Chicago Intl Charter - Larry Hawkins801 E 133RD PL Chicago, IL 60627Facility Assessment DetailThis report contains the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system byvisual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors’ visualevaluations of the property condition as of that date. For additional information, you may visit the Facilities Standards webpage under CPS Policies and Guidelines athttp://www.cps.edu/About CPS/Policies and guidelines/Pages/facilitystandards.aspx.Condition Rankings and DescriptionsRank 7: The item/system is new or in good condition and no work is required.Rank 6: The item/system requires general cleaning and/or routine maintenance.Rank 5: The item/system requires repairs and has not reached the end of its serviceable life.Rank 4: The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs.Rank 3: The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs.Rank 2: The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs.Rank 1: The item’s/system’s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹DefinitionsQuantity means, for each item, the total number (or amount) of that item that exists and was evaluated.Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement “EA” for “each.” Other items,like chimneys, are measured in terms of linear feet (“LF”). Still other items, like flooring, are generally measured in square feet (“SF”).Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This isbecause, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discoveredconditions, and additional work triggered by building codes.For the same reason, the Total Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features.Total Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, orconstruction to alleviate overcrowding; these are viewed as separate capital needs.Building: Middle - CharterCategory: EXTERIORGroupItemLocationChimneyBrick Chimney - Concrete/ Mortar LinerRoof57ChimneyBrick Chimney - Concrete/ Mortar LinerRoof730LF 0DoorsExterior Steel DoorEntire Building619EA 6,276DoorsOverhead Rolling / Garage DoorSouth Façade63EA 3,081EntranceConcrete RampMain Entrance754LF 0EntranceEntrance Controls - Audio and VideoMain Entrance61EA 1,430EntranceRamp HandrailsMain Entrance7122LF 0EntranceStone StairsEntire Building5189LF 81,081FoundationConcrete FoundationEntire Building71,473LF 0LightingExterior Lights - Parapet or Roof MountedRoof615EA 7,508LightingExterior Lights - Wall MountedBoiler Room61EA 215LintelsLintels - SteelEntire Building71,503LF 0ParapetCoping - MetalCentral Courtyard798LF 0ParapetCoping - MetalCentral Courtyard628LF 0Assessment Date: 11/26/2012Sub GroupRank QuantityUnitCostLF 12,513ReasonMortar spalling, severeefflorescencePage 1

Chicago Intl Charter - Larry Hawkins801 E 133RD PL Chicago, IL 60627Building: Middle - CharterCategory: EXTERIORGroupSub GroupItemLocationRank QuantityUnitCostParapetParapetCoping - StoneParapet 16" HeightRoofLower Roof661,747236LFLF 36,752ParapetParapet 16" to 30" HeightHigh roofRoof SystemRoof SystemExterior DownspoutsInterior DownspoutsStair towers, low roofRoof61,609LF 334,0866655436LFLF 1,022 0Roof SystemInterior DownspoutsNortheast corner543LF 4,612Roof SystemRoof SystemMetal RoofRoof650,989SF 384,987Roof Structure: Steel with Clay Tile ArchRoof750,989SF 0SuperstructureSteel with Clay Tile ArchEntire FSF 0 384,002 13,591WallsStone - CastEntire BuildingSouthwest elevation, lightcourtyard, below stone bandthroughoutEntire Building64,692SF 67,096WallsTerra CottaEntire Building61,797SF 51,394WindowsWindow - Guards perforated1st Floor64,920SF 0WindowsWindow - Guards wire guardGym61,159SF 0WindowsWindows - DecorativeCentral Courtyard618SF 103WindowsWindows - Sash Aluminum Double-paneEntire Building612,878SF 110,493EXTERIOR Sub TotalReason 0Drain plugged due to sinkreportedly tied into stormconductor, water backsup and leaks throughparapet lighting electricalpenetration 1,500,241Building: Middle - CharterCategory: ELECTRICALGroupItemLocationUnitCostEmergency SystemEmergency A/C power - Corridors and StairsCorridors and Stairs6Emergency SystemEmergency A/C power - Gym and Lunch roomsLunch Room632,975SF 14,1465,958SFEmergency SystemEmergency A/C power - Gym and Lunch roomsGym 3,15266,043SFEmergency SystemEmergency A/C power - Students ToiletsStudent Toilets 3,19761,810SFEmergency System61EA 776 5,577622EA 5,128Emergency SystemEmergency SystemEmergency generator below 60 KW diesel East CourtyardOutdoorExit Signs - Corridors and StairsCorridors and StairsExit Signs - Lunchroom - Gym - multipurpose rooms Lunch RoomExit Signs - Lunchroom - Gym - multipurpose rooms Gym6448EAEA 7,436Emergency SystemPublic Announcement System4144,504SF 512,469Emergency SystemAssessment Date: 11/26/2012Sub GroupMain OfficeRank QuantityReason 932Page 2

Chicago Intl Charter - Larry Hawkins801 E 133RD PL Chicago, IL 60627Building: Middle - CharterCategory: ELECTRICALGroupSub GroupItemLocationRank QuantityEmergency SystemMain ServiceSecurity System - Intrusion detectionMain Electrical service 1200 A 120/240/3PHLower level Janitors ClosetElectrical Room64144,5041Main ServiceMain Electrical service 2000 A 120/240/3PHElectrical Room4Power DistributionPower DistributionLighting and power panelsLighting and power panelsEntire BuildingMain Entry64Power DistributionMain distribution panels 400-600 ampElectrical RoomPower DistributionPower DistributionMain distribution panels above 600 ampMain distribution panels less than 400 ampElectrical RoomElectrical RoomPower DistributionTransformers 120/240-120/208Electrical RoomUnitSFCostEA 134,316 113,2561271EA 161,304EAEA 19,305 5,43461EA 1,4306641EAEA 8,580 1,21671EA 0ELECTRICAL Sub TotalReason 997,656Building: Middle - CharterCategory: FIRE PROTECTIONGroupSub GroupItemLocationRank QuantityUnitFire AlarmFire Alarm Strobe LightsEntire Building6144,504SF 51,660Fire AlarmFire Alarm SystemElectrical Room6144,504SF 175,645FIRE PROTECTION Sub TotalCostReasonHas had reoccurringproblems 227,305Building: Middle - CharterCategory: MECHANICALGroupItemLocationAir ConditioningCondensing Unit - Roof Mounted 31 to 50 tonsMechanical Room3Air ConditioningWindow A/C UnitEntire BuildingAir Handling SystemsAir Intake - Built Up Air Handling UnitRoofAir Handling SystemsAir Intake - Built Up Air Handling UnitRoofAssessment Date: 11/26/2012Sub GroupRank QuantityUnitCost1EA 35,750511EA34EA 11,798 104,67641EA 26,169ReasonNew Self ContainedControls will not let thesystem operate.- NotifiedCPS Prior Work notcompleted. Board is outand System notOperable. Unit will notrun to heat the space dueto non DDC Controlsafeties.Air intakes are blockedclosed, air intakedampers are rusted anddo not workDampers work, Noscreens on any OAintakesPage 3

Chicago Intl Charter - Larry Hawkins801 E 133RD PL Chicago, IL 60627Building: Middle - CharterCategory: MECHANICALGroupItemLocationMulti Zone Built Up Air Handling Unit - Steam15,001 to 25,000 cfmMulti Zone Built Up Air Handling Unit - Steam15,001 to 25,000 cfmMechanical Room42EA 185,900Mechanical Room41EA 92,950Multi Zone Built Up Air Handling Unit - Steam8,000 to 15,000 cfmMulti Zone Built Up Air Handling Unit - Steam8,000 to 15,000 cfmMulti Zone Built Up Air Handling Unit Auxiliaries Steam 15,001 to 25,000 cfmMechanical Room41EA 57,200Mechanical Room41EA 57,200Mechanical Room22EA 65,780Air Handling SystemsMulti Zone Built Up Air Handling Unit Auxiliaries Steam 8,000 to 15,000 cfmMechanical Room21EA 21,450Air Handling SystemsMulti Zone Built Up Air Handling Unit Auxiliaries Steam 8,000 to 15,000 cfmMechanical Room21EA 21,450Air Handling SystemsMulti Zone Built Up Air Handling Unit Auxiliaries Steam above 35,000 cfmMechanical Room21EA 44,330Air Handling SystemsReturn Duct Work - Masonry and Ducts - Existingor Missing Exterior ShaftBoiler Assembly - Steam - Low Pressure ScotchMarine Boiler greater than 200 HPPlenum5500LF 214,500Boiler Room31EA 298,87041EA 298,870Boiler SystemsBoiler Assembly - Steam - Low Pressure ScotchBoiler RoomMarine Boiler greater than 200 HPBoiler Auxiliary - Steam Boiler greater than 200 HP Boiler Room42EA 65,780Boiler SystemsCombustion DampersBoiler Room62EABoiler SystemsHeating DevicesFeed Water Pumps and Tank - Steam BoilersCabinet Heaters With Electric CoilsMechanical RoomElevator Lobby4611EAEA 572 31,460 501Heating DevicesCabinet Heaters With Steam CoilsWeight Room64EA 2,002Air Handling SystemsAir Handling SystemsAir Handling SystemsAir Handling SystemsAir Handling SystemsBoiler SystemsBoiler SystemsAssessment Date: 11/26/2012Sub GroupRank QuantityUnitCostReasonUnit is more than 40years of age and the unitis operable, More than 25years old motor, housingwalls and fan housingsare deteriorated andplenum is not sealed,Fan bearings aredeteriorated, coils areleaking, control dampersare not workingOutside air intakedampers inoperable(rusted and controls notworking)Outside air intakedampers inoperable(rusted and controls notworking)Outside air intakedampers inoperable(rusted and controls notworking),Outside air intakedampers inoperable(rusted and controls notworking),Base Structure has failedand causing the SteamHeader to be stressed.Page 4

Chicago Intl Charter - Larry Hawkins801 E 133RD PL Chicago, IL 60627Building: Middle - CharterCategory: MECHANICALGroupSub GroupItemLocationRank QuantityUnitCostHeating DevicesHeating DevicesRadiators - SteamUnit Heater - Hot WaterEntire BuildingBoiler Room and Shop44285EAEA 39,239 35,750Mechanical PlumbingCondensate Assembly - Pumps and TankMechanical RoomMechanical PlumbingMechanical PlumbingCondensate Assembly - Pumps and TankPiping - Condensate - Steel or GalvanizedMechanical RoomEntire Building62EA 1,430541600EALF 58,773Mechanical PlumbingPiping - Steam - Steel or GalvanizedTemperature ControlPneumatic SystemEntire Building4Entire Building3600144,504LFSF 71,858 1,033,204Temperature ControlTemperature ControlThermostats - PneumaticEntire Building479EA 51,966Zone DampersPlenum576EA 28,257VentilationExhaust Fan - IndoorEntire Building613EA 6,507VentilationExhaust Fan - IndoorShop31EA 5,577VentilationExhaust Fans - Roof Mounted 500 to 1,500 cfmNorth Courtyard62EA 458VentilationType I Exhaust Hood - Kitchen or Culinary ArtsKitchen51EA 13,728VentilationType II Exhaust Hood - Warming KitchenKitchen62EA 1,859MECHANICAL Sub TotalReason 9,438Controls are more than30 years of age and onlyfew of the controls work(most damper and valveactuators are notworking, not all sensorsare responding, mostdampers and valves areoperating in manualmode, temperatures arenot maintained).Dampers openedmanually by wood blocks,controls do not workFan Inoperative 2,995,249Building: Middle - CharterCategory: PLUMBINGGroupItemLocationMechanical Room4Hot WaterHot Water Heater - Gas more than 300,000BTU/HRStorage Tank more than 500 gallonsMechanical RoomHot WaterStorage Tank more than 500 gallonsHot WaterStorage Tank more than 500 gallonsPipingDomestic Piping - Cold Water from Risers toFixturesHot WaterAssessment Date: 11/26/2012Sub GroupRank QuantityUnitCost1EA 32,03231EA 28,600Boiler Room51EA 11,440Mechanical Room32EA 57,200Entire Building7115,603SF 0ReasonUnit has Flamed out andis severely damaged.No InsulationStorage tank is more than20 years of age is leakingand shows signs ofexcessive corrosionPage 5

Chicago Intl Charter - Larry Hawkins801 E 133RD PL Chicago, IL 60627Building: Middle - CharterCategory: PLUMBINGGroupSub GroupItemLocationUnitCostEntire Building4Entire BuildingEntire BuildingPipingDomestic Piping - Cold Water from Risers toFixturesDomestic Piping - Cold Water RisersDomestic Piping - Cold Water RisersDomestic Piping - Hot Water from Riser to fixtures28,901SF 9,5067115,603SF 0428,901SF 18,598PipingDomestic Piping - Hot Water from Riser to fixturesEntire Building7115,603SF 0Entire Building428,901SF 6,199PipingPipingDomestic Piping - Hot Water Return RisersEntire Building7115,603SF 0Domestic Piping - Hot Water Return RisersEntire Building428,901SF 13,225PipingDomestic Piping - Hot Water RisersEntire Building428,901SF 15,705PipingDomestic Piping - Hot Water RisersEntire Building7115,603SF 0PipingDomestic Piping Cold Water Horizontal linesEntire Building7115,603SF 0PipingDomestic Piping Cold Water Horizontal linesEntire Building428,901SF 69,018PipingDomestic Piping Hot Water Horizontal lines101 - 129 - 229 and 159328,901SF 57,033PipingDomestic Piping Hot Water Horizontal linesEntire Building428,901SF 57,033PipingDomestic Piping Hot Water Horizontal linesEntire Building7115,603SF 0PipingDomestic Piping Hot Water Return LinesEntire Building428,901SF 33,063PipingDomestic Piping Hot Water Return LinesEntire Building7115,603SFPipingPipingSanitary PipingSanitary PipingEntire BuildingEntire Building4728,90186,702SFSF 0 27,690 0PipingStorm PipingEast Center Roof31,545SF 1,105PipingStorm PipingEntire Building5144,504SF 68,191PipingPumpsVent PipingDomestic Booster Pump simplexEntire BuildingMechanical Room52144,5043SFEA 51,660 51,480PipingPipingPipingRank QuantityPLUMBING Sub TotalReason4 Risers cannot berodded out from ADAProject - 4 Classroomshave no working sinks.Sump Pump used tocarry water to anotherdrain to prevent floodingof classroomPump is more than 20years of age and is notworking, 608,779Building: Middle - CharterCategory: INTERIORGroupSub GroupItemLocationAdministrative ites/OfficesCeiling - Plaster/DrywallFirst floor, main office, officenext to vaultFirst floor, main office,admin ifficeAdministrative SuitesAssessment Date: 11/26/2012Ceiling - Plaster/DrywallRank QuantityUnitCost6168SF 4766366SF 1,036ReasonPage 6

Chicago Intl Charter - Larry Hawkins801 E 133RD PL Chicago, IL 60627Building: Middle - CharterCategory: INTERIORGroupSub GroupItemLocationAdministrative SuitesAdministrativeSuites/OfficesCeiling - Plaster/Drywall6109SF 309Administrative SuitesAdministrativeSuites/OfficesCeiling - Plaster/Drywall6149SF 422Administrative ministrativeSuites/OfficesCeiling - Plaster/Drywall6132SF 374Ceiling - Plaster/DrywallFirst floor, main office, officenext toAssistant principalofficeFirst floor, mainoffice,Assistant principalofficeFirst floor, main office, staffofficeFirst floor, Main office6688SF 1,948Ceiling - Plaster/DrywallFirst floor, room 1226362SF 1,025Ceiling - Plaster/Drywall62,124SF 6,014Ceiling - Plaster/DrywallBasement to east of lunchroomNortheast, nurses office7136SF 0Ceiling - Plaster/DrywallGym office6279SF 790Ceiling - Plaster/DrywallBasement center of building6764SF 2,163Ceiling - Plaster/DrywallBasement rooms #007 &009Basement engineer's officesat NW cornerNortheast, nurses office61,606SF 4,5475603SF 3,4156136SF 194Basement to east of lunchroomFirst floor, Main office62,124SF 3,0376688SF 9846168SF 2406366SF 5236109SF 156Administrative SuitesAdministrativeSuites/OfficesFlooring - Tile/Sheet6149SF 213Administrative ites/OfficesFlooring - Tile/SheetFirst floor, main office, officenext to vaultFirst floor, main office,admin ifficeFirst floor, main office, officenext toAssistant principalofficeFirst floor, mainoffice,Assistant principalofficeFirst floor, main office, staffofficeBasement engineer's officesat NW corner6132SF 1896603SF 862Administrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAssessment Date: 11/26/2012Ceiling - Plaster/DrywallFlooring - Tile/SheetFlooring - Tile/SheetFlooring - Tile/SheetFlooring - Tile/SheetFlooring - Tile/SheetFlooring - Tile/SheetFlooring - Tile/SheetRank QuantityUnitCostReasonPage 7

Chicago Intl Charter - Larry Hawkins801 E 133RD PL Chicago, IL 60627Building: Middle - CharterCategory: INTERIORGroupSub GroupItemLocationAdministrative ring - Tile/Sheet6Flooring - Tile/SheetBasement rooms #007 &009Basement center of buildingFlooring - veSuites/OfficesLighting - sAdministrativeSuites/OfficesLighting - Pendant/SurfaceAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAssessment Date: 11/26/2012UnitCost1,606SF 2,2976764SF 1,093First floor, room 1226362SF 518Flooring - WoodGym office6279SF 2,107Lighting - Pendant/Surface42SF 1366SF 462SF 162SF 1Lighting - Pendant/SurfaceFirst floor, main office, officenext toAssistant principalofficeFirst floor, main office,admin ifficeFirst floor, mainoffice,Assistant principalofficeFirst floor, main office, staffofficeFirst floor, Main office612SF 9Lighting - Pendant/SurfaceFirst floor, room 12269SF 6Lighting - Pendant/Surface640SF 29Lighting - Pendant/SurfaceBasement to east of lunchroomNortheast, nurses office42SF 13Lighting - Pendant/SurfaceGym office42SF 13Lighting - Pendant/SurfaceBasement center of building612SF 9Lighting - Pendant/SurfaceBasement rooms #007 &009Basement engineer's officesat NW cornerFirst floor, main office, officenext to vaultBasement rooms #007 &009First floor, main office, officenext to vaultFirst floor, main office,admin iffice616SF 1146SF 3942SF 136400SF 1,1446656SF 1,5486956SF 2,256Lighting - Pendant/SurfaceLighting - Pendant/SurfaceLighting - Pendant/SurfaceWalls - Concrete BlockWalls - Plaster/DrywallWalls - Plaster/DrywallRank QuantityReasonT-12Page 8

Chicago Intl Charter - Larry Hawkins801 E 133RD PL Chicago, IL 60627Building: Middle - CharterCategory: INTERIORGroupSub GroupItemLocationAdministrative SuitesAdministrativeSuites/OfficesWalls - Plaster/Drywall6Administrative SuitesAdministrativeSuites/OfficesWalls - Plaster/DrywallAdministrative /OfficesWalls - Plaster/DrywallWalls - Plaster/DrywallFirst floor, main office, officenext toAssistant principalofficeFirst floor, mainoffice,Assistant principalofficeFirst floor, main office, staffofficeFirst floor, room 122Walls - Plaster/DrywallAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesAdministrative SuitesUnitCost520SF 1,2276610SF 1,4396606SF 1,4306952SF 2,246Gym office6806SF 1,902Walls - Plaster/DrywallFirst floor, Main office61,302SF 3,072Walls - Plaster/DrywallBasement center of building61,008SF 2,378Walls - Plaster/DrywallBasement rooms #007 &009Basement engineer's officesat NW cornerNortheast, nurses office6400SF 94461,269SF 2,9946598SF 1,41163,010SF 7,10261,100SF 4,672616LF 0Walls - Plaster/DrywallWalls - Plaster/DrywallAuditorium - DedicatedStage PlatformCorridorStair HandrailsCorridorStair HandrailsBasement to east of lunchroomfirst floor, gymBasement inside engineer'sofficeFirst floor, gym Stairs668LF 0CorridorStairs - TerrazzoFirst floor, gym Stairs619LF 215CorridorStairs - Wood66LF 112DoorsInterior Steel Doors incl hw619EA 5,380DoorsInterior Steel Doors incl hw617EA 4,813DoorsInterior Steel Doors incl hwBasement inside engineer'soffice2nd Floor1st FloorBasement668EA 19,254DoorsInterior Wood Doors incl hw1st Floor630EA 8,494DoorsInterior Wood Doors incl hwBasement628EA 7,928DoorsInterior Wood Doors incl hw1st Floor735EA 0DoorsInterior Wood Doors incl hw2nd Floor739EA 0DoorsInterior Wood Doors incl hw2nd Floor65EA 1,416DoorsSide-liteBasement618SF 335DoorsTransom Window1st Floor7180SF 0DoorsTransom Window2nd Floor6243SF 4,517Assessment Date: 11/26/2012Walls - Plaster/DrywallRank QuantityReasonPage 9

Chicago Intl Charter - Larry Hawkins801 E 133RD PL Chicago, IL 60627Building: Middle - CharterCategory: INTERIORGroupSub GroupDoorsDoorsDoorsItemLocationRank QuantityTransom WindowTransom Window2nd FloorBasement76UnitCost219150SFSF 2,789 0Transom Window1st Floor6227CorridorsCorridorsDouble FountainDouble Fountain2nd FloorBasement7623SFEAEA 4,220Drinking FountainsDrinking FountainsDrinking FountainsCorridorsDouble Fountain1st Floor72EADrinking FountainsDrinking FountainsCorridorsCorridorsSingle FountainSingle Fountain1st Floor2nd Floor6712EAEA 0 386 0Drinking FountainsCorridorsSingle Fountain1st Floor72EA 0Gymnasium / AuditoriumGymnasium.Auditorium Ceiling - Plaster/Drywall1st Floor66,043SF 51,676Gymnasium / AuditoriumGymnasium.Auditorium Flooring - Wood1st Floor66,043SF 45,627Gymnasium / AuditoriumGymnasium.Auditorium Lighting - Pendant/Surface1st Floor624EA 2,917Gymnasium / AuditoriumGymnasium.Auditorium Scoreboards1st Floor42EA 41,527Gymnasium / AuditoriumGymnasium.Auditorium Walls - Concrete Block1st Floor68,058SF 69,138KitchenCooking KitchenCeiling - Plaster/DrywallBasement61,580SF 5,965KitchenCooking KitchenFlooring - Tile Ceramic/PorcelainBasement61,580SF 4,022KitchenCooking KitchenLighting - Pendant/SurfaceBasement615SF 11KitchenCooking KitchenWall - Plaster/DrywallBasement6676SF 1,595KitchenCooking KitchenWall - Structural Glazed TileBasement6676SF 4,833LibraryLibraryLibraryLibraryCaseworkCeiling - Splined2nd Floor2nd Floor77631,622LFSF 0 0LibraryLibraryFlooring Tile/ Sheet2nd Floor61,622SF 2,319LibraryLocker/Shower RoomLibraryLocker/Shower RoomLighting - Pendant/ SurfaceBenches663260SFLF 343Locker/Shower RoomLocker/Shower RoomLockers6160EA 7,852Locker/Shower RoomLocker/Shower RoomLockers6120EA 5,889Locker/Shower RoomLocker/Shower RoomShowers52EA 2,431Locker/Shower RoomLocker/Shower RoomShowers2nd FloorBasement boys next tolunch roomBasement boys next tolunch roomFirst floor, girls locker roomBasement boys next tolunch roomFirst floor, girls locker room69EA 2,188LunchroomLunchroomCeiling - Plaster/DrywallBasement65,958SF 16,869LunchroomLunchroomLunchroomLunchroomFlooring - Tile/SheetLighting - Pendant/SurfaceBasementBasement665,95876SFSF 8,520 54LunchroomLunchroomServing LineBasement6LunchroomLunchroomWall - Plaster/DrywallWall - Structural Glazed TileBasementBasement66652,2322,232LFSFSF 2,789LunchroomLunchroom 15,959FinishesSecond floor, southeast6363SF 1,235MDF/IDFAssessment Date: 11/26/2012Reason 0 1,973 23 5,266Page 10

Chicago Intl Charter - Larry Hawkins801 E 133RD PL Chicago, IL 60627Building: Middle - CharterCategory: INTERIORGroupSub GroupItemLocationUnitCostMDF/IDFMechanical/Service RoomsVentilation and CoolingBoiler RoomSecond floor, southeastBasement at NW cornerboiler room632,163EASF 61,243Mechanical/Service RoomsJanitor's Closet1st FloorMechanical/Service RoomsJanitor's ClosetSecond floor, west690SF 425645SFMechanical/Service RoomsJanitor's Closet 212Second floor, east end545SFMechanical/Service RoomsJanitor's Closet 510Basement next to girlsrestroomBasement next to kitchen664SF 302Mechanical/Service RoomsMechanical/Service RoomsMechanical/Service RoomsMechanical/Service Rooms563,6911,226SFSF 41,803 5,785Mechanical/Service RoomsMechanical/Service RoomsMechanical/Service RoomsMechanical/Service RoomsMechanical/Service RoomsStorage RoomBasement around interiorcourt yardSmall gym storage654615,287SFSF 173,134Mechanical/Service RoomsStorage RoomLarger gym storage6254SF 1,1996374SFMechanical/Service RoomsStorage Room 1,7656197SF 9306156SF 7366836SF 3,945Storage RoomSecond floor, southeast,book storagesecond floor, room 206,storageSecond floor, southeast,storageSecond floor, library storageMechanical/Service RoomsStorage RoomMechanical/Service RoomsStorage RoomMechanical/Service RoomsMechanical/Service Rooms6249SF 1,175Storage RoomSecond floor, northwest670SF 330Mechanical/Service RoomsStorage RoomFirst floor, southeast6182SF 859Mechanical/Service RoomsStorage RoomMain office mail roomstorageFirst floor, main office665SF 30761491,130301SF 703 7,272 2,324Mechanical/Service RoomsPhysical Education RoomsStaff RestroomStaff RestroomStaff RestroomAssessment Date: 11/26/2012VaultsClassroomChildren's StandardStudent RestroomLocker/Shower RoomChildren's StandardStudent RestroomSecond floor, northeast, fanroomSecond floor, northeastRank Quantity1SFSFReason 1,401Major ground water leaksthrough walls. waterdamaging boilersupporting steelmembers on walls andfloor. One steel beamunder boiler #1 isseverely deformed andready to give up.T-12 lights 217Weight/ Fitness Room Floor MattingAccessoriesBasement boys at east66AccessoriesFirst floor, girls locker room680SF 618Accessories1st floor girls west6301SF 2,324T-12 lightsPage 11

Chicago Intl Charter - Larry Hawkins801 E 133RD PL Chicago, IL 60627Building: Middle - CharterCategory: INTERIORGroupSub GroupItemLocationUnitCostStaff RestroomAccessories1st floor girls east6AccessoriesBasement girls at westAccessoriesAccessoriesStaff RestroomChildren's StandardStudent RestroomChildren's StandardStudent RestroomStaff RestroomChildren's StandardStudent RestroomLocker/Shower Room301SF 2,3246301SF 2,324Second floor, west2nd floor girls west6674301SFSF 2,324Accessories61,932SF 14,919628SF 216684SF 649674SF 571674SF 571AccessoriesBasement boys next tolunch roomFirst floor, Assistantprincipal bathroomBasement 2 toilets insideengineer's officeFirst floor, westSecond floor, eastFirst floor, eastStaff RestroomStaff RestroomAccessoriesStaff RestroomStaff RestroomAccessoriesStaff RestroomStaff RestroomAccessoriesStaff RestroomStaff RestroomAccessoriesStaff RestroomStaff Restroom674SFStaff Restroom 571Staff RestroomAccessoriesFirst floor, nurses bathroom630SF 232Staff RestroomStaff RestroomAccessories694SF 726Staff RestroomStaff RestroomAccessories664SF 494Staff RestroomChildren's StandardStudent RestroomChildren's StandardStudent RestroomChildren's StandardStudent RestroomChildren's StandardStudent RestroomChildren's StandardStudent RestroomStaff RestroomChildren's StandardStudent RestroomStaff RestroomStaff RestroomChildren's StandardStudent RestroomStaff RestroomLocker/Shower RoomStaff RestroomAccessoriesBasement inside storage atSW cornerBasement next to boysrestroom2nd floor girls east6301SF 2,324Ceiling - Plaster/Drywall1st floor girls east6302SF 855Ceiling - Plaster/Drywall2nd floor girls east6301SF 852Ceiling - Plaster/DrywallBasement girls at west6302SF 855Ceiling - Plaster/Drywall1st floor girls west6302SF 855Ceiling - Plaster/DrywallFirst floor, nurses bathroom62nd floor girls west630301SFCeiling - Plaster/DrywallSF 85 852Ceiling - Plaster/DrywallSecond floor, west674SF 210Ceiling - Plaster/DrywallSecond floor, east674SF 210Ceiling - Plaster/DrywallBasement boys at east6302SF 855Ceiling - Plaster/DrywallFirst floor, east6First floor, girls locker roomBasement inside storage atSW corner66741,97894SFCeiling - Plaster/DrywallCeiling - Plaster/Drywall 210 5,601 266Staff RestroomStaff RestroomStaff RestroomStaff RestroomStaff RestroomStaff RestroomStaff RestroomStaff RestroomStaff RestroomStaff RestroomStaff RestroomStaff RestroomStaff RestroomStaff RestroomStaff RestroomAssessment Date: 11/26/2012Rank QuantitySFSFReason 571Page 12

Chicago Intl Charter - Larry Hawkins801 E 133RD PL Chicago, IL 60627Building: Middle - CharterCategory: INTERIORGroupSub GroupItemLocationUnitCostStaff RestroomLocker/Shower RoomCeiling - Plaster/Drywall6Staff RestroomStaff RestroomCeiling - Plaster/DrywallStaff RestroomStaff RestroomCeiling - Plaster/DrywallStaff RestroomStaff RestroomCeiling - Plaster/DrywallStaff RestroomStaff RestroomCeiling - Plaster/DrywallBasement boys next tolunch roomBasement next to boysrestroomBasement 2 toilets insideengineer's officeFirst floor, Assistantprincipal bathroomFirst floor, west1,932SF 5,470664SF 181684SF 238628SF 79Staff RestroomStaff RestroomFloor DrainFirst floor, west674SF 21071EAStaff RestroomFloor DrainStaff RestroomChildren's StandardStudent RestroomChildren's StandardStudent Restroom

Air Conditioning Window A/C Unit Entire Building 5 11 EA 11,798 Air Handling Systems Air Intake - Built Up Air Handling Unit Roof 3 4 EA 104,676 Air intakes are blocked closed, air intake dampers are rusted and do not work Air Handling Systems Air Intake - Built Up Air Handling Unit Roof 4 1 EA 26,169 Dampers work, No screens on any OA intakes