NEC NEAX2000 IVS ISDN System Manual

Transcription

ND-45857 (E)ISSUE 3STOCK # 151916 ISDN System ManualJANUARY, 1998NEC America, Inc.

LIABILITY DISCLAIMERNEC America, Inc. reserves the right to change the specifications,functions, or features, at any time, without notice.NEC America, Inc. has prepared this document for use by its employees and customers. The information contained herein is theproperty of NEC America, Inc. and shall not be reproduced withoutprior written approval from NEC America, Inc.NEAX and Dterm are registered trademarks of NEC Corporation.Copyright 1998NEC America, Inc.Printed in USA

ND-45857 (E)ISSUE 3JANUARY, 1998NEAX2000 IVSISDN System ManualTABLE OF CONTENTSPageLIST OF FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ivLIST OF TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vCHAPTER 1INTRODUCTION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12.OUTLINE OF THE MANUAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13.REFERENCE MANUALS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1CHAPTER 2SYSTEM DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31.GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .32.SYSTEM CONFIGURATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .32.1 System Outline . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .32.1.1 System Outline of ISDN with PRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .32.1.2 System Outline of ISDN with BRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .42.1.3 System Outline of ISDN Terminal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .52.1.4 System Outline of Event Based CCIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .72.2 DTI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .92.3 DCH . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .92.4 BRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .92.5 PLO . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .92.6 ICH . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .102.7 ILC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .102.8 Equipment for Event Based CCIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .113.SYSTEM SPECIFICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .123.1 System Capacity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .123.1.1 System Capacity for ISDN with PRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .123.1.2 System Capacity for ISDN with BRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .123.2 System Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .133.2.1 Time Slot Assignment Condition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .133.2.2 Time Slot Allocation for DTI/DCH Card . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .143.2.3 Line Distance between PBX and CSU/ISDN Terminal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .153.2.4 Service Conditions for Event Based CCIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .163.3 DTI Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .193.3.1 Transmission Characteristics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .193.3.2 Frame Configuration of 24-DTI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20CHAPTER 3INSTALLATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .231.GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .232.PRECAUTION IN HANDLING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .233.REQUIRED EQUIPMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .26ND-45857 (E)TABLE OF CONTENTSPage iRevision 3.0

TABLE OF CONTENTS (CONTINUED)Page3.13.23.34.4.14.24.34.4Required Equipment for ISDN with PRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .26Required Equipment for ISDN with BRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .26Required Equipment for Event Based CCIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .27INSTALLATION PROCEDURE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .28Installation Procedure for ISDN with PRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .284.1.1 Mounting DTI and DCH Card . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .294.1.2 Selection of PLO in MP Card . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .344.1.3 Cable Connection via the MDF for ISDN with PRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .374.1.4 Mounting PLO Card. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .40Installation Procedure for ISDN with BRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .424.2.1 Mounting BRI Card . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .434.2.2 Cable Connection via the MDF for ISDN with BRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .46Installation Procedure for ISDN Terminal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .494.3.1 Mounting ICH Card . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .504.3.2 Mounting ILC Card . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .534.3.3 Cable Connection via the MDF (for ISDN Terminal) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .55Installation Procedure for Event Based CCIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .584.4.1 Mounting CCH Card . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .59CHAPTER 4SYSTEM DATA PROGRAMMING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .611.GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .612.SYSTEM DATA PROGRAMMING INFORMATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .613.PROGRAMMING PROCEDURE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .613.1 Basic Data Assignment for ISDN with PRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .623.1.1 DTI Assignment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .623.1.2 DCH Assignment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .693.2 Basic Data Assignment for ISDN with BRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .703.2.1 BRI Assignment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .703.3 Service Data Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .763.3.1 Calling Party Recognition Service (Direct-In Termination (DIT)) Assignment . . . . . . . . . . . . . . . . .763.3.2 DID Addressing Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .773.3.3 MEGACOM Access Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .793.3.4 MEGACOM 800 Service Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .803.3.5 CPN to Network – Presentation Assignment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .813.3.6 CPN to Terminating User – Display Assignment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .853.3.7 Subaddress – Addressing Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .853.3.8 Subaddress – Present Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .863.3.9 Trunk Provisioning Service Selection Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .863.3.10 Automated Attendant Assignment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .873.3.11 Direct Inward System Access (DISA) Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .933.4 ISDN PRI Call By Call Service Selection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1033.4.1 Call By Call Service Selection Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1063.5 Basic Data Assignment for ISDN Terminal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1093.5.1 ILC Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1093.5.2 ICH Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1113.6 Service Data Assignment for ISDN Terminal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1123.6.1 Point to Point Connection Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1123.6.2 Point to Multipoints Connection Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .114TABLE OF CONTENTSPage iiRevision 3.1ND-45857 (E)Addendum-001AUGUST, 1998

TABLE OF CONTENTS (CONTINUED)Page3.6.3 National ISDN 1 BRI Terminal Assignment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 115-13.6.4 Individual Terminal Call Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1163.6.5 Group Call Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1213.7 Data Assignment for Event Based CCIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1263.7.1 Outline of Data Programming for Event Based CCIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1263.7.2 Virtual Trunk Data Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 126-13.7.3 Access Code/Terminating Number Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 126-53.7.4 Channel Release Timer Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 126-63.7.5 CCH Data Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 126-73.7.6 E-CCIS Tandem Connection Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 126-93.8 Event Based CCIS Programming Example . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1273.9 Numbering Plan Programming in PBX A:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1273.9.1 Telco BRI Trunk Programming . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1283.9.2 Program Termination for Incoming E-CCIS Calls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1333.9.3 Program Access Code/Terminating Number Assignment for Outgoing E-CCIS Calls . . . . . . . . .1333.9.4 Program Release Timer for Virtual Tie Lines (Home-Side & Mate-Side Trunks) . . . . . . . . . . . . .1333.9.5 CCH Data Assignment: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1343.10 Numbering Plan Programming in PBX B:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1353.10.1 Telco BRI Trunk Programming . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1363.10.2 Program Termination for Incoming E-CCIS Calls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1413.10.3 Program Access Code/Terminating Number Assignment for Outgoing E-CCIS Calls . . . . . . . . .1413.10.4 Program Release Timer for Virtual Tie Lines (Home-Side & Mate-Side Trunks) . . . . . . . . . . . . .1413.10.5 CCH Data Assignment: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1423.10.6 Alternative ISDN Route Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .142CHAPTER 5INSTALLATION TEST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1431.GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1432.OUTLINE OF INSTALLATION TEST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1433.INSTALLATION TEST PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1433.1 Transmission Line Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1433.2 PLO Operation Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1453.2.1 Clock Signal Generation Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1453.2.2 Clock Signal Synchronization Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1463.2.3 Interoffice Synchronization Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1483.2.4 Master Office Mode Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .149ND-45857 (E)Addendum-001AUGUST, 1998TABLE OF CONTENTSPage iiiRevision 3.1

LIST OF FIGURESFigureTitlePageFigure 2-1Connection Diagram for PBX and ISDN Line with PRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3Figure 2-2Connection Diagram for PBX and ISDN Line with BRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4Figure 2-3Connection Diagram of ISDN Terminal (for ISDN with PRI) . . . . . . . . . . . . . . . . . . . . . . . . . . 5Figure 2-4Connection Diagram of ISDN Terminal (for ISDN with BRI) . . . . . . . . . . . . . . . . . . . . . . . . . . 6Figure 2-5Outline of Event Based CCIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7Figure 2-6Clock Supply Route Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10Figure 2-7Virtual Trunk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11Figure 2-8Accommodation of DTI/DCH/ICH into TDSW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13Figure 2-9Time Slot Allocation for DTI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14Figure 2-10 Line Distance between PBX and CSU/ISDN Terminal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15Figure 2-11 Release Timing of Virtual Tie Line and CCIS Link . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16Figure 2-12 DTI Frame Configuration (24-Multiframe) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20Figure 3-1Static Electricity Precautions (1/2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23Figure 3-2Installation Procedure for ISDN with PRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28Figure 3-3Switch Settings on the DTI Card (1/2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29Figure 3-4Switch Settings on the DCH Card . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32Figure 3-5Mounting Location of DTI/DCH Card . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33Figure 3-6Switch Settings on the MP Card (1/3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34Figure 3-7Cable Connection via the MDF for ISDN with PRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37Figure 3-8Location of the AP Slots and the LTC Connectors for DTI . . . . . . . . . . . . . . . . . . . . . . . . . . 38Figure 3-9Example of Cable Connection via the MDF for DTI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39Figure 3-10 Switch Settings on the PLO Card . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40Figure 3-11 Mounting Location of the PLO Card . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41Figure 3-12 Installation Procedure for ISDN with BRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42Figure 3-13 Switch Settings on the BRI Card (PN-BRTA) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43Figure 3-13-1 Switch Settings on the BRI Card (PN-2BRTC) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44-1Figure 3-14 Mounting Location of BRI Card . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45Figure 3-15 Cable Connection via the MDF for ISDN with BRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46Figure 3-16 Location of the AP Slots and the LTC Connectors for BRI . . . . . . . . . . . . . . . . . . . . . . . . . . 47Figure 3-17 Example of Cable Connection via the MDF for BRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48Figure 3-18 Installation Procedure for ISDN Terminal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49Figure 3-19 Switch Settings on the ICH Card (1/2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50Figure 3-20 Mounting Location of the ICH Card . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52Figure 3-21 Switch Settings on the ILC Card . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53Figure 3-22 Mounting Location of the ILC Card . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54Figure 3-23 Cable Connection via the MDF for ISDN Terminal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55Figure 3-24 Location of the LT Slots and the LTC Connectors for ISDN Terminal . . . . . . . . . . . . . . . . . 56Figure 3-25 Example of Cable Connection via the MDF for ISDN Terminal . . . . . . . . . . . . . . . . . . . . . . 57Figure 3-26 Installation Procedure for Event Based CCIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58Figure 3-27 Switch Settings on the CCH Card . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59Figure 3-28 Mounting Location of the CCH Card . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59LIST OF FIGURESPage ivRevision 3.1ND-45857 (E)Addendum-001AUGUST, 1998

LIST OF TABLESPageTable 2-1Table 2-2Table 2-3Table 2-4Table 2-5Table 3-1Table 3-2Table 3-3Table 3-4Table 3-5Table 3-6Table 3-6-1Table 3-6-2Table 5-1System Capacity for ISDN with PRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12System Capacity for ISDN with BRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12Availability of CCIS Service Features for Event Based CCIS . . . . . . . . . . . . . . . . 17Transmission Characteristics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1924-Multi Frame Bit Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21Required Equipment for ISDN with PRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26Required Equipment for ISDN with BRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26Required Equipment for Event Based CCIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27Switch Settings for SW-1 and SW-2 on the DTI Card . . . . . . . . . . . . . . . . . . . . . . . 31Switch Settings for SW0-2 and SW0-3 on the BRI Card (PN-BRTA) . . . . . . . . . . . 44Switch Settings for SW1 on the BRI Card (PN-BRTA) . . . . . . . . . . . . . . . . . . . . . . 44Switch Settings for SW0 and SW10 on the BRI Card (PN-2BRTC) . . . . . . . . . . . 44-2Switch Settings for SW11-2 and S11-3 on the BRI Card (PN-2BRTC) . . . . . . . . . 44-2Alarm Indications on the PN-24DTA Card . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 144ND-45857 (E)Addendum-001AUGUST, 1998LIST OF TABLESPage vRevision 3.1

This page is for your notes.LIST OF TABLESPage viRevision 3.0ND-45857 (E)

CHAPTER 1INTRODUCTION1. PURPOSEThis manual provides the information needed for installing and programming the system data to provide theISDN service on the NEAX2000 IVS (PBX).2. OUTLINE OF THE MANUALThis manual consists of five chapters. The contents of Chapters 2 through 5 are outlined as follows: CHAPTER 2 (SYSTEM DESCRIPTION):This chapter explains the system configuration and system specifications required to provide ISDN on thePBX.CHAPTER 3 (INSTALLATION):This chapter explains the procedure for hardware installation which is required to provide ISND on thePBX.CHAPTER 4 (SYSTEM DATA PROGRAMMING):This chapter explains the system data programming procedure required to assign ISDN.CHAPTER 5 (INSTALLATION TEST):This chapter explains the operation tests to be performed after completing the installation of ISDN on thePBX.3. REFERENCE MANUALSWhen installing ISDN and assigning the relevant system data, refer to the following manuals in addition to thismanual: Installation Procedure ManualCommand ManualOffice Data Programming ManualSMDR System ManualCircuit Card ManualWhen assigning the relevant system data for providing the CCIS service features, refer to the CCIS SystemManual.ND-45857 (E)CHAPTER 1Page 1Revision 3.0

This page is for your notes.CHAPTER 1Page 2Revision 3.0ND-45857 (E)

SYSTEM DESCRIPTIONCHAPTER 2SYSTEM DESCRIPTION1. GENERALThis chapter explains the system configuration, additional hardware and system specifications pertaining toISDN of the PBX.2. SYSTEM CONFIGURATION2.1 System OutlineThe PBX can interface with an ISDN with Primary Rate Interface (1.5 Mbps PCM - 23B D), Basic Rate Interface (144 kbps PCM - 2B D) and ISDN Terminal.2.1.1System Outline of ISDN with PRIWhen installing ISDN-PRI for a NEAX2000 IVS, two circuit cards are required. A PN-24DTA/24DTA-A 24channel Digital Trunk Interface (DTI) card is used to interface to the digital network, and satisfies the requirements for ISDN Layer 1. A PN-SC01 D Channel Handler (DCH) card is used to transmit and receive D Channelsignaling data to/from the network. A phase-locked oscillator (PLO) is required to synchronize the PBX withthe network.Figure 2-1 shows the connection diagram for PBX and ISDN Line with PRI.PBX24-CHANNEL PCMDIGITAL LINE (23B SIGNALDLCPLODCHTDSWFPMPDTI:DCH:PLO:CSU:24-Channel Digital Trunk InterfaceD Channel HandlerPhase Locked Oscillator in MPConnection Service UnitFigure 2-1 Connection Diagram for PBX and ISDN Line with PRIND-45857 (E)Addendum-001AUGUST, 1998CHAPTER 2Page 3Revision 3.1

SYSTEM DESCRIPTION2.1.2System Outline of ISDN with BRIWhen the system is to be interfaced with a relevant ISDN exchange with the Basic Rate Interface (BRI), it isnecessary to install a BRI card for the digital network interface. A Phase Locked Oscillator (PLO) is required tosynchronize the PBX with the network.Figure 2-2 shows the connection diagram of ISDN with BRI.PBX2-CHANNEL PCMDIGITAL LINE (2B D)SLT2BLCBRIISDNNETWORKNT1MultilineTerminalD k Termination Device 1Basic Rate InterfacePhase Locked OscillatorFigure 2-2 Connection Diagram for PBX and ISDN Line with BRICHAPTER 2Page 4Revision 3.1ND-45857 (E)Addendum-001AUGUST, 1998

SYSTEM DESCRIPTION2.1.3System Outline of ISDN TerminalWhen providing the system with an ISDN Terminal, it is necessary to install an ISDN Line Circuit (ILC) cardfor the line interface of an ISDN Terminal and an ISDN Channel Handler (ICH) card for layer 2 protocol processing (LAP-D).Figure 2-3 and Figure 2-4 show the connection diagram of ISDN Terminal.PBX Point to PointConnectionILCISDNTerminal(TE)24-CHANNEL PCMDIGITAL LINE (23B D)23B2B x 2DTIISDNNETWORKCSU2DDCLOCKSIGNAL Point to Multi-pointConnection2B x 2PLOILCTA2DDataTerminal2D/8DISDN Terminal(TE) O)DTI:DCH:PLO:ILC:ICH:TA:CSU:24-Channel Digital Trunk InterfaceD Channel HandlerPhase Locked OscillatorISDN Line CircuitISDN Channel HandlerTerminal AdapterConnection Service UnitNote 1: When providing ISDN Terminal, the ILC and ICH are necessary.Note 2: The following connections are only available. ISDN Terminal to ISDN Terminal Connection ISDN Terminal to ISDN Trunk (DTI) Connection ISDN Trunk (DTI) to ISDN Terminal Connection ISDN Terminal to Single Line Telephone Connection ISDN Terminal to Multiline Terminal ConnectionFigure 2-3 Connection Diagram of ISDN Terminal (for ISDN with PRI)ND-45857 (E)Addendum-001AUGUST, 1998CHAPTER 2Page 5Revision 3.1

SYSTEM DESCRIPTIONPBX Point to PointConnectionILCISDNTerminal(TE)2-CHANNEL PCMDIGITAL LINE (2B D)2B2B x 2BRIISDNNETWORKNT12DD channel Point to Multi-pointConnectionCLOCKSIGNAL2B x 2ILCTAPLO2DDataTerminal2D/8DISDN SWFPMP(PLO)NT1:BRI:PLO:ILC:ICH:TA:Network Termination Device 1Basic Rate InterfacePhase Locked OscillatorISDN Line CircuitISDN Channel HandlerTerminal AdapterNote 1: When providing ISDN Terminal, the ILC and ICH are necessary.Note 2: The following connections are only available. ISDN Terminal to ISDN Terminal Connection (S/T Interface) ISDN Terminal to ISDN Trunk (BRI) Connection (S/T Interface) ISDN T

NEC America, Inc. reserves the right to change the specifications, functions, or features, at any time, without notice. NEC America, Inc. has prepared this document for use by its em-ployees and customers. The information contained herein is the property of NEC America, Inc. and shall not be reproduced without