Residential Construction And Remodeling Estimates COST

Transcription

Residential Construction and Remodeling EstimatesCOST GUIDECOMPLIMENTS OFpillartopost.com

STRUCTURE/EXTERIORStructure addition (foundation to roof) basement entrance basement main beam basement support post / foundation excavation / waterproofing foundation cracks (excavation method) foundation cracks (injection method) (per crack) masonry wall (single story) lower basement remove bearing wall remove partition wall re-support floor joist (sistering) roof sheathing (replace) underpinning termite prevention (chemical soil treatment) 95 – 130/sq.ft. 5250 – 10500 2100 500 – 1000 125 – 175/sq.ft. 525 – 1100 500 525 – 800/lin.ft. 200 – 425 2100 – 3200 850 – 1700 325 – 525 6 – 8/sq.ft. 325 – 525/lin.ft. 2100Wall System aluminum siding brick veneer brick cleaning (unpainted) brick cleaning (painted) brick repainting cedar siding stucco vinyl siding 5 – 6/sq.ft 10 – 25/sq.ft. 3/sq.ft. 6/sq.ft. 6 – 8/sq.ft. 10 – 15/sq ft. 10 – 15/sq.ft. 5 – 6/sq.ft.Exterior Door aluminum storm door metal insulated door patio door - replace patio door - brick wall (6ft.) patio door - wood wall (6ft.) 375 675 – 800 775 – 1600 2600 – 3600 2100 – 3100ROOF/EAVE/FLASHING/CHIMNEYSloped Roofs asphalt shingle (over existing) asphalt shingle (strip & re-shingle) asphalt shingle (high quality) cedar shake / shingle clay tile concrete tile wood shake / shingle slate tileFlat Roofs roll roofing asphalt (90lb.) 4 ply (tar and gravel) single ply membrane 2 – 3/sq.ft. 3 – 5/sq.ft. 5 – 7/sq.ft. 7 – 10/sq.ft. 15 – 20/sq.ft. 9 – 13/sq.ft. 6 – 8/sq.ft. 30 – 55/sq.ft. 2 – 3/sq.ft. 6 – 11/sq.ft. 6 – 11/sq.ft.Gutters gutter cleaning gutter / downspout - aluminum gutter / downspout - galvanized downspout extension soffits / fascia (aluminum)Flashing chimney flashing (sloped asphalt) chimney flashing (flat built-up) metal cricket at chimney parapet wall flashing roof vent flashing reflash skylight valley flashing wall flashingChimney chimney extension chimney repointing concrete cap (single flue) concrete cap (double flue) rain cap reline flue 175 7 – 9/lin.ft. 6 – 7/lin.ft. 16 16/lin.ft. 250 – 500 350 – 600 250 – 500 32/lin.ft. 125 425 – 625 21 – 32/lin.ft. 6 – 7/lin.ft. 150 – 275/lin.ft. 8 – 11/brick 100 – 275 200 – 425 125 45 – 55/lin.ft.pillartopost.com

GARAGE/DRIVEWAY/WALKWAYGarage detached carport detached wood frame - single detached wood frame - double detached block - single detached block - double removal of existing garage 5250 10500 15750 21000 26250 1575 Overhead Doors automatic garage door opener cladboard - single cladboard - double metal - single (one piece) metal - double (one piece) wood - single (one piece) wood - double (sectional) 475 625 – 850 1050 – 1275 900 1350 1050 1900Driveway asphalt paving (existing base) asphalt paving (new base) asphalt (seal) concrete (stamped) interlock brick / stone 5 – 7/sq.ft. 5 – 8/sq.ft. 65 – 80 7 – 11/sq.ft. 11 – 13/sq.ft.LANDSCAPING/DECK/PATIO/FENCELandscaping lay soil & sod sprinkler system retaining wall - concrete retaining wall - wood 3 – 6/sq.ft. 1200 55/sq.ft. 45/sq.ft.Deck pressure treated / cedar custom designed & built 15 – 30/sq.ft. 55 – 80/sq.ft.Patio concrete flagstone / fieldstone interlock brick / stone patio stone 16 – 25/sq.ft. 21/sq.ft. 11 – 16/sq.ft. 6/sq.ft.Porch flooring railing skirting steps - concrete steps - wood 8/sq.ft. 225 21/lin.ft. 525 325Fence chain-link (h 4ft.) wood - cedar (h 5ft.) wood - pressure treated (h 5ft.) reset post in concrete 10 – 20/lin.ft. 15 – 30/lin.ft. 10 – 20/lin.ft. 80INTERIORWindows awning awning / casement (replace) bay / bow casement double hung double hung (replace) skylight slider - aluminum slider - aluminum (replace) storm - aluminum thermal glass (existing frame)Kitchen / Bathroom kitchen cabinet kitchen counter - laminate kitchen counter - marble kitchen renovation bathroom renovation 55/sq.ft. 50/sq.ft. 50 – 70/sq.ft. 63/sq.ft. 53/sq.ft. 42/sq.ft. 800 32/sq.ft. 27/sq.ft. 75 – 200 32/sq.ft. 50 – 125/lin.ft. 45/lin.ft. 80/lin.ft. 7500 5250 pillartopost.com

Floor carpet - clean carpet - outdoor carpet and underpad ceramic tile hardwood hardwood - prefinished hardwood - refinish vinyl - sheet vinyl - tile 125/room 3/sq.ft. 6 – 11/sq.ft. 6 – 11/sq.ft. 6 – 11/sq.ft. 11 – 16/sq.ft. 3 – 6/sq.ft. 4 – 9/sq.ft. 4 – 9/sq.ft.Doors bi-fold louver bi-fold panel custom with casing / hardware exterior - panel interior - panel french patio storm - aluminumStairs/Railings curved stair - oak (7 risers) spiral stair - oak standard stair - oak (7 risers) stair railing 850 625 525 1050 525 1050 2100 200 – 325 7350 5250 1050 42 – 63/lin.ft.Insulation rigid exterior (prior to finish) r20 - batt r20 - loose r32 - batt r32 - loose wall / roof cavity 1 1 1 2 2 2Fireplaces damper brick replacement gas insert glass door hearth extension flue cleaning metal box insert masonry with flue rough-in wood stove–––––– 2/sq.ft. 2/sq.ft. 2/sq.ft. 3/sq.ft. 5/sq.ft. 5/sq.ft. 175 400 – 1050 2600 – 4200 525 420 200 – 300 1050 – 2600 5250 1575 – 3500Ceiling/Wall acoustic ceiling (suspended) baseboard / door / window casing drywall over plaster plaster (over existing plaster) stucco / stipple walls (insulations / drywall) walls painting (3 coats) wallpaperSecurity System alarm monitoring alarm system intercom system (retrofit) wired system wireless motion detectors 6/sq.ft. 4/lin.ft. 3 – 4/sq.ft. 3 – 4/sq.ft. 3/sq.ft. 4/sq.ft. 2/sq.ft. 6 – 11/sq.ft. 35/month 2500 1500 1500 525Misc central vacuum (retrofit) central vacuum (canister only)Swimming Pool / Hot Tub pool - vinyl lined (16ft. x 40ft.) pool - concrete lined (16ft. x 40ft.) pool heater pump / filter hot tub fiberglasspillartopost.com 1050 – 2100 1050 – 1600 15000 – 20000 30000 2100 1600 5250

ELECTRICALRetrofit attic ventilator - mechanical baseboard heater (4’) ceiling fan doorbell system dryer duct hardwired smoke detector exhaust fan - bathroom exhaust fan - oven exterior light fixture fluorescent light fixture ground - public system ground - private system 325 180 – 575 250 100 – 130 125 – 200 75 – 150 150 – 200 250 – 325 125 – 275 175 – 275 90 – 125 250 – 325(with ground rods) receptacle - conventional 125 – 175 receptacle - split 175 – 275 receptacle - exterior with cover 175 – 275 receptacle - replace conventional 100 – 150with GFCI receptacle - CO/ALR (aluminum) 75 – 125 receptacle - stove/dryer 100 – 150 receptacle - rewire reverse polarity 50 – 80 standard light fixture 125 – 225Upgrade 100 amp (new panel) 100 amp (existing panel) 200 amp (new panel) 200 amp (existing panel) 120 / 240 volt circuit breaker panel - main breaker panel - auxiliary circuit breaker (replace) knob and tube wiring 1200 – 1600 750 – 1100 2100 – 2600 1250 – 1600 250 – 525 775 – 950 125 – 325 75 – 125 7500 – 13000(replace)HEATING AND COOLINGForced-Air System air duct (new) air duct (retrofit) annual service blower motor clean duct convert oil to gas (1 story) convert hot water to 4200 6300 100 – 175 375 – 525 180 – 325 2500 – 3300y 7500 – 11000forced air (1 story)electronic air filter 625 – 950gas - mid efficiency 2600 – 3300gas - high efficiency 3600 – 4700humidifier - drum type 100 – 175humidifier - flow through type 400 – 475existing chimney flue - metal 600 – 1100Hot Water System 600 – 800 circulating pump cast iron radiator 600 – 800 expansion tank 300 – 450 gas boiler - standard 3000 – 4800 gas boiler - high efficiency 6500 – 11000 removal of oil tank from basement 400 – 650 radiator / boiler removal 1500 – 2600 radiator 600 – 950 radiator valve 125 – 225Air Conditioner/Heat Pump 1400 – 1900 air handler 3-ton (vertical) air handler 3-ton (horizontal) 1800 – 2100 central A/C existing duct 2500 – 5000 central A/C attic mounted;y 11000 separate duct compressor (replace) condenser (replace) heat recovery ventilator (HRV) heat pump 1500 1800 1800 5200–––– 1800 2700 2700 6500PLUMBINGBathroom basin - pedestal type basin - vanity bathtub - replace / retile shower connection shower stall - plastic shower stall - ceramic tile toilet - flush mechanism toilet - replace toilet - replace seal toilet - unclog tub enclosure - ceramic tile tub enclosure - plastic whirlpool bathKitchen dishwasher garbage disposal range hood sink - porcelain sink - stainless steel 375 250 2500 250 900 – 2000 2500 – 3300 125 – 175 425 125 – 275 125 – 225 2500 – 3300 600 – 1275 4250 675 200 350 750 650––––– 950 425 525 900 800Private Plumbing System 525 – 850 laundry tub and waste pump septic tank (1000gal.) 2600 – 6000 septic tank cleaning 175 – 325 sewage waste pump 1500 – 1800 well - shallow 32/lin.ft. well - deep 42/lin.ft. well - submersible pump 1275 well - suction / jet pump 600 – 950Upgrade 125 – 175 hose bibb hot water tank (40 Gal Electric) 600 – 800 hot water tank (40 Gal Gas) 800 – 1000 tankless water heater 2000 – 3000 laundry tub / connection 350 – 550 main water service 175 – 225/lin.ft. main shut-off valve 175 – 325 sump pump 175 – 275 supply lines - 1 story; 1850 – 2600up to 2 baths temperature & pressure relief valve 60 – 100 water softener 925 – 1600 waste drain lines 2600 – 4200pillartopost.com

LIFE EXPECTANCYComponentAverage Life (yrs.)Roof Covering asphalt standard shingle asphalt premium shingle wood shingle concrete / clay tile asbestos cement slate tile roll roofing tar & gravel ing forced air furnace oil tank water / steam boiler - welded steel water / steam boiler - cast iron water / steam circulating pump10-254015-3030-5010-25Cooling central air heat pump window air conditioning10-1510-1510-20Plumbing galvanized water pipe hot water heater septic / sewer pump well pump20-255-155-1010Appliances dishwasher dryer garbage disposal oven / range washing machine5-1210-255-1215-205-15These estimates reflect the average basic costs for suppliesand installation of building materials in Canada and the UnitedStates anticipated for 2019-2020. Costs may vary depending onregions, upgrades, complexity and disposal fees.It is our strong recommendation that you obtain a minimum ofthree written quotes from reputable licensed local contractorsfor validation. 2019-2020 Pillar To Post Inc.Each office is independently owned and operated.pillartopost.com

Residential Construction and Remodeling Estimates COST GUIDE COMPLIMENTS OF. STRUCTURE/EXTERIOR Structure addition (foundation to roof) 95 – 130/sq.ft. basement entrance 5250 – 10500 >