THE WCM GROUP, INC.110 S. Bender Ave.Humble, TX 77338July 20, 2020Mr. David OwenBureau of Operating PermitsNew Jersey Department of Environmental ProtectionMail Code 401-02401 East State Street, 2nd FloorTrenton, NJ 08625-0027REFERENCEVIA E-MAILApplication for Minor Modification to Remove Quarterly H2S MonitoringRequirementsNewark Bay Cogeneration Partnership, L.P.Newark, Essex County; New JerseyProgram Interest No. 07617; Permit Activity No. BOP190001Dear Mr. Owen:On behalf of Newark Bay Cogeneration Partnership, L.P. (Newark Bay), The WCM Group, Inc. issubmitting an application for a Minor Modification to Air Pollution Control Operating PermitBOP190001 in accordance with N.J.A.C. 7:27-22.23 to remove the quarterly hydrogen sulfide(H2S) monitoring requirements.1.0BackgroundNewark Bay operates a cogeneration facility located at 414-462 Avenue P, Newark, EssexCounty, New Jersey. The facility consists of two (2) Westinghouse CW251/B-12 combustionturbines with unfired heat recovery steam generators (HRSGs) with a nominal heat input of 640MMBtu/hr each, and one (1) Victory Energy package boiler with a nominal heat input of 38MMBtu/hr. The primary fuel for the combustion turbines and boiler is natural gas with ultra-lowsulfur distillate oil (ULSD) as backup. A selective catalyst reduction (SCR) is utilized to controlnitrogen oxides (NOX) in the combustion turbine/HRSG units.wcmgroup.com phone 281.446.7070 fax 281.446.3348 1594657623.ltr.docx

The WCM Group, Inc.July 20, 2020 PAGE 2 Mr. David Owen, NJDEP2.0110 S. Bender Ave.Humble, TX 77338Hydrogen Sulfide Monitoring RequirementNewark Bay is currently required to conduct quarterly monitoring for H2S at each of the six (6)landfill exhaust vents (U6). According to U6 OS1 Ref. #4, if the facility achieves and maintainscompliance with quarterly monitoring in four (4) consecutive quarters then Newark Bay maysubmit a modification request to remove the monitoring from the permit. Quarterly monitoring hasbeen conducted in accordance with the approved monitoring protocol beginning in the thirdquarter of 2019. The maximum monitored value averaged over a 30-minute period was 3.2 ppbvH2S (Unit 001, 4th quarter 2019). The H2S monitoring data is provided in Attachment A.Newark Bay has satisfied the monitoring requirement of Ref. #4 and requests that the quarterlyH2S monitoring requirement be removed from the permit. This application constitutes a minormodification to the operating permit as the H2S monitoring requirement is not provided for in NewJersey’s current State Implementation Plan (SIP). Therefore, the monitoring requirement is not afederally enforceable provision and removal of the requirement may be done as a minormodification. The application has been prepared in RADIUS version 5 and uploaded to theNJDEP web portal. A hard copy of the RADIUS application is provided in Attachment B.Should you have any questions regarding the information provided, please do not hesitate tocontact me at (281) 446-7070.Sincerely,John S. PandolphSr. Special Consultant, Technical ServicesJSP/llbENCLOSUREcc:M. Driscoll (electronic)J. Lopez (electronic)wcmgroup.com phone 281.446.7070 fax 281.446.3348 1594657623.ltr.docx

THE WCM GROUP, INC.110 S. Bender Ave.Humble, TX 77338ATTACHMENT AH2S MONITORING DATAwcmgroup.com phone 281.446.7070 fax 281.446.3348 1594657623.ltr.docx

Table 1 - Quarterly Hydrogen Sulfide Monitoring Field LogNewark Bay Cogeneration FacilityNewark, NJLangan Project No.: 200065001Date: 9/25/2019Weather: Clear 65FField Staff: KNWind Direction: SEWind Speed: 2-5 mphBlower IDUnit 001Unit 002Unit 003Unit 004Unit 005Unit 006Unit 007OperationStatus(on/off)ONONONONONONONAverage Oxygen(% LEL)(Vol %)000000020.920.920.920.920.920.920.9Start Time of 5Minute SampleSample 202NotesNotes:H2S - Hydrogen Sulfideppbv - parts per billion by volumeUnit 001 - Sample location at each of the mitigation system blowers' vents1. Measurements are collected at the effluent of each blower using a Jerome 631-X Hydrogen Sulfide Analyzer. The detection limit of said device is 3 ppbv, thus any results below the detection limit(3 ppbv) are estimates.2. Refer to the attached Site Plan figure for the respective location of each blower's vent monitoring location.Page 1 of 1

Table 1 - Quarterly Hydrogen Sulfide Monitoring Field LogNewark Bay Cogeneration FacilityNewark, NJLangan Project No.: 200065001Date: 12/19/2019Weather: Clear 5-15FField Staff: KNWind Direction: SEWind Speed: 10-15 mphBlower IDUnit 001Unit 002Unit 003Unit 004Unit 005Unit 006Unit 007OperationStatus(on/off)ONONONONONONONAverage Oxygen(% LEL)(Vol %)0000000Start Time of 5Minute SampleSample 120.920.920.920.920.920.920.9NotesNotes:H2S - Hydrogen Sulfideppbv - parts per billion by volumeUnit 001 - Sample location at each of the mitigation system blowers' vents1. Measurements are collected at the effluent of each blower using a Jerome 631-X Hydrogen Sulfide Analyzer. The detection limit of said device is 3 ppbv, thus any resultsbelow the detection limit (3 ppbv) are estimates.2. Refer to the attached Site Plan figure for the respective location of each blower's vent monitoring location.Page 1 of 1

Table 1 - Quarterly Hydrogen Sulfide Monitoring Field LogNewark Bay Cogeneration FacilityNewark, NJLangan Project No.: 200065001Date: 3/16/2020Weather: Clear 35-40FField Staff: KNWind Direction: NEWind Speed: 8-12 mphBlower IDUnit 001Unit 002Unit 003Unit 004Unit 005Unit 006Unit 007OperationStatus(on/off)ONONONONONONONAverage Oxygen(% LEL)(Vol %)0000000Start Time of 5Minute SampleSample H2S - Hydrogen Sulfideppbv - parts per billion by volumeUnit 001 - Sample location at each of the mitigation system blowers' vents1. Measurements are collected at the effluent of each blower using a Jerome 631-X Hydrogen Sulfide Analyzer. The detection limit of said device is 3 ppbv, thus any resultsbelow the detection limit (3 ppbv) are estimates.2. Refer to the attached Site Plan figure for the respective location of each blower's vent monitoring location.Page 1 of 1

Table 1 - Quarterly Hydrogen Sulfide Monitoring Field LogNewark Bay Cogeneration FacilityNewark, NJLangan Project No.: 200065001Date: 6/19/2020Weather: Clear 70-80FField Staff: KNWind Direction: EWind Speed: 2-6 mphBlower IDUnit 001Unit 002Unit 003Unit 004Unit 005Unit 006Unit 007OperationStatus(on/off)ONONONONONONONAverage Oxygen(% LEL)(Vol %)0000000Start Time of 5Minute SampleSample .920.920.920.920.920.9NotesNotes:H2S - Hydrogen Sulfideppbv - parts per billion by volumeUnit 001 - Sample location at each of the mitigation system blowers' vents1. Measurements are collected at the effluent of each blower using a Jerome 631-X Hydrogen Sulfide Analyzer. The detection limit of said device is 3 ppbv, thus any resultsbelow the detection limit (3 ppbv) are estimates.2. Refer to the attached Site Plan figure for the respective location of each blower's vent monitoring location.Page 1 of 1

Site BoundaryPREFERRED FREEZERSERVICES LLCPRAXAIR WELDINGGAS AND SUPPLYCENTERUnit 002Unit 004Unit 003Unit 007PARKINGAREAUnit 005Unit 001Unit 006120080120SCALE IN FEETWarrington, PA 18976T: 215.491.6500F: 215.491.6501 www.langan.comHYDROGEN SULFIDEQUARTERLYMONITORINGSAMPLE LOCATIONS2/4/2019KN1NN02/27/19Filename: \\langan.com\data\DT\data8\200038801\Cadd Data - 200038801\Newark Bay Site Plan-AOCs.dwg Date: 11/19/2014 Time: 16:23 User: aruane Style Table: Langan.stb Layout: ANSIB-BL 2014 LanganUnit 001 Sample location at each of the mitigation system blowers's ventsNOTE:SITE PLAN FROM "PHASE I ESA UPDATE AND MATERIAL COMPLIANCE EVALUATION" BY AECOM, DATED FEBRUARY 2011.40

THE WCM GROUP, INC.110 S. Bender Ave.Humble, TX 77338ATTACHMENT BRADIUS APPLICATIONwcmgroup.com phone 281.446.7070 fax 281.446.3348 1594657623.ltr.docx

Newark Bay Cogeneration Partnership LP (07617)Date:7/17/2020New Jersey Department of Environmental ProtectionReason for ApplicationPermit Being ModifiedPermit Class: BOPNumber: 190001In accordance with N.J.A.C 7:27-22.23, Newark Bay Cogeneration Partnership LP, isDescriptionof Modifications: submitting a application for a minor modification to remove the quarterly hydrogen sulfide(H2S) monitoring requirement.Page 1 of 1

Date: 7/17/2020Newark Bay Cogeneration Partnership LP (07617)New Jersey Department of Environmental ProtectionFacility Profile (General)Facility Name (AIMS): Newark Bay Cogeneration Partnership LP414-462 AVE PStreetAddress: NEWARK, NJ 07105Facility ID (AIMS): 07617State Plane Coordinates:Mailing 414-462 AVE PAddress: NEWARK, NJ Source Org.:Other/UnknownSource Type:Hard Copy MapIndustry:Primary SIC:4931Secondary SIC:NAICS:Page 1 of 4221112

Date: 7/17/2020Newark Bay Cogeneration Partnership LP (07617)New Jersey Department of Environmental ProtectionFacility Profile (General)Contact Type: Air Permit Information ContactOrganization: Newark Bay Cogeneration Partnership, L.P.Org. Type: PartnershipName: Mark DriscollNJ EIN:Title:Environmental DirectorPhone: (848) 448-4852 xFax:51030292900(973) 491-9560 xOther: ( )-MailingAddress:414-462 Avenue PNewark, NJ 07105xType:Email: Mark.Driscoll@TalenEnergy.comContact Type: ConsultantOrganization: The WCM Group, Inc.Org. Type: CorporationName: Kerry HigginsNJ EIN:Title:Vice President, Technical ServicesPhone: (281) 446-7070 xFax:51030292900(281) 446-3348 xOther: ( )-MailingAddress:P.O. Box 3247Humble, TX 77347-3247xType:Email: khiggins@wcmgroup.comContact Type: Emission StatementsOrganization: Newark Bay Cogeneration Partnership, L.P.Org. Type: PartnershipName: Mark DriscollNJ EIN:Title:Environmental DirectorPhone: (848) 448-4852 xFax:51030292900(973) 491-9560 xOther: ( )-MailingAddress:xType:Email: Mark.Driscoll@TalenEnergy.comPage 2 of 4414-462 Avenue PNewark, NJ 07105

Date: 7/17/2020Newark Bay Cogeneration Partnership LP (07617)New Jersey Department of Environmental ProtectionFacility Profile (General)Contact Type: Environmental OfficerOrganization: Newark Bay Cogeneration Partnership, L.P.Org. Type: PartnershipName: Mark DriscollNJ EIN:Title:Environmental DirectorPhone: (848) 448-4852 xFax:51030292900(973) 491-9560 xOther: ( )-MailingAddress:414-462 Avenue PNewark, NJ 07105xType:Email: Mark.Driscoll@TalenEnergy.comContact Type: Fees/Billing ContactOrganization: Ethos Energy GroupOrg. Type: CorporationName: Joseph LopezNJ EIN:Title:Facility ManagerPhone: (973) 491-9559 x0213Fax:50130292900(973) 491-9650 xOther: ( )-MailingAddress:414-465 Avenue PNewark, NJ 07105xType:Email: Joseph.Lopez@ethosenergygroup.comContact Type: On-Site ManagerOrganization: Ethos Energy GroupOrg. Type: CorporationName: Joseph LopezNJ EIN:Title:Facility ManagerPhone: (973) 491-9559 x0213Fax:50130292900(973) 491-9650 xOther: ( )-MailingAddress:xType:Email: Joseph.Lopez@ethosenergygroup.comPage 3 of 4414-465 Avenue PNewark, NJ 07105

Date: 7/17/2020Newark Bay Cogeneration Partnership LP (07617)New Jersey Department of Environmental ProtectionFacility Profile (General)Contact Type: OperatorOrganization: Ethos Energy GroupOrg. Type: CorporationName: Joseph LopezNJ EIN:Title:Facility ManagerPhone: (973) 491-9559 x0213Fax:50130292900(973) 491-9650 xOther: ( )-MailingAddress:414-465 Avenue PNewark, NJ 07105xType:Email: Joseph.Lopez@ethosenergygroup.comContact Type: Owner (Current Primary)Organization: Newark Bay Cogeneration Partnership, LPOrg. Type: PartnershipName: Scott M. BlairNJ EIN:Title:Vice PresidentPhone: (410) 787-5017 xFax:51030292900( )-xMailingAddress:1005 Brandon Shores RoadBaltimore, MD 21226Other: (410) 917-6068 xType: MobileEmail: Scott.Blair@TalenEnergy.comContact Type: Responsible OfficialOrganization: Newark Bay Cogeneration Partnership, L.P.Org. Type: PartnershipName: Mark DriscollNJ EIN:Title:Environmental DirectorPhone: (848) 448-4852 xFax:51030292900(973) 491-9560 xOther: ( )-MailingAddress:xType:Email: Mark.Driscoll@TalenEnergy.comPage 4 of 4414-462 Avenue PNewark, NJ 07105

Newark Bay Cogeneration Partnership LP (07617)Date: 7/17/2020New Jersey Department of Environmental ProtectionFacility Profile (Permitting)1. Is this facility classified as a small business by the USEPA?No2. Is this facility subject to N.J.A.C. 7:27-22?Yes3. Are you voluntarily subjecting this facility to the requirements of Subchapter 22?No4. Has a copy of this application been sent to the USEPA?Yes5. If not, has the EPA waived the requirement?6. Are you claiming any portion of this application to be confidential?No7. Is the facility an existing major facility?Yes8. Have you submitted a netting analysis?No9. Are emissions of any pollutant above the SOTA threshold?No10. Have you submitted a SOTA analysis?No11. If you answered "Yes" to Question 9 and "No" to Question 10, explain whya SOTA analysis was not required12. Have you provided, or are you planning to provide air contaminant modeling?Page 1 of 1No

RADIUS File SubmissionNote: Following is a summary of the information contained in your application. If you have completed the submittal, the service will appear in the "My Services Submitted" section of your My Workspace page. Please check the "Status" column to confirm whether it was successfully transmitted or not. If the status of theservice is "Submission Failed - Please Contact NJDEP," please send an e-mail message to njdeponlinesupport@dep.nj.gov for assistance, including the ServiceID number of the failed submittal in the message. If you have not yet completed the submittal, the service will appear in the "My Services - In Progress" section ofthe My Workspace page instead, and the "Status" column will indicate the stage of the submittal.Selected Facility Name:NEWARK BAY COGENERATION PARTNERSHIP L PSelected Facility ID:07617Submittal Type:Operating Permit Application - Initial - (Modification)Click here to access the pdf version of the information submitted in the RADIUS file.Uploaded AttachmentsAttachment TypeAttachment DescriptionFile NameRADIUS AttachmentMinor Mod Application to remove H2S MonitoringNewark Bay Minor Mod to Remove H2S Monitoring 07-20-2020.pdfCertification

Certifier:Certifier ID:Challenge/Response Question:Challenge/Response Answer:Certification PIN:Date/Time of Certification:John PandolphJPANDOLPHWhat is your favorite color?************07/20/2020 11:46For Air Permits:"I certify under penalty of law that I believe the information provided in this document is true, accurate, and complete. I am aware that there are significant civil andcriminal penalties, including the possibility of fine or imprisonment or both, for submitting false, inaccurate or incomplete information."For Emission Statements:"I certify under penalty of law that I believe the information provided in this document is true, accurate, and complete. For those portions of the document that arebased on estimates, those estimates are the result of good faith application of sound professional judgment, using techniques, factors, or standards approved bythe Department or EPA, or generally accepted in the trade. I am aware that there are significant civil and criminal penalties, including fines or imprisonment orboth, for submitting false, inaccurate or incomplete information."John PandolphIndividual With Direct Knowledge07/20/2020DateCertifier:Certifier ID:Challenge/Response Question:Challenge/Response Answer:Certification PIN:Date/Time of Certification:Mark DriscollMKDRISCOLLWhat is your favorite pet?************07/20/2020 15:52For Air Permits:"I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document and all attachments and that, basedon my inquiry of those individuals immediately responsible for obtaining the information, I believe that the information is true, accurate, and complete. I am awarethat there are significant penalties for submitting false information, including the possibility of fine and imprisonment."For Emission Statements:"I certify under penalty of law that I have personally examined and am familiar with the information submitted in the attached document and, based on my inquiry ofthose officials immediately responsible for obtaining the information, I believe that the submitted information is true, accurate and complete. I certify that, based onmy inquiry of those officials immediately responsible for obtaining the information, I believe that any estimates are the result of good faith application of soundprofessional judgment, using techniques, factors, or standards approved by the Department or EPA, or generally accepted in the trade. I am aware that there aresignificant civil and criminal penalties, including fines or imprisonment or both, for submitting false, inaccurate or incomplete information."Mark DriscollResponsible OfficialPayment Information07/20/2020Date

Total Payment Amount:Payment Date:Payment Method: .00

MMBtu/hr each, and one (1) Victory Energy package boiler with a nominal heat input of 38 MMBtu/hr. The primary fuel for the combustion turbines and boiler is natural gas with ultra-low sulfur distillate oil (ULSD) as backup. A selective catalyst reduction (SCR) is utilized to control nit