Village of Mantua, OhioRESOLUTION 2020-32A RESOLUTION ACCEPTING THE QUOTE OF 20,378.30 FROM TODD LAMBPAVING AND EXCAVATING FOR THE BUCHERT PARK WALKING TRAILPROJECT PHASE 2 AND DECLARING AN EMERGENCY.WHEREAS, the Village of Mantua has applied for and received funding through theState of Ohio NatureWorks grant program, administered by the Ohio Department of NaturalResources (ODNR), for the eligible components of the Buchert Park Walking Trail Project Phase2; andWHEREAS, Village Engineer CT Consultants, on behalf of the Village, has solicitedquotes for the Project to be funded by the grant monies and local contributions; andWHEREAS, Todd Lamb Paving and Excavating has submitted the only quote for thework, which has been reviewed and recommended by Village Engineer, CT Consultants as setforth in the attached Exhibit A; andWHEREAS, the Council of the Village of Mantua wishes to accept this quote andauthorize the Mayor and Clerk-Treasurer to enter into a contract for said improvements.NOW THEREFORE, BE IT RESOLVED by the Council of the Village of Mantua,Portage County, Ohio, two-thirds or more of the members elected thereto concurring, that:SECTION 1: The Council of the Village of Mantua, Ohio hereby accepts the quote ofTodd Lamb Paving and Excavating, in the amount of 20,378.30, including Base Bid andAlternate A (work in the Right of Way), as set forth in the Bid Tabulation Summary marked“Exhibit B”, attached hereto and incorporated herein by reference, for the Buchert Park WalkingTrail Project Phase 2.SECTION 2: The Mayor and the Clerk-Treasurer of the Village of Mantua, Ohio arehereby authorized and directed to execute any documents required to enter into an Agreementwith Todd Lamb Paving and Excavating for execution of the work described in “Exhibit B”.SECTION 3: The Mayor and the Clerk-Treasurer of the Village of Mantua, Ohio arefurther authorized and directed to execute any documents required to obtain reimbursementunder the terms of the ODNR NatureWorks Grant Program for the eligible costs of the project.SECTION 4: It is hereby found and determined that all formal actions of this Councilconcerning and relating to the passage of this Resolution were adopted in an open meeting of thisCouncil, and that all deliberations of this Council and any of its Committees that resulted in suchformal action were in meetings open to the public in compliance with all legal requirements,including Section 121.22 of the Ohio Revised Code.SECTION 5: This Resolution is hereby declared an emergency measure, in order topermit execution of the Buchert Park Walking Trail Project Phase 2 at the earliest possible time,and shall become immediately effective upon its proper passage by two thirds or more of themembers elected to the Mantua Village Council.

Village of Mantua, OhioRESOLUTION 2020-32PASSED AS EMERGENCY, this 21st day of July, 2020.ATTEST:Linda Clark, MayorJenny August, Clerk-TreasurerI hereby certify that this Resolution was duly published by public posting at five pre-designatedposting places in the Village of Mantua on the day of July, 2020.Jenny August, Clerk-TreasurerApproved as to Form:Michele Stuck, Solicitor

Village of Mantua, OhioRESOLUTION 2020-32"Exhibit A"July 21, 2020Mayor Linda Clark and Members of CouncilVillage of Mantua4650 West Main StreetMantua, Ohio 44255Owner NameOwner AddressRe:Buchert Park Trail Improvements – Phase 2Quote ResultsDear Mayor and Council Members:A quote was received for the above referenced project on July 17, 2020 and attached you willfind a copy of a tabulation of the Quote for your review. The Base Bid is 17,262.82 for thework in the Park and the Alternate is 3,115.48 for the work in the R/W.We have reviewed the quote from Todd Lamb Paving and Excavating of Mantua, Ohio andfound it to be in conformance with all contract requirements. It is our opinion that they areexperienced and qualified to perform the work within the contract. This firm has performedmultiple paving projects in the Village including the Park Phase 1 and the SR 44 Connectorproject.For additional budget information, please refer to my project summary of 7-17-20.Should you have any questions or require additional information, please feel free to contact ouroffice.Respectfully,CT CONSULTANTS, INC.Richard J. Iafelice, P.E.Village \Bid Results Letter.Doc8150 Sterling Ct. Mentor OH 44060 440.951.9000 www.ctconsultants.com

Village of Mantua, OhioRESOLUTION 2020-32"Exhibit B"Buchert Park Walking Trail – Phase 2Village of MantuaBid Opening Date: June 19, 2020Bid Tabulation SummaryBase Bid - North & South Sides of High Street - Out of R/WProject No. 200608LIST OF BIDDERSBIDDER1 Todd Lamb Paving & Excavating3569 Beck RoadMantua, OH 44255Phone number: (330) 274-0161July 21, 2020Page 1

Buchert Park Walking Trail – Phase 2Village of MantuaBid Opening Date: June 19, 2020Bid Tabulation SummaryBase Bid - North & South Sides of High Street - Out of R/WProject No. 200608LIST OF TOTALSNOTE: Bidders Informal Totals appear if different than bid tab calculated total.Name1.Calculated TotalTodd Lamb Paving & ExcavatingJuly 21, 2020 17,262.82Page 1Bidder'sInformal Totals

Buchert Park Walking Trail – Phase 2Village of MantuaBid Opening Date: June 19, 2020Bid Tabulation SummaryBase Bid - North & South Sides of High Street - Out of R/WProject No. 200608LIST OF ALL ITEMSNOTE: Bidders Informal unit price or item total appear if different than bid tab calculated price.Bidders1.Bidder'sInformalUnit PriceCalculatedLine ItemTotalLaborMaterialCalculatedUnit Price 900.00 0.00 900.00 900.00 6.67 2.61 9.28 835.20 3.10 1.45 4.55 9,828.00 500.00 0.00 500.00 500.00 34.50 0.00 34.50 1,621.50 8.50 0.00 8.50 399.50 2.05 7.05 705.00 44.64 82.14 1,149.96 50.91 1,323.661.00 LS OF (201) CLEARING AND GRUBBINGTodd Lamb Paving & Excavating2. 90.00 FT OF (605) AGGREGATE DRAINTodd Lamb Paving & Excavating3. 2,160.00 SF OF (608) 3 INCH ASPHALT CONCRETE WALKTodd Lamb Paving & Excavating4.1.00 LS OF (624) MOBILIZATIONTodd Lamb Paving & Excavating5. 47.00 CY OF (651) TOPSOIL STRIPPED AND STOCKPILEDTodd Lamb Paving & Excavating6. 47.00 CY OF (652) PLACING STOCKPILED TOPSOILTodd Lamb Paving & Excavating7. 100.00 SY OF (659) SEEDING AND MULCHING, CLASS 1Todd Lamb Paving & Excavating 5.008. 14.00 CY OF (680) PERVIOUS BASE, ODOT 703.01-1 TABLE, NO. 57Todd Lamb Paving & Excavating 37.509. 26.00 CY OF (703) AGGREGATE SURFACE COURSE, #8/10 LIMESTONE BLEND, AS PER PLANTodd Lamb Paving & ExcavatingJuly 21, 2020 22.05 28.86Page 1Bidder'sInformalLine ItemTotal

Buchert Park Walking Trail – Phase 2Village of MantuaBid Opening Date: June 19, 2020Bid Tabulation SummaryAlternate 1 - Asphalt Trail & Pavement Marking Within R/WProject No. 200608LIST OF TOTALSNOTE: Bidders Informal Totals appear if different than bid tab calculated total.Name1.Calculated TotalTodd Lamb Paving & ExcavatingJuly 21, 2020 3,115.48Page 1Bidder'sInformal Totals

Buchert Park Walking Trail – Phase 2Village of MantuaBid Opening Date: June 19, 2020Bid Tabulation SummaryAlternate 1 - Asphalt Trail & Pavement Marking Within R/WProject No. 200608LIST OF ALL ITEMSNOTE: Bidders Informal unit price or item total appear if different than bid tab calculated price.Bidders1.Bidder'sInformalUnit PriceCalculatedLine ItemTotalLaborMaterialCalculatedUnit Price 35.00 0.00 35.00 210.00 12.50 0.00 12.50 250.00 1.45 4.55 1,474.20 2.50 6.25 8.75 210.00 2.50 12.40 14.90 402.30 3.15 2.75 5.90 283.20 8.50 0.00 8.50 51.00 2.05 7.05 70.50 44.64 82.14 164.286.00 CY OF (204) EXCAVATION OF SUBGRADETodd Lamb Paving & Excavating2. 20.00 FT OF (607) FENCE REMOVED AND REBUILTTodd Lamb Paving & Excavating3. 324.00 SF OF (608) 3 INCH ASPHALT CONCRETE WALKTodd Lamb Paving & Excavating 3.104. 24.00 FT OF (630) GROUND MOUNTED SUPPORT, NO. 2 POSTTodd Lamb Paving & Excavating5. 27.00 SF OF (630) SIGN, FLAT SHEETTodd Lamb Paving & Excavating6. 48.00 FT OF (644) CROSSWALK LINETodd Lamb Paving & Excavating7.6.00 CY OF (652) PLACING STOCKPILED TOPSOILTodd Lamb Paving & Excavating8. 10.00 SY OF (659) SEEDING AND MULCHING, CLASS 1Todd Lamb Paving & Excavating9. 5.002.00 CY OF (680) PERVIOUS BASE, ODOT 703.01-1 TABLE, NO. 57Todd Lamb Paving & ExcavatingJuly 21, 2020 37.50Page 1Bidder'sInformalLine ItemTotal

multiple paving projects in the Village including the Park Phase 1 and the SR 44 Connector project. For additional budget information, please refer to my project summary of 7-17-20. . Richard J. Iafelice, P.E. Village Engineer RJI/BR:saa/br Enclosures H:\2020\200608\SPEC\Bid Results Letter.Doc Village of Mantua, Ohio RESOLUTION 2020-32 .