DESIGN MANUAL - United States Army

Transcription

HNC-PR-ED-2000.10CEHNC 1110-1-1US Army Corps of EngineersEngineering and Support Center, HuntsvilleENGINEERING GUIDANCEDESIGN MANUALREVISION 831 DECEMBER 2013PREPARED BYDIRECTORATE OF ENGINEERINGU.S. ARMY ENGINEERING AND SUPPORT CENTER, HUNTSVILLEHUNTSVILLE, ALABAMA

HNC-PR-ED-2000.10CEHNC 1110-1-1TABLE OF CONTENTS1. GENERAL INSTRUCTIONS . 91.1PURPOSE AND APPLICABILITY. . 91.1.1Purpose .91.1.2Applicability .91.2RELATIONSHIP OF THIS MANUAL TO THE USAESCH QUALITYMANAGEMENT SYSTEM. .91.3REFERENCE DOCUMENTS. . 91.4GENERAL GUIDANCE . 101.4.1Overall Objective. . 101.4.2Ownership and Rights. . 101.5PROFESSIONAL REGISTRATION . 101.6SUSTAINABLE DESIGN . 111.6.1Policy. . 111.6.2LEED. . 122. PROJECT INITIATION . 152.1USAESCH BUSINESS PROCESSES. . 152.1.1General. . 152.1.2Swimlane Flow Chart Descriptions . 152.2PROJECT INITIATION. . 172.3PROJECT PLANNING. . 172.3.1PMP Development. . 172.3.2Criteria Development. . 172.4INTERRELATION BETWEEN TECHNICAL PRODUCTS AND SERVICES,CUSTOMER REQUIREMENTS, AND ACQUISITION. 182.5PREPARATION OF SCOPE OF WORK (SOW). 182.5.1Basic Definition. . 182.5.2General. . 182.5.3MILCON SOWs. 192.5.4Architect-Engineer (A-E) SOWs . . 192.6PREPARATION OF PERFORMANCE WORK STATEMENT (PWS). . 192.6.1Basic Definition of a PWS. . 192.6.2Elements of a PWS . 202.7PREPARATION OF TECHNICAL REQUIREMENTS FOR DESIGN-BUILDRFPS 212.8PREPARATION OF ARCHITECT-ENGINEER (A-E) DESIGN ESTIMATE. . 222.9PREPARATION OF DESIGN-BUILD (DB) COST ESTIMATE. . 222

HNC-PR-ED-2000.102.10CEHNC 1110-1-1PREPARATION OF DESIGN QUALITY CONTROL PLAN (DQCP) . 222.10.1Applicability. . 222.10.2Development of DQCPs. . 222.10.3Contents of DQCPs. 232.11TECHNICAL AND COST EVALUATIONS. . 233. TECHNICAL REQUIREMENTS . 253.1CAD/BIM DELIVERABLES . 253.1.1Computer-Aided Design (CAD) . 253.1.2Building Information Modeling (BIM) . 253.2DESIGN-BID-BUILD DESIGN SUBMITTALS. . 253.2.1Geotechnical. . 253.2.2Civil. . 273.2.3Structural. . 333.2.4Architectural. . 393.2.5Interior Design. 443.2.6Fire Protection. 463.2.7Plumbing . 493.2.8Process . 513.2.9HVAC . 543.2.10Electrical. . 573.2.11Telecommunications. . 613.2.12Utility Monitoring And Control Systems (UMCS). . 633.2.13Electronic Security Systems (ESS) . 673.2.14Project Specifications . 753.2.15Design Analysis. . 833.2.16Preparation of Design Bid Build Construction Cost Estimates . 833.2.17Design Signature . 843.3DESIGN-BUILD DESIGN SUBMITTALS. . 843.3.1Geotechnical. . 853.3.2Civil. . 853.3.3Structural. . 883.3.4Architectural Design-Build Design Submittals. 943.3.5Interior Design. 973.3.6Fire Protection. 1003.3.7Plumbing . 1023.3.8Process. . 1043

HNC-PR-ED-2000.10CEHNC 1110-1-13.3.9Mechanical. . 1083.3.10Electrical. . 1103.3.11Telecommunications. . 1113.3.12Utility Monitoring And Control Systems (UMCS). . 1133.3.13Electronic Security Systems (ESS) . 1163.3.14Specifications . 1233.3.15Design Analysis. . 1243.3.16Design Signatures. . 1243.4WORK PLAN SUBMITTALS. . 1243.5ENGINEERING DURING CONSTRUCTION. 1253.5.1Requests for Information (RFIs). . 1253.5.2Field Modifications. . 1263.5.3Construction Submittal Review. 1263.6AS-BUILT DRAWINGS. . 1264. QUALITY REQUIREMENTS . 1274.1GENERAL REQUIREMENTS. . 1274.2REVIEW OF CONTRACTOR DESIGNS AND OTHER TECHNICALPRODUCTS . 1274.3SUPERVISORY OVERSIGHT (BOTH IN-HOUSE AND CONTRACTOR). . 1284.3.1Designs and Other Technical Products. . 1284.3.2Review Comments. . 1284.4ROLE OF THE PROJECT ENGINEER/ARCHITECT (PE/A) AND FACILITYSTANDARDS TECHNICAL LEAD (FSTL). . 1294.4.1Professional and Ethical Responsibilities. . 1294.4.2Assignment. . 1294.4.3Duties Prescribed by Regulation. . 1294.4.4Other Duties. . 1294.4.5FSTL Responsibilities and Duties. 1314.4.6Training. . 1314.4.7Supervisory Support for PE/As and FSTLs. 1324.5REVIEW OF DESIGN-BUILD DESIGN SUBMITTALS. . 1324.6REVIEW OF WORK PLANS. . 1324.7REVIEW OF IN-HOUSE DESIGNS – CUSTOMER INPUT/REVIEW, ITR,QUALITY ASSURANCE. . 1334.7.1Customer Input and Review. . 1334.7.2Independent Technical Review (ITR). . 1334.8BIDDABILITY, CONSTRUCTABILITY, OPERABILITY, ENVIRONMENTAL,4

HNC-PR-ED-2000.10CEHNC 1110-1-1AND SUSTAINABILITY (BCOES) REVIEWS. . 1345. SPECIAL TOPICS . 1355.1PARAMETRIC DESIGN . 1355.2SITE ADAPTATION OF DESIGN PACKAGES . 1355.2.1Standard Designs. 1355.2.2Explosive safety-related designs. . 1355.2.3Non-standard designs. . 1355.3GIS PACKAGES. . 1365.4GEOTECHNICAL INVESTIGATION AND REPORT. . 1365.5TOPOGRAPHIC SURVEY. . 1375.6ENVIRONMENTAL DOCUMENTATION. . 1375.7ENVIRONMENTAL CONTROL DURING CONSTRUCTION. . 1385.8ENVIRONMENTAL SAMPLING AND LABORATORY REQUIREMENTS. . 1385.9SPECIAL PROJECTS – MUNITIONS AND EXPLOSIVES OF CONCERN(MEC) RECONNAISSANCE (RECON) SURVEYS . 1385.10HARDENED/PROTECTIVE CONSTRUCTION . 1395.10.1Governing criteria. . 1395.10.2Safety Approval. . 1415.11PHYSICAL SECURITY. . 1415.11.1Integrating With Other Requirements. . 1425.11.2Submittal requirements. . 1425.12ANTI-TERRORISM. . 1425.12.1Governing Criteria. . 1425.12.2Level of Protection. . 1435.12.3Coordination of AT with other security requirements. . 1435.12.4Submittal requirements. . 1435.13MEDICAL FACILITIES . 1435.13.1Governing Criteria. . 1435.13.2Medical Facilities Center of Expertise and Standardization (MX). 1435.13.3Customer Interaction. . 1455.13.4Non-MILCON projects for military customers. . 1455.13.5Non-military customers . 1465.14LOW IMPACT DEVELOPMENT (LID). . 1465.15SYSTEMS ENGINEERING. . 1465.15.1Purpose And Applicability. 1465.15.2Systems Engineering Management Plan (SEMP). . 1465

HNC-PR-ED-2000.10CEHNC 1110-1-15.15.3Systems Engineering Elements. 1475.15.4Systems Analysis. . 1475.15.5Product Assurance. . 1485.15.6Integrated Logistics Support (ILS). . 1505.15.7Configuration Management (CM). . 1525.16VALUE ENGINEERING. . 1525.17SYSTEMS SAFETY. . 1535.17.1Facility System Safety. . 1535.17.2Explosives Safety. . 1535.18 PREPARATION OF LIFE CYCLE COST ESTIMATES AND OTHER COSTPRODUCTS . 1585.18.1Purpose and Applicability. . 1585.18.2Engineer/Analyst Qualifications. . 1585.18.3Development of the Life Cycle Cost or Study. . 1585.18.4Report Format. . 1595.18.5Cost Engineering Support to Planning and Programming. 1605.18.6Other Cost Products. 1615.19INFORMATION ASSURANCE AND INFORMATION TECHNOLOGY . 1615.19.1References. 1615.19.2IA in the Project Life Cycle. . 1625.19.3IT in the Project Life Cycle. . 1635.20RENOVATIONS/RETROFITS/ADDITIONS . 1645.20.1Assessment of Customer’s Needs. . 1645.20.2Site Investigations . 1655.20.3Design Considerations . 1655.20.4Coordination/phasing. . 1665.21UMCS SITE SURVEY/FEASIBILITY STUDY . 1665.22DESIGN MANUAL CHANGE PROCEDURE. . 166APPENDICES . 166APPENDIX A Consolidated Reference List . 167APPENDIX B STANDARD OPERATING PROCEDURE FOR AMENDMENT ANDCHANGE ORDER PREPARATION . 176B-1 PURPOSE AND APPLICABILITY. . 176B-1.1Amendments And Change Orders. . 176B-1.2Narrative Of Specifications And Drawing Changes. . 176B-1.3Drafting Method. . 176B-1.4Specifications. 1766

HNC-PR-ED-2000.10CEHNC 1110-1-1B-2 RECORD COPY. . 176B-3 IDENTIFYING REVISIONS. . 176B-3.1Deltas. . 177B-3.2Cloud. . 177B-3.3Recording Revisions. . 177B-3.4Symbol Column. . 177B-3.5Description Column. . 177B-3.6Date Column. . 178B-3.7Approval. 178B-3.8Border Identification. . 178B-4 DRAWING INDEX SHEETS.

hnc-pr-ed-2000.10 cehnc 1110-1-1 . engineering guidance . design manual. revision 8 . 31 december 2013 . prepared by . directorate of engineeri