Tenderer Occupational Health And Safety (Ohs) Management System .

Transcription

TENDERER OCCUPATIONAL HEALTH AND SAFETY (OHS) MANAGEMENT SYSTEMQUESTIONNAIREThis questionnaire forms part of the SANBI tender evaluation process and is to be completed bytenderers and submitted with their tender offer. The objective of the questionnaire is to provide anoverview of the status of the tenderers’ OHS management system. Tenderers will be required toverify their responses noted in their questionnaire by providing evidence of their ability and capacityin relevant matters.DeclarationThe information provided in this questionnaire is an accurate summary of the company’s occupationalhealth and safety management system.Company name:Signed:Position:Name:Date:Contract detailsContract name:Contract number:Tenderers are required to supply evidence to the questions posed below(see the client’s checklist of what will be considered):1.OHS policy and managementYes1.1 Is there a written company health and safety policy?If yes, provide a copy of the policy.Comments:1.2 Does the company have an OHS management system certified by aa recognised independent authority, e.g. NOSA?If yes, provide details:1No

Tenderer occupational health and safety (OHS) management system questionnaire1.3 Is there a company OHS management system file available?If yes, prepare and provide when requested.Comments:1.4 Are health and safety responsibilities clearly identified for all levelsof staff employed?If yes, provide appointment letters.2.Safe work practices and procedures2.1 Has the company prepared safe operating procedures or specificsafety instructions relevant to its operations?If yes, provide a summary listing of procedures or instructions.Comments:2.2 Is the company registered with the Compensation Commissioner?If yes, provide a letter of good standing for the company.2.3 Is there a documented incident investigation procedure?If yes, provide a copy of a standard incident report form.2.4 Are there procedures for maintaining, inspecting and assessingthe hazards of plant operated/machinery owned by the company?If yes, provide procedure document.2.5 Are there procedures for storing and handling of hazardoussubstances?If yes, provide a copy of a procedure document.2.6 Are there procedures for identifying, assessing and controllingrisks associated with manual handling?If yes, provide a copy of procedure and risk assessmentdocuments.3.OHS training3.1 Are records maintained of all training and induction programmesundertaken for employees in your company?If yes, provide examples of the safety training records, especially2

Tenderer occupational health and safety (OHS) management system questionnairefor employees to be utilised.4.Health and safety workplace inspection4.1 Are regular health and safety inspections undertaken at worksites?If yes, provide a copy of such inspection checklists.4.2 Is there a procedure in place for employees to report hazards atthe workplace?If yes, provide an incident reporting procedural document asexample.5.Health and safety consultation5.1 Is there a workplace health and safety committee?5.2 Are there employees elected as health and safety representatives?Comments:6.OHS performance monitoring6.1 Is there a system in place for recording and analysing health andsafety performance statistics?If yes, provide details of such recordings and analyses:6.2 Are employees regularly provided with information on thecompany’s health and safety performance?If yes, provide details of what was communicated:6.3 Has the company ever been convicted of an occupational healthand safety offence?If yes, provide details of the offence, outcomes and correctivemeasures implemented:3

Tenderer occupational health and safety (OHS) management system questionnaire6.4 Additional checklistsThe OHS department must be consulted to provide all otherrelevant forms.7.Company references7.1 Please provide the following information for the three most recentcontracts completed by the company:Contract 1 Contract 2 Contract 3Contract description:Client:Contact person:Phone number:Number of lost time injuries:Number of person days on contract:Total days lost due to injuries:REVIEW OF TENDERER’S OHS MANAGEMENT SYSTEM QUESTIONNAIREContract name:Contract description:Contract manager:Contractor:Indicate in the following manner: – acceptable1.Date: – not acceptableN/A – not applicableOHS policy and managementCompany health and safety policyThe policy provided by the tenderer should indicate the following: Be signed by the CEO or equivalent Outline clear objective statements Show commitment to improve performance Be relevant to the company’s operations Be reviewed on a regular basis (at least once a year)Certified OHS management systemCertification demonstrates that the tenderer meets the minimumstandards, and that it was verified by an independent party.4

Tenderer occupational health and safety (OHS) management system questionnaire The company indicated the independent party, e.g.:NOSA, etc. Indicated certificationOHS management system or planThe company's OHS manual or plan should have included as aminimumthe following:the following: An OHS policy Management’s OHS responsibilities General OHS procedures Safe work procedures relevant to the company’s operations A waste management plan and procedures An incident/accident management plan and procedures Induction and training procedures Issued resolution and OHS consultation mechanismsHealth and safety responsibilitiesHealth and safety responsibilities in the company should have beendocumented and must demonstrate the following: OHS responsibility statements Employee’s job description (especially those utilized for theproject) Demonstrate formal and informal performance appraisal on Healthand Safety issues Issued and signed appointment letters Accountability of line managers and supervisors for health andsafety performance of their employees.2.Safe work practices and proceduresThe tenderer should have demonstrated safe work procedureswhich: Are relevant to the company's operations Contain a description of the tasks and associated hazards Outlined control measures and methods to minimize health andsafety risks Make reference to any relevant legislation, codes of practice,standards or regulationsSafe work permitsWhere relevant, the tenderer should have demonstrated thatsafe work permits for the following types of work have been issued: Work in confined spaces (confined space entry permits) Hot work (hot work permits) Lockout permits (plant, electrical systems, steam)Incident reporting and investigationTenderers should have provided evidence of the following: Incident/accident reporting and investigation form5

Tenderer occupational health and safety (OHS) management system questionnaire Incident/accident investigation procedure Evidence of completed investigation forms Corrective measure adopted to correct future similar situationsPlant safetyThe tenderer should demonstrate that mechanisms are in place forthe identification of hazards, assessment of risks and theimplementation of control measures associated with the plant. Thisshould have included: Documented risk assessments for the relevant plant or riskassessment procedure A copy of plant operator licenses and/or permits A register of plant requiring registration A list of persons responsible for undertaking plant riskassessments Plant maintenance and inspection forms Pre-start daily safety inspection forms for plant Plant fault reporting system and forms Public and client employee health and safety reportsHazardous substancesTenderer should have provided evidence to demonstrate the safehandling and storage of hazardous substances by supplying thefollowing documentation: A manifest or register of chemicals used by the company Copies of material safety data sheets for chemicals used Safe handling procedures, including personal protective equipmentissued Proof of the relevant trainingManual handlingThe tenderer should have supplied documented evidence of thefollowing: The risk assessments for manual handling of hazards Systems used to control manual handling of risks e.g. lifting aids,work procedures, etc.3.OHS trainingTenderer should have supplied evidence of the following: Training records and competencies of employees (licenses,permits, certificates) Records of ‘on the job’ training Toolbox talk sessions conducted Induction training programmes4.Health and safety workplace inspectionsRegular inspections undertaken6

Tenderer occupational health and safety (OHS) management system questionnaireTenderer should have provided evidence of the following: Plant inspection schedules Completed inspection reports Types of inspections undertakenStandard inspection checklistsTenderer should have supplied:Copies of the types of inspection checklists used.Hazard reporting from tendererThe tenderer should have supplied evidence of the following: Documented hazard reporting procedures and forms Copies of completed hazard reports5.Health and safety consultationHealth and safety committeeThe tenderer should have supplied evidence of the following: Structure of the committee/s Meeting schedule/s Minutes of meetingsEmployee consultationThe tenderer should have provided evidence of the following: The list of employee health and safety representatives Documented procedures for consultation and dissemination ofinformation Employee involvement in inspections and accident investigations6.OHS performance monitoringSafety performance statisticsThe tenderer should have supplied evidence of the following: Reports on the company’s health and safety injury trend data Performance targets established e.g. lost time injuries, persondays lost, etc.Health and safety performance informationThe tenderer should have supplied evidence of the following: Records of who received reports Types of reports produced and suppliedConviction of health and safety offenceIf the tenderer had been convicted of a health and safety offence,details/casefile should be supply for the client to determine: The nature and circumstances of the incident/accident Proof of corrective actions undertaken7

Tenderer occupational health and safety (OHS) management system questionnaireComments:The checklist below is included as a guide only and may be modified to suit specific contractrequirements.GENERAL HEALTH AND SAFETY CHECKLISTContract name:Contract description:Contractor:Worksite location:Persons completing inspection:Indicate in the following manner: – 21.131.141.152.2.12.22.32.42.52.62.7Date: – not acceptableN/A – not applicableHealth and safety systems evidence:OHS policy displayedAccident report book availableInduction recordsRehabilitation policy availableWorkplace inspection recordsEmergency proceduresTraining recordsDocumented safe work proceduresProtective clothing and equipment recordsMaterial safety data sheets (MSDS) availableHealth and safety systems manualHealth and safety representatives appointedManagement safety representative appointedContract risk assessment availableContract health and safety plan availableHousekeepingWork areas free from rubbish and obstructionsSurfaces safe and suitableSurfaces free from slip/trip hazardsFloor openings coveredStock/material stored safelyAisles:Unobstructed and clearly definedAdequate lighting8

Tenderer occupational health and safety (OHS) management system questionnaire2.8 Vision at corners2.9 Wide 3ElectricalNo broken plugs, sockets, switches, etc.No frayed or defective leadsPower tools in good conditionNo work near exposed live electrical equipmentTools and leads inspected and taggedNo strained leadsNo cable-trip hazardsSwitches/circuits identifiedLock-out procedures/danger tags in placeEarth leakage systems usedStart/stop switches clearly identifiedSwitchboards securedAppropriate fire fighting equipment4.14.24.34.44.54.64.74.84.94.104.11Mobile plant and equipmentPlant and equipment in good conditionDaily safety inspection procedures/checklistsFault reporting/rectification system usedOperators trained and licensedWarning and instructions displayedWarning lights operationalReversing alarm operationalSatisfactory operating practicesFire extinguisher in good condition and operationalTyres satisfactorySWL of lifting or carrying equipment .26.36.4Machinery and workbenchesAdequate work spaceClean and tidyFree from excess oil and greaseAdequately guardedWarnings or instructions displayedEmergency stops appropriately placed and clearly identifiableOperated safely and correctlyWorkbenches:Clear of rubbishTools in proper placeDuckboards or floor mats providedHazardous substancesStored appropriatelyContainers labelled correctlyAdequate ventilation/exhaust systemsProtective clothing/equipment available/issued and used9

Tenderer occupational health and safety (OHS) management system questionnairePersonal hygiene – dermatitis controlWaste disposal proceduresMaterial safety data sheets (MSDS) availableChemical handling procedures followedChemical register keptAppropriate emergency/first aid equipment (shower, eye bath,extinguishers)6.11 Hazchem signing 77.87.9WeldingGas bottles securely fixed to trolleyWelding fumes well ventilatedFire extinguisher near work areaOnly flint guns used to light torchFlash back spark arresters fittedVision screens used for electric weldingLPG bottles within 10 year stampPersonal protective equipment issued and wornHot work permit system used8.18.28.38.48.58.68.7ExcavationsShoring in place and in sound conditionExcavation well securedSignage displayedBanks battered correctly and spoil away from edgeClear and safe access around excavationSeparate access and egress points from excavationSafe work procedure in place9.19.29.39.49.5Prevention of fallsAll work platforms have secure handrails, guarding or fence panelsHarnesses and lanyards or belts providedAll floor penetrations covered or barricadedUnsafe areas signposted and fencedSafe work procedure in airs, steps and landingsNo worn or broken stepsHandrails in good repairClear of obstructionsAdequate lightingEmergency lightingNon-slip treatments/treads in good conditionKick plates where requiredClear of debris and spillsUsed correctly11.Ladders11.1 Ladders in good condition10

Tenderer occupational health and safety (OHS) management system questionnaire11.211.311.411.511.6Ladders not used to support planks for working platformsCorrect angle to structure 1:4Extended 1.0 metre above top landingStraight or extension ladders securely fixed at topMetal ladders not used near live exposed electrical equipment12.12.112.212.312.4Personal protectionEmployees provided with personal protective equipmentPersonal protective equipment worn by employeesSun cream and sunglasses providedCorrect signage at access points13.13.113.213.313.4Manual handlingMechanical aids provided and usedSafe work procedures in placeManual handling risk assessment performedManual handling controls implemented14.14.114.214.314.4Workplace ergonomicsWorkstation and seating design acceptableErgonomic factors considered in work layout and task designUse of excessive force and repetitive movements minimisedAppropriate training 1015.1115.1215.13Material storageStacks stableHeights correctSufficient space for moving stockMaterial stored in racks/binsShelves free of rubbishFloors around stacks and racks clearDrums checkedPallets in good repairHeavier items stored lowNo danger of falling objectsNo sharp edgesSafe means of accessing high shelvesRacks clear of lights/sprinklers16.16.116.216.316.416.5Confined spacesRisk assessment undertakenCommunication and rescue plan in placeSafety equipment in good working conditionSuitable training provided to employeesConfined space permit used17.Lasers17.1 Operator has laser operator licence17.2 Signage displayed11

Tenderer occupational health and safety (OHS) management system questionnaire17.3 Laser not used in a manner to endanger other persons18.18.118.218.318.418.5DemolitionRisk assessment undertaken in advanceAccess prevented to demolition areaOverhead protection in placeProtection of general publicSafe work procedures in place19.Public protection19.1 Appropriate barricades, fencing, hoarding, gantry secure and inplace19.2 Signage in place19.3 Suitable lighting for public access19.4 Footpaths clean and free from debris19.5 Dust and noise controls in place19.6 Site access controlled19.7 Traffic control procedures in place19.8 Public complaints actioned20.20.120.220.320.420.5AmenitiesWashrooms cleanToilets cleanLockers cleanMeal rooms clean and tidyRubbish bins available – covered21.21.121.221.321.421.521.6First aidCabinets and contents clean and orderlyStocks meet requirementsFirst aiders names displayedFirst aiders location and phone numbersQualified first aider(s) (Certificates available)Record of treatment and of supplies dispensed22.22.122.222.322.422.5LightingAdequate and free from glareLighting clean and efficientWindows cleanNo flickering or inoperable lightsEmergency lighting system operational23.23.123.223.323.423.523.6Fire controlExtinguishers in placeFirefighting equipment serviced/taggedAppropriate signing of extinguishersExtinguishers appropriate to hazardEmergency exit signageExit doors easily opened from inside12

Tenderer occupational health and safety (OHS) management system 23.1523.1623.17Exit pathways clear of obstructionAlarm/communication system – adequateSmoking/naked flame restrictions observedMinimum quantities of flammables at workstationFlammable storage proceduresEmergency personnel identified and trainedEmergency procedures documented – issuedEmergency telephone numbers displayedAlarms testedTrial evacuations conductedPersonnel trained in use of firefighting equipment13

Tenderer occupational health and safety (OHS) management system questionnaire 6.4 7. 7.1 Contract 1 Contract 2 Contract 3 Date: 1. relevant forms. Company references Additional checklists The OHS department must be consulted to provide all other contracts completed by the company: REVIEW OF TENDERER'S OHS MANAGEMENT SYSTEM QUESTIONNAIRE