VICTORY VSP The Boiler For Reference.

Transcription

VICTORY VSPThis manual must be leftwith owner and should behung on or adjacent tothe boiler for reference.DIRECT-VENT SEALED COMBUSTION BOILERSHOT WATER MODELS VSP-60 THROUGH VSP-180GAS-FIRED CAST-IRON BOILERS FOR NATURAL AND L.P. PROPANE GASESINSTALLATION AND OPERATING INSTRUCTIONSTABLE OF CONTENTSDimensions, Rating and Orifice Sizes .2Identification of Parts .3Installation Requirements .4Venting Application .5Boiler Room Air Supply and Ventilation.5Flue gas Venting Requirements.5Vent Material .5Air Intake Material .6Flue and Air Intake Restrictions .6Non-Direct Vent Installation .8Sidewall Venting, Non-Direct Vent .8Vent Termination Location and Clearance.8Non-Direct Vent Vertical Venting .8Direct Vent Installation .8Sidewall Venting, Direct Vent .8Vent/Air Intake Termination Installation.8Direct Vent, Venting and Air Intake through a Roof .13Venting and Air Intake Regular Inspection .15Gas Piping .15Electrical Wiring .15Multi Zoning .18Water Piping .18Wiring Diagram .16Operating Instructions.19Gas Input Rate Adjustment .20Boiler Control .22Sequence of Operation.21Status of Indicator Lights (LED’s) .22Safety Check .23Care and Maintenance .24General Troubleshooting Guide .25-27WARNINGThe venting system of this boiler is under positive pressure. Leakage from thissystem can be hazardous and if not avoided can result in death or serious injury.In addition to the recommendations within this manual and the User’s InformationManual, the venting system, from the blower to the outdoor discharge, must becarefully checked annually by aqualified service agency.IMPORTANTRADIANT FLOOR, LOW WATER TEMPERATURE, AND LARGE WATER VOLUMEsystems require special piping arrangements. See page 18.IMPORTANTREAD ALL OF THE FOLLOWINGWARNINGS AND STATEMENTSBEFORE READING THEINSTALLATION INSTRUCTIONSWARNINGLIQUEFIED PETROLEUM (L.P.)PROPANE GAS-FIRED BOILERSInstallation location ONLY as permitted in paragraphentitled "LIQUEFIED PETROLEUM (L.P.) PROPANEGAS-FIRED BOILER LOCATION" on page 4 of thisinstruction book.The above warning does not apply to NATURAL gasfired boilers.The installation must conform to the requirements ofthe authority having jurisdiction or, in the absence ofsuch requirements, to the National Fuel Gas Code,ANSI Z223.1-latest edition. The installation must alsoconform to the additional requirements in this Slant/FinInstruction Book.In addition where required by the authority having jurisdiction, the installation must conform to AmericanSociety of Mechanical Engineers Safety Code forControls and Safety Devices for Automatically FiredBoilers, No. CSD-1.WARNINGThis boiler, gas piping and accessories must beinstalled, connected, serviced and repaired by atrained, experienced service technician, familiar with allprecautions required for gas-fired equipment andlicensed or otherwise qualified, in compliance with theauthority having jurisdiction.Heating ContractorBoiler Model NumberAddressBoiler Serial NumberPhone NumberInstallation DatePublication No. VSP-40Part No. 455002Printed in U.S.A.303

2VICTORY VSP ModelsRATINGS AND DIMENSIONS(DOTTEDPIPINGBY OTHERS)INSTALLMA NUAL MA INSHUTOFFVALVE 5'ABOVEFLOOR W HEN REQUIRED BYLOCAL CODEPRESSURE RELIEFVALVE3/4" TO AIRELIM INATINGSYSTEM1-1/2"FPTSUPPLY28-3/4(SEENO TE)3" DIAVENTCONN ECTOR30-1/2(SEENO TE)3/4"DRAINPRESS/TEM PGAUGEJUNCTIONBOXVENTCONN ECTOR28-1/2"(SEENO TE)1-1/2"RETURN TAPPING,1-1/4"CIR. FLANGESEDIM ENTTRAP(REQUIRED)"A"JACKET"B"25-1/8(SEENO TE)RIGHT SIDEFRONTLEFT SIDENOTE: Height dimensions increase by 11 2" and depth increases to 281 2" when combustible floor kit is used.Figure 1. Dimensions dataBoilerModelInputBtuhNo. ofSectionsABVSP-6060,0003111 8"173 8"VSP-9090,0004141 8"203 8"VSP-120120,0005171 8"233 8"VSP-150150,0006201 8"263 8"VSP-180180,0007231 8"293 8"Gas Orifice SizeVictory VSP boilerOrifice Sizes for High AltitudesIncludes 4% Reduction for Each 1000 FeetOrificeSize forSea on — Feet5000 6000 7000Orifice sizes indicated for sea level above are factory installed in boiler unless otherwise specified by the local authority. Orificetable is based on a higher heating value between 1000 Btuh and 1010 Btuh for Natural Gas (See page 20, if local higher heating value exceeds these numbers). See page 20, for burner input adjustment.

3VICTORY VSP ModelsLOCATION AND IDENTIFICATION OF PARTSBase AssemblyFigure 2. Location and identification of parts

4INSTALLATION REQUIREMENTSThe installation must conform to the requirements of theauthority having jurisdiction or, in the absence of suchrequirements, to the National Fuel Gas Code, ANSI Z223.1latest edition.This installation must also conform to the additional requirements in this Slant/Fin Instruction Book.NATURAL GAS-FIRED BOILER LOCATIONProvide a level, solid foundation for the boiler. Locationshould be as near as possible to chimney or outside wall sothat the flue pipe from boiler is short and direct. (See Appendix A for vent terminal location restrictions.) The locationshould also be such that all boiler components are protectedfrom water (dripping, spraying, rain, etc.) during applianceoperation and service (circulator replacement, controlreplacement, etc.).WARNINGLIQUEFIED PETROLEUM (L.P.) PROPANE GAS-FIREDBOILER LOCATIONREQUIRES SPECIAL ATTENTIONLiquefied Petroleum (L.P.) propane gas is heavier than air.Therefore, propane boilers, piping, valves should NOT beinstalled in locations where propane leaking from defectiveequipment and piping will "pool" in a basement or otherspace below the leak.VICTORY VSP ModelsMINIMUM CLEARANCES FROM COMBUSTIBLECONSTRUCTIONSA. Minimum clearances to the exterior surfaces of the boilershall be as follows:MINIMUM ALCOVE AND CLOSET CLEARANCESurfaceFrontRearLeft SideRight SideTopFlue Connector:Enclosed —Uninclosed —For CombustibleConstruction6"6"6"12"12"Recommendedfor Service18"18"18"24"12"6"2"6"6"B. Provide accessibility clearance of 24" on sides requiringservicing and 18" on sides used for passage.C. All minimum clearances shown above must be met. Thismay result in increased values of some minimum clearances in order to maintain the minimum clearances ofothers.D. Clearance from hot water pipes shall be 1 inch**.** At points where hot water pipes emerge from a floor, wall or ceiling,the clearance at the opening through the finished floor boards or wallor ceiling boards may be not less than 1/2 inch. Each such openingshall be covered with a plate of uncombustible material.A spark or flame from the boiler or other source may ignitethe accumulated propane gas causing an explosion or fire.Provide a level, solid foundation for the boiler. Locationshould be as near the chimney as possible so that the fluepipe from boiler to chimney is short and direct.The UNIFORM MECHANICAL CODE may be in effect inyour geographic area.The following precautions are cited by the 1994 UNIFORMMECHANICAL CODE, section 304.6:"LPG Appliances. Liquefied petroleum gas-burningappliances shall not be installed in a pit, basement orsimilar location where heavier-than-air-gas might collect.Appliances so fueled shall not be installed in an abovegrade under-floor space or basement unless such location is provided with an approved means for removal ofunburned gas."Consult Chapter 5 of the 1994 UNIFORM MECHANICALCODE for design criteria of the "approved" means forremoval of unburned gas.*6"2"12"6"2"*6"12"*: 6" FOR ENCLOSEDBOILER FOUNDATIONA. Provide a solid, level foundation, capable of supportingthe weight of the boiler filled with water, and extending atleast 2" past the jacket on all sides. See dimensions ofboilers, page 2.B. For installation on non-combustible floors only*.C. If boiler is to be located over buried conduit containingelectric wires or telephone cables, consult local codes orthe National Board of Fire Underwriters for specificrequirements.* Installation on combustible flooring allowed only with proper Combustible Floor Kit. Kit part number is printed on boiler rating plate.In no case may the boiler be installed on carpeting.VICTORY "VSPH" BOILERMIN. CLEARANCES FORCOMBUSTIBLE CONSTRUCTIONFigure 3. Victory “VSP” boiler min. clearances forcombustible construction.SAFETYKEEP THE BOILER AREA CLEAR AND FREE FROMCOMBUSTIBLE MATERIALS, GASOLINE AND OTHERFLAMMABLE VAPORS AND LIQUIDS.

5VICTORY VSP ModelsVENTING APPLICATIONVSP Series are sealed combustion type boilers, they maybeinstalled and vented either as direct vent boiler which all air forcombustion is obtained directly from outside or as non-directvent boiler which air for combustion is taken from inside theboiler room.VSP boilers must be vented by proper 3" diameter. StainlessSteal venting system (see “vent material” on this page) throughthe roof or sidewall.BOILER ROOM AIR SUPPLY AND VENTILATIONAn ample supply of air is required for combustion and ventilation. When buildings are insulated, caulked and weatherstripped, now or later on, direct openings to outside may berequired and should be provided. If the boiler is not near anoutside wall, air may be ducted to it from outside wall openings.Provisions for combustion and ventilation air must be made inaccordance with section 5.3, Air for Combustion and Ventilation, of the National Fuel Gas Code, ANSI Z223.1-latest edition, or applicable provisions of the local building codes. Thefollowing recommendation applies to buildings of energy-savingconstruction, fully caulked and weatherstripped.INSTALLATION IN ENCLOSED BOILER ROOM REQUIRESTWO UNOBSTRUCTED OPENINGS FOR PASSAGE OF AIRINTO THE BOILER ROOM:A. NON-DIRECT VENT INSTALLATION1. Air drawn horizontally from outdoors DIRECTLYthrough an outside wall; one louvered opening near thefloor and one louvered opening near the ceiling, each opening with a minimum FREE air passage area of 1 squareinch per 4000 Btuh of total appliances’ input.2. Air drawn horizontally through HORIZONTAL DUCTS;one opening near the floor and one opening near the ceiling, each opening with a minimum FREE air passage areaof 1 square inch per 2000 Btuh of total appliances’ input.3. Air drawn VERTICALLY from outdoors; one opening atthe floor and one opening at the ceiling, each opening witha minimum FREE air passage area of 1 square inch per4000 Btuh of total appliances’ input.4. Air drawn from inside the building; one opening nearthe floor and one opening near the ceiling, each openingwith a minimum FREE air passage area of 1 square inchper 1000 Btuh of total appliances’ input.If additional non-direct vent appliances are installed in the samespace and adequate air openings are provided for them, thereare no additional air openings required for the VSP boiler.For both direct and non-direct installation, the following must beconsidered:- Openings must never be reduced or closed. If doors orwindows are used for air supply, they must be locked open.- Protect against closure of openings by snow and debris.Inspect frequently.- No mechanical draft exhaust or supply fans are to beused in or near the boiler area.- Boiler area must never be under negative pressure. Theflow of combustion and ventilating air to the boiler mustnot be obstructed.FLUE GAS VENTING REQUIREMENTSThe Victory VSP series boiler is a high efficiency, mechanicallyinduced draft boiler and, therefore, requires different ventingarrangements than natural draft, lower efficiency boilers.THE FOLLOWING INSTRUCTIONS MUST BE CAREFULLYREAD AND FOLLOWED IN ORDER TO AVOID ANY HAZARDOUS CONDITIONS DUE TO IMPROPER INSTALLATIONOF THE AIR INTAKE AND FLUE GAS VENTING SYSTEM.The vent piping installation MUST be in accordance with theseinstructions and with ANSI Z223.1-latest edition NATIONALFUEL GAS CODE, Part 7, Venting of Equipment. Other localcodes may also apply and must be followed. Where there is aconflict between these requirements, the more stringent caseshall apply.The use of a vent damper is NOT permitted on this boiler series.VENT MATERIALThe vent system for direct or non-direct vent installation must beUL listed single wall 3” diameter AL29-4C* stainless steel material. The following manufacturers’ systems are approved for usewithin a specified minimum and maximum equivalent vent lengthfor each model. Proper adapter must be used as a connectorbetween Victory VSP boilers flue collar and venting system asshown below:Manufacturer Type/System Adapter PartNo.SealantHeat-Fab. Inc.Saf-T VentNot RequiredRTV 106 or DowCorning 732IF BOILERS ARE INSTALLED ADJACENT TO OTHER FUELBURNING EQUIPMENT, THE AREA OF FREE OPENINGSMUST BE APPROPRIATELY INCREASED TO ACCOMMODATE THE ADDITIONAL LOAD.Heat-Fab. Inc.Saf-T VentEZ SealNot RequiredNot RequiredProTechSystem, Inc.FasNSealFSA-SLB-3Not RequiredB. DIRECT VENT INSTALLATIONFlex-LInternational, Inc.StaR-34SRAFSA3GE-1S806Adequate air supply should be provided to prevent overheatingof the boiler controls and boiler room. Openings for passage ofair into the boiler room for direct-vent installation must be atleast 1 2 of the openings required for the non-direct vent as mentioned above.Z-Flex, Inc.Z-VentO2SVSSLA2GE, RTV 106Heat-Fab Part Numbers for various items of vent system are listed inSlant/Fin Part List, Publication No. VSP-10PL*AL29-4C is a registered Trademark of Allegheny Ludlum Corp

6When joining the various components of the above listedvent systems, the manufacturers’ instructions should beclosely followed to insure proper sealing. Use sealant specified by vent system manufacturer for sealing of pipe and fittings. See Figure 4 for proper application of vent pipe sealingfor Saf-T vent system by Heat-Fab, Inc. All vent connectionsmust be liquid and pressure tight. Flue vent system CANNOTbe cut to length. Consult manufacturer’s instructions. For HeatFab system, use slip joint connector to adjust pipe lengthsdimensions.DO NOT use plastic or galvanized flue pipe.VICTORY VSP ModelsEXAMPLE: Boiler model VSP-180 is to be installed at sealevel. The combustion air is provided by air intake pipingdirectly to the boiler (direct-vent installation). Flue pipingincludes 2 elbows and using Heat-Fab system. Air intake isPVC and includes 3 elbows.Maximum straight flue length would be 30-2x3 24 feet.Maximum straight air intake pipe would be 40-3x5 25 feet.If the air for combustion were taken from the boiler room(non-direct vent installation), still the maximum straight fluelength would be 24 feet.6.All Victory VSP boilers are equipped with a built-incondensation drain and trap. The trap loop must befilled with water. DO NOT operate the boiler withoutfilling the trap with water to prevent flue gas dischargeinto space. The drain should extend to a floor drain orto a container which may require emptying periodically.7.The horizontal vent pipe must be sloped upward fromthe boiler at a pitch of at least 1 4" per 1 foot of run, sothat the condensate from the vent system runs to thedrain trap.8.The horizontal vent pipes must be supported with pipestraps at intervals no greater than indicated by ventpipe manufacturer’s instructions. The vertical portionvent pipe also must be supported per manufacturer’sinstructions. Support air intake piping in the samemanner as the vent pipes.9.Minimum clearances of vent pipes from combustibleconstructions must be maintained (see Page 4). Maintain minimum 1" clearance between vent pipes andPVC air intake pipes.10.Common venting with other appliances or another VSPboiler is not allowed.11.DO NOT install a vent damper or similar devices invent system or on the boiler.12.Do not insulate venting system.Figure: 4 Vent Sealing Instructions(Consult vent manufacturer’s instructions.)AIR INTAKE PIPE MATERIAL3” PVC Schedule 40 or galvanized steel materials are recommended.All joints must be sealed using appropriate sealants.FLUE AND AIR INTAKE RESTRICTIONS1. Maximum allowed equivalent flue and air intake length fordifferent flue systems at different altitudes are given in thetables on page 7.2. Equivalent of flue or air intake length is sum of thestraight pipe lengths and equivalent length of elbows asshown in the table on this page.3. The vent termination is in addition to the allowed equivalent lengths.4. Minimum flue length is 2 feet.5. Flue length restriction is for both direct and non-directvent installations.Equivalent Length of Various 90-Degree ElbowsManufacturerHeat-Fab, Inc.Type/SystemEquivalentLength (Feet)3Heat-Fab, Inc.ProTech System, Inc.Saf-T StandardelbowSaf-T, tight radius elbowFasNsealFlex-L International, Inc.StaR-346Z-Flex, Inc.Z-Vent6N/AN/APVC, Schedule 40Galvanized steel5666

7VICTORY VSP ModelsMaximum allowed flue and air intake equivalent length (Feet)forHeat-Fab Saf-T vent system (Including EZ-Seal)Boiler ModelNumberPipingVSP-60FlueAir IntakeVSP-90FlueAir IntakeVSP-120FlueAir IntakeVSP-150FlueAir IntakeVSP-180FlueAir Intake0 - 5,000 Ft. 5,000 - 7,500 540304028357,500 - 10,000 Ft.Elevation40403540304025352330Maximum allowed flue and air intake equivalent length (Feet)forZ-Flex Z-Vent and Flex-L StaR-34 vent systemsBoiler ModelNumberPipingVSP-60FlueAir IntakeVSP-90FlueAir IntakeVSP-120FlueAir IntakeVSP-150FlueAir IntakeVSP-180FlueAir Intake0 - 5,000 Ft. 5,000 - 7,500 040254023357,500 - 10,000 Ft.Elevation35403040254020351830Maximum allowed flue and air intake equivalent length (Feet)forProTech FasNSeal vent systemsBoiler ModelNumberVSP-60PipingFlueAir IntakeVSP-90FlueAir IntakeVSP-120FlueAir IntakeVSP-150FlueAir IntakeVSP-180FlueAir Intake0 - 5,000 Ft. 5,000 - 7,500 540204018357,500 - 10,000 Ft.Elevation30402540204015351530

8VICTORY VSP ModelsVENTING INSTALLATIONFollow the vent material manufacturer’s instructions in conjunction with these instructions for venting system installation.I.Non-Direct Vent Installationrequired for each ceiling and floor penetration. For roof passage, an appropriate UL listed roof flashing must be used.An existing chimney (see Figure 8) may be used as a chasefor vertical venting. Other appliances CANNOT be ventedinto the same chimney or vent pipe with in the chimney.The air for combustion is taken from the ambient air surrounding the boiler; therefore, ample supply of air is requiredfor combusti

KEEP THE BOILER AREA CLEAR AND FREE FROM COMBUSTIBLE MATERIALS, GASOLINE AND OTHER FLAMMABLE VAPORS AND LIQUIDS. * * * 12" 6 " 6 "6 "2" 2" 1 2 ": 6" FOR ENCLOSED VICTORY "VSPH" BOILER MIN. CLEARANCES FOR COMBUSTIBLE CONSTRUCTION Figure 3. Victory “VSP” boiler min. clearances for combustible construction. INSTALLATION REQUIREMENTSFile Size: 2MB