SANTA CRUZ METROPOLITAN TRANSIT DISTRICTInvitation for Bids (IFB) for Construction of theJudy K. SouzaOperations Facility , Parki ng Structure andRelated S ite WorkSanta Cruz METRO IFB No. 12-23Date Issued: June 29, 2012Bid Deadline: 2:00 p.m., August 23, 2012Contents of this IFB1. Volume 1: Bidding and Contracting RequirementsPart I.Instructions to BiddersPart II.Bid FormPart III.General Conditions of the ContractPart IV.Special Conditions of the ContractPart V.ContractPart VI.FTA Requirements for Construction ContractsPart VII.Protest Procedures2. Volume 2: Construction Specifications Divisions 1 - 93. Volume 3: Construction Specifications Divisions 10 - 164. Construction DrawingsVolume 3 of 3Construction Specifications Divisions 10 - 16

DOCUMENT 00005CERTIFICATIONS PAGESanta Cruz Metropolitan Transit DistrictMetrobase Project, Operations BuildingVolume 3 of 3: Introductory Information, Divisions 10 through 16We hereby certify that these Contract Documents have been prepared by us or under our direct supervision in accordance with therules and regulations governing the Architects and Engineers practicing in the State of California.ArchitectRNL Design333 South Grand Ave; Suite. 1480Los Angeles, CA 90017Mechanical EngineerJacobsFrank H. Ogawa Plaza; Ste. 10Oakland, CA 94612Electrical EngineerJacobsFrank H. Ogawa Plaza; Ste. 10Oakland, CA 94612RNL Design00005 - 1CERTIFICATIONS PAGE6040-1569-09

DOCUMENT 00006PROJECT DIRECTORYSanta Cruz Metropolitan Transit DistrictMetrobase Project, Operations BuildingOwnerSanta Cruz METRO110 Vernon StreetSanta Cruz, CA 95060Les Whitelwhite@scmtd.comFrank Chengfcheng@scmtd.com831-426-6080Fax 831-426-6117Ed Carfagno, Principaled.carfagno@rnldesign.comHenry Leung, Project Architecthenry.leung@rnldesign.com213-955-9775Fax 213-955-9885Mark Mesiti-Millermark@mme.comRodney Cahilrodney@m-me.com831-426-3186Fax 831-426-6607Joni Janeckijlj@jlja.comNicole Steelnjs@jlja.com831-423-6040Fax 831-423-6054Mark Mesiti-Millermark@mme.comDale Hendsbeedale@m-me.com831-426-3186Fax 831-426-6607Scott Andersonscott.anderson@teecom.com510-337-2800Fax 510-337-2804Darin Stuartdarin.stuart@jacobs.com510-457-0027Fax 510-457-0037Darin Stuartstuartdl@c-b.com510-457-0027Fax 510-457-0037Pat ShiresDavid Schrierdschrier@conttonshires.com408-354-5542Fax 408-354-1852ArchitectRNL Design333 South Grand Ave; Ste. 1480Los Angeles, CA 90017Civil EngineerMesiti-Miller Engineering224 Walnut Avenue; Ste.BSanta Cruz, CA 95060Landscape ArchitectJoni L. Janecki & Associates515 Swift StreetSanta Cruz, CA 95060Structural EngineerMesiti-Miller Engineering224 Walnut Avenue; Ste.BSanta Cruz, CA 95060Security / Data ConsultantTEECOM1333 Broadway; Ste. 601Oakland, CA 94612-1906Mechanical EngineerJacobsFrank H. Ogawa Plaza; Ste. 10Oakland, CA 94612Electrical EngineerJacobsFrank H. Ogawa Plaza; Ste. 10Oakland, CA 94612Geotechnical ConsultantCotton Shires & Associates330 Village LaneLos Gatos, CA 95030-7218END OF DOCUMENT 00006RNL Design00006 - 1PROJECT DIRECTORY6040-1569-09

DOCUMENT 00010TABLE OF CONTENTSSanta Cruz Metropolitan Transit DistrictMetrobase Project, Operations BuildingVolume 1 of 3: Introductory Information, Bidding and Contracting RequirementsINTRODUCTORY INFORMATION000050000600010CERTIFICATIONS PAGE [RNL]PROJECT DIRECTORY [RNL][RNL]TABLE OF CONTENTSBIDDING AND CONTRACTING REQUIREMENTS[SCMTD]INVITATION FOR BIDSI.Instructions to BiddersII.Bid FormDocument 1 - Bid FormDocument 2 - Statement Of Bidder’s Qualifications, Experience, Financial Viability, And Ability & Project CapacityDocument 3 - Non-Collusion Declaration To Be Executed By Bidder And Submitted With BidDocument 4 - Bidder’s BondDocument 5 - Certification Of Proposed Contractor Regarding Debarment, Suspension And Other Ineligibility AndVoluntary ExclusionDocument 6 - Certification Of Proposed Subcontractor Regarding Debarment, Suspension And Other Ineligibility AndVoluntary Exclusion (over 100,000)Document 7 - Certification Of Proposed Subcontractor Regarding Debarment, Suspension And Other Ineligibility AndVoluntary Exclusion ( 100,000 or less)Document 8 - Disclosure Of Governmental PositionsDocument 9 - Designation Of SubcontractorsDocument 10 - Buy America CertificateDocument 11 - Certification Regarding Lobbying & Disclosure Form To Report Lobbying ActivitiesDocument 12 - Statement Of ComplianceDocument 13 - Apprenticeship Employment CertificationDocument 14 - Workers’ Compensation CertificationDocument 15 - Conflict Of Interest Statement & ChecklistDocument 16 - Levine Act Disclosure StatementDocument 17 - Organizational Conflicts Of Interest Disclosure StatementDocument 18 - Acknowledgment Of AddendaIII.IV.V.General Conditions of the ContractSpecial Conditions of the ContractContractSample contractPayment BondFaithful Performance BondVI.FTA Requirements for Construction ContractsFederal Transit Administration (FTA) Requirements for Construction ContractsAttachment A - Notice To Bidders/Proposers Disadvantaged Business Enterprise InformationAttachment B - Standard Agreement For Subcontractor/DBE ParticipationVII. Protest Procedures00320 GEOTECHNICAL INVESTIGATION INFORMATIONRNL Design[RNL]00010 - 1TABLE OF CONTENTS6040-1569-09

Volume 2 of 3: Introductory Information, Divisions 1 through 9INTRODUCTORY INFORMATION000050000600010CERTIFICATIONS PAGE [RNL]PROJECT DIRECTORY [RNL]TABLE OF CONTENTS [RNL]DIVISION 1 - GENERAL 0001420015000157301600017000173101770SUMMARY [RNL]SPECIAL REQUIREMENTS FOR WORK SEQUENCINGCONTRACT MODIFICATION PROCEDURES [RNL]PAYMENT PROCEDURES [RNL]PROJECT MANAGEMENT AND COORDINATION [RNL]CONSTRUCTION PROGRESS DOCUMENTATION [RNL]SUBMITTAL PROCEDURES [RNL]QUALITY REQUIREMENTS [RNL]REFERENCES [RNL]TEMPORARY FACILITIES AND CONTROLS [RNL]TEMPORARY MOISTURE CONTROLS [RNL]PRODUCT REQUIREMENTS [RNL]EXECUTION REQUIREMENTS [RNL]CUTTING AND PATCHING [RNL]CLOSEOUT PROCEDURES [RNL][RNL]DIVISION 2 - SITE 210274002750027630281002830028400287002872RNL DesignEXISTING PLANTS TO REMAIN [JLJ]FINISH GRADING [JLJ]BUILDING DEMOLITION [RNL]SITE CLEARING [MME]AGGREGATE BASE COURSE [MME]EXCAVATION [MME]BACKFILLL [MME]TRENCHING [MME]EROSION CONTROL [MME]PRESTRESSED CONCRETE PILES [MME]SITE WATER DISTRIBUTION [MME]PRECAST CONCRETE PAVING [JLJ]SITE SANITARY SEWER SYSTEMS [MME]NATURAL GAS DISTRIBUTION [MME]MANHOLES AND COVERS [MME]SUBDRAINAGE SYSTEMS [MME]STORM DRAINAGE [MME]STORMWATER TREATMENT SYSTEM [MME]FLEXIBLE PAVEMENT [MME]RIGID PAVEMENT [MME]PAVEMENT MARKINGS AND STRIPING [RNL]AUTOMATIC IRRIGATION SYSTEM [JLJ]CHAIN LINK FENCING [MME]SIGNAGE [RNL]SITE AND STREET FURNISHINGS [JLJ]BICYCLE RACKS [MME]00010 - 2TABLE OF CONTENTS6040-1569-09

029200295002970SOIL PREPARATION [JLJ]PLANTING [JLJ]LANDSCAPE MAINTENANCE[JLJ]DIVISION 3 - CONCRETE0310003200033000333003480CONCRETE FORMWORK [MME]CONCRETE REINFORCEMENT [MME]CAST-IN-PLACE CONCRETE [MME]ARCHITECTURAL CONCRETE [RNL]PRECAST CONCRETE VALVE VAULT[MME]DIVISION 4 - MASONRY04200UNIT MASONRY[MME]DIVISION 5 - 005720STRUCTURAL STEEL [MME]STEEL DECK [MME]COLD-FORMED METAL FRAMING [MME]METAL FABRICATIONS [RNL]METAL STAIRS [RNL]PIPE AND TUBE RAILINGS [RNL]HEAVY DUTY MODULAR RAILINGS [RNL]GRATINGS [RNL]PERFORATED SHEET METAL [RNL]DECORATIVE METAL RAILINGS [RNL]DIVISION 6 - WOOD AND PLASTICS061050616006402MISCELLANEOUS CARPENTRY [RNL]GYPSUM SHEATHING [RNL]INTERIOR ARCHITECTURAL WOODWORK[RNL]DIVISION 7 - THERMAL AND MOISTURE 0762007770078410784207843079200792107922RNL Design[RNL]BITUMINOUS DAMPPROOFING[RNL]TRAFFIC COATINGSWATER REPELLENTS [RNL]BUILDING INSULATION [RNL]CONTINUOUS BOARD INSULATION [RNL]PLASTIC SHEET AIR BARRIERS [RNL]REAR-VENTILATED FIBER-REINFORCED CEMENTITIOUS FACADE PANEL SYSTEMADHERED POLYVINYL-CHLORIDE (PVC) ROOFING [RNL]SHEET METAL FLASHING AND TRIM [RNL]ROOF SCREEN WALL SUPPORT [RNL]THROUGH-PENETRATION FIRESTOP SYSTEMS [RNL]FIRE RESISTIVE JOINT SYSTEMS [RNL]BUILDING PERIMETER FIRESTOPPING [RNL]JOINT SEALANTS [RNL]ACOUSTICAL JOINT SEALANTS [RNL]ACOUSTICAL CONTROL PUTTY PADS [RNL]00010 - 3TABLE OF CONTENTS[RNL]6040-1569-09

DIVISION 8 - DOORS AND 00871008800088400890008950STANDARD HOLLOE METAL DOORS AND FRAMES [RNL]INTERIOR ALUMINUM FRAMES [RNL]PLASTIC-LAMINATE-FACED WOOD DOORS [RNL]ACCESS DOORS AND FRAMES [RNL]OVERHEAD FIRE-RATED COILING SHUTTERS [RNL]OPEN-CURTAIN OVERHEAD COILING GRILLES [RNL]ALUMINUM-FRAMED ENTRANCES, STOREFRONTS, AND WINDOWALL-GLASS ENTRANCE DOORS [RNL]SLIDING ALUMINUM COUNTER WINDOWS [RNL]DOOR HARDWARE [RNL]GLAZING [RNL]PLASTIC GLAZING [RNL]GLAZED ALUMINUM CURTAIN WALL [RNL]POLYCARBONATE GLAZED WALL ASSEMBLIES [RNL][RNL]DIVISION 9 - 654099100991109912GYPSUM BOARD ASSEMBLIES [RNL]CERAMIC TILE [RNL]ACOUSTICAL PANEL CEILINGS [RNL]LUMINOUS CEILINGS [RNL]CONCRETE MOISTURE VAPOR EMISSION AND pH TESTING [RNL]FLUID APPLIED CONCRETE SEALER, DENSIFIER AND HARDENERSLIP RESISTANT STAIR TREAD STRIPING [RNL]RESILIENT WALL BASE AND ACCESSORIES [RNL]LINOLEUM FLOOR COVERINGS [RNL]INTERIOR PAVEMENT MARKING [RNL]EXTERIOR PAINTING [RNL]INTERIOR PAINTING [RNL][RNL]Volume 3 of 3: Introductory Information, Divisions 10 through 16INTRODUCTORY INFORMATION000050000600010[RNL]CERTIFICATIONS PAGE[RNL]PROJECT DIRECTORY[RNL]TABLE OF CONTENTSDIVISION 10 - SPECIALTIES10101101601044010505105201052110550RNL Design[RNL]MARKERBOARDS[RNL]METAL TOILET COMPARTMENTS[RNL]INTERIOR BUILDING SIGNAGE[RNL]METAL LOCKERS[RNL]FIRE EXTINGUISHERS AND BRACKETS[RNL]PORTABLE FIRE EXTINGUISHER CABINETS[RNL]POSTAL SPECIALTIES00010 - 4TABLE OF CONTENTS6040-1569-09

106051065110801CHAIN-LINK PARTITIONS AND GATES [RNL]MANUALLY OPERATED ACOUSTICAL PANEL PARTITIONS [RNL]TOILET ROOM ACCESSORIES [RNL]DIVISION 11 - EQUIPMENT1102011132FIRE DEPARTMENT KEY BOX [RNL]FIXED PROJECTION SCREENS [RNL]DIVISION 12 - FURNISHINGS (Not Used)DIVISION 13 - SPECIAL IC SECURITY SYSTEM REQUIREMENTS [TCM]ACCESS CONTROL AND ALARM MONITORING SYSTEMVIDEO SURVEILLANCE [TCM]SECURITY SYSTEM CABLING [TCM]SECURITY SYSTEM LABELING [TCM]SECURITY SYSTEM COMMISSIONING [TCM]FIRE PROTECTION SYSTEMS [JE][TCM]DIVISION 14 - CONVEYING SYSTEMS14240HYDRAULIC ELEVATORS[RNL]DIVISION 15 - 1555015642157321573715740158101582015834RNL DesignMECHANICAL GENERAL PROVISIONS [JE]SUBMITTALS [JE]OPERATION AND MAINTENANCE MANUALS [JE]HANGERS AND SUPPORTS [JE]VIBRATION ISOLATION [JE]MECHANICAL IDENTIFICATION [JE]DUCT INSULATION [JE]PIPING INSULATION [JE]PIPING SPECIALTIES [JE][JE]PUMPSDOMESTIC WATER AND SANITARY DRAINAGE PIPINGSTORM DRAINAGE PIPING [JE]REFRIGERATION PIPING AND SPECIALTIES [JE]CHEMICAL WATER TREATMENT [JE]NATURAL GAS PIPING [JE]PLUMBING FIXTURES [JE]DOMESTIC WATER HEATERS [JE]HEATING BOILER AND ACCESSORIES [JE]FLUE PIPE [JE]CLOSED CIRCUIT COOLING TOWER [JE]PACKAGED ROOFTOP AIR CONDITIONING UNITS [JE]SPLIT SYSTEM AIR CONDITIONERS [JE]WATER SOURCE HEAT PUMP UNITS [JE]DUCTS [JE]DUCT ACCESSORIES [JE]CENTRIFUGAL FANS [JE]00010 - 5TABLE OF CONTENTS[JE]6040-1569-09

1583615850158621590015950POWER VENTILATORS [JE]AIR OUTLETS AND INLETS [JE]AIR FILTERS [JE]CONTROLS [JE]TESTING, ADJUSTING, AND BALANCING[JE]DIVISION 16 - 16900ELECTRICAL GENERAL PROVISIONS [JE]SUBMITTALS [JE]OPERATION AND MAINTENANCE MANUALS [JE]ELECTRICAL SYSTEM COORDINATION STUDY [JE]ELECTRICAL DEMOLITION [JE]GROUNDING AND BONDING SYSTEMS [JE]TELECOMMUNICATIONS GROUNDING BACKBONE [JE]SUPPORTING DEVICES [JE]SEISMIC CONTROLS FOR ELECTRICAL WORK [JE]ELECTRICAL IDENTIFICATION [JE]ELECTRICAL TESTING [JE]WIRE AND CABLE [JE]BOXES [JE]CONDUIT [JE]WIREWAYS [JE]WIRING DEVICES [JE]WIRE CONNECTIONS AND DEVICES [JE]SERVICE ENTRANCE [JE]ENGINE GENERATOR [JE]DRY TYPE TRANSFORMERS [JE]TRANSIENT VOLTAGE SURGE SUPPRESSORS [JE]DISCONNECT SWITCHES [JE]CONTACTORS [JE]INDIVIDUAL MOTOR STARTERS [JE]SWITCHBOARDS [JE]PANELBOARDS [JE]FUSES [JE]LIGHTING FIXTURES - BUILDING [JE]LIGHTING FIXTURES - SITE [JE][JE]EMERGENCY LIGHTING[TCM]TELECOMMUNICATIONS BASIC REQUIREMENTS[TCM]TELECOMMUNICATIONS EQUIPMENT ROOMSTELECOMMUNICATIONS BONDING [TCM]TELECOMMUNICATIONS HORIZONTAL CABLING [TCM]TELECOMMUNICATIONS BACKBONE TWISTED PAIR CABLING [TCM]TELECOMMUNICATIONS BACKBONE FIBER OPTIC CABLING [TCM]TELECOMMUNICATIONS TESTING [TCM]FIRE ALARM SYSTEMS [JE]LIGHTING CONTROL SYSTEMS [JE]END OF DOCUMENT 00010RNL Design00010 - 6TABLE OF CONTENTS6040-1569-09

SECTION 10101MARKERBOARDSPART 1 - GENERAL1.01 RELATED DOCUMENTSA.Drawings and general provisions of the Contract, including Invitation For Bids (IFB)and other Division 1 Specification Sections, apply to this Section.1.02 SUMMARYA.This Section includes markerboards.1.03 SUBMITTALSA.Product Data: For each type of product indicated.B.Shop Drawings: Include plans, elevations, sections, details, and attachments to otherwork.1.Include sections of typical trim members.C. Samples for Initial Selection: For each type of marker board surface indicated and asfollows:1.Samples of accessories involving color selection.D. Maintenance Data: For marker boards to include in maintenance manuals.E.Warranties: Special warranties specified in this Section.1.04 QUALITY ASSURANCEA.Source Limitations: Obtain each type of marker board through one source from asingle manufacturer.1.05 DELIVERY, STORAGE, AND HANDLINGA.Deliver factory-built marker boards, including factory-applied trim where indicated,completely assembled in one piece.B.Store marker board units vertically with packing materials between each unit.1.06 WARRANTYA.Special Warranty for P

Construction Specifications Divisions 10 - 16 SANTA CRUZ METROPOLITAN TRANSIT DISTRICT Invitation for Bids (IFB) for Construction of the Judy K. Souza Operations Facility, Parking Structure and Related Site Work Santa Cruz METRO IFB No. 12-23 Date Issued: June 29, 2012 Bid Deadline: 2:00 p.m., August 23, 2012 Contents of this IFB 1. Volume 1: Bidding and Contracting Requirements