth and Safety DocumentationHealth and Safety Policy StatementWho to contact on site with regards to health, safety, equipmentNon compliant waste identification and notificationAny hazardous materials / substancesSite specific risksOn completion all personnel shall sign the Max Recycle “induction register”confirming their understanding and acceptance of all information as discussed withinthe induction.Tool Box Talks shall be given by Max Recycle covering the risks associated with thespecific working activity being undertaken. Tool Box Talks shall also be used tocommunicate to all staff where ever working activities or site conditions havechanged.Minimum PPE to be worn on this site shall be safety helmets, safety footwear, hivisibility clothing. Further PPE, if required, shall be obtained from the TransportManager in accordance with the risk assessment for the task being undertaken.12. Sub-Contracted Elements andControl:13. Client or site specific safety rulesthat apply to the project:14. Personnel involved in working,planning and controlling activitieson site, including managers,supervisors.It is not our intention to use sub-contractors on this contract.General Safety regulations applyNameRoleCompetence DetailsPatrick RocheOperations DirectorWamitab COTC, DGSA,CPC – National RoadHauilageDavid TateTransport ManagerCertificate of ProfessionalCompetence – NationalRoad HaulagePage 4 of 10
Natalie EwingAccount ManagerCertificate of ProfessionalCompetence – NationalRoad HaulageOperational Staff (TBC)Driving waste collectionvehiclesLGV Cat C, Drivers CPC15. Welfare Facilities:No welfare facilities are required for the contractor’s staff.16. Waste Containment:The appropriate waste containers shall be delivered to site at the commencement ofthe contract as required by the tender specification. All waste containers once fullshall be emptied or removed from site and where applicable replaced with emptyones. An exclusion zone shall be established around the skips once on site. Ifpossible, skips shall be placed to ensure access and egress for other interestedparties is not compromised. Waste containers will only be placed on hard smoothsurfaces which offer ease of access.17. Disposal of Waste MaterialsDisposal of all waste materials will be in accordance with current regulationrequirements. Waste will be transported by Max Recycle (a registered carrier) to alicensed facility – strictly in accordance with all current Waste Regulations.Non-compliant wastes which are identified will be removed from the container whereit is safe to do so, put to one side, and The Customer personnel advised.If a non-compliant waste is identified when the container/vehicle has reached adisposal point a non-compliance form will be raised, the waste quarantined, and theCustomer contacted to discuss the next steps required.18. Scope of Works:Emptying wheeled units containing General Mixed Municipal Waste EWC 200301Emptying wheeled units containing waste glass EWC 150107Emptying wheeled units containing Dry Mixed Recycling waste EWC 150106Removing emptying and replacing skip and RoRo’s from 8cu to 40cuVarious non-hazardous EWC codes, including those mentioned above.19. Vehicles to be used on site:32 Tonne Hookloader26 Tonne Refuse Collection Vehicle18 Tonne Telehoist3.5 Tonne Box Van20. Sequence of OperationsOperatives will arrive on site then, in normal circumstances, follow a setroute to bin stores/collection areas to empty, remove, replace wastecontainers. Where applicable wheel brakes will be reapplied when thecontainer has been emptied and returned to its collection point.Max Recycle trucks and vans will be assisted by a banksman whenoperating on The Customer premises to ensure manoeuvres are alwayscarried out safely.All movements will try to avoid peak times to ease any traffic problems andto reduce risk to pedestrians etc. A timetable for collections will be agreedwith the Customer prior to the commencement of the contract. This will beregularly reviewed to ensure efficiency of service and safety of all interestedparties.All wastes will be segregated at source and loaded into the appropriatewheeled units, skips or RoRo’s.Upon the completion of the collections the site will be left tidy at all times.21. Hot Works:N/A22. Completion Arrangements:On completion of the works, or at regular intervals, Max Recycle Manager’s shallseek confirmation from The Customer representatives that the works have beencompleted to their satisfaction. Only once the Customer is satisfied can works onsite be considered to be complete.Page 5 of 10
The site shall be left in a clean, tidy and safe condition.23. Amendments:The above safe method of works should not be considered to a final or exhaustivedocument. Working methods may change during the course of the contract fromthat which were originally envisaged.Where working practices do change the safe method of work shall be amended toreflect this. In such circumstances all personnel shall be given a toolbox talk, by theContract Manager to cover all amendments made. All personnel are required to signand date the sheet attached with the amendment to confirm their understanding andacceptance of the change in working practices.Any amendments to the safety method statement shall be developed directly by thecontract management team in conjunction with The Customer representatives.24. Site Safety:Max Recycle personnel will check that they leave The Customer premises in a safeand secure condition. If there are any problems encountered while carrying outcollections the management team must be informed immediately, who will thenmake contact with the Customer to resolve the situation.25. Environmental Considerations:As part of the company’s ongoing commitment to the environment and our aim forcontinual improvement we shall strive to reduce dust, noise, waste and emissionspollution created through our working processes to as far as reasonably practicable.a.NoiseAll vehicles used are of the appropriate specification to best suit our needs.All plant and equipment are serviced regularly and kept well maintained.All vehicles/containers shall be positioned strategically on site and be inoperation at suitable times to avoid any nuisance concerns to localresidents, especially within sensitive areas.b.DustAgain vehicles/equipment shall be positioned accordingly on site to ensureminimum disturbance to the local residents by any dust created by theservice.If found necessary noise and dust emissions deemed shall be monitoredand measured using suitable equipment.26. Documentation to Present:Suitable and sufficient management arrangements shall be provided to enable thiscontract to be ran in a safe manner with good levels of communication, co-ordinationand co-operation. The following information and instruction resources shall bereadily available to ensure that this is provided: 27. Emergency Preparedness – includethe procedures to be put in place onthis site for accidents, disturbanceevents, major spillages, etc:Safety method statementsRisk / COSHH assessmentsPermit to work, if requiredPersonnel training filesVehicle certificationEmergency proceduresSite ruleHealth and safety policy statementEnvironmental policy statementCollection schedule/diaryInduction formsAttendance formsPPE registerMaterials/container logTool box talksOther postersStandard Procedures in place to contain and remedy any such event.All vehicles to carry spill kits, fire extinguishers and first aid kits etc.Page 6 of 10
28. Emergency Procedures:In the event of a fire on site all persons shall follow the information given within thesite specific safety induction and emergency procedures notices. A fire assemblypoint will be identified at the outset of the contract as well as any location where firstaid is available.All personnel should retreat to a place of safety in the event of an emergency whenon site.All Max Recycle employees are issued with mobile phones which can be used tocontact the emergency services, Max Recycle management and The Customerpersonnel.Name of Max Recyclefirst aiderRobert Roche (training refresher undertaken (11/2018)All vehicles29. First AidFirst aid box or medicalcentre location:30. Nearest Hospital:Royal Victoria Infirmary, Queen Victoria Rd. Newcastle, NE1 4LP31. COSHH hazardoussubstances likely to beused:Applicable to this project or works:Toxic orVery ToxicHarmful orIrritantNoNoCorrosiveDangerousfor es - DieselNoNoNoPage 7 of 10
PPE RequirementsPPE ItemsApplicable:Specify the exactType of PPE to beworn on this siteand/or doing thistaskState the Safety and/or OccupationalHealth Reason the Item is neededYesStandard IssuePrevent crushing and penetration of the soleby sharp objectsYesStandard IssuePrevent head injuries from falling objects orthose obstructing access/workingenvironmentYesStandard IssuePrevent skin being damaged by puncture,abrasion, irritants, dirt and offensivematerials.YesStandard issuePrevent damage to hearing throughexcessive noise.NoOSafety BootsHard HatsPersonnel ProtectiveEquipment Requirements:use this section to specifyitems of standard andspecialistThe minimum items ofPPE needed when onsite are: hard hat correct gloves for thetask lace up boots (notshoes) high visibility outerwear covered up – no barearms & legsSafety GlovesHearingProtectionEye ProtectionNoFace ProtectionYesHeavy duty workweartrousers, sweatshirts,jackets and bodywarmersPrevent exposure to materials which couldbe an irritant, hazardous to health and toensure that personnel are comfortable whilecarrying out their roleYesStandard issueEasy identification even in areas of low light.Body Cover /OverallsHigh VisibilityNoRespiratoryProtectionAny Other PPE SpecialistItems needed, forexample:- State DetailsHead torch for working in areas of restricted light or outside daytime hoursPage 8 of 10
32. Method Statement Briefing RecordThis document must be briefed to operatives, client employees and others as needed.Max Recycle Briefing delivered by: Patrick RochePosition: Operations DirectorDate: 17th December 2018We (the undersigned) have been briefed on; we have read and understood the attached methodstatement and will comply with the specified requirements and control measures. If the work activitychanges or deviates from that originally envisaged, we will seek further advice and request an amendedmethod statement.Name (Print):Signature:Date:David TateNatalie EwingCollection staff (TBC)This method statement of work was compiled by Max Recycle. Under no circumstancesmust it be used in any other way than intended, copied or altered.33.Quality AssurancePage 9 of 10
This safety Method Statement has been prepared by:Signature Patrick RocheName Patrick RocheDate 17.12.2018This safety Method Statement has been reviewed by:Signature Scott HawthorneName Scott HawthorneDate 19.12.2018This safety Method Statement has been Accepted by (Client):SignatureNameDatePage 10 of 10
Donna Ingram Financial Director Office 0191 3851300 David Tate Transport Manager Office 0191 3851300 Natalie Ewing Account Manager Office 0191 3851300 11. Site Induction & Procedures: All personnel are to receive a site specific induction to be undertaken by Max Recycle in conjunction with the relevant Customer personnel.