C TS420 1709 - SAPSPOT

Transcription

C TS420 1709SAP S/4HANA Production Planning and Manufacturing Certification Questions ngC TS420 1709SAP Certified Application Associate – SAP S/4HANA Production Planning and Manufacturing (1709)80 Questions Exam – 60% Cut Score – Duration of 180 minutes

C TS420 1709 Exam QuestionsC TS420 1709 Practice TestERPPrep.com’s C TS420 1709 PDF is a comprehensive compilation of questions andanswers that have been developed by our team of SAP S/4HANA Production Planningand Manufacturing experts and experienced professionals. To prepare for the actualexam, all you need is to study the content of this exam questions. You can identifythe weak area with our premium C TS420 1709 practice exams and help you toprovide more focus on each syllabus topic covered. This method will help you to boostyour confidence to pass the SAP S/4HANA Production Planning and Manufacturingcertification with a better score.C TS420 1709 Questions and Answers SetQuestion 1.Which of the following apply to MRP Live?Note: There are 2 correct answers to this question.a) The BAdIs for classical MRP also apply to MRP Live.b) The definition of the planning scope is more flexible.c) The sequence of planning materials is calculated across plants.d) Planned orders need to be converted to purchase requisitions for externallyprocured materials.Answer: b, cQuestion 2.How can Production Planning and Detailed Scheduling (PP/DS) enhance thestandard planning functionality?Please choose the correct answer.a) By providing multilevel material requirements planningb) By providing future demands from demand figures in the pastc) By providing cross-plant planning and deploymentd) By providing replenishment proposals with exact timesAnswer: cSAP S/4HANA Production Planning and Manufacturing Certification PracticeExamwww.erpprep.com

C TS420 1709 Exam QuestionsQuestion 3.Which technological advances enabled the development of SAP S/4HANA as thedigital core?Note: There are 3 correct answers to this question.a) Big and affordable memoryb) Multi core processors enabling parallelism of tasksc) Wide adoption of web standards such as Service oriented architectured) Advances in the three-tier architecture approache) Capability to add to server landscape and scaleAnswer: c, b, eQuestion 4.The procurement type of your material is set to "E" for In-house production. Whichof the following is valid to determine a source of supply in SAP S/4HANA?Please choose the correct answer.a) Selection Methodb) Contractc) Purchasing Info Recordd) Production VersionAnswer: dQuestion 5.How can you limit the number of master data objects to be created when themanufacturing process is the same for many different products?Please choose the correct answer.a) By creating routings with parallel sequencesb) By assigning the same production version to different materialsc) By creating routings with alternative sequencesd) By assigning different materials to the same routingAnswer: dSAP S/4HANA Production Planning and Manufacturing Certification PracticeExamwww.erpprep.com

C TS420 1709 Exam QuestionsQuestion 6.You want to procure your material components based on a forecast for the finishedmaterial derived from historical sales. When customers order, you produce thefinished product and reserve it for that particular order. Which is the appropriateplanning strategy to use?Please choose the correct answer.a) Planning with final assembly (40)b) Make-to-order production (20)c) Planning without final assembly (50)d) Production by lot size (30)Answer: cQuestion 7.Which elements are included in the structure of the batch where-used list?Note: There are 3 correct answers to this question.a) Purchase ordersb) Planned ordersc) Transfers from batch to batchd) Stock transferse) Collective ordersAnswer: a, c, dQuestion 8.A customer is considering switching from order-related settlement to productrelatedsettlement. What are capabilities of cost collectors?Note: There are 2 correct answers to this question.a) They can be created automatically during month end process.b) They can be applied to make-to-stock production order.c) They can be used for manufacturing with collective orders.d) They can be used for repetitive manufacturing.Answer: b, dSAP S/4HANA Production Planning and Manufacturing Certification PracticeExamwww.erpprep.com

C TS420 1709 Exam QuestionsQuestion 9.Which warehouse management functions are available in SAP EWM but NOT in SAPWM?Note: There are 3 correct answers to this question.a) Handling Unit Managementb) Expected goods receiptc) Labor Managementd) Yard ManagAnswer: b, c, eQuestion 10.The settings for MRP can be maintained at different levels. If settings have beenmaintained in different places, in which sequence does the system search for theMRP settings?Please choose the correct answer.a) MRP Group – Material Master – Plant Settingsb) Plant Settings – MRP Group – Material Masterc) Material Master – Plant Settings – MRP Groupd) Material Master – MRP Group – Plant SettingsAnswer: dFull Online Practice of C TS420 1709 CertificationERPPREP.COM presents authentic, genuine and valid practice exams for SAP OracleDB Certification, which is similar to actual exam. We promise 100% success in veryfirst attempt. We recommend going ahead with our online practice exams to performoutstandingly in the actual exam. We suggest to identify your weak area from ourpremium practice exams and give more focus by doing practice with SAP system. Youcan continue this cycle till you achieve 100% with our practice exams. Our techniquehelps you to score better in the final C TS420 1709 exam.Start Online practice of C TS420 1709 Exam by visiting ap-s4hana-productionplanning-and-manufacturingSAP S/4HANA Production Planning and Manufacturing Certification PracticeExamwww.erpprep.com

SAP S/4HANA Production Planning and Manufacturing Certification Practice Exam www.erpprep.com Question 9. Which warehouse management functions are available in SAP EWM but NOT in SAP WM? Note: There are 3 correct answers to this question. a) Handling Unit Management b) Expected goods receipt c) Labor Management d) Yard Manag Answer: b, c, eFile Size: 393KBPage Count: 5