DESIGN DEVELOPMENT - GMP3, GMP4 - Montgomery College

Transcription

Montgomery CollegeCatherine and Isiah Leggett Math and Science BuildingTakoma Park / Silver Spring CampusDESIGN DEVELOPMENT - GMP3, GMP4SEPTEMBER 27, 2019Montgomery College #: FP16-077Montgomery College Building #319MHEC Project #CC-01-MC16-458SMITHGROUP Project #: 12543.000

MONTGOMERY COLLEGE PROJECT #FP16-077MONTGOMERY COLLEGE BUILDING #319MHEC PROJECT #CC-01-MC16-458SMITHGROUP #12543.000MONTGOMERY COLLEGELEGGETT BUILDINGISSUED FOR DESIGN DEVELOPMENT - GMP3, GMP427 SEPTEMBER 2019TABLE OF CONTENTSDIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTSSECTION 003132 - GEOTECHNICAL DATASECTION 003132A - FINAL GEOTECHNICAL REPORT – REV. 2DIVISION 01 - GENERAL REQUIREMENTSGeneral comment for Architectural SectionsSECTION 011000 - SUMMARY- Many divisions call for Owner Testing Agency. This needs to bediscussed. MC is not planning to be repsonsible for independent testingSECTION 012100 - ALLOWANCESSECTION 012200 - UNIT PRICESSECTION 012300 - ALTERNATESSECTION 012500 - SUBSTITUTION PROCEDURESSECTION 012600 - CONTRACT MODIFICATION PROCEDURESSECTION 012900 - PAYMENT PROCEDURESSECTION 013100 - PROJECT MANAGEMENT AND COORDINATIONSECTION 013200 - CONSTRUCTION PROGRESS DOCUMENTATIONSECTION 013233 - PHOTOGRAPHIC DOCUMENTATIONSECTION 013300 - SUBMITTAL PROCEDURESSECTION 014000 - QUALITY REQUIREMENTSBMC to coordinateSECTION 014200 - REFERENCESwith college on whoSECTION 015000 - TEMPORARY FACILITIES AND CONTROLSwill handle 3rdSECTION 015639 - TEMPORARY TREE AND PLANT PROTECTIONparty inpectionsSECTION 016000 - PRODUCT REQUIREMENTSSECTION 017300 - EXECUTIONSECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSALSECTION 017419A - CONSTRUCTION WASTE IDENTIFICATIONSECTION 017419B - DEMOLITION WASTE IDENTIFICATIONSECTION 017419C - CONSTRUCTION WASTE REDUCTION WORK PLANSECTION 017419D - DEMOLITION WASTE REDUCTION WORK PLANSECTION 017419G - CONSTRUCTION WASTE REDUCTION PROGRESS REPORTSSECTION 017419H - DEMOLITION WASTE REDUCTION PROGRESS REPORTSSECTION 017700 - CLOSEOUT PROCEDURESSECTION 017823 - OPERATION AND MAINTENANCE DATASECTION 017839 - PROJECT RECORD DOCUMENTSSECTION 017900 - DEMONSTRATION AND TRAININGSECTION 018113.15 - SUSTAINABLE DESIGN REQUIREMENTS - LEEDV4 BD CSECTION 018113.15A - LEED V4 PRODUCT DATA SUBMITTAL REPORTING FORMSECTION 018113.15B - LEED V4 BD C SCORECARDDIVISION 02 - EXISTING CONDITIONSNOT APPLICABLEDIVISION 03 - CONCRETESECTION 033000 - CAST-IN-PLACE CONCRETE – TO BE ISSUED IN CDSECTION 035300 - CONCRETE TOPPINGTable of ContentsTOC - 1

MONTGOMERY COLLEGE PROJECT #FP16-077MONTGOMERY COLLEGE BUILDING #319MHEC PROJECT #CC-01-MC16-458SMITHGROUP #12543.000MONTGOMERY COLLEGELEGGETT BUILDINGISSUED FOR DESIGN DEVELOPMENT - GMP3, GMP427 SEPTEMBER 2019DIVISION 04 - MASONRYSECTION 042000 - UNIT MASONRYSECTION 042613 - MASONRY VENEERSECTION 047200 - CAST STONE MASONRYDIVISION 05 - METALSSECTION 051200 SECTION 053100 SECTION 055000 SECTION 055113 SECTION 055213 SECTION 055213 SECTION 055313 SECTION 057000 SECTION 057300 SECTION 057500 -STRUCTURAL STEEL FRAMING - TO BE ISSUED IN CDSTEEL DECKING – TO BE ISSUED IN CDMETAL FABRICATIONSMETAL PAN STAIRSPIPE AND TUBE RAILINGSPIPE AND TUBE RAILING – FROM LANDSCAPEBAR GRATINGSDECORATIVE METALDECORATIVE METAL RAILINGSDECORATIVE FORMED METALDIVISION 06 - WOOD, PLASTICS, AND COMPOSITESSECTION 061053 SECTION 061600 SECTION 062023 SECTION 064116 SECTION 066116 -MISCELLANEOUS ROUGH CARPENTRYSHEATHINGINTERIOR FINISH CARPENTRYPLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETSSOLID SURFACING FABRICATIONSDIVISION 07 - THERMAL AND MOISTURE PROTECTIONSECTION 071113 - BITUMINOUS DAMPROOFINGSECTION 071326 - SELF-ADHERING SHEET WATERPROOFINGSECTION 071619 - METAL OXIDE WATERPROOFINGSECTION 071800 - TRAFFIC COATINGSSECTION 072100 - THERMAL INSULATIONSECTION 072119 - FOAMED-IN-PLACE INSULATIONSECTION 072500 - WEATHER BARRIERSECTION 072726 - FLUID-APPLIED MEMBRANE AIR BARRIERSSECTION 074113.13 - FORMED METAL ROOF PANELSSECTION 074213.13 - FORMED METAL WALL PANELSSECTION 075216 - STYRENE-BITADIENE-STYRENE (SBS) MODIFIED BITUMINOUSMEMBRANE ROOFINGSECTION 076200 - SHEET METAL FLASHING AND TRIMSECTION 077100 - ROOF SPECIALTIESSECTION 078100 - APPLIED FIREPROOFINGSECTION 078413 - PENETRATION FIRESTOPPINGSECTION 078443 - JOINT FIRESTOPPINGSECTION 079200 - JOINT SEALANTSSECTION 079219 - ACOUSTICAL JOINT SEALANTSTable of ContentsTOC - 2

MONTGOMERY COLLEGE PROJECT #FP16-077MONTGOMERY COLLEGE BUILDING #319MHEC PROJECT #CC-01-MC16-458SMITHGROUP #12543.000MONTGOMERY COLLEGELEGGETT BUILDINGISSUED FOR DESIGN DEVELOPMENT - GMP3, GMP427 SEPTEMBER 2019DIVISION 08 - OPENINGSSECTION 081113 - HOLLOW METAL DOORS AND FRAMESSECTION 081213 - HOLLOW METAL FRAMESSECTION 081416 - FLUSH WOOD DOORSSECTION 083113 - ACCESS DOORS AND FRAMESSECTION 083323 - OVERHEAD COILING DOORSSECTION 083473.16 - WOOD SOUND CONTROL DOOR ASSEMBLIESSECTION 084113 - ALUMINUM-FRAMED ENTRANCES AND STOREFRONTSSECTION 084413 - GLAZED ALUMINUM CURTAIN WALLSSECTION 086200 - UNIT SKYLIGHTSSECTION 087100 - DOOR HARDWARESECTION 088000 - GLAZINGSECTION 088813 - FIRE-RATED GLAZINGDIVISION 09 - FINISHESSECTION 090561.13 - MOISTURE VAPOR EMISSION CONTROLSECTION 092116.23 - GYPSUM BOARD SHAFT WALL ASSEMBLIESSECTION 092216 - NON-STRUCTURAL METAL FRAMINGSECTION 092900 - GYPSUM BOARDSECTION 093013 - CERAMIC TILINGSECTION 095113 - ACOUSTICAL PANEL CEILINGSSECTION 095436 - SUSPENDED GRIDSSECTION 096513 - RESILIENT BASE AND ACCESSORIESSECTION 096516 - RESILIENT SHEET FLOORINGSECTION 096519 - RESILIENT TILE FLOORINGSECTION 096536 - STATIC CONTROL RESILIENT FLOORINGSECTION 096623 - RESINOUS MATRIX TERRAZZO FLOORINGSECTION 096723 - RESINOUS FLOORINGSECTION 096813 - TILE CARPETINGSECTION 099113 - EXTERIOR PAINTINGSECTION 099123 - INTERIOR PAINTINGSECTION 099600 - HIGH PERFORMANCE COATINGSDIVISION 10 - SPECIALTIESCannot find locations and sizes of displaycabinets on documentsSECTION 101100 - VISUAL DISPLAY UNITSSECTION 101200 - DISPLAY CASESSECTION 102113.17 - PHENOLIC-CORE TOILET COMPARTMENTSSECTION 102239 - FOLDING PANEL PARTITIONSSECTION 102600 - WALL AND DOOR PROTECTIONSECTION 102800 - TOILET, BATH, AND LAUNDRY ACCESSORIESSECTION 104413 - FIRE PROTECTION CABINETSSECTION 104416 - FIRE EXTINGUISHERSDIVISION 11 - EQUIPMENTSECTION 111319 SECTION 115300 SECTION 115313 SECTION 115500 Table of ContentsSTATIONARY LOADING DOCK EQUIPMENTMISCELLANEOUS LABORATORY EQUIPMENTLABORATORY FUME HOODSPLANETARIUM EQUIPMENTTOC - 3

MONTGOMERY COLLEGE PROJECT #FP16-077MONTGOMERY COLLEGE BUILDING #319MHEC PROJECT #CC-01-MC16-458SMITHGROUP #12543.000MONTGOMERY COLLEGELEGGETT BUILDINGISSUED FOR DESIGN DEVELOPMENT - GMP3, GMP427 SEPTEMBER 2019DIVISION 11 – EQUIPMENT (CONTINUED)SECTION 115500A - BT PL-1 POWER AND WIREWAYSSECTION 115500B - BT PL-2 SPEAKERSDIVISION 12 - FURNISHINGSSECTION 122413 - ROLLER WINDOW SHADESSECTION 123553 - GENERAL REQUIREMENTS FOR LABORATORY CASEWORK AND FUMEHOODSSECTION 123553.19 - WOOD LABORATORY CASEWORKSECTION 123661.19 - QUARTZ AGGOMERATE COUNTERTOPSSECTION 124816 - ENTRANCE FLOOR GRILLESSECTION 129300 - SITE FURNISHINGSDIVISION 13 - SPECIAL CONSTRUCTIONSECTION 133413 - GREENHOUSE AND RELATED EQUIPMENTDIVISION 14 - CONVEYING EQUIPMENTSECTION 142400 - HYDRAULIC ELEVATORSDIVISION 21 - FIRE SUPPRESSIONSECTION 210517 SECTION 210518 SECTION 211200 SECTION 211313 SECTION 213113 -SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPINGESCUTCHEONS FOR FIRE-SUPPRESSION PIPINGFIRE-SUPPRESSION STANDPIPESWET-PIPE SPRINKLER SYSTEMSELECTRIC-DRIVE, CENTRIFUGAL FIRE PUMPSDIVISION 22 - PLUMBINGSECTION 220513 - COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENTSECTION 220516 - EXPANSION FITTINGS AND LOOPS FOR PLUMBING PIPINGSECTION 220517 - SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPINGSECTION 220518 - ESCUTCHEONS FOR PLUMBING PIPINGSECTION 220519 - METERS AND GAGES FOR PLUMBING PIPINGSECTION 220523.12 - BALL VALVES FOR PLUMBING PIPINGSECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENTSECTION 220533 - HEAT TRACING FOR PLUMBING PIPINGSECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENTSECTION 220716 - PLUMBING EQUIPMENT INSULATIONSECTION 220719 - PLUMBING PIPING INSULATIONSECTION 220800 - COMMISSIONING OF PLUMBINGSECTION 221113 - FACILITY WATER DISTRIBUTION PIPINGSECTION 221113 - FACILITY WATER DISTRIBUTION PIPING - CIVILSECTION 221116 - DOMESTIC WATER PIPINGSECTION 221119 - DOMESTIC WATER PIPING SPECIALTIESSECTION 221123 - DOMESTIC WATER PUMPSTable of ContentsTOC - 4

MONTGOMERY COLLEGE PROJECT #FP16-077MONTGOMERY COLLEGE BUILDING #319MHEC PROJECT #CC-01-MC16-458SMITHGROUP #12543.000MONTGOMERY COLLEGELEGGETT BUILDINGISSUED FOR DESIGN DEVELOPMENT - GMP3, GMP427 SEPTEMBER 2019DIVISION 22 – PLUMBING (CONTINUED)SECTION 221123.13 - DOMESTIC-WATER PACKAGED BOOSTER PUMPSSECTION 221313 - FACILITY SANITARY SEWER - CIVILSECTION 221316 - SANITARY WASTE AND VENT PIPINGSECTION 221319 - SANITARY WASTE PIPING SPECIALTIESSECTION 221413 - FACILITY STORM DRAINAGE PIPINGSECTION 221423 - STORM DRAINAGE PIPING SPECIALTIESSECTION 221429 - SUMP PUMPSSECTION 223100 - DOMESTIC WATER SOFTENERSSECTION 223400 - FUEL-FIRED, DOMESTIC-WATER HEATERSSECTION 224213.13 - COMMERCIAL WATER CLOSETSSECTION 224213.16 - COMMERCIAL URINALSSECTION 224216.13 - COMMERCIAL LAVATORIESSECTION 224216.16 - COMMERCIAL SINKSSECTION 224223 - COMMERCIAL SHOWERSSECTION 224500 - EMERGENCY PLUMBING FIXTURESSECTION 224716 - PRESSURE WATER COOLERSSECTION 226113 - COMPRESSED-AIR PIPING FOR LABORATORY AND HEALTHCAREFACILITIESSECTION 226119 - COMPRESSED-AIR EQUIPMENT FOR LABORATORY AND HEALTHCAREFACILITIESSECTION 226213 - VACUUM PIPING FOR LABORATORY AND HEALTHCARE FACILITIESSECTION 226219 - VACUUM EQUIPMENT FOR LABORATORY AND HEALTHCARE FACILITIESSECTION 226600 - CHEMICAL-WASTE SYSTEMS FOR LABORATORY AND HEALTHCAREFACILITIESSECTION 226700 - PROCESSED WATER SYSTEMS FOR LABORATORY AND HEALTHCAREFACILITIESDIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)SECTION 230513 - COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENTSECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPINGSECTION 230517 - SLEEVES AND SLEEVE SEALS FOR HVAC PIPINGSECTION 230518 - ESCUTCHEONS FOR HVAC PIPINGSECTION 230519 - METERS AND GAGES FOR HVAC PIPINGSECTION 230523.12 - BALL VALVES FOR HVAC PIPINGSECTION 230523.13 - BUTTERFLY VALVES FOR HVAC PIPINGSECTION 230523.14 - CHECK VALVES FOR HVAC PIPINGSECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENTSECTION 230533 - HEAT TRACING FOR HVAC PIPINGSECTION 230548.13 - VIBRATION CONTROLS FOR HVACSECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENTSECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVACSECTION 230713 - DUCT INSULATIONSECTION 230716 - HVAC EQUIPMENT INSULATIONSECTION 230719 - HVAC PIPING INSULATIONSECTION 230800 - COMMISSIONING OF HVACSECTION 230900 – INSTRUMENTATION AND CONTROL FOR HVACSECTION 231123 - FACILITY NATURAL-GAS PIPINGSECTION 232113 - HYDRONIC PIPINGSECTION 232113.13 - UNDERGROUND HYDRONIC PIPINGSECTION 232116 - HYDRONIC PIPING SPECIALTIESTable of ContentsTOC - 5

MONTGOMERY COLLEGE PROJECT #FP16-077MONTGOMERY COLLEGE BUILDING #319MHEC PROJECT #CC-01-MC16-458SMITHGROUP #12543.000MONTGOMERY COLLEGELEGGETT BUILDINGISSUED FOR DESIGN DEVELOPMENT - GMP3, GMP427 SEPTEMBER 2019DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)(CONTINUEDSECTION 232123 - HYDRONIC PUMPSSECTION 232300 - REFRIGERANT PIPINGSECTION 232516 - WATER TREATMENT FOR OPEN-LOOP HYDRONIC SYSTEMSSECTION 233113 - METAL DUCTSSECTION 233300 - AIR DUCT ACCESSORIESSECTION 233416 - CENTRIFUGAL HVAC FANSSECTION 233423 - HVAC POWER VENTILATORSSECTION 233600 - AIR TERMINAL UNITSSECTION 233713.13 - AIR DIFUSERSSECTION 233713.23 - AIR REGISTERS, AND GRILLESSECTION 235100 - BREECHINGS, CHIMNEYS, AND STACKSSECTION 235216 - CONDENSING BOILERSSECTION 236426.16 - WATER-COOLED, ROTARY-SCREW WATER CHILLERSSECTION 236514.13 - OPEN-CIRCUIT, INDUCED-DRAFT, COUNTERFLOW COOLING TOWERSSECTION 237323 - CUSTOM, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITSSECTION 238123.11 - SMALL CAPACITY (6 TONS (21 KW) AND SMALLER), COMPUTER-ROOMAIR-CONDITIONERS, FLOOR-MOUNTED UNITSSECTION 238126 - SPLIT-SYSTEM AIR-CONDITIONERSSECTION 238219 - FAN COIL UNITSSECTION 238239.13 - CABINET UNIT HEATERSSECTION 238239.19 - WALL AND CEILING UNIT HEATERSDIVISION 25 - INTEGRATED AUTOMATIONNOT APPLICABLEDIVISION 26 - ELECTRICALSECTION 260513 - MEDIUM-VOLTAGE CABLESSECTION 260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLESSECTION 260523 - CONTROL-VOLTAGE ELECTRICAL POWER CABLESSECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMSSECTION 260529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMSSECTION 260533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMSSECTION 260536 - CABLE TRAYS FOR ELECTRICAL SYSTEMSSECTION 260539 - UNDERFLOOR RACEWAYS FOR ELECTRICAL SYSTEMSSECTION 260543 - UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMSSECTION 260544 - SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLINGSECTION 260548 - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMSSECTION 260548.16 - SEISMIC CONTROLS FOR ELECTRICAL SYSTEMSSECTION 260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMSSECTION 260573.13 - SHORT-CIRCUIT STUDIESSECTION 260573.16 - COORDINATION STUDIESSECTION 260573.19 - ARC-FLASH HAZARD ANALYSISSECTION 260800 - COMMISSIONING OF ELECTRICAL SYSTEMSSECTION 260913 - ELECTRICAL POWER MONITORING AND CONTROLSECTION 260923 - LIGHTING CONTROL DEVICESSECTION 260933 - CENTRAL DIMMING CONTROLSSECTION 260936 - MODULAR DIMMING CONTROLSTable of ContentsTOC - 6

MONTGOMERY COLLEGE PROJECT #FP16-077MONTGOMERY COLLEGE BUILDING #319MHEC PROJECT #CC-01-MC16-458SMITHGROUP #12543.000MONTGOMERY COLLEGELEGGETT BUILDINGISSUED FOR DESIGN DEVELOPMENT - GMP3, GMP427 SEPTEMBER 2019DIVISION 26 – ELECTRICAL (CONTINUED)SECTION 260936.19 - STANDALONE MULTIPRESET MODULAR DIMMING CONTROLSSECTION 260943.16 - ADDRESSABLE-LUMINAIRE LIGHTING CONTROLSSECTION 262200 - LOW-VOLTAGE TRANSFORMERSSECTION 262413 - SWITCHBOARDSSECTION 262416 - PANELBOARDSSECTION 262713 - ELECTRICITY METERINGSECTION 262726 - WIRING DEVICESSECTION 262813 - FUSESSECTION 262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERSSECTION 262913.03 – MANUAL AND MAGNETIC MOTOR CONTROLSSECTION 262913.06 – SOFT START MOTOR CONTROLSSECTION 262923 - VARIABLE-FREQUENCY MOTOR CONTROLLERSSECTION 263100 - PHOTOVOLTAIC COLLECTORSSECTION 263213.16 - GASEOUS EMERGENCY ENGINE GENERATORSSECTION 263353 - STATIC UNINTERRUPTIBLE POWER SUPPLYSECTION 263600 - TRANSFER SWITCHESSECTION 264113 - LIGHTNING PROTECTION FOR STRUCTURESSECTION 264313 - SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITSSECTION 265100 - INTERIOR LIGHTINGSECTION 265119 - LED INTERIOR LIGHTINGSECTION 265219 - EMERGENCY AND EXIT LIGHTINGSECTION 265613 - LIGHTING POLES AND STANDARDSSECTION 265619 - LED EXTERIOR LIGHTINGDIVISION 27 - COMMUNICATIONSSECTION 270528 SECTION 271100 SECTION 271300 SECTION 271500 SECTION 273226 SECTION 275319 -PATHWAYS FOR COMMUNICATIONS SYSTEMSCOMMUNICATIONS EQUIPMENT ROOMSCOMMUNICATIONS BACKBONE CABLINGCOMMUNICATIONS HORIZONTAL CABLINGEMERGENCY TELEPHONESDISTRIBUTED ANTENNA SYSTEMDIVISION 28 - ELECTRONIC SAFETY AND SECURITYSECTION 281000 – ACCESS CONTROLSECTION 284621.11 - ADDRESSABLE FIRE-ALARM SYSTEMSDIVISIONS 31 - EARTHWORKNOT APPLICABLEDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 321216 – ASPHALT PAVINGSECTION 321313 – CONCRETE PAVINGSECTION 321373 – CONCRETE PAVING JOINT SEALANTSSECTION 321713 – PARKING BUMPERSSECTION 321723 – PAVEMENT MARKINGSSECTION 321726 – TACTILE WARNING SURFACES - CIVILTable of ContentsTOC - 7

MONTGOMERY COLLEGE PROJECT #FP16-077MONTGOMERY COLLEGE BUILDING #319MHEC PROJECT #CC-01-MC16-458SMITHGROUP #12543.000MONTGOMERY COLLEGELEGGETT BUILDINGISSUED FOR DESIGN DEVELOPMENT - GMP3, GMP427 SEPTEMBER 2019DIVISION 32 - EXTERIOR IMPROVEMENTS (CONTINUED)SECTION 321726 – TACTILE WARNING SURFACES - LANDSCAPINGSECTION 323116 – WELDED WIRE FENCESSECTION 329113 – SOIL PREPARATIONSECTION 329200 – TURF AND GRASSESSECTION 329300 - PLANTSDIVISION 33 - UTILITIESSECTION 334200 – STORMWATER CONVEYANCEDIVISIONS 34 - 48NOT APPLICABLEEND OF TABLE OF CONTENTSTable of ContentsTOC - 8

THIS PAGE LEFT INTENTIONALLY BLANK.

THIS PAGE LEFT INTENTIONALLY BLANK.

REVISION NO. 2 - GEOTECHNICAL REPORTThe Catherine and Isiah Leggett BuildingMontgomery College7600 Takoma AvenueTakoma Park, MarylandSchnabel Engineering DC, Inc.CBE License No. L22053052020Schnabel Reference: 18C41041June 24, 2019

THIS PAGE LEFT INTENTIONALLY BLANK.

SmithGroupThe Catherine and Isiah Leggett BuildingREVISION NO. 2 - GEOTECHNICAL ENGINEERING REPORTTHE CATHERINE AND ISIAH LEGGETT BUILDINGTAKOMA PARK, MARYLANDTABLE OF CONTENTS1.0EXECUTIVE SUMMARY . 12.0SCOPE OF SERVICES . 33.0DESCRIPTION OF SITE AND PROPOSED CONSTRUCTION . 43.13.24.0SUBSURFACE EXPLORATION PROGRAM . 54.14.25.0Site Geology. 7Generalized Subsurface Stratigraphy . 7Groundwater . 9In-Situ Infiltration Test Results . 10USDA Classification and Correlated Infiltration Rates . 11Seismic Site Classification . 12SITE GRADING AND EARTHWORK . 136.16.26.37.0Subsurface Exploration and Field Testing . 5Laboratory Testing . 6SITE GEOLOGY AND SUBSURFACE CONDITIONS . 75.15.25.35.45.55.66.0Site Description . 4Proposed Construction . 4Preparation of Subgrades to Receive Compacted Fill . 13Compacted Fill . 14Fill Settlement . 15FOUNDATION RECOMMENDATIONS . 167.1Spread Footings . 168.0FLOOR SLAB RECOMMENDATIONS . 179.0RETAINING STRUCTURE RECOMMENDATIONS . 189.19.2June 24, 2019Project 18C41041Below-Grade Walls . 18Backfill for Below-Grade Walls . 18Page iSchnabel Engineering DC, Inc. 2019 All Rights Reserved

SmithGroupThe Catherine and Isiah Leggett Building10.0SUBDRAINAGE RECOMMENDATIONS. 1910.110.211.0Subdrainage for Below-Grade Walls. 19Basement Subdrainage . 19CONSTRUCTION CONSIDERATIONS . 2111.111.211.311.411.5Site Grading and Earthwork . 21Foundations . 21Construction Dewatering . 21Subdrainage . 22Engineering Services During Construction . 2212.0GENERAL SPECIFICATION RECOMMENDATIONS . 2313.0LIMITATIONS . 24LIST OF FIGURESFigure 1:Figure 2:Figure 3:Figure 4:Site Vicinity MapApproximate Boring Location PlanLateral Earth Pressure Diagram for Design of Below-Grade WallsSubdrainage DetailsLIST OF TABLESTable 4.1:Table 5.1:Table 5.2:Table 6.1:Summary of Pressuremeter Tests ResultsSummary of In-Situ Infiltration Test ResultsUSDA Textural Classification and Minimum Infiltration RatesEstimated Elevation of Suitable Compacted Fill SubgradesAPPENDICESAppendix A:Appendix B:Appendix C:June 24, 2019Project 18C41041Subsurface Exploration DataIn-Situ Test ResultsSoil Laboratory Test DataPage iiSchnabel Engineering DC, Inc. 2019 All Rights Reserved

THIS PAGE LEFT INTENTIONALLY BLANK.

SmithGroupThe Catherine and Isiah Leggett Building1.0EXECUTIVE SUMMARYThis report presents the results of the geotechnical investigation and testing conducted by SchnabelEngineering DC, Inc. (SEDC) for the proposed Catherine and Isiah Leggett Building for SmithGroup.Based on our evaluation of the subsurface conditions revealed by our field investigation and the projectdata furnished to us, we have developed the following summary of our major conclusions andrecommendations. Detailed recommendations are presented in the body of the report. Ten soil test borings were advanced in the general area of the proposed building and five soilborings were advanced at proposed stormwater management locations (one of the test buildingborings also served as a stormwater boring, SB-05/SWM-4) in 2018. Two additional soil testborings were advanced in May 2019. The subsurface investigations revealed that the site isunderlain by terrace deposits (Strata B1 and B2) overlaying residual soils (Strata C1, C2, and D).Existing fill was also encountered and extended between 1.2 ft to 6 ft below surface grades in themajority of the borings, except at borings SB-08 and SB-10. At these locations, deeper fill waspresent and extended 13.5 ft to 23.5 ft below surface grades, respectively. The subject site is currently occupied by Falcon Hall with the lowest level at predominately EL 307 (ft) and some spaces with a lowest level at EL 302 (ft), and the Science South Buildingwith a lowest level at EL 326 (ft). Both buildings will be demolished in their entirety and thebuildings’ foundation systems will be completely removed. Cuts of up to about 15 ft are expected,and the majority of the fill that was encountered in the borings will be removed as part of thedemolition. At boring SB-10, where fill extended to EL 302.9 (ft), the fill material is believed tobe backfill of the present-day building. Boring SB-10 currently lies outside of the proposedbuilding footprint and our recommendations have been tailored with this consideration. To reach the proposed lowest level of the new Catherine and Isiah Leggett Building at EL 320(ft), up to about 15 ft to 18 ft of new compacted structural fill will need to be placed. Due to thelarge thickness of new fill being placed, settlement plates will need to be installed and the fillmonitored to ensure that settlement has dissipated before the building can be constructed.Additional details are included herein. Considering a maximum column load of about 200 kips to 300 kips, we recommend the newbuilding be supported on spread footings founded on firm natural soils of Strata B1, B2, C1, or C2or on compacted structural fill. In areas where existing natural soil is loose/soft or existing fillmaterial is present, these materials should be removed and replaced with compacted structural fillor lean concrete. Spread footings can be designed for an allowable soil bearing pressure of3,000 psf as discussed in detail in the report. The proposed floor slabs should be supported on suitable natural soils of Strata B1, B2, C1, andC2 or compacted structural fill. A modulus of subgrade reaction, k, of 100 kcf (kips per cubic foot)should be used in the design of floor slabs.June 24, 2019Project 18C41041Page 1Schnabel Engineering DC, Inc. 2019 All Rights Reserved

SmithGroupThe Catherine and Isiah Leggett Building We evaluated the Seismic Site Class for this project according to the International Building Code(IBC) Section 1613 2015. Our analysis indicates Site Class D for this location. This Site Classwas evaluated based on the Standard Penetration Test (SPT) values. Building walls that extend below-grade need to be designed to withstand lateral earth pressures.Additional details are provided herein. Subdrainage below the floor slab and behind below-grade walls will be required. Dewateringduring construction will also be required. Additional details are provided herein.We are providing this executive summary solely for purposes of overview. Any party that relies on thisreport must read the full report. This executive summary omits several details, any one of which could bevery important to the proper application of the report.June 24, 2019Project 18C41041Page 2Schnabel Engineering DC, Inc. 2019 All Rights Reserved

SmithGroupThe Catherine and Isiah Leggett Building2.0SCOPE OF SERVICESOur proposal dated January 18, 2018, and Revision No. 1 proposal dated May 2, 2019, defines the scopeof services for this project. The scope of services includes the following: Advancing twelve (12) soil test borings to depths between 40 ft and 55 ft each, five soil testborings to depths between 15 ft and 16 ft each, and conducting pressuremeter testing at two (2)of the building borings.Conducting falling head infiltration testing at six locations.Preparation of a report consisting of:o Project and site description, including relevant information relating to nearby foundationsand structures, etc.o A boring location plan, indicating boring locations referenced to actual physical featuresand proposed locations of structures.o Boring logs with soil/rock description, classification, and depth of fill, groundwaterobservations, and any other observations made during the exploration, including theground surface elevations at boring locations.o An estimate of subsurface conditions and groundwater levels within the area explored.o Foundation requirements including a net allowable soil bearing pressure, bearing gradesand estimated settlements for spread footings.o Recommendations for floor slab support, including a recommended modulus of subgradereaction for use in slab design.o Earthwork recommendations for the construction of load-bearing fill including anassessment of site soils for use as fill, subgrade preparation, and compaction criteria.o Recommended Seismic Site Class in accordance with IBC 2015 for use in foundationdesign based on an extrapolation of data collected in the subsurface exploration.o Recommended static earth pressures, subdrainage and backfill requirements forbasement walls, loading dock walls or retaining walls, if necessary.o Recommendations regarding permanent subdrainage design and installation, ifnecessary.o Recommendations regarding building area surcharging requirements due to theplacement of new compacted structural fill.o Construction considerations related to the implementation of our recommendations.June 24, 2019Project 18C41041Page 3Schnabel Engineering DC, Inc. 2019 All Rights Reserved

SmithGroupThe Catherine and Isiah Leggett Building3.0DESCRIPTION OF SITE AND PROPOSED CONSTRUCTION3.1Site DescriptionWe understand that the project will consist of constructing The Catherine and Isiah Leggett Building at theMontgomery College Takoma Park/Silver Spring Campus in Takoma Park, Maryland. The project site isbounded by Fenton Street to the south and west, Takoma Avenue to the east, and New York Avenue tothe north. A Site Vicinity Map is included as Figure 1.Areas to be improved are currently asphalt lots, the Falcon Hall and Science South academic buildings,tennis courts, and landscaped grass areas between academic buildings. We understand that the lowestlevel elevation for the Science South building is at elevation EL 326 (ft), and the lowest level elevationfor Falcon Hall is at approximate elevation EL 307 (ft). Both of these buildings are believed to besupported on spread footings. Existing grades in the area of the proposed building footprint range fromabout EL 315 (ft) to about EL 334 (ft).We obtained the site information from our site visits and from the information provided by your office. Thetopographic information was supplied by A. Morton Thomas and Associates.3.2Proposed ConstructionThe proposed building will be located along the east portion of the Takoma Park/Silver Spring Campus inthe area where present-day Falcon Hall, the Science South Building, Staff Parking Lot E1, and the tenniscourts are situated. We understand that existing Falcon Hall and the Science South Building

BMC to coordinate with college on who will handle 3rd party inpections. MONTGOMERY COLLEGE PROJECT #FP16-077 MONTGOMERY COLLEGE BUILDING #319 . SECTION 115313 - LABORATORY FUME HOODS SECTION 115500 - PLANETARIUM EQUIPMENT . Cannot find locations and sizes of display cabinets on documents.