TYATTP Domestic CustomersIBT BRACKET0 – 75 kWh76 – 350 kWh351 – 600 kWh6001– 900 kWh901 kWh2019/20TotalExcl VAT2019/20TotalVAT Incl.Vat2020/21TotalExcl VAT2020/21TotalVAT 0.330.331.241.362.252.542.540 – 350 kWh351 – 600 kWh601 – 900 kWh900 kWhDomestic Credit meters fixed charge Rands per 0.346.371.902.302.542.6448.86Non-ATTP Domestic Customers – Time of use tariffEnergy : PeakEnergy : StandardEnergy : Off-PeakBasic charge per 36.452.43279.441.990.302.292.090.312.40Non-ATTP CustomersCommercial and Industrial TariffsSMALL BUSINESS 230 VOLTEnergy ChargeBasic charge/monthPrepaid MetersTariff Code 32 Prepaid Urban & Tariff Code 37 - Prepaid Peri-UrbanEnergy ChargePage 11

talExcl VAT2019/20TotalVAT Incl.Vat2020/21TotalExcl VAT2020/21TotalVAT Incl.VatELECTRICITYMEDIUM BUSINESS 400 VOLT Below 200 KVASingle Rate - Scale 33 Urban & Scale 38 Peri-Urban (Supplies below 200 kVA)WinterEnergy ChargeSummerEnergy ChargeBasic 1.811,009.141.67965.270.25144.791.931,110.06Multi Rate - Scale 60 Urban & Scale 61 Peri-UrbanBasic ChargeEnergy ChargeEnergy Charge 29WinterDemand Charge per kVAEnergy : PeakEnergy : StandardEnergy : 555.201.671.00SummerDemand Charge per kVAEnergy : PeakEnergy : StandardEnergy : Off-PeakBasic Charge per 7MEDIUM BUSINESS 400 VOLT ABOVE 200 KVAMetered Demand - Scale 34 Urban & Scale 39 Peri-Urban (Supplies Equal to or above 200 kVA – Minimum Charge 70 kVA)Basic Charge/monthWinterEnergy ChargeDemand Charge per kVASummerEnergy ChargeDemand Charge per kVATime-of-Use - Scale 34T Urban & Scale 39T Peri-Urban (Supplies above 200 kVA)Page 12

TYTariff Code 33 Prepaid Urban & Tariff Code 38 Prepaid Peri-UrbanEnergy ChargeVat2020/21TotalExcl VAT2020/21TotalVAT 90.620.200.12124.134.741.520.88SummerDemand Charge per kVAEnergy : PeakEnergy : StandardEnergy : 31.631.120.78INVESTMENT TARIFFEnergy At 1,318.001,758.00Time-of-Use - Scale 40T Urban & Scale 40R Peri-Urban (Supplies above 200 kVA)Basic Charge/monthWinterDemand Charge per kVAEnergy : PeakEnergy : StandardEnergy : Off-Peak1.22019/20TotalVAT Incl.1.89LARGE BUSINESS 6600 VOLT AND ABOVEMetered Demand - Scale 35 Urban & Scale 30 Peri-Urban (Minimum charge 70 kVA) including 35PBasic Charge/monthWinterEnergy ChargeDemand Charge per kVASummerEnergy ChargeDemand Charge per kVA1.22019/20TotalExcl VATLow VoltageReplacement of fuses or resetting of circuit breakers or isolating of the supply at customer's request(Internal faultsor faultynobody at home)MunicipalbreakerNormal Working hoursOut of Normal hours (Monday to Saturday)Sundays and public holidaysNon-refundable surcharge for call-outs between22:00 and 07:00 (Only if the fault affects a single consumer)Disconnection and reconnection of supply at therequest of a customerNormal working hoursOut of normal hours (Monday to Saturday)Sundays and public holidaysRe-roofingThe contractor must supply a compliance certificateMedium / High VoltageIsolating and restoring supply at customer's requestPage 133,970.58At Cost

Item1.2Service1.2CommentsUnitR/cents/Kl/mLabour ChargesNormal working hoursOut of normal hours (Monday to Saturday)Sundays and public holidaysMETERINGMetering costs are calculated as follows: (Cost of new hardware)plus (installation labour cost)New Services:Domestic SuppliesSingle phase suppliesPrepayment Split Metering (BS or DIN Lay-out)Supply and Install 1 x Split Prepayment Meter, RF or PLC. Without Meter EnclosurePostpayment Embedded Generation (Net-Metering), 80 AmpereSupply and Install 1 x Single phase four Quadrant programmable meter with modemThree phase suppliesPrepayment Split Metering (BS Lay-out). Three phase meterSupply and Install 1 x Three phase Split 100A Prepayment Meter, RF or PLCPostpayment Embedded Generation (Net-Metering), 80 Ampere per phaseSupply and Install 1 x Three phase four Quadrant programmable meter with modemBusiness SuppliesSingle phase supplies, Direct ConnectedPrepayment Metering, BS or DIN-rail lay-out, 80 AmpereSupply and Install 1 x Split Prepayment Meter, RF or PLC. Without Meter EnclosurePostpayment Metering, BS lay-out, 100 AmpereSupply and Install 1 x Single phase programmable credit meter 100A, with modem (Direct Connected)Embedded Generation (Postpayment) - Net-Metering, BS lay-out, 100 AmpereSupply and Install 1 x Single phase four Quadrant programmable meter with modem2019/20TotalExcl .71At CostAt Cost3,890.00At At CostAt 80923.977,083.77At CostAt 4.72At CostAt CostAt CostAt CostAt CostAt 793,089.97At CostPage 14507.39At Cost375.65At CostCost of replacing damaged / destroyed / stolen MeteringEach case to be evaluated and quotation provided.At Cost2,504.35At CostThree phase supplies, Current and Voltage Transformer (CT/VT) ConnectedPostpayment metering, (6.6kV to 66kV / VT and CT Connected)Supply and Install Double Meter CT/VT-Connect Demand Meter Board Including GPRS ModemPostpayment metering, Power Quality and Billing, (132 kV, VT and CT Connected, unlimited)Supply and Install double Metering Panel CT/VT-Connect with 1 x Power Qualityand 1 x Billing Meter and Ethernet, Fibre or GPRS Modem2020/21TotalVAT Incl.Vat264.78397.83529.573,382.61Three phase supplies, Current Transformer (CT) ConnectedPostpayment metering, (400 Volt / 200 to 1200 Ampere)Supply and Install Single Meter CT-Connect Demand Meter Board Including CT's and GPRS ModemEmbedded Generation (Postpayment) - Net-Metering, BS lay-out, (400 Volt / 200 to 1200 Ampere)Supply and Install 1 x Three phase four Quadrant programmable CT metering with modem2020/21TotalExcl VAT1,765.222,652.173,530.43At CostThree phase supplies, Direct ConnectedPrepayment Metering, BS lay-out, 100 AmpereSupply and Install 1 x Split Prepayment Meter, 100 Ampere, RF or PLC communicationPrepayment Metering, metal case 600x600mm, 250 Amp per phaseSupply of 1 x Three phase 250A prepayment meter with RF UIU. Installation by customer's own contractor. NMBMwill commissionMetering,& seal. BS lay-out, 100 Ampere per phasePostpaymentSupply and Install 1 x Three phase programmable credit meter 100A, with modemPostpayment Embedded Generation (Net-Metering), 100 Ampere per phaseSupply and Install 1 x Three phase four Quadrant programmable meter with modemPostpayment Metering, BS lay-out, 160 Ampere per phaseSupply and Install 1 x Three phase programmable credit meter 160A, with modemVat2019/20TotalVAT Incl.At CostAt CostAt CostAt CostAt Cost

eous Metering Items (Collect from Munelek offices)Standard BaseUser Interface Unit (Wired type), ConlogUser Interface Unit (Wired type), Itron - obsolete, or limited availabilityUser Interface Unit (PLC), Itron - obsolete, or limited availabilityUser Interface Unit (RF), Conlog, wUIU(09)User Interface Unit (PLC), Landis & Gyr, P160Meter Room PadlockMeter Room Night LatchMeter ID CardCharge of Missing meters (affidavit required)Circuit breakerOtherSupply and Install 1 x 4-Way Meter EnclosureSupply and Install 1 x 6-Way Meter EnclosureCONVERSION CREDIT TO PREPAIDDomestic single phase suppliesThe cost of new meteringDomestic Three phase suppliesThe cost of new metering plus labourBusiness single phase suppliesThe cost of new metering plus labourBusiness Three phase suppliesThe cost of new metering plus labourSUPPLY LINE CHANGESChange from three phase to single phase meteringThe cost of new metering plus labourChange from single phase to three phase meteringThe cost of new metering plus labourTARIFF CHANGESThe cost of a tariff change is dependent on whether the metering needs to be upgradedEach case to be evaluated and quotation provided.PROVISION OF METERING PULSESEach case to be evaluated and quotation provided.TESTING OF METERS AT CONSUMERS REQUESTTesting is done at customer premises with meter in situSingle Phase MeterThree Phase Meter (Direct Connected)Three Phase Meter (CT Connected)Three Phase Meter (CT/VT Connected) Excludes CT and VT Injection TestsThree Phase Meter (CT/VT Connected) Including CT and VT Injection Tests2019/20TotalExcl 21TotalExcl VATn/an/a217.39250.00250.00 n/a250.00 n/a650.00650.00250.00250.0030.002020/21TotalVAT Incl.Vatn/an/a32.61n/an/a460.661,038.31260.87At CostAt Cost250.00n/an/a69.10155.7539.13At CostAt Cost529.751,194.06300.00At CostAt 195.651,500.001,382.61207.391,590.00At CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt Cost795.001,060.001,060.002,125.00At Cost736.50982.00982.001,964.00At Cost691.30921.74921.741,847.83At CostPage 15Vat2019/20TotalVAT Incl.103.70138.26138.26277.17At Cost110.48147.30147.30294.60At CostAt Cost846.981,129.301,129.302,258.60

Item1.2CommentsUnitR/cents/Kl/mService1.2TESTING OF METERS FOR OTHER MUNICIPALITIESMeter to be delivered to Meter Laboratory. Tested on Test BenchMeter testing and calibration certificate issuedTest old meter in test lab for accuracy without adjustmentChange of Meters Out of Normal Hours (per hr)Repositioning of meters/s at customers requestEach case to be evaluated and quotation provided.Repairs to metering where tampering is not presentCost of replacing damaged /destroyed/stolen metering equipment:Each case to be evaluated and quotation provided.DISCONNECTION OF SUPPLY FOLLOWING TAMPERINGReconnection to take place only after payment of thefollowing disconnection fees plus making arrangementson all other outstanding costs and charges in termsof the credit control policy.Domestic Single Phase SuppliesFirst offenceSecond offenceThird offenceDomestic Three Phase SuppliesFirst offenceSecond offenceThird offenceSmall Business CategoryFirst offenceSecond offenceThird offenceLarge / Industrial & Medium Business CategoryFirst offenceSecond offenceThird offence2019/20TotalExcl VATVat2019/20TotalVAT Incl.2020/21TotalExcl VAT2020/21TotalVAT Incl.Vat626.09626.09At Cost93.9193.91At Cost720.00720.00At Cost736.50736.50At CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt Cost110.48110.48At Cost846.98846.98At Costplus smart meter installation at Customer's us smart meter installation at Customer's 40,000.0050,000.00Costs will include estimated unmetered consumption, the cost of rectification of any damage to equipmentbelonging to Council plus the costs of any necessary safe guarding of the supply cable and metering installation. Incases involving bypass of the meter, such safeguarding may include re-routing the supply cable and such costsmust be paid for in full prior to the supply being restored. Where such re-routing requires any alteration wiringaffecting the distribution board, the customer will be required to submit a compliance form for the wiring installationprior to reconnection of the supply.SERVICE CONNECTIONSNew or Additional ServicesConnection FeesDomestic- Single phase service to primary dwelling unit Electrification areas- Single phase service to primary dwelling unit Non-Electrification areas- Three phase domestic Underground joint to mains- CDU Connection 3 phaseBusiness Single phase business:- CDU Connection- Underground JointThree phase business: High VoltageHV/MV Transformation - HV NetworkR 460.8769.13530.00491.3073.70565.00R 1,913.04286.962,200.002,038.26305.742,344.00At CostAt CostAt CostAt CostAt CostAt CostR/per kVA1,099.13Page 16At CostAt CostAt Cost164.871,264.001,099.13At CostAt CostAt Cost164.871,264.00

Item1.21.2Three phase business: Medium VoltageMV NetworkThree phase business: Low VoltageMV/LV TransformationThe three phase business electricity connection fees13 kVA -53kVA60 kVA -100kVA116 kVA -133kVA150 kVA -266kVA300 kVA -800kVAService Cable on erfDomesticSingle phase supply to dwelling unit:- Supplied at pedestal 1 metre inside erf boundaryThree phase suppliesBusinessService Protective Devices (for installations not equipped with pre-payment meters).2019/20TotalExcl VATCommentsUnitR/cents/Kl/mServiceR/per kVAR/per kVA (Discontinued new structure below)Vat2019/20TotalVAT Incl.1632.17244.831,877.00R 2,212.17331.832,544.00R/per kVAR/per kVAR/per kVAR/per kVAR/per kVA2020/21TotalExcl VAT1632.17All other installations (domestic and business):Per single phase circuit breaker installed,maximum100 amps (Commodity code 00308213)80 amps (Commodity code 00308201)- Three phase circuit breakers 100A- Three phase MV circuit breaker:First unitFurther unitsAlterations to ServicesChange of single or three phase overheadDomestic service to single phase undergroundChange of three phase overhead domesticService to three phase undergroundAll other service alterationsAbortive Service Installation Call ChargesNormal working hours only:- Cable Layer- Cable Jointer1,877.00Discounted (newstructure 001,504.001,696.002,034.00At costAt CostAt costAt costAt CostAt costNo chargeNo chargeAt costAt cost260.87304.35At costAt costAt costAt costAt costAt costAt costAt costAt costAt costAt costAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt CostAt Cost1547.83956.52Page 17244.83Discounted (newstructure stic single phase2020/21TotalVAT 13No 172.00

Item1.2CommentsUnitR/cents/Kl/mService1.2HIRE OF EQUIPMENTRecording EquipmentSingle Phase Recorder for Current or Voltage(At customer request)Single Phase Quality of supply recorder hire per day- InstallationThree Phase recorded for Current Voltage kVA/Power(At customers request)Three Phase Quality of supply recorder hire per day- InstallationTestCharge is per hour the equipment is in use (minimum one hour). Labour to be charged at appropriate standardrates. Consumables to be charged at cost plus 20%.2019/20TotalExcl VATVat2019/20TotalVAT Incl.2020/21TotalExcl VAT2020/21TotalVAT Incl.VatAt costAt CostAt costAt costAt CostAt CostAt costAt CostAt costPrimary Injection Test SetAt costAt CostAt costSecondary Injection Test SetAt costAt CostAt cost40kV HV Test SetAt costAt CostAt costPortable Cable Fault LocatorAt costAt CostAt costCable Tracer/ID UnitAt costAt costAt costCable Fault- Hourly- Travel Charge per kmTRAINING CENTRESpecialised Training for Private StudentsR/per dayANY OTHER WORKQuotation for work / customer request that is not included in this list of fees and chargesAt costAdministrative FeesPhotostat copies at Customer Services1.Copiesof CustomerBillings accountsRefund requestedat Customer'sfault or prerogativeDocument search348.7052.30401.00At cost2.2225%401.00At 111.30Page 1852.30At cost14.7825% of receipted amount348.7016.70

Tariff Code 33 Prepaid Urban & Tariff Code 38 Prepaid Peri-Urban Energy Charge 1.89 0.28 2.18 2.01 0.30 2.31 LARGE BUSINESS 6600 VOLT AND ABOVE Metered Demand - Scale 35 Urban & Scale 30 Peri-Urban (Minimum charge 70 kVA) including 35P . Direct Connected Prepayment Metering, BS or DIN-rail lay-out, 80 Ampere Postpayment Metering, BS lay-out .